Camp_Forbes_Topo-22x36.pdf
PDF 515 KB Posted
- Attached to
- Camp Forbes Master Plan
- Solicitation number
- SD2606
- Issued by
- Cuyahoga County, Ohio
About this file
This is a topographic survey document prepared by the City of Cleveland's Engineering & Construction Survey Section for Camp George L. Forbes, administered by the Mayor's Office of Capital Projects (MOCAP). The survey, conducted during fall 2020 with fieldwork dates of October 28, November 2, and November 9, 2020, provides existing site conditions and subsurface drainage information relevant to the Camp Forbes Master Plan project. The survey was drawn by S. Shuba, checked by E. Westfall, and completed by field crew members Shuba and Johnson, with the final revision dated November 13, 2020. The document utilizes US SPCS 1983, Ohio North 3401 datum with NAD 1983 (CONUS) and GEOID12B (CONUS) coordinates.
The topographic survey map depicts Camp Forbes' existing infrastructure at a graphic scale of 1" = 30', identifying key features including a pavilion with concrete pad, pond, asphalt parking lots, concrete pads, wooden deck, concrete dock, fireplace structure, and amphitheater. The survey establishes a benchmark elevation of 1230.00 at the southeast corner of a concrete pad and documents subsurface drainage features including various diameter PVC and VCP pipes with specific invert elevations, outfalls, catch basins, and storm/sanitary manholes throughout the site. Site elevation data ranges from approximately 1216.00 to 1242.60, with detailed contour intervals and structural foundation elevations recorded for major facilities including the main building (FF: 1242.60) and concrete walls at elevation 1230.0 to 1230.3.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Camp_Forbes_Master_Plan.pdf | ||
| NRRC_Camp_Forbes_Multi_Purpose_Building_and_Dining_Hall_Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAVILION W/
CONC. PAD
POND
ASPH.
PARKING
LOT
ASPH.
PARKING
LOT
CONC. PADS
WOODEN DECK
CONC.
DOCK
FIRE PLACE
STRUCTURE
AMPHITHEATER
CONC. FF: 1241.90
AS
PH
. A C
C
ES
S
PA
TH
AS
PH
. A C
C
ES
S
PA
TH
LANDSCAPE
MOUND
1230.00
.0
.0
1226.00
.0
.0
.0
.00
.0
.0
.0
.00
.00
.00
.00
.0
.00
1238.00
1236.00
1234.001232.0012
.00
.00
.0
.00
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
TOE OF MOUND
1229.65
1229.49
1228.98
.0
.0
.0
.0
.7
.6
.8
.5
.9
.6
.7
.0
1222.94
1223.13
1223.00
1223.11
1223.42 12
.0
.0
.0
1232.00
1234.00
.0
1236.00
1234.00
1232.00
1230.00
1226.00
1224.00
1224.00
.0
.0
12" PVC OUTFALL
INV: 1216.71
BANK
OF
POND
BANK
OF
POND
BANK
OF
POND
BANK
OF
POND
BANK
OF
POND
6" PVC W/ VALVE CAP
INV: 1225.12
1228.85
1228.96
.5
1226.47 1228.81
1228.86
1234.50
1236.72
1238.74
1238.36
1237.64
1237.35
1239.06
1240.49
1239.52
1229.28
1231.65
1229.26 1229.19
1229.32
1230.08
1239.48
1230.24
1230.51
.6
.2
1222.74
1225.19
1224.77
1225.24 1224.95
1225.20
1225.15
1225.01 1225.05
1224.61
1225.03
1225.11
6" PVC OUTFALL
INV: 1216.09
12" PVC OVERFLOW
INV: 1228.34
12" PVC
INV: 1228.33
10" VCP OVERFLOW
INV: 1226.94
12" PVC OUTLET
INV: 1228.86
BANK
OF
POND
FLOWLINE
ROCK SHELF
ROCK SHELF
CONC. WALK
C O
N C
. W
AL
K
CONC. WALK
CONC. WALK
TOP OF WALL
ELEV: 1230.0 +/-
4" PVC DRAIN
(FILLED WITH DEBRIS)
ELEV: 1225.15
MAIN BLDG
FF: 1242.60
CONC. WALK
CATCH BASIN
RIM: 1236.62
8" PVC SE INV: 1235.12
CATCH BASIN
RIM: 1237.37
8" PVC NW INV: 1234.77
8" PVC SW INV: 1234.57
STORM MH
RIM: 1240.83
8" PVC NE INV: 1231.98
12" PVC NW INV: 1230.68
CATCH BASIN
RIM: 1227.32
12" PVC NE INV: 1224.22
18" VCP NW INV: 1224.12
ASPH. ROAD
1225.84
1226.21
1227.30 1226.17
1220.00 1218.00
1222.00
.0 01224.00
1226.11
1226.73 1227.28
1227.07
.01
.25
TOP OF
SECONDARY
CONC. WALL
TOP OF WALL
ELEV: 1230.3 +/-
SHRUBS
SAN MH
SAN MH
CATCH BASIN
BM: SE CORNER OF
CONC. PAD
ELEV: 1230.00
CITY OF CLEVELAND
ENGINEERING & CONSTRUCTION
SURVEY SECTION
FIELDWORK DATE:
DRAWN BY:
CHECKED BY:
601 LAKESIDE AVENUE, ROOM 518
CLEVELAND, OH 44114
28, 11
2, 11 9, 2020
S. SHUBA
E. WESTFALL
FIELD CREW: SHUBA & JOHNSON
LAST REVISION: 11/13/2020
CAMP FORBES TOPOGRAPHIC SURVEY
MAYOR'S OFFICE OF CAPITAL PROJECTS
GRAPHIC SCALE: 1" = 30'
0 15 30 45 60
CAMP FORBES
EXISTING CONDITIONS
FALL 2020
N
BENCHMARK: SE CORNER OF CONCRETE PAD
ELEVATION: 1230.00
DATUM: US SPCS 1983, OHIO NORTH 3401, NAD
1983 (CONUS), GEOID12B (CONUS)
ONLY RELEVANT SUBSURFACE DRAINAGE
INFORMATION RELATING TO PROJECT SHOWN
NOTES
| Sheets and Views |
| 22x36 |
File details come from the government source that posted it. Updated .