Candler_EC Improvements_Bid Worksheet.pdf

PDF 431 KB Posted

Attached to
Candler County Landfll_ Erosion Control Improvements_RFP2025-12
Solicitation number
PE-77202-NONST-2025-000000014
Issued by
Candler County, Georgia

About this file

The document is a Bid Worksheet for the Candler County Landfill Erosion Control Improvements project, scheduled for April 2025. The project involves comprehensive erosion control and stormwater management improvements, with detailed line items including mobilization, construction surveying, site preparation, earthwork, stormwater drainage, and erosion and sediment control. Key quantities include 1,613 cubic yards of clayey soil and topsoil cover, 1,000 linear feet of stormwater diversion berm, 156 linear feet of double-walled corrugated polyethylene downdrain pipe, and 9,680 square yards of excelsior matting for slope stabilization.

The bid worksheet provides a structured breakdown of project components without specific pricing, indicating this is a template for potential bidders to complete. The project scope covers multiple aspects of landfill site improvement, focusing on erosion control, drainage management, and ground stabilization. While no specific budget is listed, the comprehensive nature of the work suggests a significant infrastructure investment aimed at improving the environmental sustainability and operational efficiency of the Candler County Landfill. The project appears to be prepared for competitive bidding, with detailed specifications for each line item to facilitate accurate cost estimation by potential contractors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CANDLER COUNTY LANDFILL

EROSION CONTROL IMPROVEMENTS

BID WORKSHEET

APRIL 2025

Item No.

Description Unit Estimated Quantity

Bid Unit Price

Bid Price

A.

1 Mobilization L.S. 1 -$ -$ 2 Construction Surveying L.S. 1 -$ -$ B. Site Preparation/Earthwork 1 6" Clayey Soil Cover including purchasing, hauling from off-site, placement and compaction C.Y. 1,613 -$ -$ 2 6" Top Soil including purchasing, hauling from off-site, placement and compaction C.Y. 1,613 -$ -$ C. Stormwater Drainage 1 Tack-On Stormwater Diversion Berm including Double-Sided

Excelsior Matting L.F. 1,000 -$ -$ 2 18" Dia. Double Walled Corrugated Polyethylene (CPP)

Downdrain Pipe (Including all pipe inlet connections, and fittings) L.F. 156 -$ -$

3 18" Dia. CPP Downdrain Inlet with Flared Sections Ea. 4 -$ -$ 4 24" Dia. Single Wall Corrugated Plastic Pipe including the removal and replacement of existing CMP L.F. 20 -$ -$ D. Erosion and Sediment Control 1 Type 3 Rip-Rap Outlet Protection w/ Fabric Lining S.Y. 16 -$ -$ 2 Permanent Grassing Ac. 2.00 -$ -$ 3 Excelsior Matting (slope stabilization) S.Y. 9,680 -$ -$ 4 Grassed Lined Ditch with Excelsior Matting including cleaning and re-grading existing ditches L.F. 620 -$ -$

General

TOTAL BASE BID