Cannister Integration SOW_Final.pdf
PDF 291 KB Posted
- Attached to
- Integration and De-Integration Services
- Solicitation number
- N6660425Q0521
About this file
This Statement of Work (SOW) details integration and de-integration services for the Submarine Launched Unmanned Aerial System (SLUAS) Program, managed by Naval Undersea Warfare Center Division Newport (NUWCDIVNPT). The contract requires a contractor to perform ad-hoc integration and de-integration of the Blackwing 10C Unmanned Aerial Vehicle (UAV) into the Sparton 3" Hammerhead Canister, with events to be completed within two weeks of receiving Government Furnished Equipment (GFE).
Key technical requirements include performing final acceptance testing, maintaining inventory of up to 30 UAVs and canisters, ensuring proper packaging and handling, and complying with multiple military standards including MIL-STD-882E, MIL-STD-31000B, and SAE AS9100. The contractor must have a Quality Management System compliant with AS9100D Alternative requirements and ISO 9001:2008. The work will be performed at the contractor's facility, funded by OPN type appropriation, and includes a one-year option period in support of NUWCDIVNPT Code 25's rapid fielding mission for submarine-launched unmanned aerial systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CDRL_SPARTON 250528_Redacted.pdf | ||
| Combined Synopsis-RFQ N6660425Q0521.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
STATEMENT OF WORK (SOW)
Submarine Launched Unmanned Aerial System (SLUAS) Canister Integration and De-integration Services
1.0 Background
The Submarine Launched Unmanned Aerial System (SLUAS) Program falls under the cognizance of Naval Undersea Warfare Center Division Newport (NUWCDIVNPT) Code 25. In FY15, the Advanced Weapons Enhanced by Submarine Unmanned Aerial Systems (UAS) Against Mobile Targets (AWESUM) Project developed a low cost, submarine launched Unmanned Aerial Vehicle (UAV) capability and successfully demonstrated a submarine 3-inch launcher compatible micro-UAS capability. The AWESUM Project demonstrated SLUAS capabilities at sea supporting JREAPC (Link 16 over IP) for Over the Horizon strike and third-party targeting.
The SLUAS program transitioned to PMS 425 in FY17 with the goal of accelerated deployment of the SLUAS capability followed by integration of SLUAS functionality into the AN/BYG-1 Submarine Combat Control System under the present Middle Tier of Acquisition (MTA) agreement. In FY22, SLUAS program transitioned to PMS415 to better utilize 3” launched device expertise and continue the rapid fielding mission to the fleet. As the custodian of the SLUAS Program at NUWCDIVNPT, Code 25 facilitates the shipping, integration, and de-integration of the Blackwing 10C UAV into the 3” Hammerhead Canister. In order to meet Fleet demands, NUWCDIVNPT Code 25 requires integration and de-integration services.
1.1 Place of Performance
All work shall be performed at the contractor’s facility.
1.2 Type of Funding
The tasking in this SOW will be funded using OPN type appropriation.
2.0 Scope
This Statement of Work (SOW) defines the services required for the integration and de-integration of the BW 10C UAV into the Sparton 3” Hammerhead Canister; the technical evaluation and testing of the integrated Navy SLUAS All Up Round (AUR); and the packaging for shipment of the AUR to the Fleet with a one (1) year option in support of NUWCDIVNPT Code 25.
The contractor shall perform integration and testing of the Navy SLUAS AUR as further defined in Section 4.1; de-integration of the Navy SLUAS AUR as further defined in Section 4.2; and packaging, handling, storage and transportation services as further defined in Section 4.3. The contractor shall use standards and specifications as defined in Applicable Documents Section 3.0; and adhere to quality requirements as defined in Section 6.0 applicable to the technical requirements detailed in Section 4.0.
2.1. Program or Systems Supported:
Submarine Launched Unmanned Aerial System (SLUAS) Program
3.0 Applicable Documents
The Contractor shall perform the tasking required in Section 4.0 in accordance with (IAW) the below Applicable Documents (Ads).
CUI
Document # Document Title Applicable SOW Task
3.1 MIL-STD-882E - System Safety, 11 May 2012
ALL
3.2 MIL-STD-31000B - Department of Defense Standard
Practice Technical Data Packages, 31 Oct 2018
ALL
3.3 DoD 5220.22-M - National Industrial Security Program
Operating Manual, 28 Feb 2006
ALL
3.4
NIST SP 800-171 - Protecting Controlled Unclassified Information (CUI) in Nonfederal Systems and Organizations, Rev 2 dated 21 Feb 2020
ALL
3.5 SCG 05-159 - Security Classification Guide ALL
3.6 SAE AS9100 - Quality Management Systems -
Requirements For Aviation, Space and Defense Organizations (Rev C)
ALL
3.7 NSDD 298 - National Security Decision ALL
3.8 Sparton 3” Hammerhead Canister Assembly Instructions
- Assembly and Integration Instructions with Mission Pre-load (MPL), 30 Sep 2015
4.1
3.9 MIL-STD-129P Department of Defense Standard
Practice: Military Marking for Shipment and Storage
(15 DEC 2002)
4.3
3.10 MIL-STD-2073-1E Department of Defense: Standard
Practice for Military Packaging (22 APR 2019)
4.3
4.0 Technical Requirements
Integration and de-integration events shall be performed on an ad-hoc basis and driven by the Government’s needs.
The Government shall notify the contractor at least thirty (30) days prior to any requested Integration or De-integration event.
Integration and de-integration events shall be completed by the contractor no later than two (2) weeks after receipt of
GFE.
The contractor shall provide the services below in accordance with the Applicable Documents (ADs) listed in Paragraph 3.0.
4.1 SLUAS AUR Integration of the BW-10C UAV into the Sparton 3” Hammerhead Canister
Upon receipt of the required notice from the Government, GFE listed in Section 5.0, and in accordance with AD 3.8, the contractor shall perform the integration of the BW 10C UAV into the Sparton 3” Hammerhead Canister to produce the Navy SLUAS AUR.
As part of the integration process, the contractor shall ensure that the BW 10C UAV battery is fully charged prior to integration and ensure the batteries in the Hammerhead canister have a sufficient charge for operational use.
4.1.1 Testing
The contractor shall perform a final acceptance test on the integrated product to be delivered under this Order after integration and record results of the test in accordance with CDRL A001. This Quality Assurance (QA) testing shall be performed in accordance with the contractor’s standard QA procedures and adhere to the requirements set out in paragraph 6.0 below.
The Government shall witness the acceptance testing to verify the procedures are adequate and that the unit under test performs in a Ready for Issue condition. The contractor shall alert the Government of any AUR shipset deliveries with at least seven (7) days’ notice to provide the Government sufficient time to coordinate on-site inspections.
Deliverables: Acceptance Test Report shall be delivered in accordance with CDRL A001 (DI-NDTI-80809)
4.2 SLUAS AUR De-integration of the BW-10C UAV from the Sparton 3” Hammerhead Canister
Upon receipt of the required notice from the Government, GFE listed in Attachment 1, and in accordance with AD 3.8, the contractor shall perform the de-integration of the Navy SLUAS AUR into its component parts, the BW 10C UAV and the Sparton 3” Hammerhead Canister.
4.3 Packaging, Handling, Storage, and Transportation (PHS&T)
The contractor shall ensure PHS&T processes are consistent with environmental considerations and shall comply with all federal, state, and local Government instructions concerning the use and handling of hazardous material.
The Contractor shall store up to thirty (30) BW 10C UAVs and all 3” Hammerhead Canisters for use as necessary in the SLUAS AUR integrations and de-integrations.
The contractor shall package fully integrated AUR shipsets in shipping containers provided as GFE listed in Attachment 1.
The Government will arrange for remote shipping.
The Contractor shall ensure that PHS&T processes are contractually required by vendors and subcontractors as consistent with (at a minimum) MIL-STD-129P and MIL-STD-2073-1E (1).
5.0 Government Furnished Equipment (GFE)
All GFE applicable to the above tasking in Section 4.0 will be provided in accordance with Attachment 1.
5.1 Inventory Management
The contractor will be responsible for all inventory management of the Hammerhead Canisters and support equipment. The contractor shall provide quarterly inventory reports for the Government furnished SLUAS material in accordance with CDRL A002.
Deliverables: Government Property Inventory Report shall be delivered in accordance with CDRL A002 (DI-
MGMT-80441)
6.0 Quality Management and Quality Assurance (QA)
The Contractor shall have a Quality Management System (QMS) compliant with AS9100D Alternative requirements, and a production QA system compliant with ISO 9001:2008.
File details come from the government source that posted it. Updated .