Candler_EC Improvements_Bid Worksheet.pdf
PDF 431 KB Posted
- Solicitation number
- PE-77202-NONST-2025-000000014
- Issued by
- Candler County, Georgia
About this file
The document is a Bid Worksheet for the Candler County Landfill Erosion Control Improvements project, scheduled for April 2025. The project involves comprehensive erosion control and stormwater management improvements, with detailed line items including mobilization, construction surveying, site preparation, earthwork, stormwater drainage, and erosion and sediment control. Key quantities include 1,613 cubic yards of clayey soil and topsoil cover, 1,000 linear feet of stormwater diversion berm, 156 linear feet of double-walled corrugated polyethylene downdrain pipe, and 9,680 square yards of excelsior matting for slope stabilization.
The bid worksheet provides a structured breakdown of project components without specific pricing, indicating this is a template for potential bidders to complete. The project scope covers multiple aspects of landfill site improvement, focusing on erosion control, drainage management, and ground stabilization. While no specific budget is listed, the comprehensive nature of the work suggests a significant infrastructure investment aimed at improving the environmental sustainability and operational efficiency of the Candler County Landfill. The project appears to be prepared for competitive bidding, with detailed specifications for each line item to facilitate accurate cost estimation by potential contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Candler_EC Improvements Plans_050625.pdf | ||
| Candler_Erosion Improvements_Contract Documen.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CANDLER COUNTY LANDFILL
EROSION CONTROL IMPROVEMENTS
BID WORKSHEET
APRIL 2025
Item No.
Description Unit Estimated Quantity
Bid Unit Price
Bid Price
A.
1 Mobilization L.S. 1 -$ -$ 2 Construction Surveying L.S. 1 -$ -$ B. Site Preparation/Earthwork 1 6" Clayey Soil Cover including purchasing, hauling from off-site, placement and compaction C.Y. 1,613 -$ -$ 2 6" Top Soil including purchasing, hauling from off-site, placement and compaction C.Y. 1,613 -$ -$ C. Stormwater Drainage 1 Tack-On Stormwater Diversion Berm including Double-Sided
Excelsior Matting L.F. 1,000 -$ -$ 2 18" Dia. Double Walled Corrugated Polyethylene (CPP)
Downdrain Pipe (Including all pipe inlet connections, and fittings) L.F. 156 -$ -$
3 18" Dia. CPP Downdrain Inlet with Flared Sections Ea. 4 -$ -$ 4 24" Dia. Single Wall Corrugated Plastic Pipe including the removal and replacement of existing CMP L.F. 20 -$ -$ D. Erosion and Sediment Control 1 Type 3 Rip-Rap Outlet Protection w/ Fabric Lining S.Y. 16 -$ -$ 2 Permanent Grassing Ac. 2.00 -$ -$ 3 Excelsior Matting (slope stabilization) S.Y. 9,680 -$ -$ 4 Grassed Lined Ditch with Excelsior Matting including cleaning and re-grading existing ditches L.F. 620 -$ -$
General
TOTAL BASE BID
File details come from the government source that posted it. Updated .