Calloway WLS Jan 2025.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- RoW Mow and Trim Murray Section
- Solicitation number
- RFB 605 2500000442 1
- Issued by
- Calloway County, Kentucky
About this file
This is a Mowing Work Location Sheet for the Kentucky Department of Transportation (KDOT) detailing roadside mowing services in Calloway County for project FE01-018. The document specifies mowing requirements across 39 separate routes comprising both major highways (US 641, KY 94, KY 121) and secondary roads (designated RS routes). The total project encompasses 254.471 miles of roadway requiring mowing across 1,026 acres, with all routes scheduled for three mowing cycles annually. The work is divided into two main categories: MP (milepost) routes totaling 59.582 miles and 354 acres, and RS (secondary road) routes totaling 194.889 miles and 672 acres. Each mowing cycle must be completed within a maximum of 20 working days. Individual routes vary significantly in length from 0.307 miles (KY 748) to 29.778 miles (KY 893 RS), with corresponding acreage ranging from 1 to 101 acres per route.
No information regarding pricing, contract term, bid submission deadlines, award dates, site visit requirements, or bidders' conferences is provided in this work location document. The sheet functions solely as a scope-of-work reference outlining the geographic limits, project locations, and physical specifications for the mowing services to be performed in Calloway County.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| How to Submit an Online Response - March 2023.pdf | ||
| Trigg WLS Jan 2025.xlsx | XLSX spreadsheet | |
| Marshall WLS Jan 2025.xlsx | XLSX spreadsheet | |
| 2025 Drawing - Trimming of Bridge Embankments.pdf | ||
| 2025 Drawings Mowing with Trimming.pdf | ||
| 2025 Drawings - Delineator Posts.pdf | ||
| Final_RFB_605_2500000442_1_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Mowing Work Location Sheet | Sheet 1 of 4 | |||||||
| Limits of Project | Project | Type 3 | Number | |||||
| Route | Project | Length | Mowing | of | ||||
| Number | System | County | Number | Begin | End | (Miles) | Acres | Cycles |
| US 641 | MP | Calloway | FE01 018 0641 | Tennessee State Line | KY 1550 | 7.444 | 156 | 3 |
| 000-008 | (MP 0.000) | (MP 7.444) | ||||||
| US 641X | MP | Calloway | FE01 018 641X | KY 1550 | KY 1327 | 2.873 | 3 | 3 |
| 000-003 | (MP 0.000) | (MP 2.873) | ||||||
| KY 94 | MP | Calloway | FE01 018 0094 | Graves Co. Line | Marshall Co. Line | 24.209 | 89 | 3 |
| 000-025 | (MP 0.000) | (MP 24.209) | ||||||
| KY 94C | MP | Calloway | FE01 018 094C | KY 94 | KY 80 | 0.385 | 5 | 3 |
| 000-001 | (MP 0.000) | (MP 0.385) | ||||||
| KY 121 | MP | Calloway | FE01 018 0121 | Tennessee State Line | KY 893 | 24.671 | 101 | 3 |
| 000-0025 | (MP 0.000) | (MP 24.671) | ||||||
| Subtotal MP | 59.582 | 354 | ||||||
| KY 280 | RS | Calloway | FE01 018 0280 | KY 94 | KY 121 | 12.552 | 36 | 3 |
| 000-013 | (MP 0.000) | (MP 12.552) | ||||||
| KY 299 | RS | Calloway | FE01 018 0299 | KY 94 | Marshall Co. Line | 10.665 | 36 | 3 |
| 000-011 | (MP 0.000) | (MP 10.665) | ||||||
| KY 444 | RS | Calloway | FE01 018 0444 | KY 121 | Tea Rose Drive | 6.437 | 17 | 3 |
| 000-007 | (MP 0.000) | (MP 6.437) | ||||||
| KY 464 | RS | Calloway | FE01 018 0464 | Graves Co. Line | KY 94 | 18.655 | 80 | 3 |
| 000-019 | (MP 0.000) | (MP 18.655) | ||||||
| Mowing Work Location Sheet | Sheet 2 of 4 | |||||||
| Limits of Project | Project | Type 3 | Number | |||||
| Route | Project | Length | Mowing | of | ||||
| Number | System | County | Number | Begin | End | (Miles) | Acres | Cycles |
| KY 497 | RS | Calloway | FE01 018 0497 | KY 94 | Barge Terminal Ent. | 2.635 | 7 | 3 |
| 000-003 | (MP 0.000) | (MP 2.635) | ||||||
| KY 732 | RS | Calloway | FE01 018 0732 | KY 94 | Watrview Lane | 9.571 | 28 | 3 |
| 000-010 | (MP 0.000) | (MP 9.571) | ||||||
| KY 748 | RS | Calloway | FE01 018 0748 | KY 1327 | Valentine Avenue | 0.307 | 2 | 3 |
| 000-001 | (MP 0.000) | (MP 0.307) | ||||||
| KY 774 | RS | Calloway | FE01 018 0774 | KY 121 | KY 1327 | 0.483 | 2 | 3 |
| 000-001 | (MP 0.000) | (MP 0.483) | ||||||
| KY 783 | RS | Calloway | FE01 018 0783 | KY 893 | Magness Road | 16.257 | 56 | 3 |
| 000-017 | (MP 0.000) | (MP 16.257) | ||||||
| KY 821 | RS | Calloway | FE01 018 0821 | KY 822 | US 641 | 0.506 | 2 | 3 |
| 000-001 | (MP 0.000) | (MP 0.506) | ||||||
| KY 822 | RS | Calloway | FE01 018 0822 | KY 1550 | KY 94 | 1.170 | 3 | 3 |
| 000-002 | (MP 0.000) | (MP 1.170) | ||||||
| KY 893 | RS | Calloway | FE01 018 0893 | Graves Co. Line | KY 121 | 29.778 | 91 | 3 |
| 000-030 | (MP 0.000) | (MP 29.778) | ||||||
| KY 972 | RS | Calloway | FE01 018 0972 | KY 732 | Moser Drive | 2.100 | 6 | 3 |
| 000-003 | (MP 0.000) | (MP 2.100) | ||||||
| KY 1270 | RS | Calloway | FE01 018 1270 | Graves Co. Line | KY 893 | 4.338 | 16 | 3 |
| 000-005 | (MP 0.000) | (MP 4.338) | ||||||
| Mowing Work Location Sheet | Sheet 3 of 4 | |||||||
| Limits of Project | Project | Type 3 | Number | |||||
| Route | Project | Length | Mowing | of | ||||
| Number | System | County | Number | Begin | End | (Miles) | Acres | Cycles |
| KY 1327 | RS | Calloway | FE01 018 1327 | KY 1660 | US 641 | 2.035 | 2 | 3 |
| 000-003 | (MP 0.000) | (MP 2.035) | ||||||
| KY 1346 | RS | Calloway | FE01 018 1346 | US 641 | Resort Road | 13.103 | 75 | 3 |
| 000-014 | (MP 0.000) | (MP 13.103) | ||||||
| KY 1429 | RS | Calloway | FE01 018 1429 | KY 783 | US 641 | 3.556 | 9 | 3 |
| 000-004 | (MP 0.000) | (MP 3.556) | ||||||
| KY 1483 | RS | Calloway | FE01 018 1483 | KY 94 | Elm Grove Road | 4.118 | 10 | 3 |
| 000-005 | (MP 0.000) | (MP 4.118) | ||||||
| KY 1497 | RS | Calloway | FE01 018 1497 | Tennessee State Line | KY 121 | 6.085 | 15 | 3 |
| 000-007 | (MP 0.000) | (MP 6.085) | ||||||
| KY 1509 | RS | Calloway | FE01 018 1509 | Kyle Field End | KY 783 | 0.538 | 1 | 3 |
| 000-001 | (MP 0.000) | (MP 0.538) | ||||||
| KY 1536 | RS | Calloway | FE01 018 1536 | KY 280 | KY 280 | 7.419 | 18 | 3 |
| 000-008 | (MP 0.000) | (MP 7.419) | ||||||
| KY 1550 | RS | Calloway | FE01 018 1550 | KY 893 | US 641 | 6.968 | 18 | 3 |
| 000-007 | (MP 0.000) | (MP 6.968) | ||||||
| KY 1551 | RS | Calloway | FE01 018 1551 | KY 464 | KY 94 | 1.774 | 6 | 3 |
| 000-002 | (MP 0.000) | (MP 1.774) | ||||||
| KY 1660 | RS | Calloway | FE01 018 1660 | KY 94 | KY 121 | 1.530 | 6 | 3 |
| 000-002 | (MP 0.000) | (MP 1.530) | ||||||
| Mowing Work Location Sheet | Sheet 4 of 4 | |||||||
| Limits of Project | Project | Type 3 | Number | |||||
| Route | Project | Length | Mowing | of | ||||
| Number | System | County | Number | Begin | End | (Miles) | Acres | Cycles |
| KY 1824 | RS | Calloway | FE01 018 1824 | US 641 | Marshall Co. Line | 5.208 | 28 | 3 |
| 000-006 | (MP 0.000) | (MP 5.208) | ||||||
| KY 1828 | RS | Calloway | FE01 018 1828 | KY 893 | US 641 | 6.048 | 26 | 3 |
| 000-007 | (MP 0.000) | (MP 6.048) | ||||||
| KY 1836 | RS | Calloway | FE01 018 1836 | KY 893 | Marshall Co. Line | 10.651 | 32 | 3 |
| 000-011 | (MP 0.000) | (MP 10.651) | ||||||
| KY 1918 | RS | Calloway | FE01 018 1918 | KY 444 | End State Maint. | 3.017 | 8 | 3 |
| 000-004 | (MP 0.000) | (MP 3.017) | ||||||
| KY 2075 | RS | Calloway | FE01 018 2075 | KY 2594 | US 641 | 1.678 | 9 | 3 |
| 000-002 | (MP 0.000) | (MP 1.678) |
| KY 2547 | RS | Calloway | FE01 018 2547 | US 641 | US 641 | 4.909 | 25 | 3 |
| 000-005 | (MP 0.000) | (MP 4.909) | ||||||
| KY 2594 | RS | Calloway | FE01 018 2594 | KY 94 | KY 2075 | 0.798 | 2 | 3 |
| 000-001 | (MP 0.000) | (MP 0.798) | ||||||
| Subtotal RS | 194.889 | 672 |
| Grand Total | 254.471 | 1,026 | |
| Maximum number of days to complete a mowing cycle: 20 Working Days |
File details come from the government source that posted it. Updated .