CALL 003.pdf

PDF 23 MB Posted

Attached to
Construction of a Bridge and Approaches on Lower Pateville Road (CR 11)
Solicitation number
B1CBA2601878-0
Issued by
Dade County, Atlanta City, Georgia

About this file

Summary of CALL 003.pdf

This is a bidders conference call notice issued by the Georgia Department of Transportation for the construction of a bridge and approaches on Lower Pateville Road (CR 11) over Swift Creek Tributary. The project involves 0.180 mile of construction work. The document provides notice of a mandatory or informational bidders conference meeting related to this project, detailing the location, date, and time for interested contractors to attend and obtain clarification on project requirements, specifications, and site conditions. Attendance at the conference allows potential bidders to ask questions directly to department representatives and better understand the scope of work before submitting their bids.

The bidders conference serves as an opportunity for contractors to review project documents, understand technical requirements, and address any concerns prior to bid submission. Contractors attending will receive essential information regarding site conditions, access, environmental considerations, and any special provisions applicable to the bridge construction project. This pre-bid meeting facilitates transparency and ensures all interested parties have equal access to information necessary for preparing competitive and compliant bids for the Georgia Department of Transportation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proposal ID :

Projects :

B1CBA2601878-0

Counties :

Proposal

Crisp

0016572

Call Order : 003

Project No. : 0016572

Date of Opening : May 15, 2026

DEPARTMENT OF TRANSPORTATION

STATE OF GEORGIA

0.180 MILE OF CONSTRUCTION OF A BRIDGE AND APPROACHES ON LOWER PATEVILLE RD (CR

11) OVER SWIFT CREEK TRIBUTARY.

(E)

Bidders must enter all unit prices, make all extensions, and total the bid.

NOTICE TO BIDDERS

If a DBE goal is specified, the bidder shall submit with this bid proposal a list of all proposed DBE participants. A form for this purpose is provided in this proposal. Please refer to the following specificatons:

102.07 Rejection of Proposals

Disadvantaged Business Enterprise Program (Special Provision)

DBE Goal: 0.00% Proposal Guaranty: 5.00%

Time

ID

Completion Date or Number of Units

Time Type

Description

00 3/31/2027 DTCOMPLETE CONTRACT

01 90 CDFAIL TO REOPEN ROADWAY - SEE SPEC PROV SEC 108

02 7 CDFAIL TO REPLACE ROW/LTD FENCE-SEE SPEC PROV SEC

03 ADREMOVE +0.5 MILE OF FENCE - SEE SPEC PROV SEC 108

(*) - Indicates Cost Plus Time Site. See Schedule of Items for Cost Per Unit

Proposal ID : B1CBA2601878-0

4/9/2026

Proposal ID: B1CBA2601878-0 Project(s): 0016572

Contractor:

SECTION: 0001 ROADWAY

Alt Set ID: Alt Mbr ID:

Proposal Line

Number Item ID Approximate

Quantity and Units

Unit Price Bid Amount

Description Dollars Cents Dollars Cents

0005 150-1000

TRAFFIC CONTROL - 0016572 LUMP SUM LUMP SUM _________._____

0010 163-0232 0.680

TEMPORARY GRASSING AC _________._____ _________._____

0015 163-0240 18.000

MULCH TN _________._____ _________._____

0020 163-0503 3.000

CONSTRUCT AND REMOVE SILT

CONTROL GATE, TP 3

EA _________._____ _________._____

0025 163-0520 60.000

CONSTRUCT AND REMOVE

TEMPORARY PIPE SLOPE DRAIN

LF _________._____ _________._____

0030 163-0528 200.000

CONSTRUCT AND REMOVE FABRIC

CHECK DAM - TYPE C SILT FENCE

LF _________._____ _________._____

0035 163-0541 3.000

CONSTRUCT AND REMOVE ROCK

FILTER DAMS

EA _________._____ _________._____

0040 163-0550 4.000

CONSTRUCT AND REMOVE INLET

SEDIMENT TRAP

EA _________._____ _________._____

0045 165-0030 780.000

MAINTENANCE OF TEMPORARY SILT

FENCE, TP C

LF _________._____ _________._____

0050 165-0041 200.000

MAINTENANCE OF CHECK DAMS -

ALL TYPES

LF _________._____ _________._____

0055 165-0087 3.000

MAINTENANCE OF SILT CONTROL

GATE, TP 3

EA _________._____ _________._____

Proposal Schedule of Items Page 1 of 7

Contractor:

SECTION: 0001 ROADWAY

Alt Set ID: Alt Mbr ID:

Proposal Line

Number Item ID Approximate

Quantity and Units

Unit Price Bid Amount

Description Dollars Cents Dollars Cents

0060 165-0105 4.000

MAINTENANCE OF INLET SEDIMENT

TRAP

EA _________._____ _________._____

0065 165-0110 3.000

MAINTENANCE OF ROCK FILTER DAM EA _________._____ _________._____

0070 167-1000 6.000

WATER QUALITY MONITORING AND

SAMPLING

EA _________._____ _________._____

0075 167-1500 12.000

WATER QUALITY INSPECTIONS MO _________._____ _________._____

0080 171-0030 1,560.000

TEMPORARY SILT FENCE, TYPE C LF _________._____ _________._____

0085 207-0203 22.000

FOUND BKFILL MATL, TP II CY _________._____ _________._____

0090 210-0100

GRADING COMPLETE - 0016572 LUMP SUM LUMP SUM _________._____

0095 310-5080 810.000

GR AGGR BASE CRS, 8 INCH, INCL

MATL

SY _________._____ _________._____

0100 318-3000 130.000

AGGR SURF CRS TN _________._____ _________._____

0105 402-1812 95.000

RECYCLED ASPH CONC LEVELING,

INCL BITUM MATL & H LIME

TN _________._____ _________._____

0110 402-3102 85.000

RECYCLED ASPH CONC 9.5 MM

SUPERPAVE, TYPE II, BLEND 1, INCL

BITUM MATL & H LIME

TN _________._____ _________._____

Proposal Schedule of Items Page 2 of 7

Contractor:

SECTION: 0001 ROADWAY

Alt Set ID: Alt Mbr ID:

Proposal Line

Number Item ID Approximate

Quantity and Units

Unit Price Bid Amount

Description Dollars Cents Dollars Cents

0115 402-3121 140.000

RECYCLED ASPH CONC 25 MM

SUPERPAVE, GP 1 OR 2, INCL BITUM

MATL & H LIME

TN _________._____ _________._____

0120 402-3190 131.000

RECYCLED ASPH CONC 19 MM

SUPERPAVE, GP 1 OR 2,INCL BITUM

MATL & H LIME

TN _________._____ _________._____

0125 413-0750 160.000

TACK COAT GL _________._____ _________._____

0130 433-1000 185.000

REINF CONC APPROACH SLAB SY _________._____ _________._____

0135 441-0004 31.300

CONC SLOPE PAV, 4 IN SY _________._____ _________._____

0140 441-0303 4.000

CONC SPILLWAY, TP 3 EA _________._____ _________._____

0145 550-2180 24.000

SIDE DRAIN PIPE, 18 IN, H 1-10 LF _________._____ _________._____

0150 550-3418 2.000

SAFETY END SECTION 18 IN, SIDE

DRAIN, 4:1 SLOPE

EA _________._____ _________._____

0155 550-4218 2.000

FLARED END SECTION 18 IN, STORM

DRAIN

EA _________._____ _________._____

0160 550-5180 50.000

STORM DRAIN PIPE, 18 IN, CLASS III LF _________._____ _________._____

0165 603-2018 21.000

STN DUMPED RIP RAP, TP 1, 18 IN SY _________._____ _________._____

Proposal Schedule of Items Page 3 of 7

Contractor:

SECTION: 0001 ROADWAY

Alt Set ID: Alt Mbr ID:

Proposal Line

Number Item ID Approximate

Quantity and Units

Unit Price Bid Amount

Description Dollars Cents Dollars Cents

0170 603-2181 79.000

STN DUMPED RIP RAP, TP 3, 18 IN SY _________._____ _________._____

0175 603-7000 100.000

PLASTIC FILTER FABRIC SY _________._____ _________._____

0180 634-1200 10.000

RIGHT OF WAY MARKERS EA _________._____ _________._____

0185 636-1033 12.000

HIGHWAY SIGNS, TP 1 MATL, REFL

SHEETING, TP 9

SF _________._____ _________._____

0190 636-1036 54.000

HIGHWAY SIGNS, TP 1 MATL, REFL

SHEETING, TP 11

SF _________._____ _________._____

0195 636-2070 48.000

GALV STEEL POSTS, TP 7 LF _________._____ _________._____

0200 636-2090 93.000

GALV STEEL POSTS, TP 9 LF _________._____ _________._____

0205 636-3010 3.000

GROUND-MOUNTED BREAKAWAY

SIGN SUPPORT

EA _________._____ _________._____

0210 636-5030 16.000

DELINEATOR, TP 3 EA _________._____ _________._____

0215 641-1100 87.500

GUARDRAIL, TP T LF _________._____ _________._____

0220 641-1200 312.500

GUARDRAIL, TP W LF _________._____ _________._____

0225 641-5001 4.000

GUARDRAIL ANCHORAGE, TP 1 EA _________._____ _________._____

Proposal Schedule of Items Page 4 of 7

Contractor:

SECTION: 0001 ROADWAY

Alt Set ID: Alt Mbr ID:

Proposal Line

Number Item ID Approximate

Quantity and Units

Unit Price Bid Amount

Description Dollars Cents Dollars Cents

0230 641-5015 2.000

GUARDRAIL TERMINAL, TP 12A, 31 IN,

TANGENT, ENERGY-ABSORBING

EA _________._____ _________._____

0235 643-8200 1,420.000

BARRIER FENCE (ORANGE), 4 FT LF _________._____ _________._____

0240 653-1906 780.000

THERMOPLASTIC SOLID TRAF

STRIPE, 6 IN, WHITE

LF _________._____ _________._____

0245 653-2602 780.000

THERMOPLASTIC SOLID TRAF

STRIPE, 6 IN, YELLOW

LF _________._____ _________._____

0250 654-1001 22.000

RAISED PVMT MARKERS TP 1 EA _________._____ _________._____

0255 700-6910 1.360

PERMANENT GRASSING AC _________._____ _________._____

0260 700-7000 2.730

AGRICULTURAL LIME TN _________._____ _________._____

0265 700-8000 0.410

FERTILIZER MIXED GRADE TN _________._____ _________._____

0270 700-8100 68.200

FERTILIZER NITROGEN CONTENT LB _________._____ _________._____

0275 713-3001 1,080.000

WOOD FIBER BLANKET, TP I, SLOPES SY _________._____ _________._____

Section: 0001 Total: _________._____

Proposal Schedule of Items Page 5 of 7

Contractor:

SECTION: 0002 BRIDGE NO 1 - OVER SWIFT CREEK TRIBUTARY

Alt Set ID: Alt Mbr ID:

Proposal Line

Number Item ID Approximate

Quantity and Units

Unit Price Bid Amount

Description Dollars Cents Dollars Cents

0280 500-2100 126.000

CONCRETE BARRIER LF _________._____ _________._____

0285 500-3101 41.000

CLASS A CONCRETE CY _________._____ _________._____

0290 507-0027 632.000

PSC BOX BEAMS, 27 IN, BR NO - 1 LF _________._____ _________._____

0295 511-1000 6,094.000

BAR REINF STEEL LB _________._____ _________._____

0300 511-3000

SUPERSTR REINF STEEL, BR NO - 1 LUMP SUM LUMP SUM _________._____

0305 520-2218 540.000

PILING, PSC, 18 IN SQ LF _________._____ _________._____

0310 520-3218 2.000

TEST PILE, PSC, 18 IN SQ EA _________._____ _________._____

0315 520-4218 1.000

LOAD TEST, PSC, 18 IN SQ EA _________._____ _________._____

0320 523-1100 2.000

DYNAMIC PILE TEST EA _________._____ _________._____

0325 533-0010 204.000

BRIDGE DECK WATERPROOFING

MEMBRANE, METHOD A

SY _________._____ _________._____

0330 540-1102

REMOVAL OF EXISTING BR, BR NO - 1 LUMP SUM LUMP SUM _________._____

0335 603-2018 559.000

STN DUMPED RIP RAP, TP 1, 18 IN SY _________._____ _________._____

Proposal Schedule of Items Page 6 of 7

Contractor:

SECTION: 0002 BRIDGE NO 1 - OVER SWIFT CREEK TRIBUTARY

Alt Set ID: Alt Mbr ID:

Proposal Line

Number Item ID Approximate

Quantity and Units

Unit Price Bid Amount

Description Dollars Cents Dollars Cents

0340 603-7000 559.000

PLASTIC FILTER FABRIC SY _________._____ _________._____

Section: 0002 Total: _________._____

Total Bid: _________._____

Proposal Schedule of Items Page 7 of 7

Georgia Department of Transportation DBE Goals

Processed Date: Apr-09-2026 11:07:02 AM

Vendor ID: Bidder's Company Name:

Project No: 0016572 County: CRISP

Let No: 003 Let Date: May-15-2026 Total BID :

The Required DBE Goal on This Contract is: 0 %

I Propose To Utilize The Following DBE Contractors:

LIST OF DBE PARTICIPANTS

Vendor Number

DBE

Name/Address (City/State)

Type of Work CERT Type Work Code Race Conscious Amount

$0.00

Total: $0.00

*For Departmental use only. Do not fill in Work codes.

Please Note: Only 60% of the participation of a DBE Supplier who does not manufacture or install the product will be counted toward the goal. See below for further instructions.

INSTRUCTIONS FOR LIST OF DBE PARTICIPANTS

If a DBE Goal is indicated, you must propose to achieve a goal that is equal or greater than the percentage required. If no goal is indicated, you may propose your own goal.

The DBE firms to be utilized as counting toward the proposed goal must be listed on this form, along with their addresses, type of work and the amount to be paid to each of the minority firms. The amount entered will not necessarily be the contract amount, but must be the actual amount that will be paid to the DBE firm. In the case of a DBE supplier, the amount paid and 60% of that amount both will be entered; and only the 60% figure should be added to the total. An example of this is shown in the example chart:

Vendor Number

Company Name And Address (City and State)

Type Of Work *Work Code Race

Neutral Race Conscious Amount

ABC Oil Company Atlanta, GA

Diesel Fuel Supplier

$80.000.00 (60% =

$48,000.00)

*For Departmental use ONLY. Do not fill in Work Codes.

The Contractor shall indicate for each DBE and Type of Work whether the DBE Participant is Race Neutral or Race Conscious by placing a checkmark in the appropriate column.

Please Note: For 60% of the amount paid to a DBE supplier to be eligible to count toward fulfilling the DBE goal, the supplier must be an established "regular dealer' in the product involved, and not just a broker. A "regular dealer" would normally sell the product to several customers and would usually have product inventory on hand.

STATE OF GEORGIA DEPARTMENT OF TRANSPORTATION FORM EEOP

CONSTRUCTION CONTRACTORS PREQUALIFICATION OFFICE

BID OPPORTUNITY LIST Revised 04/16/21

Please complete and mail or FAX to:

Construction Bidding Administration

600 West Peachtree Street, NW Suite 1113

Atlanta, Georgia 30308

TELEPHONE: (404) 631-1147

EMAIL: biddocuments@dot.ga.gov

This information shall be submitted in accordance with Specification Section 102.18

Prime Contractor/Consultant:

Address/Telephone Number:

Bid/Proposal Number:

Quote Submitted MM/YY:

49 CRF Part 26.11 requires the Georgia Department of Transportation to develop and maintain a “bid opportunity list”. The list is intended to be a listing of all firms participating or attempting to participate, on DOT assisted contracts. The list must include all firms that bid on prime contracts, or bid or quote subcontracts and materials supplies on DOT-assisted projects, including both DBEs and non-DBEs. For consulting companies this list must include all subconsultants contacting you and expressing an interest in teaming with you on a specific DOT assisted project. Prime contractors and consultants must provide information for Nos. 1, 2, 3, and 4 and must provide information they have available on Numbers 5, 5.A.6, 7 , 8 and 9 for themselves, and their subcontractors and subconsultants.

1. Federal Tax ID Number:

2. Firm Name:

3. Phone:

4. Address:

6. □ DBE

□ Non-DBE

7. □ Subcontractor

8. □ Subconsultant

9. □Supplier

5. Contact 5.A. Company E mail address

1. Federal Tax ID Number:

2. Firm Name:

3. Phone:

4. Address:

6. □ DBE

□ Non-DBE

7. □ Subcontractor

8. □ Subconsultant

9. □Supplier

5. Contact 5.A. Company E mail address

1. Federal Tax ID Number:

2. Firm Name:

3. Phone:

4. Address:

5. contact 5.A. Company E mail address

6. □ DBE

□ Non-DBE

7. □ Subcontractor

8. □ Subconsultant

9. □Supplier mailto:biddocuments@dot.ga.gov

DEPARTMENT OFTRANSPORTATION

GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT

Contractor’s Name:

Solicitation/Contract No./ Call No.

or ProjectDescription:

CONTRACTOR AFFIDAVIT

By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, entity or corporation which is engaged in the physical performance of services on behalf of the Georgia Department of Transportation has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91.

Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10- 91(b). Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

Federal Work Authorization UserIdentification Number Date of Authorization (EEV/E-Verify Company Identification Number)

Name of Contractor

I hereby declare under penalty of perjury that the foregoing is true and correct

Printed Name (of Authorized Officer or Agentof Contractor) Title (of Authorized Officer or Agent of Contractor)

Signature (of Authorized Officer or Agent) Date Signed

SUBSCRIBED AND SWORN BEFORE ME ON THIS THE

DAY OF , 20_

Notary Public

My Commission Expires:

[NOTARY SEAL]

Rev. 11/01/15

Georgia Department of Transportation Revised D.O.T. RFETB April 16, 2021

REQUEST FOR ELIGIBILITY TO BID

GEORGIA DEPARTMENT OF TRANSPORTATION

OFFICE OF CONSTRUCTION BIDDING ADMINISTRATION

600 West Peachtree St., N.W.

Atlanta, GA 30308

Email: biddocuments@dot.ga.gov

LETTING DATE:

GDOT

VENDOR CODE:

COMPANY NAME:

CONTACT PERSON:

EMAIL ADDRESS:

FOR OPTIMUM SERVICE, KEEP GDOT UP-TO-DATE

WITH YOUR CONTACT INFORMATION

(Mailing Address, Phone No., Fax No., E-mail Address, Primary Contact Person, etc.)

Indicate below the three digits of the Call Order Number, and your bidding status

B = Bidding Prime

(Example: 1.) 001 B 2.) 006 B 3.) 018 B etc.)

Complete this form to Request For Eligibility To Bid. The deadline to submit this form to GDOT, Office of Construction Bidding Administration is no later than 12:00 p.m. on the day preceding the letting. **Failure to submit this document will result in ineligibility to bid.

mailto:biddocuments@dot.ga.gov

FEDERAL AID CERTIFICATION

(English Project) Revised: April 19, 2024 First Use Date 2021 Specifications: April 16, 2021

Failure to complete appropriate certification requirements identified below or submission of a false certification shall render the bid non-responsive.

EQUAL EMPLOYMENT OPPORTUNITY

I further certify that I have □ / have not □ participated in a previous contract or subcontract subject to the equal opportunity clause, as required by Executive Orders 10925, 11114, or 11246, and that I have □ / have not □ filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance, a Federal Government contracting or administering agency, or the former President's Committee on Equal Employment Opportunity, all reports due under the applicable filing requirements.

I understand that if I have participated in a previous Contract or Subcontract subject to the Executive Orders above and have not filed the required reports that 41 CFR 601.7 (b)(1) prevents the award of this Contract unless I submit a report governing the delinquent period or such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, U. S. Department of Labor.

Reports and notifications required under 41 CFR 604, including reporting subcontract awards in excess of $10,000.00 should be addressed to:

Mr.Samuel Maiden Regional Director, U. S. Department of Labor Office of Federal Contract Compliance Programs, Region 4 Rm. 7B75 61 Forsyth St. SW Atlanta, GA 30303

EXAMINATION OF PLANS AND SPECIFICATIONS

I acknowledge that this Project will be constructed in English units.

I certify that I have carefully examined the Plans for this Project and the Standard Specifications, 2021 Edition, the 2024 Supplemental Specifications modifying the 2021 Standard Specifications, and Special Provisions included in and made a part of this Proposal, and have also personally examined the site of the work. On the basis of the said Specifications and Plans, I propose to furnish all necessary machinery, tools, apparatus and other means of construction, and do all the work and furnish all the materials in the manner specified.

I understand the quantities mentioned are approximate only and are subject to either increase or decrease and hereby propose to perform any increased or decreased quantities of work or extra work on the basis provided for in the Specifications.

I also hereby agree that the State, or the Department of Transportation, would suffer damages in a sum equal to at least the amount of the enclosed Proposal Guaranty, in the event my Proposal should be accepted and a Contract tendered me thereunder and I should refuse to execute same and furnish bond as herein required, in consideration of which I hereby agree that, in the event of such failure on my part to execute said Contract and furnish bond within fifteen (15) days after the date of the letter transmitting the Contract to me, the amount of said Proposal Guaranty shall be and is hereby, forfeited to the State, or to the Department of Transportation, as liquidated damages as the result of such failure on my part.

I further propose to execute the Contract agreement described in the Specifications as soon as the work is awarded to me, and to begin and complete the work within the time limit provided. I also propose to furnish a Contract Bond, approved by the State Transportation Board, as required by the laws of the State of Georgia. This bond shall not only serve to guarantee the completion of the work on my part, but also to guarantee the excellence of both workmanship and materials until the work is finally accepted, as well as to fully comply with all the laws of the State of Georgia.

CONFLICT OF INTEREST

By signing and submitting this Contract I hereby certify that employees of this company or employee of any company supplying material or subcontracting to do work on this Contract will not engage in business ventures with employees of the Georgia Department of Transportation (GA D.O.T.) nor shall they provide gifts, gratuities, favors, entertainment, loans or other items of value to employees of this department.

Also, by signing and submitting this Contract I hereby certify that I will notify the Georgia Department of Transportation through its District Engineer of any business ventures entered into between employees of this company or employees of any company supplying material or subcontracting to do work on this Contract with a family member of GA D.O.T. employees.

DRUG FREE WORKPLACE

The undersigned certifies that the provisions of Code Sections 50-24-1 through 50-24-6 of the Official Code of Georgia Annotated, relating to the "Drug-free Workplace Act", have been complied with in full. The undersigned further certifies that:

1. A drug-free workplace will be provided for the Contractor's employees during the performance of the Contract; and

2. Each Contractor who hires a Subcontractor to work in a drug-free workplace shall secure from that Subcontractor the following written certification:

"As part of the subcontracting agreement with (Contractor's name) , (Subcontractor's name) certifies to the Contractor that a drug free workplace will be provided for the Subcontractor's employees during the performance of this Contract pursuant to paragraph (7) of subsection

(b) of Code Section 50-24-3."

Also, the undersigned further certifies that he will not engage in the unlawful manufacture, sale distribution, dispensation, possession, or use of a controlled substance or marijuana during the performance of the Contract.

BOYCOTT OF ISRAEL

By signing and submitting this Contract and Pursuant to O.C.G.A. Sec. 50-5-85, Contractor hereby certifies that is not currently engaged in, and agrees that for the duration of this contract, it will not engage in a boycott of Israel.

NON-COLLUSION CERTIFICATION

STATE OF GEORGIA

I hereby certify that I have not, nor has any member of the firm(s) or corporation(s), either directly or indirectly entered into any agreement, participated in any collusion, nor otherwise taken any action in restraint of free competitive bidding in connection with this submittedbid.

It is understood and agreed that this Proposal is one of several competitive bids made to the Department of Transportation, and in consideration of mutual agreements of the bidders, similar hereto, and in consideration of the sum of One Dollar cash in hand paid, receipt whereof is hereby acknowledged, the under signed agrees that this Proposal shall be an option, which is hereby given by the undersigned to the Department of Transportation to accept or reject this Proposal at any time within thirty (30) calendar days from the date on which this sealed proposal is opened and read, unless a longer period is specified in the Proposal or the successful bidder agrees in writing to a longer period of time for the award, and in consideration of the premises, it is expressly covenanted and agreed that this Proposal is not subject to withdrawal by the Proposer or Bidder, during the term of saidoption.

I hereby acknowledge receipt of the following checked amendments of the Proposal, Plans, Specifications and/orother documents pertaining to the Contract.

Amendment Nos.: I understand that failure to confirm the receipt of amendments is cause for rejection ofbids.

(COMPANY NAME)

Signature of Contractor (SEAL)

Printed Name of Signee

Title

CERTIFICATION OF COMPLIANCE WITH THE STATE OF GEORGIA’S

SEXUAL HARASSMENT PREVENTIONPOLICY

The State of Georgia promotes respect and dignity and does not tolerate sexual harassment in the workplace. The State is committed to providing a workplace and environment free from sexual harassment for its employees and for all persons who interact with state government. All State of Georgia employees are expected and required to interact with all persons including other employees, contractors, and customers in a professional manner that contributes to a respectful work environment free from sexual harassment. Furthermore, the State of Georgia maintains an expectation that its contractors and their employees and subcontractors will interact with entities of the State of Georgia, their customers, and other contractors of the State in a professional manner that contributes to a respectful work environment free from sexualharassment.

Pursuant to the State of Georgia’s Statewide Sexual Harassment Prevention Policy (the “Policy”), all contractors who are regularly on State premises or who regularly interact with State personnel must complete sexual harassment prevention training on an annual basis.

A contractor, including its employees and subcontractors, who have violated the Policy, including but not limited to engaging in sexual harassment and/or retaliation may be subject to appropriate corrective action. Such action may include, but is not limited to, notification to the employer, removal from State premises, restricted access to State premises and/or personnel, termination of contract, and/or other corrective action(s) deemed necessary by the State.

(i) If Contractor is an individual who is regularly on State premises or who will regularly interact with State personnel, Contractor certifiesthat:

(a) Contractor has received, reviewed, and agreed to comply with the State of Georgia’s Statewide Sexual Harassment Prevention Policy located at http://doas.ga.gov/human‐resources‐administration/board‐rules‐policy‐and‐ compliance/jointly‐issued‐statewide‐policies/sexual‐harassment‐prevention‐ policy;

(b) Contractor has completed sexual harassment prevention training in the last year; or will complete the Georgia Department of Administrative Services’ sexual harassment prevention training located at http://doas.ga.gov/human‐ resources‐administration/sexual‐harassment‐prevention/hr‐ professionals/employee‐training (scroll down to section for entities without a LMS section) or this direct link https://www.youtube.com/embed/NjVt0DDnc2s?rel=0 prior to accessingState premises and prior to interacting with State employees; and on an annual basis thereafter; and,

(c) Upon request by the State, Contractor will provide documentation substantiating the completion of sexual harassment training.

http://doas.ga.gov/human http://doas.ga.gov/human http://www.youtube.com/embed/NjVt0DDnc2s?rel=0

(ii) If Contractor has employees and subcontractors that are regularly on State premises or who will regularly interact with State personnel, Contractor certifies that:

(a) Contractor will ensure that such employees and subcontractors have received, reviewed, and agreed to comply with the State of Georgia’s Statewide Sexual Harassment Prevention Policy located at http://doas.ga.gov/human‐resources‐ administration/board‐rules‐policy‐and‐compliance/jointly‐issued‐statewide‐ policies/sexual‐harassment‐prevention‐policy;

(b) Contractor has provided sexual harassment prevention training in the last year to such employees and subcontractors and will continue to do so on an annual basis; or Contractor will ensure that such employees and subcontractors complete the Georgia Department of Administrative Services’ sexual harassment prevention training located at http://doas.ga.gov/human‐ resources‐administration/sexual‐harassment‐prevention/hr‐ professionals/employee‐training (scroll down to section for entities without a LMS section) or this direct link https://www.youtube.com/embed/NjVt0DDnc2s?rel=0 prior to accessingState premises and prior to interacting with State employees; and on an annual basis thereafter; and

(d) Upon request of the State of the Georgia Department of Transportation, Contractor will provide documentation substantiating such employees and subcontractors’ acknowledgment of the State of Georgia’s Statewide Sexual Harassment Prevention Policy and annual completion of sexual harassment preventiontraining.

[Contractor Name]

Signature of Contractor

Printed Name of Signee

Title http://doas.ga.gov/human http://doas.ga.gov/human http://www.youtube.com/embed/NjVt0DDnc2s?rel=0

Let Date :May 15, 2026

STATE OF GEORGIA

PROPOSAL INDEX

Call Order Number: 003 Counties: Crisp Project No(s):0016572

Listed below are modifications and additions to the 2021 State of Georgia Standard Specifications and 2024 Supplemental Specifications Construction of Transportation Systems.

DBE Requirements Bid Opportunity List Georgia Security and Immigration Compliance Act Affidavit Request for Eligibility to Bid Federal Aid Requirements Certification/Drug Free Workplace Signature Page Sexual Harassment Prevention Policy Proposal Index Notice to All Bidders Federal Labor Provisions (FHWA 1273) Required Contract Provisions Federal-Aid Contracts Notice to Contractors Wage Rates Standard EEO Specifications Notice of Affirmative Action Disadvantaged Business Enterprise Program Prompt Payment Buy America Utility Conflicts Sec. 107 - Legal Regulations and Responsibilities to the Public (April 30, 2025) Sec. 161 - Control of Soil Erosion and Sedimentation (November 26, 2025) Sec. 163 - Miscellaneous Erosion Control Items (March 18, 2026) Sec. 201 - Clearing and Grubbing Right-of-Way (July 21, 2025) Sec. 208 - Embankments (August 26, 2024) Sec. 300 - General Specifications for Base and Subbase Courses (January 22, 2025) Sec. 301 - Soil-Cement Construction (January 22, 2025) Sec. 315 - Cement Stabilized Reclaimed Base Construction (CSRB) (January 22, 2025) Sec. 456 - Rumble Strips (July 1, 2025) Sec. 500 - Concrete Structures (March 23, 2026) Sec. 511 - Reinforcement Steel (March 23, 2026) Sec. 548 - Micropile Foundations (September 9, 2025) Sec. 621 - Concrete Barrier (February 20, 2026)

Sec. 631 - Dynamic Message Signs (January 27, 2026) Sec. 632 - Portable Changeable Message Signs (July 21, 2025) Sec. 646 - Emergency Access Gate (January 27, 2026) Sec. 647 - Traffic Control Signal Installation (January 27, 2026) Sec. 653 - Thermoplastic Traffic Stripe (September 16, 2024) Sec. 654 - Raised Pavement Markers (February 12, 2025) Sec. 694 - Environmental Sensor Station (January 27, 2026) Sec. 700 - Grassing (November 26, 2025) Sec. 716 - Erosion Control Mats (Slopes) (March 6,2024) Sec. 799 - Communication Network Building (January 27, 2026) Sec. 800 - Coarse Aggregate (January 22, 2025) Sec. 801 - Fine Aggregate (July 24, 2025) Sec. 802 - Aggregates for Asphaltic Concrete (August 5, 2024) Sec. 815 - Graded Aggregate (March 18, 2026) Sec. 820 - Asphalt Cement (October 22, 2024) Sec. 849 - Thin Lift Surface Sealing Asphaltic Concrete Mix (August 26, 2025) Sec. 925 - Traffic Control Signal Equipment (January 27, 2026) Sec. 926 - Wireless Communications Equipment (January 27, 2026) Sec. 936 - Closed Circuit Television (January 27, 2026) Sec. 939 - Communications and Electronic Equipment (January 27, 2026) Sec. 942 - ITS General Requirements (January 27, 2026)

Construction Activity Sec. 107 - Legal Regulations and Responsibility to the Public Sec. 108 - Temporary Suspension of Work Sec. 108 - Prosecution and Progress (Failure or Delay in Completing Work on Time) Sec. 150 - Traffic Control Sec. 165 - Maintenance of Temporary Erosion and Sedimentation Control Devices Sec. 523 - Dynamic Pile Testing Sec. 713 - Organic and Synthetic Material Fiber Blanket

NOTICE TO ALL BIDDERS

To report bid rigging activities call:

1-800-424-9071

The U.S. Department of Transportation (DOT) operates the above toll-free “hotline” Monday through Friday, 8:00 AM to 5:00 PM, Eastern Time. Anyone with the knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the “hotline” to report such activities.

The “hotline” is part of the DOT’s continuing effort to identify and investigate highway construction contract fraud and abuse, and is operated under the direction of the DOT Inspector General. All information will be treated confidentially and caller anonymity will be respected.

FHWA-1273 – Revised October 23, 2023

REQUIRED CONTRACT PROVISIONS

FEDERAL-AID CONSTRUCTION CONTRACTS

I. General II. Nondiscrimination III. Non-segregated Facilities IV. Davis-Bacon and Related Act Provisions V. Contract Work Hours and Safety Standards Act

Provisions VI. Subletting or Assigning the Contract VII. Safety: Accident Prevention VIII. False Statements Concerning Highway Projects IX. Implementation of Clean Air Act and Federal Water

Pollution Control Act X. Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion XI. Certification Regarding Use of Contract Funds for

Lobbying XII. Use of United States-Flag Vessels:

ATTACHMENTS

A. Employment and Materials Preference for Appalachian Development Highway System or Appalachian Local Access Road Contracts (included in Appalachian contracts only)

I. GENERAL

1. Form FHWA-1273 must be physically incorporated in each construction contract funded under title 23, United States Code, as required in 23 CFR 633.102(b) (excluding emergency contracts solely intended for debris removal). The contractor (or subcontractor) must insert this form in each subcontract and further require its inclusion in all lower tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services). 23 CFR 633.102(e).

The applicable requirements of Form FHWA-1273 are incorporated by reference for work done under any purchase order, rental agreement or agreement for other services. The prime contractor shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider. 23 CFR 633.102(e).

Form FHWA-1273 must be included in all Federal-aid design-build contracts, in all subcontracts and in lower tier subcontracts (excluding subcontracts for design services, purchase orders, rental agreements and other agreements for supplies or services) in accordance with 23 CFR 633.102. The design-builder shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider.

Contracting agencies may reference Form FHWA-1273 in solicitation-for-bids or request-for-proposals documents, however, the Form FHWA-1273 must be physically incorporated (not referenced) in all contracts, subcontracts and lower-tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services related to a construction contract). 23 CFR 633.102(b).

2. Subject to the applicability criteria noted in the following sections, these contract provisions shall apply to all work performed on the contract by the contractor's own organization and with the assistance of workers under the contractor's immediate superintendence and to all work performed on the contract by piecework, station work, or by subcontract. 23 CFR 633.102(d).

3. A breach of any of the stipulations contained in these Required Contract Provisions may be sufficient grounds for withholding of progress payments, withholding of final payment, termination of the contract, suspension / debarment or any other action determined to be appropriate by the contracting agency and FHWA.

4. Selection of Labor: During the performance of this contract, the contractor shall not use convict labor for any purpose within the limits of a construction project on a Federal-aid highway unless it is labor performed by convicts who are on parole, supervised release, or probation. 23 U.S.C. 114(b).

The term Federal-aid highway does not include roadways functionally classified as local roads or rural minor collectors.

23 U.S.C. 101(a).

II. NONDISCRIMINATION (23 CFR 230.107(a); 23 CFR Part 230, Subpart A, Appendix A; EO 11246)

The provisions of this section related to 23 CFR Part 230, Subpart A, Appendix A are applicable to all Federal-aid construction contracts and to all related construction subcontracts of $10,000 or more. The provisions of 23 CFR Part 230 are not applicable to material supply, engineering, or architectural service contracts.

In addition, the contractor and all subcontractors must comply with the following policies: Executive Order 11246, 41 CFR Part 60, 29 CFR Parts 1625-1627, 23 U.S.C. 140, Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794), Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C.

2000d et seq.), and related regulations including 49 CFR Parts 21, 26, and 27; and 23 CFR Parts 200, 230, and 633.

The contractor and all subcontractors must comply with: the requirements of the Equal Opportunity Clause in 41 CFR 60- 1.4(b) and, for all construction contracts exceeding $10,000, the Standard Federal Equal Employment Opportunity Construction Contract Specifications in 41 CFR 60-4.3.

Note: The U.S. Department of Labor has exclusive authority to determine compliance with Executive Order 11246 and the policies of the Secretary of Labor including 41 CFR Part 60, and 29 CFR Parts 1625-1627. The contracting agency and the FHWA have the authority and the responsibility to ensure compliance with 23 U.S.C. 140, Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794), and Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C.

2000d et seq.), and related regulations including 49 CFR Parts 21, 26, and 27; and 23 CFR Parts 200, 230, and 633.

The following provision is adopted from 23 CFR Part 230, Subpart A, Appendix A, with appropriate revisions to conform to the U.S. Department of Labor (US DOL) and FHWA requirements.

1. Equal Employment Opportunity: Equal Employment Opportunity (EEO) requirements not to discriminate and to take affirmative action to assure equal opportunity as set forth under laws, executive orders, rules, regulations (see 28 CFR Part 35, 29 CFR Part 1630, 29 CFR Parts 1625-1627, 41 CFR Part 60 and 49 CFR Part 27) and orders of the Secretary of Labor as modified by the provisions prescribed herein, and imposed pursuant to 23 U.S.C. 140, shall constitute the EEO and specific affirmative action standards for the contractor's project activities under this contract. The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) set forth under 28 CFR Part 35 and 29 CFR Part 1630 are incorporated by reference in this contract. In the execution of this contract, the contractor agrees to comply with the following minimum specific requirement activities of EEO:

a. The contractor will work with the contracting agency and the Federal Government to ensure that it has made every good faith effort to provide equal opportunity with respect to all of its terms and conditions of employment and in their review of activities under the contract. 23 CFR 230.409 (g)(4) & (5).

b. The contractor will accept as its operating policy the following statement:

"It is the policy of this Company to assure that applicants are employed, and that employees are treated during employment, without regard to their race, religion, sex, sexual orientation, gender identity, color, national origin, age or disability. Such action shall include: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship, pre-apprenticeship, and/or on-the-job training."

2. EEO Officer: The contractor will designate and make known to the contracting officers an EEO Officer who will have the responsibility for and must be capable of effectively administering and promoting an active EEO program and who must be assigned adequate authority and responsibility to do so.

3. Dissemination of Policy: All members of the contractor's staff who are authorized to hire, supervise, promote, and discharge employees, or who recommend such action or are substantially involved in such action, will be made fully cognizant of and will implement the contractor's EEO policy and contractual responsibilities to provide EEO in each grade and classification of employment. To ensure that the above agreement will be met, the following actions will be taken as a minimum:

a. Periodic meetings of supervisory and personnel office employees will be conducted before the start of work and then not less often than once every six months, at which time the contractor's EEO policy and its implementation will be reviewed and explained. The meetings will be conducted by the EEO Officer or other knowledgeable company official.

b. All new supervisory or personnel office employees will be given a thorough indoctrination by the EEO Officer, covering all major aspects of the contractor's EEO obligations within thirty days following their reporting for duty with the contractor.

c. All personnel who are engaged in direct recruitment for the project will be instructed by the EEO Officer in the contractor's procedures for locating and hiring minorities and women.

d. Notices and posters setting forth the contractor's EEO policy will be placed in areas readily accessible to employees, applicants for employment and potential employees.

e. The contractor's EEO policy and the procedures to implement such policy will be brought to the attention of employees by means of meetings, employee handbooks, or other appropriate means.

4. Recruitment: When advertising for employees, the contractor will include in all advertisements for employees the notation: "An Equal Opportunity Employer." All such advertisements will be placed in publications having a large circulation among minorities and women in the area from which the project work force would normally be derived.

a. The contractor will, unless precluded by a valid bargaining agreement, conduct systematic and direct recruitment through public and private employee referral sources likely to yield qualified minorities and women. To meet this requirement, the contractor will identify sources of potential minority group employees and establish with such identified sources procedures whereby minority and women applicants may be referred to the contractor for employment consideration.

b. In the event the contractor has a valid bargaining agreement providing for exclusive hiring hall referrals, the contractor is expected to observe the provisions of that agreement to the extent that the system meets the contractor's compliance with EEO contract provisions. Where implementation of such an agreement has the effect of discriminating against minorities or women, or obligates the contractor to do the same, such implementation violates Federal nondiscrimination provisions.

c. The contractor will encourage its present employees to refer minorities and women as applicants for employment.

Information and procedures with regard to referring such applicants will be discussed with employees.

5. Personnel Actions: Wages, working conditions, and employee benefits shall be established and administered, and personnel actions of every type, including hiring, upgrading, promotion, transfer, demotion, layoff, and termination, shall be taken without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age or disability.

The following procedures shall be followed:

a. The contractor will conduct periodic inspections of project sites to ensure that working conditions and employee facilities do not indicate discriminatory treatment of project site personnel.

b. The contractor will periodically evaluate the spread of wages paid within each classification to determine any evidence of discriminatory wage practices.

c. The contractor will periodically review selected personnel actions in depth to determine whether there is evidence of discrimination. Where evidence is found, the contractor will promptly take corrective action. If the review indicates that the discrimination may extend beyond the actions reviewed, such corrective action shall include all affected persons.

d. The contractor will promptly investigate all complaints of alleged discrimination made to the contractor in connection with its obligations under this contract, will attempt to resolve such complaints, and will take appropriate corrective action within a reasonable time. If the investigation indicates that the discrimination may affect persons other than the complainant, such corrective action shall include such other persons. Upon completion of each investigation, the contractor will inform every complainant of all of their avenues of appeal.

6. Training and Promotion:

a. The contractor will assist in locating, qualifying, and increasing the skills of minorities and women who are applicants for employment or current employees. Such efforts should be aimed at developing full journey level status employees in the type of trade or job classification involved.

b. Consistent with the contractor's work force requirements and as permissible under Federal and State regulations, the contractor shall make full use of training programs (i.e., apprenticeship and on-the-job training programs for the geographical area of contract performance). In the event a special provision for training is provided under this contract, this subparagraph will be superseded as indicated in the special provision. The contracting agency may reserve training positions for persons who receive welfare assistance in accordance with 23 U.S.C. 140(a).

c. The contractor will advise employees and applicants for employment of available training programs and entrance requirements for each.

d. The contractor will periodically review the training and promotion potential of employees who are minorities and women and will encourage eligible employees to apply for such training and promotion.

7. Unions: If the contractor relies in whole or in part upon unions as a source of employees, the contractor will use good faith efforts to obtain the cooperation of such unions to increase opportunities for minorities and women. 23 CFR

230.409. Actions by the contractor, either directly or through a contractor's association acting as agent, will include the procedures set forth below:

a. The contractor will use good faith efforts to develop, in cooperation with the unions, joint training programs aimed toward qualifying more minorities and women for membership in the unions and increasing the skills of minorities and women so that they may qualify for higher paying employment.

b. The contractor will use good faith efforts to incorporate an EEO clause into each union agreement to the end that such union will be contractually bound to refer applicants without regard to their race, color, religion, sex, sexual orientation, gender identity, national origin, age, or disability.

c. The contractor is to obtain information as to the referral practices and policies of the labor union except that to the extent such information is within the exclusive possession of the labor union and such labor union refuses to furnish such information to the contractor, the contractor shall so certify to the contracting agency and shall set forth what efforts have been made to obtain such information.

d. In the event the union is unable to provide the contractor with a reasonable flow of referrals within the time limit set forth in the collective bargaining agreement, the contractor will, through independent recruitment efforts, fill the employment vacancies without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, or disability;

making full efforts to obtain qualified and/or qualifiable minorities and women. The failure of a union to provide sufficient referrals (even though it is obligated to provide exclusive referrals under the terms of a collective bargaining agreement) does not relieve the contractor from the requirements of this paragraph. In the event the union referral practice prevents the contractor from meeting the obligations pursuant to Executive Order 11246, as amended, and these special provisions, such contractor shall immediately notify the contracting agency.

8. Reasonable Accommodation for Applicants / Employees with Disabilities: The contractor must be familiar with the requirements for and comply with the Americans with Disabilities Act and all rules and regulations established thereunder. Employers must provide reasonable accommodation in all employment activities unless to do so would cause an undue hardship.

9. Selection of Subcontractors, Procurement of Materials and Leasing of Equipment: The contractor shall not discriminate on the grounds of race, color, religion, sex, sexual orientation, gender identity, national origin, age, or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

a. The contractor shall notify all potential subcontractors, suppliers, and lessors of their EEO obligations under this contract.

b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

10. Assurances Required:

a. The requirements of 49 CFR Part 26 and the State DOT’s FHWA-approved Disadvantaged Business Enterprise (DBE) program are incorporated by reference.

b. The contractor, subrecipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate, which may include, but is not limited to:

(1) Withholding monthly progress payments;

(2) Assessing sanctions;

(3) Liquidated damages; and/or

(4) Disqualifying the contractor from future bidding as non-responsible.

c. The Title VI and nondiscrimination provisions of U.S.

DOT Order 1050.2A at Appendixes A and E are incorporated by reference. 49 CFR Part 21.

11. Records and Reports: The contractor shall keep such records as necessary to document compliance with the EEO requirements. Such records shall be retained for a period of three years following the date of the final payment to the contractor for all contract work and shall be available at reasonable times and places for inspection by authorized representatives of the contracting agency and the FHWA.

a. The records kept by the contractor shall document the following:

(1) The number and work hours of minority and non-minority group members and women employed in each work classification on the project;

(2) The progress and efforts being made in cooperation with unions, when applicable, to increase employment opportunities for minorities and women; and

(3) The progress and efforts being made in locating, hiring, training, qualifying, and upgrading minorities and women.

b. The contractors and subcontractors will submit an annual report to…