Camp Grayling Area 600 Utilities Drawings - B-C_Part1.pdf
PDF 5 MB Posted
- Solicitation number
- RFQ - 171 - 230000000328
- Issued by
- Crawford County, Michigan
About this file
This document contains civil utility drawings for the Camp Grayling Annual Training Site in Grayling, Michigan. The project is being managed by the Michigan Department of Military and Veterans Affairs and the Department of Design and Construction Division. The drawings include plans for the demolition of existing utilities, layout of proposed water mains and sanitary sewers, and grading and erosion control measures. The proposed work includes approximately 860 linear feet of water main and sanitary sewer installation, as well as related appurtenances such as hydrants, valves, and manholes. Bids for this project are due on March 15, 2023.
The bid documents provide general notes regarding contractor responsibilities such as permits, utility coordination, and record drawings. Pricing details, funding sources, and set-aside requirements are not included in the drawings. The incumbent contractor is not specified. The project appears to be funded by the State of Michigan, but the total project budget is not provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Camp Grayling Area 600 Utilities Drawings - B-C_Part2.pdf | ||
| Advertisement 20313.pdf | ||
| MtgAttend1 - 20313 Area 600 Utilities.doc | DOC document | |
| Camp Grayling Area 600 Utilities Specifications - B-C.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PA
PA
PA
#676
#636
#628 #624
#631
#638
#641
#656
#626
#560
#654
#561
#552
PIV
PIV
PIV
PIV
TH
S
TR
EE
T
TH
S
TR
EE
T
HOWE ROAD
8T
H
ST
RE
ET
PARADE ROAD
7T H
ST
RE
ET
SOLDIER DRIVE
EXISTING
MAINTENANCE
BUILDING
#674
HELIPORT
W
IL
SO
N
HI
LL
P
AR
KI
NG
A
RE
A
W
IL
SO
N
HI
LL
P
AR
KI
NG
A
RE
A
PA
PA
PA
PA
PA
PA
W
IL
SO
N
H
IL
L R
OA
D
REVIEW STAND
PA
PA
PA
PA
PA
PA
M A
10/05
14"
4"
#676
#636
#628 #624
#631
#638
#641
#656
#626
#560
#545
#547
#654
#561
#562
#563
#570
#575
#552
#1005
PIV
PIV
PIV
PIV
EXISTING
MAINTENANCE
BUILDING
#674
S. ACCESS RD
ST
AT
E O
F M
IC
H
IG
AN
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
AR
EA
U
TI
LI
TI
ES
1/
3.
C
AK
0.
1G R
D
EP
AR
TM
EN
T
O F
M
IL
IT
AR
Y
AN
D V
ET
ER
AN
S
AF
FA
IR
S
C
AM
P G
R
AY
LI
N
G A
N N
U
AL
T R
AI
N
IN
G
S
IT
E
G R
AY
LI
N G
, M
IC
H
IG
AN
B1
PARADIGM DESIGN
www.paradigmae.com
Grand Rapids | Phoenix I Traverse City
415 Leonard Street NW, Suite 200 Grand Rapids, MI 49504
(616) 785-5656
ENGINEERSARCHITECTS
JOB #2009080GR
WILLIS MONTE HADLOCK, P.E.
MI - REGISTRATION #6201045738
EXP. DATE 09/02/2023
DEVELOPMENT REFERENCE:
OWNERS MICHIGAN DEPARTMENT OF MILITARY AND
VETERANS AFFAIRS
(517)-481-7561
CONTACT BRIAN BUSHNELL
CIVIL ENGINEER: PARADIGM DESIGN
415 LEONARD ST SUITE 200
GRAND RAPIDS, MI 49504
(616) 785-5656
ATTN DAVID HENDERSHOTT
SURVEYOR: SIMMER LAND SURVEYING
404 W MESICK AVENUE
MESICK, MI 49668
(231) 429-4914
NOT TO SCALE
SITE LOCATION MAP
5353 PARKVIEW DRIVE
GRAYLING
CRAWFORD COUNTY, MICHIGAN
SECTION 06, TOWN 26 N, RANGE 03 W
44°40'50" N, 84°43'44" W
SHEET LIST TABLE
C001 CIVIL COVER SHEET
C101 CIVIL EXISTING CONDITIONS & DEMOLITION PLAN
C102 CIVIL LAYOUT AND UTILITIES PLAN
C103 CIVIL GRADING AND SWPP PLAN
C201 CIVIL WATER MAIN PLAN & PROFILE (STA 20+00 TO 28+50)
C202 CIVIL WATER MAIN PLAN & PROFILE (STA 28+50 TO 37+00)
C203 CIVIL WATER MAIN PLAN & PROFILE ( STA 40+00 TO 43+75)
C204 CIVIL SANITARY SEWER PLAN & PROFILE (STA 0+00 TO 6+50)
C205 CIVIL SANITARY SEWER PLAN & PROFILE (STA 6+50 TO 14+00)
C501 CIVIL DETAILS
N
0 150' 300'
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY
PIPES, CONDUITS OR STRUCTURES SHOWN ON THESE PLANS WAS
OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. THE
CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY
MEASURES TO PROTECT THE UTILITY LINES SHOWN ON THESE
DRAWINGS. THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY
AND RESPONSIBILITY FOR THE UTILITY PIPES, CONDUITS OR
STRUCTURES SHOWN OR NOT SHOWN ON THESE DRAWINGS. THE
CONTRACTOR SHALL POTHOLE ALL EXISTING UTILITIES TO VERIFY
THE LOCATION AND ANY DISCREPANCY BETWEEN THE PLANS
SHALL BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER.
UTILITIES
989-344-6184
72 HOURS
(3 WORKING DAYS)
CALL Mr. Halcomb
BEFORE YOU DIGC.G.
MICHAEL HALCOMB
CAMP GRAYLING ENGINEERING
KAB'17
KNOW WHAT'S BELOW.
CALL BEFORE YOU DIG.
CIVIL COVER SHEET C
GENERAL NOTES:
REFER TO SECTION 32 9200 FOR RESTORATION OF ALL NON PAVED SURFACES.
REFER TO SECTION 31 1000 OF THE PROJECT MANUAL FOR SITE CLEARING WORK.
REFER TO SECTION 31 5000 AND 31 2319 OF THE PROJECT MANUAL FOR EXCAVATION SUPPORT
AND PROTECTION OF EXISTING UTILITIES AND STRUCTURES AS WELL AS DEWATERING
REQUIREMENTS.
REFER TO PROJECT MANUAL FOR SITE "RECORD DRAWING" SUBMITTAL REQUIREMENTS.
CONTRACTOR IS RESPONSIBLE TO OBTAIN ALL SITE RELATED PERMITS. CONTRACTOR IS
REQUIRED TO COMPLETE THE APPLICATION, AND SUBMIT NECESSARY DRAWINGS, FEES, ETC. TO
THE APPROPRIATE JURISDICTION. CONTRACTOR SHALL PAY ALL FEES RELATED TO PERMIT(S)
AND SECURE PERMIT(S) IN HIS NAME.
CONTRACTOR IS RESPONSIBLE TO COORDINATE ALL SITE UTILITY CONNECTIONS AND
INSPECTIONS WITH THE PROPER JURISDICTION AND PAY ALL ASSOCIATED FEES.
THE CONTRACTOR SHALL FIELD VERIFY LOCATION AND ELEVATION OF EXISTING WATER,
SANITARY SEWER, AND STORM SEWER CROSSINGS AND CONNECTION POINTS PRIOR TO
CONSTRUCTION. CONTACT ENGINEER WITH ANY DISCREPANCIES.
ALL MDOT REFERENCES ARE TO THE 2012 EDITION.
PROPOSED
WATER MAIN
PROPOSED
SANITARY SEWER
LAKE MARGRETHE
N
SITE
LOCATION
HOWE RD
8T H
ST
S.
M
ILI
TA
RY
R
OA
D
WILS
ON HILL
ROAD
LAKE
MARGRETHE
CAMP
GRAYLING
FRONT GATE
tboze Typewriter
BIDS &
CONSTRUCTION
tboze Typewriter
MARCH 15, 2023
tboze Rectangle
SN
MP
H
G
G
BP
G
T
GM
GM
GATE
UG-E
UG-EUG-E
UG
-E
UG
-E
UG-E
U G
-E
U G
-E U
G -E
U G
-E U
G -E
U G
-E
U G
-E
UG-E
UG-EUG-E
UG-E
UG-E
UG-EUG-E
UG-E UG-E
UG-E
UG-E
UG-E
UG-E
U G
-E U
G -E
UG
-E
UG-E
UG-E
UG-E
UG-E
UG-EUG-E
UG-E
U G
-E
U G
-E
U G
-E U
G -E
U G
-E
U G
-E
U G
-E
UG
-E
UG-E
UG-E
UG-E UG-E UG-E UG-E
FIBER
FIBER
FIBER FIBER
FI
BE
R
FI
BE
R
FIBERFIBER
U G
-E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E
UG
-E
UG
-E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E
U G
-E U
G -E
U G
-E U
G -E
U G
-E
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
XFMR
U G
-E U
G -E
FI
BE
R
FI
BE
R
FI
BE
R
CP #10
CP #11
CP #12
PIV
PIV
PIV
PIV
PIV
PIV
E
XFMRE
S
PIV
PIV
PIV
E
S
S
CO
ICV
S
ICV CO
PIV
S
S
FF 1173.62'FF 1173.63'
FF 1173.63'
FF 1173.63'
FF 1173.59'
FF 1173.63'FF 1173.55' G
G
G G
EXIST SAN MH-A
RIM: 1172.47
8" INVERT E.:1168.09
8" INVERT N.:1168.19
SAN SAN
SA
N
SA
N
SAN
SAN SAN
SAN
SAN
GG
GGG
G
G
G G
G
G G
G G
GG
GG
W
TR
WTR
GWTR
W
TR
STM
STM
STM STMEX 24"
STORM
EX 24" STORM
EX
ST
OR
M
EX 24" STORM
EX
ST
OR
M
WTR
W
TR
W
TR
W
TR
W
TR
W
TR
W
TR
W
TR
W
TR
EX
IS
TI
NG
MA
IN
TE
NA
NC
E
BU
ILD
IN
G
FF
E
.70
91 1192
1195 11
TH
S
TR
EE
T
TH
S
TR
EE
T
TH
S
TR
EE
T
TH
S
TR
EE
T
EXISTING
BUILDING
#656
EXISTING
BUILDING
#654
G
EX 8" WATER
EX 6" WATER
EX 8" WATER
WTR WTR WTR WTR WTR WTR WTR WTR WTR WTR
EX 2" WATER
G
G
G
SN STOP
GUARD RAIL
UG
-T
U G
-T U
G -T
U G
-T U
G -T
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
EX GAS LINE
WH
PIV
PIV
G G
G G
G G
G G
G
WTRWTR WTR WTR WTR WTR
G G
G G
EX 6" WATER
EX
IS
TI
NG
BU
ILD
IN
G
MP
COCO
SAN
CO
CO
EX
IS
TI
NG
MA
IN
TE
NA
NC
E
BU
ILD
IN
G
FF
E
.70
EX
IS
TI
NG
BU
ILD
IN
G
EX
IS
TI
NG
BU
ILD
IN
G
#6
HOWE ROAD
TH
S
TR
EE
T
G G G G
EX GAS LINE
G G G G G
G G
G
W
TR
W
TR
W
TR
W
TR
W
TR
W
EX 6" WATER
ST
AT
E O
F M
IC
H
IG
AN
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
AR
EA
U
TI
LI
TI
ES
1/
3.
C
AK
0.
1G R
D
EP
AR
TM
EN
T
O F
M
IL
IT
AR
Y
AN
D V
ET
ER
AN
S
AF
FA
IR
S
C
AM
P G
R
AY
LI
N
G A
N N
U
AL
T R
AI
N
IN
G
S
AY
LI
N G
, M
IC
H
IG
AN
B1
PARADIGM DESIGN
www.paradigmae.com
Grand Rapids | Phoenix I Traverse City
415 Leonard Street NW, Suite 200 Grand Rapids, MI 49504
(616) 785-5656
ENGINEERSARCHITECTS
JOB #2009080GR
WILLIS MONTE HADLOCK, P.E.
MI - REGISTRATION #6201045738
EXP. DATE 09/02/2023
DEMOLITION NOTES:
ALL MATERIAL THAT IS NOT SUITABLE AS BACKFILL AND MATERIALS THAT ARE EXCESS SHALL BE REMOVED FROM THE SITE
AND DISPOSED OF IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS.
ALL AREAS OF UNDERGROUND DEMOLITION; UTILITY LINE REMOVAL; AND UNDERGROUND TREE, STUMP, AND VEGETATION
REMOVAL SHALL BE BACKFILLED.
BACKFILLING SHALL PROMPTLY FOLLOW UNDERGROUND DEMOLITION OR REMOVAL WORK AND SHALL CONTINUE AS THE
DEMOLITION PROGRESSES.
CONTRACTOR SHALL BE RESPONSIBLE FOR APPLYING FOR AND OBTAINING ALL NECESSARY DEMOLITION PERMITS AND
PAYING FOR ANY ASSOCIATED PERMIT FEES.
NOTIFY ARCHITECT/ENGINEER OF ANY OTHER UNDERGROUND MATERIALS OR EQUIPMENT ENCOUNTERED DURING
EXCAVATION NOT SPECIFICALLY NOTED ON THE DRAWING(S).
PRIVATE UTILITY REMOVAL - CONTRACTOR TO COORDINATE PRIVATE UTILITY (GAS, ELECTRIC, PHONE, CABLE, ETC.)
REMOVAL WITH APPROPRIATE AUTHORITY. ALTHOUGH ALL PRIVATE UTILITY SERVICES MAY NOT BE SHOWN ON THIS
DRAWING, CONTRACTOR IS RESPONSIBLE FOR REMOVAL OF SERVICE AS NECESSARY.
WHERE CURBING OR PAVEMENT IS INDICATED TO BE REMOVED, IT SHALL BE SAWCUT FULL DEPTH. REMOVE TO THE NEAREST JOINT, IF THE JOINT IS WITHIN 3 FEET OF THE REMOVAL LINE. VERIFY REMOVAL LIMITS WITH ENGINEER PRIOR
TO BEGINNING WORK.
SURVEY PROVIDED BY:
TOPOGRAPHIC SURVEY PROVIDED BY SIMMER LAND SURVEYING ON A DRAWING TITLED "461022TMAINBASERAW", DATED
AUGUST 26, 2022.
BENCHMARKS:
TOP OF THE MOST SOUTHWESTERLY FLANGE BOLT ON THE FIRE HYDRANT ALONG 11TH STREET; ELEV: 1176.43 (NAVD 88)
COORDINATE SYSTEM:
COORDINATES & BEARINGS ARE BASED ON MICHIGAN CENTRAL, NAD83.
WETLAND DATA:
THERE ARE NO WETLANDS ON THE SUBJECT PROPERTY BASED ON MAPPING PUBLISHED BY THE U.S. FISH & WILDLIFE
SERVICE NATIONAL WETLANDS INVENTORY MAPS.
N
0 50' 100'
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY
PIPES, CONDUITS OR STRUCTURES SHOWN ON THESE PLANS WAS
OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. THE
CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY
MEASURES TO PROTECT THE UTILITY LINES SHOWN ON THESE
DRAWINGS. THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY
AND RESPONSIBILITY FOR THE UTILITY PIPES, CONDUITS OR
STRUCTURES SHOWN OR NOT SHOWN ON THESE DRAWINGS. THE
CONTRACTOR SHALL POTHOLE ALL EXISTING UTILITIES TO VERIFY
THE LOCATION AND ANY DISCREPANCY BETWEEN THE PLANS
SHALL BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER.
S
CO
PIV
E
XFMR G
T
BP
GMEM
ICV
CONTROL POINT
BUMP POST
SIGN
HYDRANT LIGHT POLE
METER
TRANSFORMER
METER
MARKER
MANHOLE
WATER ELECTRICAL
NATURAL GAS
POST INDICATOR VALVE
PEDESTALIRRIGATION CONTROL VALVE
MANHOLE
CLEAN OUT
ROUND CATCH BASIN
PIPE INVERT
SANITARY SEWER STORM SEWER
TELEPHONE
SANITARY SEWERSAN SAN
STORM SEWERSTM STM
FIBER OPTICFIBER FIBER
BITUMINOUS
CONCRETE
EXISTING LEGEND
BENCHMARK
GRAVEL
CONTOUR LINE
FENCE
WATER MAINWTR WTR
NATURAL GASG G
UNDERGROUND ELECTRICUG-E UG-E
UNDERGROUND TELEPHONEUG-T UG-T
CENTER LINE
1180 1181
GUARDRAIL
WH WELL HEAD
UTILITIES
989-344-6184
72 HOURS
(3 WORKING DAYS)
CALL Mr. Halcomb
BEFORE YOU DIGC.G.
MICHAEL HALCOMB
CAMP GRAYLING ENGINEERING
KAB'17
KNOW WHAT'S BELOW.
CALL BEFORE YOU DIG.
CIVIL EXISTING CONDITIONS & DEMOLITION PLAN C
MATCHLINE - SEE ABOVE FOR CONTINUATION
MATCHLINE - SEE BELOW FOR CONTINUATION
DEMOLITION LEGEND
(R) REMOVE THESE ITEMS
REMOVE THESE ITEMS
REMOVE CONCRETE & SIDEWALK
SAWCUT AND REMOVE 20'± OF EXISTING SIDEWALK TO
THE NEAREST JOINT FOR NEW SANITARY SEWER LINE
HAZARDOUS OR
FLAMMABLE MATERIAL
CAUTION - CRITICAL
UTILITY
HAZARDOUS OR
FLAMMABLE MATERIAL
HAZARDOUS OR
FLAMMABLE MATERIAL
REMOVE/REPLACE ROAD AS NECESSARY
TO COMPLETE WORK. MATCH EXISTING
MATERIALS AND THICKNESS.
25.05'± OF EXISTING
6" WATERMAIN
TO BE REMOVED
tboze Typewriter
BIDS &
CONSTRUCTION
tboze Typewriter
MARCH 15, 2023
SN
MP
H
G
G
BP
G
T
GM
GM
GATE
UG-E
UG-EUG-E
UG
-E
UG
-E
UG-E
U G
-E
U G
-E U
G -E
U G
-E U
G -E
U G
-E
U G
-E
UG-E
UG-EUG-E
UG-E
UG-E
UG-EUG-E
UG-E UG-E
UG-E
UG-E
UG-E
UG-E
U G
-E U
G -E
UG
-E
UG-E
UG-E
UG-E
UG-E
UG-EUG-E
UG-E
U G
-E
U G
-E
U G
-E U
G -E
U G
-E
U G
-E
U G
-E
UG
-E
UG-E
UG-E
UG-E UG-E UG-E UG-E
FIBER
FIBER
FIBER FIBER
FI
BE
R
FI
BE
R
FIBERFIBER
U G
-E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E
UG
-E
UG
-E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E
U G
-E U
G -E
U G
-E U
G -E
U G
-E
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
XFMR
U G
-E U
G -E
FI
BE
R
FI
BE
R
FI
BE
R
PIV
PIV
PIV
PIV
PIV
PIV
E
XFMRE
S
PIV
PIV
PIV
E
S
S
CO
ICV
S
ICV CO
PIV
S
S
FF 1173.62'FF 1173.63'
FF 1173.63'
FF 1173.63'
FF 1173.59'
FF 1173.63'FF 1173.55' G
G
G G
EXIST SAN MH-A
RIM: 1172.47
8" INVERT E.:1168.09
8" INVERT N.:1168.19
SAN SAN
SA
N
SA
N
SAN
SAN SAN
SAN
SAN
GG
GGG
G
G
G G
G
G G
G G
GG
GG
W
TR
WTR
GWTR
W
TR
STM
STM
STM STMEX 24"
STORM
EX 24" STORM
EX
ST
OR
M
EX 24" STORM
EX
ST
OR
M
WTR
W
TR
W
TR
W
TR
W
TR
W
TR
W
TR
W
TR
W
TR
EX
IS
TI
NG
MA
IN
TE
NA
NC
E
BU
ILD
IN
G
FF
E
.70
TH
S
TR
EE
T
TH
S
TR
EE
T
TH
S
TR
EE
T
TH
S
TR
EE
T
EXISTING
BUILDING
#656
EXISTING
BUILDING
#654
G
EX 8" WATER
EX 6" WATER
EX 8" WATER
WTR WTR WTR WTR WTR WTR WTR WTR WTR WTR WTR WTR
EX 2" WATER
PIV
PIV
PIV
S-2
S-1
PR
8"
S
AN
PR
8"
S
AN
PR 8" SAN
G
G
G
SN STOP
GUARD RAIL
UG
-T
U G
-T U
G -T
U G
-T U
G -T
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
EX GAS LINE
WH
PIV
PIV
G G
G G
G G
G G
G
WTRWTR WTR WTR WTR WTR
G G
G G
EX 6" WATER
EX
IS
TI
NG
BU
ILD
IN
G
MP
COCO
SAN
CO
CO
EX
IS
TI
NG
MA
IN
TE
NA
NC
E
BU
ILD
IN
G
FF
E
.70
EX
IS
TI
NG
BU
ILD
IN
G
EX
IS
TI
NG
BU
ILD
IN
G
#6
HOWE ROAD
TH
S
TR
EE
T
G G G G
EX GAS LINE
G G G G G
G G
G
W
TR
W
TR
W
TR
W
TR
W
TR
W
EX 6" WATER
PIV
S-5
S-3
PR
8"
S
AN
PR
8"
S
AN
S-4
ST
AT
E O
F M
IC
H
IG
AN
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
AR
EA
U
TI
LI
TI
ES
1/
3.
C
AK
0.
1G R
D
EP
AR
TM
EN
T
O F
M
IL
IT
AR
Y
AN
D V
ET
ER
AN
S
AF
FA
IR
S
C
AM
P G
R
AY
LI
N
G A
N N
U
AL
T R
AI
N
IN
G
S
AY
LI
N G
, M
IC
H
IG
AN
B1
PARADIGM DESIGN
www.paradigmae.com
Grand Rapids | Phoenix I Traverse City
415 Leonard Street NW, Suite 200 Grand Rapids, MI 49504
(616) 785-5656
ENGINEERSARCHITECTS
JOB #2009080GR
WILLIS MONTE HADLOCK, P.E.
MI - REGISTRATION #6201045738
EXP. DATE 09/02/2023
C
GENERAL WATER SERVICE NOTES:
POST INDICATOR VALVES TO BE INSTALLED AT ALL MAINLINE WATER VALVE LOCATION.
N
0 50' 100'
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY
PIPES, CONDUITS OR STRUCTURES SHOWN ON THESE PLANS WAS
OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. THE
CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY
MEASURES TO PROTECT THE UTILITY LINES SHOWN ON THESE
DRAWINGS. THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY
AND RESPONSIBILITY FOR THE UTILITY PIPES, CONDUITS OR
STRUCTURES SHOWN OR NOT SHOWN ON THESE DRAWINGS. THE
CONTRACTOR SHALL POTHOLE ALL EXISTING UTILITIES TO VERIFY
THE LOCATION AND ANY DISCREPANCY BETWEEN THE PLANS
SHALL BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER.CIVIL LAYOUT AND UTILITIES PLAN
PROPOSED LEGEND
MANHOLE (DETAIL #1 / C501)HYDRANT (DETAIL #7 / C501) WATER VALVE
PIPE PLUG90° BEND TEE
SANITARY SEWER
WATER MAIN
CONCRETE SIDEWALK (DETAIL #8 / C501)
GENERAL PRIVATE UTILITY NOTES:
PROPOSED PRIVATE UTILITY SERVICE AS SHOWN IS SCHEMATIC ONLY. ACTUAL LOCATION TO BE COORDINATED WITH
INDIVIDUAL UTILITY COMPANY AND APPROVED BY OWNER.
CONTRACTOR SHALL COORDINATE LOCATION OF ALL PRIVATE UTILITIES (GAS, ELECTRIC, PHONE, CABLE, ETC.) WITH THE LOCAL UTILITY COMPANIES AND THE MECHANICAL DRAWINGS. COORDINATE ALL PRIVATE UTILITY LOCATIONS WITH ALL
SUB-SURFACE SITE UTILITIES SHOWN ON THIS PLAN.
MATCHLINE - SEE ABOVE FOR CONTINUATION
MATCHLINE - SEE BELOW FOR CONTINUATION
PROPOSED HYDRANT
ASSEMBLY
PROPOSED
HYDRANT
ASSEMBLY
PROPOSED HYDRANT
ASSEMBLY
PROPOSED 8" SANITARY SEWER
SEE SHEET C204
PROPOSED 8" SANITARY SEWER
SEE SHEET C205
PROPOSED 8" WATER MAIN
SEE SHEET C203
PROPOSED 8" WATER MAIN
SEE SHEET C202
PROPOSED 8" WATER MAIN
SEE SHEET C201
PROPOSED 8" WATER MAIN
SEE SHEET C202
PROPOSED 8" SANITARY SEWER
SEE SHEET C205
C501
C501
C501
REPLACE SIDEWALK
(SEE DET 8/C-501)
REMOVE/REPLACE ROAD AS NECESSARY
TO COMPLETE WORK. MATCH EXISTING
MATERIALS AND THICKNESS.
C501
C501
C501
C501
POST INDICATOR VALVE (DETAIL #6 / C501)PIV
tboze Typewriter
BIDS &
CONSTRUCTION
tboze Typewriter
MARCH 15, 2023
S-1
S-2
SN
MP
H
G
G
BP
G
T
GM
GM
GATE
UG-E
UG-EUG-E
UG
-E
UG
-E
UG-E
U G
-E
U G
-E U
G -E
U G
-E U
G -E
U G
-E
U G
-E
UG-E
UG-EUG-E
UG-E
UG-E
UG-EUG-E
UG-E UG-E
UG-E
UG-E
UG-E
UG-E
U G
-E U
G -E
UG
-E
UG-E
UG-E
UG-E
UG-E
UG-EUG-E
UG-E
U G
-E
U G
-E
U G
-E U
G -E
U G
-E
U G
-E
U G
-E
UG
-E
UG-E
UG-E
UG-E UG-E UG-E UG-E
FIBER
FIBER
FIBER FIBER
FI
BE
R
FI
BE
R
FIBERFIBER
U G
-E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E
UG
-E
UG
-E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E
U G
-E U
G -E
U G
-E U
G -E
U G
-E
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
XFMR
U G
-E U
G -E
FI
BE
R
FI
BE
R
FI
BE
R
PIV
PIV
PIV
PIV
PIV
PIV
E
XFMRE
S
PIV
PIV
PIV
E
S
S
CO
ICV
S
ICV CO
PIV
S
S
FF 1173.62'FF 1173.63'
FF 1173.63'
FF 1173.63'
FF 1173.59'
FF 1173.63'FF 1173.55' G
G
G G
EXIST SAN MH-A
RIM: 1172.47
8" INVERT E.:1168.09
8" INVERT N.:1168.19
SAN SAN
SA
N
SA
N
SAN
SAN SAN
SAN
SAN
GG
GGG
G
G
G G
G
G G
G G
GG
GG
W
TR
WTR
GWTR
W
TR
STM
STM
STM STMEX 24"
STORM
EX 24" STORM
EX
ST
OR
M
EX 24" STORM
EX
ST
OR
M
WTR
W
TR
W
TR
W
TR
W
TR
W
TR
W
TR
W
TR
W
TR
EX
IS
TI
NG
MA
IN
TE
NA
NC
E
BU
ILD
IN
G
FF
E
.70
91 1192
1195 11
TH
S
TR
EE
T
TH
S
TR
EE
T
TH
S
TR
EE
T
TH
S
TR
EE
T
EXISTING
BUILDING
#656
EXISTING
BUILDING
#654
G
EX 8" WATER
EX 6" WATER
EX 8" WATER
WTR WTR WTR WTR WTR WTR WTR WTR WTR WTR WTR WTR
EX 2" WATER
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF SF
SFSFSF
SF
SF
SF
SF
SF
SF
SF SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
PIV
PIV
PIV
1178.87 RIM
1181.53 RIM
23 LF - PROPOSED FILL
16 LF - PROPOSED FILL
S-5
S-3
0+
1+
2+
3+
4+
5+
6+
7+
8+
G
G
G
SN STOP
GUARD RAIL
UG
-T
U G
-T U
G -T
U G
-T U
G -T
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E U
G -E
U G
-E
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
U G
-T U
G -T
EX GAS LINE
WH
PIV
PIV
G G
G G
G G
G G
G
WTRWTR WTR WTR WTR WTR
G G
G G
EX 6" WATER
EX
IS
TI
NG
BU
ILD
IN
G
MP
COCO
SAN
CO
CO
EX
IS
TI
NG
MA
IN
TE
NA
NC
E
BU
ILD
IN
G
FF
E
.70
EX
IS
TI
NG
BU
ILD
IN
G
EX
IS
TI
NG
BU
ILD
IN
G
#6
HOWE ROAD
TH
S
TR
EE
T
G G G G
EX GAS LINE
G G G G G
G G
G
W
TR
W
TR
W
TR
W
TR
W
TR
W
EX 6" WATER
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
PIV
79 11
1178.78 RIM
1178.76 RIM S-4
1178.89 RIM
ST
AT
E O
F M
IC
H
IG
AN
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
AR
EA
U
TI
LI
TI
ES
1/
3.
C
AK
0.
1G R
D
EP
AR
TM
EN
T
O F
M
IL
IT
AR
Y
AN
D V
ET
ER
AN
S
AF
FA
IR
S
C
AM
P G
R
AY
LI
N
G A
N N
U
AL
T R
AI
N
IN
G
S
AY
LI
N G
, M
IC
H
IG
AN
B1
PARADIGM DESIGN
www.paradigmae.com
Grand Rapids | Phoenix I Traverse City
415 Leonard Street NW, Suite 200 Grand Rapids, MI 49504
(616) 785-5656
ENGINEERSARCHITECTS
JOB #2009080GR
WILLIS MONTE HADLOCK, P.E.
MI - REGISTRATION #6201045738
EXP. DATE 09/02/2023
C
CIVIL GRADING AND SWPP PLAN
N
0 40' 80'
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY
PIPES, CONDUITS OR STRUCTURES SHOWN ON THESE PLANS WAS
OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. THE
CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY
MEASURES TO PROTECT THE UTILITY LINES SHOWN ON THESE
DRAWINGS. THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY
AND RESPONSIBILITY FOR THE UTILITY PIPES, CONDUITS OR
STRUCTURES SHOWN OR NOT SHOWN ON THESE DRAWINGS. THE
CONTRACTOR SHALL POTHOLE ALL EXISTING UTILITIES TO VERIFY
THE LOCATION AND ANY DISCREPANCY BETWEEN THE PLANS
SHALL BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER.
SURFACE FLOW ARROW
CONTOUR LINE1178
SILT FENCE (DETAIL #8 / C501)SF SF SF
GRADING LIMITS
EROSION CONTROL BLANKET
PROPOSED SPOT GRADE
SEDIMENTATION CONTROL MEASURE
PERMANENT SOIL EROSION &
SEDIMENTATION CONTROL MEASURE
TEMPORARY SOIL EROSION &
675.00 FG
BITUMINOUS GRADE
CONCRETE GRADE
SIDEWALK GRADE
STRUCTURE RIM ELEVATION
MATCH EXISTING ELEVATION
TOP OF CURB GRADE
FLOW LINE GRADEFL
TC
CON
MX
SW
BIT
RIM
FINISHED GROUNDFG
X PX T
RIP RAP
GENERAL CONTRACTOR SHALL COMPLETE CONSTRUCTION SEQUENCE SCHEDULE
WHEN MAKING APPLICATION FOR SOIL EROSION CONTROL PERMIT.
YEAR: 2020
LANDSCAPING
FINISH GRADING
SITE CONSTRUCTION
FOUNDATION / BUILDING CONSTRUCTION
PERMANENT CONTROL MEASURES
TEMPORARY CONSTRUCTION ROADS
STORM UTILITIES
TEMPORARY CONTROL MEASURES
ROUGH GRADING SEDIMENT CONTROL
STRIPPING & STOCKPILING TOPSOIL
JA
N
FE
B.
M
AR
AP
R
M
AY
JU
N
E
JU
LY
AU
G
SE
P.
O C
T.
N O
V.
D
EC
.CONSTRUCTION SEQUENCE
GENERAL SOIL EROSION AND SEDIMENTATION CONTROL NOTES:
IT IS THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN THE SOIL EROSION PERMIT FROM THE PROPER GOVERNING
AUTHORITY AT CAMP GRAYLING.
A CONTRACTOR / INSPECTOR SHALL INSPECT THE SOIL EROSION/SEDIMENT CONTROL DEVICES ONCE EACH WEEK AND/OR WITHIN 24 HOURS OF A PRECIPITATION EVENT WHICH RESULTS IN A STORM DISCHARGE FROM THE SITE.
ALL DISTURBED NON-PAVEMENT AREAS MUST BE RESTORED WITH TOPSOIL, SEED, FERTILIZER, AND MULCH UNLESS
SODDED.
ALL SLOPES STEEPER THAN 1V:3H SHALL USE AN EROSION CONTROL BLANKET (NORTH AMERICAN GREEN S150BN OR EQUAL). ALL SLOPES BETWEEN 1V:4H AND 1V:3H SHALL USE AN EROSION CONTROL BLANKET (NORTH AMERICAN GREEN
DS75 OR EQUAL). UNLESS INDICATED OTHERWISE ON PLANS.
SEEDING SHOULD BE PREPARED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS. THE CONTRACTOR / INSPECTOR SHALL INSPECT THE AREA AFTER SEEDING IS COMPLETED. AREAS THAT ARE BARE OR NOT MULCHED
PROPERLY WILL NEED TO BE SPOT SEEDED AND/OR RE-MULCHED.
SILT FENCE SHOULD BE TRENCHED IN, BACKFILLED, AND STAPLED OR STAKED ACCORDING TO THE MANUFACTURER'S SPECIFICATIONS. MAINTENANCE INCLUDES THE REMOVAL OF BUILT-UP SEDIMENT WHEN THE SEDIMENT ACCUMULATES TO 1/3 TO 1/2 THE HEIGHT OF THE FENCE. CONTRACTOR SHALL REMOVE, REPLACE, RETRENCH, OR REBACKFILL THE FENCE IF IT FAILS. CONTRACTOR SHALL REINSTALL IF ANY PORTION OF THE FENCING IS DAMAGED BY CONSTRUCTION
MACHINERY.
SOIL EROSION CONTROL METHODS SHOWN ARE A GUIDELINE AND DO NOT RELIEVE THE CONTRACTOR FROM ADDITIONAL
METHODS THAT MAY BE REQUIRED BY THE SOIL EROSION CONTROL PERMIT.
THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL ACCUMULATED SEDIMENT AND RESTORATION OF THE EXISTING
CATCH BASINS PRIOR TO ACCEPTANCE BY THE OWNER.
THE CONTRACTOR WILL ENGAGE A CERTIFIED STORM WATER OPERATOR IN ACCORDANCE WITH EPA PHASE II RULES TO MEET REQUIREMENTS OF THE PERMIT. THIS OPERATOR WILL INSPECT THE JOB SITE AS REQUIRED BY RULE, NOTIFY JOB SITE SUPERINTENDENT OF ANY DEFICIENCIES, AND ENTER FINDINGS IN THE JOB SITE INSPECTION JOB BOOK.
SITE SOILS CONSIST OF GRAYLINE SAND, 81B & 81D PER USDA NRCS MAPS.
TOTAL DISTURBED AREA = 1.7 ACRES.
NPDES PERMIT NOT REQUIRED SINCE DISTURBANCE IS LESS THAN 5 ACRES.
GEOTEXTILE SILT FENCE
UNIFIED KEYING SYSTEM
SOIL EROSION AND SEDIMENTATION CONTROL MEASURES
SEEDING
GEOTEXTILE INLET FILTER
MATCHLINE - SEE ABOVE FOR CONTINUATION
MATCHLINE - SEE BELOW FOR CONTINUATION
54 T
54 T
55 T
55 T
54 T 5P
55 T
5 P 54 T
5 P
5 P
55 T
PROPOSED LEGEND
MANHOLEHYDRANT WATER VALVE
PIPE PLUG90° BEND TEE
SANITARY SEWER
WATER MAIN
CONCRETE SIDEWALK
860 LF - PROPOSED FILL
POST INDICATOR VALVEPIV
tboze Typewriter
BIDS &
CONSTRUCTION
tboze Typewriter
MARCH 15, 2023
| 080.1-040-C-001 |
| 080.1-040-C-001 |
| 080.1-040-C-101 |
| 080.1-040-C-101 |
| 080.1-040-C-102 |
| 080.1-040-C-102 |
File details come from the government source that posted it. Updated .