About this file

This combined synopsis/solicitation from the Department of Agriculture Forest Service requests proposals for habitat improvement projects under solicitation number 12363N23Q4286. The agency seeks to award contracts for services including site preparation, tree planting, invasive species removal and other habitat restoration work. Responses are due by April 15th, 2023 and the period of performance for awarded contracts will be one base year with four optional one-year extensions. Small businesses and HUBZone, veteran-owned, service-disabled veteran-owned, and women-owned small businesses are encouraged to apply. Pricing will be on a firm-fixed-price basis for individual task orders issued against the contracts.

View the file

Other files for this federal contract opportunity

Other files attached to CadMan Habitat Improvement, newest first.
File Type Posted
MAP REVISION FOR 12363NQ4286 CADMAN HABITAT IMPROVEMENT.pdf PDF
Cadman 12363N23Q4286 questions and Answers.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

Combined Synopsis and Solicitation

Request for Quote #12363N23Q4286 **MUST BE REGISTERED IN SAM (www.sam.gov) TO BE ELIGIBLE FOR AWARD**

Payment will be made via EFT. Invoice using IPP.Gov

FOB: X Destination Origin

Set Aside For: Large Small

Woman- Owned SDVOSB Hubzone 8(a)

(Please check all that apply)

NAICS Code: Size Standard:

Delivery address

Date and time needed

**MUST HAVE ALL INFO BELOW**

Company Name:

Vendor Rep:

Phone:

Email:

Mailing Address:

UEI SAM #

**QUOTES ARE DUE BY: 08/18/2023 by 1:30PM EST**

Questions are due by 08/15/2023 COB.

115310 34 MILLION

USDA FOREST SERVICE

Stewardship Branch

12363N23Q4286 R-9 CadMan Habitat Improvement Page 1 of 31 http://www.sam.gov/

Solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2023-04

The full text of FAR provisions or clauses may be accessed electronically at https://www.acquisition.gov/

The following contract clauses apply to this acquisition:

FAR 52.212-4, “Contract Terms and Conditions–Commercial Items” FAR 52.212-5, “Contract Terms and Conditions Required to Implement Statutes or Executive Orders”

The following subparagraphs of FAR 52.212-5 are applicable:

• 52.219-6 Notice of Total Small Business Set-Aside.

52.219-28 Post-Award Small Business Program Representation.

• 52.222-3 Convict Labor.

• 52.222-19 Child Labor---Cooperation with Authorities and Remedies.

• 52.222-21 Prohibition of Segregated Facilities.

• 52.222-26 Equal Opportunity.

• 52.222-36 Equal Opportunity for Workers with Disabilities.

• 52.222-41 Service Contract Labor Standards.

• 52.222-42 Statement of Equivalent Rates for Federal Hires.

Grade: 9 Pay: $27.37 hr

• 52.222-50 Combating Trafficking in Persons.

• 52.222-55 Minimum Wages Under Executive Order 13658.

• 52.222-62 Paid Sick Leave Under Executive Order 13706.

• 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving

• 52.225-1 Buy American -- Supplies.

The offeror certifies that the following end products are qualifying country end products:

Line Item No.: Country of Origin:

• 52.225-13 Restrictions on Certain Foreign Purchases.

• 52.232-33 Payment by Electronic Funds Transfer—System for Award Management.

• 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards.

• 52.209-6, Protecting the Government's Interests When Subcontracting with Contractors Debarred, Suspended or Proposed.

• 52.225-3 Buy American -- Free Trade Agreements -- Israeli Trade Act.

Over 150K

• 52.219-14 Limitations on Subcontracting.

• 52.222-35 Equal Opportunity Veterans.

• 52.222-37 Employment Reports on Veterans.

12363N23Q4286 R-9 CadMan Habitat Improvement Page 2 of 31 https://www.acquisition.gov/

ADDENDUM TO FAR CLAUSE 52.212-4, CONTRACT TERMS AND CONDITIONS—

COMMERCIAL ITEMS (INCORPORATED BY REFERENCE ON STANDARD FORM 1449)

• 52.204-18 Commercial and Government Entity Code Maintenance

• 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

• 52.232-40 Providing Accelerated Payments to Small Business Subcontractors.

(End of clause)

12363N23Q4286 R-9 CadMan Habitat Improvement Page 3 of 31

SCHEDULE OF ITEMS

ITEM

NUMBER

DESCRIPTION QUANTITY

UNIT PRICE

(Price per site or acre)

TOTAL AMOUNT

(Quantity x Unit

Price)

Base #1. Planting Potted

Trees/Shrubs

5 Planting

Sites (50 trees total)

$______/Site $_____________

Optional #1. Planting Potted

Trees/Shrubs

50 Planting

Sites (500 trees total)

$______/Site $_____________

Base #2.

Planting and

Protecting Potted

Trees/Shrubs

5 Planting and

Protecting

Sites (50 trees total)

$______/Site $_____________

Optional #2.

Planting and

Protecting Potted

Trees/Shrubs

60 Planting

Sites (600 trees total)

$______/Site $_____________

Base #3. Tree felling ≤18”

DBH

6 Tree felling sites (60 trees total)

$______/Site $_____________

Base #4. Mechanical Brushing

≤ 6” DBH and Piling 26 Acres $_______/Acre $_____________

Optional

#4.

Mechanical Brushing

≤ 6” DBH and Piling 14 Acres $_______/Acre $_____________

Base #5.

Mechanical Brushing

≤ 3” DBH

30 Acres $______/Acre $_____________

12363N23Q4286 R-9 CadMan Habitat Improvement Page 4 of 31

Table 1 continued.

ITEM

NUMBER

DESCRIPTION QUANTITY

UNIT PRICE

(Price per site or acre)

TOTAL AMOUNT

(Quantity x Unit

Price)

Optional

#5.

Mechanical Brushing

≤ 3” DBH

10 Acres $______/Acre $_____________

Base #6.

Brushing ≤ 3” DBH and herbicide

5 Acres $______/Acre $_____________

Optional

#6.

Brushing ≤ 3” DBH and herbicide 14 Acres $______/Acre $_____________

Base #7.

Mechanical and/or

Manual Tree Felling ≤

10” DBH and Piling

4 Acres $______/Acre $_____________

Optional

#7.

Mechanical and/or

Manual Tree Felling ≤

10” DBH and Piling

4 Acres $______/Acre $_____________

Attachments

Incorporated Provisions/Clauses Statement of Work

Maps

Wage Determination

- Lake, Mason, Manistee, Wexford Counties

CONTRACTING OFFICER’S REPRESENTATIVE (COR)

A COR will be designated to represent the Contracting Officer for the duration of this task order. The COR is not authorized to make any commitments or changes that will affect price, quality, quantity, delivery, or any other term or condition of the contract.

RETURN TO:

USDA/Forest Service Procurement and Property Services (PPS)

ATTN:

Darlene Chase Contracting Specialist Darlene.Chase@usda.gov

Site Visit Information: There is No formal site visit scheduled. Offerors shall quote in accordance with the SOW.

Quotes shall be valid for a minimum of 60 calendar days after submission.

12363N23Q4286 R-9 CadMan Habitat Improvement Page 5 of 31

STATEMENT OF WORK

Item #1. Planting Potted Trees/Shrubs

Logistics:

The COR will provide Contractor with planting site maps at least 14 days prior to the scheduled

Prework Meeting between the Government and the Contractor. During the prework meeting, the

COR will provide the Contractor with directions on how to receive the Government-furnished potted trees/shrubs from the Cadillac-Manistee Ranger Station in Wellston, Michigan.

Navigating to and locating planting sites is the responsibility of the Contractor. Individual planting sites are located within 0.5 miles of a Forest Service road (i.e., high clearance 4WD

“two tracks”). Access to planting areas located away from roads must be done on foot, without the use of motorized all-terrain or 4-wheel drive vehicles. At each planting site, the Contractor will plant 10 potted trees/shrubs. Within the planting site, individual tree/shrub planting locations will be marked with flagging and/or pin flags a minimum of 14 days prior to start of work. The work shall be completed between March 15, 2024 and May 31, 2024, but planting may only occur when snow is not present at planting sites. The Contractor will notify COR when planting is complete. To evaluate survival, final inspection will occur 7-14 days after Contractor notifies

COR planting is complete.

The following technical specifications must be met for an acceptable level of work:

a) Contractor will pick-up Government furnished property from the Cadillac-Manistee

Ranger Station/COR after a Notice to Proceed has been issued by Contracting Officer.

Contractor will maintain a record of when trees/shrubs are picked up and when they are planted. To maximize survival trees/shrubs must be planted within 48 hours (unless specified otherwise by the COR) of being picked up.

b) Contractor is responsible for tree/shrub survival during transport and planting. Care must be taken by the Contractor to keep roots hydrated and not damage trees when moving or planting them. Improper handling resulting in tree mortality or damage (including drying out) is unacceptable.

c) 10 Trees/shrubs will be planted by Contractor at each planting site. Contractor will make every effort to plant as close to the flagging and/or pin flags as possible. Minimum spacing between trees is 10 feet.

d) Contractor will perform the following for all planted trees/shrubs:

i. Clear existing vegetation and debris in a 36-inch diameter circle not exceeding 4-inch depth at planting site.

ii. Dig planting hole slightly larger than the size of the tree/shrub pots. Hole will consist of primarily mineral soil and be free of debris, foreign material, or excessive organic matter. Add 1.5 teaspoons of Government furnished soil moisture granules to hole.

12363N23Q4286 R-9 CadMan Habitat Improvement Page 6 of 31

iii. Gently remove tree/shrub from pot and agitate bottom of roots before planting.

Firmly pack soil around planted tree/shrub roots removing any air pockets.

Trees/shrubs will be planted so the root flare is slightly above or at the soil surface.

iv. Water each tree/shrub with 1.0 gallon of water after planting.

v. Install Government furnished tree ring mat at base of tree/shrub on top of cleared area.

vi. Place a Government furnished wooden stake 2’ from each planted tree/shrub.

e) 95% of planted trees/shrubs must be alive and 100% of trees/shrubs must be correctly planted/protected at the time of the COR’s final inspection. Alive is defined as pliable, green colored foliage, and/or green colored cambium.

Item #2. Planting and Protecting Potted Trees/Shrubs

Logistics:

The COR will provide Contractor with planting site maps at least 14 days prior to the scheduled

Prework Meeting between the Government and the Contractor. During the prework meeting, the

COR will provide the Contractor with directions on how to receive the Government-furnished potted trees/shrubs and caging materials from the Cadillac-Manistee Ranger Station in Wellston, Michigan. Navigating to and locating planting sites is the responsibility of the Contractor.

Individual planting sites are located within 0.5 miles of a Forest Service road (i.e., high clearance

4WD “two tracks”). Access to planting areas located away from roads must be done on foot, without the use of motorized all-terrain or 4-wheel drive vehicles. At each planting site, the

Contractor will plant and protect 10 potted trees/shrubs. Within the planting site, COR will mark individual tree/shrub planting locations with flagging and/or pin flags a minimum of 14 days prior to start of work. The work shall be completed between March 15, 2024 and May 31, 2024, but planting may only occur when snow is not present at planting sites. The Contractor will notify COR when planting is complete. To evaluate survival, final inspection will occur 7-14 days after Contractor notifies COR planting is complete.

The following item-specific technical specifications must be met for an acceptable level of work:

a) Contractor will pick-up Government furnished property from the Cadillac-Manistee

Ranger Station/COR after a Notice to Proceed has been issued by Contracting Officer.

Contractor will maintain a record of when trees/shrubs are picked up and when they are planted. To maximize survival trees/shrubs must be planted within 48 hours (unless specified otherwise by the COR) of being picked up.

b) Contractor is responsible for tree/shrub survival during transport and planting. Care must be taken by the Contractor to keep roots hydrated and not damage trees when moving or planting them. Improper handling resulting in tree mortality or damage (including drying out) is unacceptable.

12363N23Q4286 R-9 CadMan Habitat Improvement Page 7 of 31

f) 10 Trees/shrubs will be planted by Contractor at each planting site. Contractor will make every effort to plant as close to the flagging and/or pin flags as possible. Minimum spacing between trees is 10 feet.

c) Contractor will perform the following for all planted trees/shrubs:

i. Clear existing vegetation and debris in a 36-inch diameter circle not exceeding 4-inch depth at planting site.

ii. Dig planting hole slightly larger than the size of the tree/shrub pots. Hole will consist of primarily mineral soil and be free of debris, foreign material, or excessive organic matter. Add 1.5 teaspoons of Government furnished soil moisture granules to hole.

iii. Gently remove tree/shrub from pot and agitate bottom of roots before planting.

Firmly pack soil around planted tree/shrub roots removing any air pockets.

Trees/shrubs will be planted so the root flare is slightly above or at the soil surface.

iv. Water each tree/shrub with 1.0 gallon of water after planting.

v. Install Government furnished tree ring mat at base of tree/shrub on top of cleared area.

d) At the time of planting, Contractor will use Government furnished supplies to install a

36” wide circular cage (14 gauge galvanized fencing or poly deer fence) around planted trees/shrubs. Cage height will range from 5’ to 6’. Cages will be flush with ground and affixed to ground using Government furnished hardware. Cages will be affixed to a T-post at three points with zip-ties and T-post shall be driven into the ground 16” to 24” deep.

e) 95% of planted trees must be alive and 100% of trees/shrubs must be correctly planted/protected at the time of the COR’s final inspection. Alive is defined as pliable, green colored foliage, and/or green colored cambium.

Item #3. Tree Felling ≤ 18” DBH

Logistics:

The COR will provide the Contractor with tree felling site maps at least 14 days prior to the scheduled Prework Meeting between the Government and the Contractor. Navigating to and locating tree felling sites is the responsibility of the Contractor. Individual tree felling sites are located within 0.5 miles of a County Road. Access to tree felling sites must be done on foot, without the use of motorized all-terrain or 4-wheel drive vehicles. Within the tree felling site, the

COR will mark 10 individual trees between 8” and 18” DBH with flagging/paint a minimum of

14 days prior to start of work. The COR may also mark each tree to indicate the direction it should be felled. The 10 individual trees at a tree felling site will be close to and within sight of one another. The work shall be completed between November 1, 2023 and April 14, 2024.

The following items are required for an acceptable level of work:

12363N23Q4286 R-9 CadMan Habitat Improvement Page 8 of 31

(a) The Contractor will fell individually marked trees in a directional manner according to the COR’s marking scheme. After felling, the crown of the tree must be in contact with the ground and the tree cannot be suspended from shrubs, trees, or snags. It is acceptable to suspend crown on other individually marked trees that have previously been felled. If the Contractor identifies hazards/concerns related to felling specific individually marked trees, they may request that alternate tree(s) be selected by the COR. If approved, alternate trees selected by the COR will be adjacent to the same felling site and will be of similar DBH. Work must be completed via hand cutting (e.g., chainsaws).

(b) Stumps must be left no greater than 6 inches above the ground.

(c) Do not cut or damage reserve or protected species as identified by the COR.

Item #4. Mechanical Brushing ≤ 6” DBH and Piling

Logistics:

COR will provide Contractor with job area maps at least 14 days prior to the scheduled

Prework Meeting between the Government and the Contractor. Navigating to and locating job areas is the responsibility of the Contractor. The use of mechanical equipment is allowed.

Individual job areas occur within 0.5 miles of Forest Service or County roads. Job areas may require contractors to operate the equipment off-road to access the job areas. Off-road access routes from roads to job areas will be identified and marked in advance by COR. Alternate off-road access routes requested by the Contractor must be approved by the COR. Any

Contractor requests to cut vegetation, move woody debris, or otherwise modify off-road access routes must be approved by the COR. Job area boundaries will be delineated by the

COR with flagging and/or paint at least 14 days prior to start of work. Individual reserve trees, shrubs or reserve islands of trees/shrubs will be marked with flagging and/or paint by the COR at least 14 days prior to the start of work. The work shall be completed between

August 25, 2023 and April 14, 2024.

The following items are required for an acceptable level of work:

a) Contractor will use motorized vehicles/mechanical equipment, including but not limited to masticator, tractor, bobcat, brush hog, and/or hand tools including but not limited to chainsaws and brush saws to cut all deciduous and conifer woody species >1” DBH and

≤ 6” DBH. It is acceptable if woody stems or vegetation <1” DBH are damaged or cut during the brushing process.

b) Stumps must be left no greater than 6 inches above the ground.

c) All woody stems cut during the brushing process must be consolidated into brush piles at

COR-specified locations within the job area OR must be run through a brush hog or forestry mulching attachment head. If run through a brush hog or forestry mulching

12363N23Q4286 R-9 CadMan Habitat Improvement Page 9 of 31 head, brush must, at a minimum, be severed from the stump, be de-limbed, and lay within

6” of the ground. If piled, brush piles must occupy a minimum area of 15’ length by 15’ width by 6’ but not exceed 25’ length by 25’ width by 15’ height. Brush piles must be constructed so slash is packed down with adequate density that piles are not able to be seen through.

d) Do not cut or damage reserve or protected species or reserve islands as identified by the

COR.

e) Upon completion of work within the job area, off-road access routes will be closed by the

Contractor using natural materials present on site. Route closure will be done by placing brush piles at up to 3 locations flagged by the COR, typically the start, middle, and end points of the off-road access route. Route closure brush piles must be constructed to dimensions preventing an All-terrain and/or 4-Wheel Drive vehicles from traveling from the road to the job area along the Contractor’s off-road access route.

Item #5. Mechanical Brushing ≤ 3” DBH

Logistics:

COR will provide Contractor with job area maps at least 14 days prior to the scheduled

Prework Meeting between the Government and the Contractor. Navigating to and locating job areas is the responsibility of the Contractor. The use of mechanical equipment is required.

Individual job areas are located immediately adjacent to Forest Service or County. Contractor requests to cut vegetation, move woody debris, or otherwise modify off-road access routes must be approved by the COR. Job area boundaries will be delineated by the COR with flagging and/or paint at least 14 days prior to start of work. Individual reserve trees, shrubs or reserve islands of trees/shrubs will be marked with flagging and/or paint by the COR at least

14 days prior to the start of work. If there is question about where the job area boundary or reserve trees/shrubs/islands, contact the COR for clarification. The work shall be completed between August 25, 2023 and April 14, 2024.

The following item-specific technical specifications must be met for an acceptable level of work:

a) The Contractor will use mechanical equipment (e.g., skidsteers, hydro-axes, fecon, brush hog, bobcats, tractors, masticators, mulching attachment) to brush all herbaceous vegetation and woody vegetation > 24” tall and ≤ 3” DBH within the job areas. The brushing process should effectively mulch, chip, de-limb, and/or shred woody vegetation woody vegetation > 24” tall and ≤ 3”. After the brushing process, brush must, at a minimum, be severed from the stump, be de-limbed, and lay within 6” of the ground.

f) Upon completion of work within the job area, off-road access routes will be closed by the

Contractor using natural materials present on site. Route closure will be done by placing brush piles at up to 3 locations flagged by the COR, typically the start, middle, and end

12363N23Q4286 R-9 CadMan Habitat Improvement Page 10 of 31 points of the off-road access route. Route closure brush piles must be constructed to dimensions preventing an All-terrain and/or 4-Wheel Drive vehicles from traveling from the road to the job area along the Contractor’s off-road access route.

Item #6. Brushing ≤ 3” DBH and Herbicide

Logistics:

COR will provide Contractor with job area maps at least 14 days prior to the scheduled

Prework Meeting between the Government and the Contractor. Navigating to and locating job areas is the responsibility of the Contractor. Individual job areas occur within 0.25 miles of a County road. Access to job areas located away from roads must be done on foot, without the use of motorized all-terrain or 4-wheel drive vehicles. Job area boundaries will be delineated by the COR with flagging and/or paint at least 14 days prior to start of work.

Individual reserve trees, shrubs or reserve islands of trees/shrubs will be marked with flagging and/or paint by the COR at least 14 days prior to the start of work. If there is question about where the job area boundary or reserve trees/shrubs/islands, contact the COR for clarification. The work shall be completed between October 16, 2023 and March 14, 2024.

The following items are required for an acceptable level of work:

a) The contractor will use hand tools (e.g., Brush cutter saws, chainsaws, loppers, etc.) to cut all deciduous (non-pine) stems > 24” tall and ≤ 3” DBH, except white oak. White oak stems do not need to be cut or treated with herbicide, but it is acceptable if they are damaged while cutting other species. Upon completion, cut stem height will be <6” from the ground.

b) Hand operated equipment will be used to spot apply glyphosate or triclopyr and dye on all cut stems within 5 minutes of cutting, Or Methylated Seed Oil may be used as a carrier and stumps can be treated with herbicide and dye within 14 days of cutting.

Petroleum based carriers are not acceptable.

c) Contractor will maintain a current State of Michigan commercial pesticide applicators business license and all applicators will have current State of Michigan herbicide certification and be certified for the type of habitat(s) required for this contract.

Contractor will provide a copy of license/certifications upon request of the COR.

d) Application operations shall be conducted as indicated on the herbicide label, including approved concentrations, rates/acre, and environmental conditions. Only chemicals approved for aquatic use shall be used adjacent to waterways and wetlands or whenever directed. Aquatic approved chemicals include the aquatic formulation of glyphosate

(Rodeo® or equivalent product).

12363N23Q4286 R-9 CadMan Habitat Improvement Page 11 of 31

e) Herbicide dye will be used according to manufacturing label.

f) The Contractor will provide a written Safety Plan that demonstrates how the Contractor will ensure a safe work environment for themselves and their employees, including a chemical spill plan documenting procedures in the event of a chemical spill on-site or in transport. The Contractor is responsible for the cleanup of any spills and will notify the

COR immediately of any spills. The Contractor must have herbicide labels and copies of material safety data sheets (MSDS) of chemicals used on site. The Contractor must provide copies of MSDS of chemicals to the COR prior to the start of work.

g) The Contractor will maintain an accurate daily log record of herbicide used in each area as described below. Other minimum record requirements include copies of hazardous material handling certificates, copies of material safety data sheets (MSDS) of chemicals used, and the location of the waste site and/or use destination locations. The Daily Log must record the Contract Line Item, target plant species, chemical used (product name and EPA registration number), quantity of herbicide (volume applied & unit of measure – including product and carrier/dilutant), application rate (active ingredient applied & unit of measure), and adjuvant used (product name & rate applied, if any). The log will record weather information consisting of wind velocity (MPH), wind direction, air temperature (F), condition (cloud cover), relative humidity (RH), and precipitation

(inches). Other log requirements include date, time of day (start time and stop time), treatment location, approximate acres treated, hours to complete task, type of application

(method/technique), color of dye used on job area, name of certified applicators, type of equipment used, plus optional information such as any other miscellaneous notes or observations. All treatment daily logs and summary log must be completed separately for each job area that herbicide is applied to such that total volume of herbicide can be determined for that land unit. A copy must be made available to the Forest Service upon request.

h) Contractor will place caution signs around sprayed areas according to the appropriate interval per label directions of the chemical used. Signage will be removed after treatment is completed.

i) Contractor will conduct treatments at a sufficient interval and concentration to meet or exceed the kill rate ranging from 85-90% for target undesirable vegetation, and with no mortality to nearby non-target plants because of inadvertent treatment or overspray of herbicides.

j) All herbicide applicator staff must be able to identify target species in the field, including during dormant seasons, to a sufficient degree to avoid mortality of desirable non-target plant species and to meet minimum kill rates to target species.

Item #7. Mechanical and/or Manual Tree Felling ≤ 10” DBH and Piling

Logistics:

12363N23Q4286 R-9 CadMan Habitat Improvement Page 12 of 31

COR will provide Contractor with job area maps at least 14 days prior to the scheduled

Prework Meeting between the Government and the Contractor. Navigating to and locating job areas is the responsibility of the Contractor. The use of mechanical equipment is allowed.

Individual job areas occur within 0.25 miles of Forest Service roads. Off-road access routes from roads to job areas will be identified and marked in advance by COR. Alternate off-road access routes requested by the Contractor must be approved by the COR. Contractor requests to cut vegetation, move woody debris, or otherwise modify off-road access routes must be approved by the COR. Job area boundaries will be delineated by the COR with flagging and/or paint at least 14 days prior to start of work. Individual reserve trees, shrubs or reserve islands of trees/shrubs will be marked with flagging and/or paint by the COR at least 14 days prior to the start of work. If there is question about where the job area boundary or reserve trees/shrubs/islands, contact the COR for clarification. The work shall be completed between October 1, 2023 and April 14, 2024.

The following items are required for an acceptable level of work:

a) Contractor will use mechanical equipment to cut all live trees and shrubs >1” DBH and ≤

10” DBH. Live trees may be uprooted whole (e.g., excavator or dozer) and piled OR trees may be cut first followed by removal of stump and rootwad. Soil disturbance from uprooting the trees must be rehabilitated so that the stump hole is filled and exposed soil from each stump location does not exceed an 8’ by 8’ area. For coniferous tree species

(e.g., pine), removal of the stump and rootwad is not required but cut stumps must be ≤6” from the ground.

b) All woody stems cut or uprooted during the treatment process must be consolidated into brush piles at COR-specified locations within the job area. Brush piles must occupy a minimum area of 15 feet length by 15 feet width by 6’ height but not exceed 25’ length by 25’ width by 15’ height. Brush piles must be constructed so slash is packed down with adequate density that piles are not able to be seen through.

g) Upon completion of work within the job area, off-road access routes will be closed by the

Contractor using natural materials present on site. Route closure will be done by placing brush piles at up to 3 locations flagged by the COR, typically the start, middle, and end points of the off-road access route. Route closure brush piles must be constructed to dimensions preventing an All-terrain and/or 4-Wheel Drive vehicles from traveling from the road to the job area along the Contractor’s off-road access route.

3.2 General Technical Requirements (Applicable to all Items)

(a) Job Area Prioritization - The Contractor may be required to treat certain Forest Service specified job areas prior to others. This information will be given to the Contractor at least 14 days before the start of work and will be reviewed at the Pre-Work Meeting.

12363N23Q4286 R-9 CadMan Habitat Improvement Page 13 of 31

(b) Communication Expectations/Anti-Procrastination Clause – Before a Notice to Proceed is issued, the Contractor will provide the COR with a written Schedule of Work stating when the Contractor intends to begin to perform the work, where the work will begin, and scheduled progression through job areas. The Contractor is required to inform the

COR at least 7 days in advance before beginning work. Cancellations or rescheduling by the contractor, shall be done in writing by the Contractor, at least 7 days in advance. If the Contractor cancels or postpones scheduled meetings, equipment inspections, or start dates, it may result in the COR requiring an additional 7 days before he/she is available to meet with contractor or conduct equipment inspections and thus start dates may be delayed but the Period of Performance will remain the same.

Procrastination by the Contractor will not be grounds for an extension.

Procrastination is defined as waiting to begin work until the last 21 days of the Period of

Performance.

(c) Protected Wildlife, Vegetation, and Cultural Resource Sites – Avoid harming or harassing any wildlife species encountered during contract activities. Protected plant, wildlife, and/or cultural resource sites will be identified and flagged off on a site-by-site basis by the COR and will be discussed during the pre-work conference. Communicate all concerns/discoveries relating to wildlife, vegetation, and cultural resource sites to the

COR immediately before continuing work.

(d) Equipment Cleaning - To prevent the spread of non-native invasive species, the

Contractor’s equipment will be inspected prior to starting work with the Forest

Service. All equipment must be cleaned and free of brush, debris, mud, dirt, and plant parts including roots and seed prior to travel on Forest Service roads, before entering the first job area, and between moving from one job area to another. Methods of equipment cleaning may include, but are not limited to powerwashing, steam-cleaning, running through a car wash, or compressed air cleaning. The COR will inspect equipment upon being brought onto National Forest System lands for the first time, or subsequent times if the equipment is taken off site and returned.

(e) Herbicide Use - Herbicide transport, use, mixing, and disposal will comply with all federal, state, and local regulations. Herbicide solutions will be mixed at appropriate locations, not within wildlife openings, to eliminate the potential for spills in naturally vegetated areas. Application will not occur within 2 days of forecasted major rain events.

Install temporary signs at treated areas to notify visitors. Remove signs after treatment has concluded.

(f) Salvage - No cut materials are to be salvaged, sold, or collected.

(g) Snags – Standing dead trees or shrubs will not be cut or disturbed, unless they pose a hazard to operation. Discuss with COR before removing/felling any snags.

12363N23Q4286 R-9 CadMan Habitat Improvement Page 14 of 31

(h) Private Land – No activity or trespassing will occur on non-National Forest System lands. It is the Contractor’s responsibility to avoid trespassing. Contact the COR if there are any questions about job area boundaries.

(i) Personal Protective Equipment – Personal protective equipment (PPE) will be worn at all times while in job areas. Unsafe work practices could result in a ‘Stop Work’ order being issued by the Contracting Officer or further penalties.

Period of Performance: August 25, 2023, through August 24, 2024

12363N23Q4286 R-9 CadMan Habitat Improvement Page 15 of 31

S 2 7 R d

Ch ief

Rd th

Av e

N

R d

Millerton Rd

S 2 5 R d

N 1 R d N

Ja me s R d

M-

E Hansen Rd

Hibma Rd

0th

Av e th

Av e 60 th Av e th

Av e

N Tu ttl e R d

14 Mile Rd

0th

Av e

N

R d

E 36th St

N Tw in Cr ee k R d

7 Mile Rd

S 4 5 R d

La ko la Rd

Potter Rd

N Se ele y R d

W 26 Rd

W Beyer Rd

N St ep he ns R d

S 3 7 R d th

Av e

Lindy Rd

Norconk Rd

0th

Av e

W Hansen Rd

Little River Rd

N

R d

E 30 Rd

W Geers Rd

Via du ct Rd

Flarity Rd

E Hoague Rd

N Cu ste r R d

Brewer Rd

E 1 Mile Rd

W Arnold Rd

0th

Av e th

Av e

W Decker Rd Hansen Rd

W 16th St

Hulls Rd

E 46 Rd

S 4 3 R d

N

R d

W Stoney Corners Rd

W Kelly Rd

N Va nd erm eu len

R d

N Je ba vy

D r

W 40 Rd

W 46 Rd

S 3 5 R d

W 36 Rd

Lit ze n R d

W Finkle Rd

N

R d

Lin de rm an

R d th

Av e

Chauvez Rd

S 5 R d

11 Mile Rd

Feldhak Rd

E Freesoil Rd

Fox Trl

W 48 1/2 Rd

W US Highway 10

Chicago Ave

Springdale Rd

W Sanborn Rd

S 2 9 R d

Qu ar ter Li ne R d

Milks Rd

Read Rd

Burley

5398 Rd

N

R d

N Sk oc ela s R d

10 Mile Rd

Bo ss ch em

R d

W 8th St N

Ra ym on d R d

Elk Hwy

W 34 Rd

S 3 1 R d

NF-5015

E 8 Rd

E Chauvez Rd

Beall Rd

E 3 Mile Rd

E 9 Mile Rd

E 4 Rd

Good Rd

N Qu ee ns

H wy

Hi ll R d

E Barothy Rd

W Rhoby Rd

Dontz Rd

E 12 Mile Rd

W Sugar Grove Rd

Le ck ro ne

R d

Bern Dr

N

R d

Tim be r D r N

S B ry e R d

22 Mile Rd

N 33 Rd

Mi lar ch R d

S 15 Rd

Caberfae Hwy

N

R d E 24th St

W Fountain Rd

E 8th St

Up pe r R ive r R d

Er dm an R d

Taylor Rd

9 Mile Rd

E 40th St

N St

Elliott Rd

0th

Av e

S 3 3 R d

0th Av e

N Da rr Rd

S 4 9 R d

N

R d

W 50 Rd

W 3 Mile Rd

13 Mile Rd

M-115

Lumley Rd

N

1/ 2 R d

N Taylor Rd

E 32 Rd

N 3 R d

5th

Av e

US-10

8 Mile Rd

S B ur ke tt

Rd

0th

Av e

18 Mile Rd

Cedar Rd

N

R d

S 1 3 R d

M-

Pole Rd

N

R d

W Victory D

Tu sti n R d

W 4 Mile Rd

E 28 Rd

N 9 R d M-

12 Mile Rd

Makinen Rd

0th

Av e

N 7 R d

0th

Av e

N Br ow n R dN

R d

Ya tes

R d

S M cG ee R d

N Bl od ge tt R d

E 6 Rd W 4 Rd

W 1st St th

Av e

W Cadillac Rd12th St

N

R d

Mi lle r R d

E Johnson Rd

N Pe ac oc k T rl

Old M-63

N Ki ng s H wy

Beers Rd

E Wilson Rd N

R d

W 30 Rd

N

R d

St ate

R d

8th St

W Meyering Rd

N

R d

E County Line Rd

River Rd

N Lin co ln

Rd

S 3 R d th

Av e

0th

Av e

E 1st St

0th

Av e

US

-31

Ple tt

Rd

E Conrad Rd

E 10 Mile Rd

0th

Av e

M-

N St

0th

Av e

7 Mile Rd

M-55

La ko la Rd

M-

M-37

M-37 th

Av e

W 26 Rd

M-

13 Mile Rd th

Av e

9 Mile Rd

E 24th St

US-10

S 2 5 R d th

Av e

N

R d

N

R d

8 Mile Rd th

Av e

M-55

US-10

E 30 Rd

M-55

M 37

M-

M-115

Grant

M-55

0 25 5012.5 Miles

FY23 CadMan Wildlife Habitat Improvement Projects - Vicinity Map Base and Optional Items #1, #2, #3, #4, #5, #6, #7.

Manistee National Forest, Michigan Lake, Mason, Manistee, Wexford Counties

Base #3

Base and Optional #6

Base and Option Items 4,5

Base and Opt r ional Item #7

Option Item #5

Base and Option Items 1, 2

12363N23Q4286 R-9 CadMan Habitat Improvement Page 16 of 31

T21N,R11W

8 9

5273 5275 54

MI-55

USDA-FPAC in partnership with USFS-FS

Base and Option Item #1. Planting Potted Trees/Shrubs

(5 sites, 50 trees total in Base #1, 50 Sites, 500 trees total in Option Item #1) Base and Option Item #2. Planting and Protecting Potted Trees/Shrubs

(5 sites, 50 trees total in Base #2, 50 Sites, 500 trees total in Option Item #2) Wexford County, Henderson Township, T21N R11W Sect 8

N44.22881 W-85.66510

0 0.45 0.90.225 Miles

Legend Planting and Protecting Potted Trees/Shrubs Planting Potted Trees/Shrubs

12363N23Q4286 R-9 CadMan Habitat Improvement Page 17 of 31

OLD STRONACH RD

LITTLE RIVER RD

SOUTH COUNTY LINE RD

SIX

M

ILE

BR

IDG

E R

D

RY

BIC

KI

RD

Base Item #3. Tree felling <18" DBH

6 tree felling sites, 60 trees total Manistee County, Stronach Township, T21N R15W Sect 31

N44.17750 W-86.17776

0 0.45 0.90.225 Miles

All 60 trees to be felled are individually painted and within this 3 acre area

12363N23Q4286 R-9 CadMan Habitat Improvement Page 18 of 31

T22N,R10W

9 108

Woodward Lake

R

D

R

D

32 RD

34 RD

34 1/2 RD

AU

TU

MN

R

D

MI-115

USDA-FPAC in partnership with USFS-FS

Base Item #4. 26 Acres Total

Mechanical Brushing ≤ 6" and Piling Job Area 126-9, 10 acres , 44.27602 -85.53469 Job Area 137-36, 3 acres , 44.29910 -85.52489 Job Area 137-37, 4 acres , 44.30336 -85.52826 Job Area 137-38, 3 acres , 44.29984 -85.52909 Job Area 137-39, 6 acres , 44.29765 -85.52615

Wexford County, Selma Towns hip , T22N R10W Sect 16, 28

0 0.8 1.60.4 Miles

Job Area 126-9 Legend

Base Item #4

Private Land

Job Area 137-38

Job Area 137-39

Job Area 137-36

Job Area 137-37

12363N23Q4286 R-9 CadMan Habitat Improvement Page 19 of 31

T22N,R10W

R

D

34 RD

32 RD

MI-115

USDA-FPAC in partnership with USFS-FS

O p t i o n a l I t e m # 5 . J o b A r e a 1 3 3 - 8

M e c h a n i c a l B r u s h i n g ≤ 6" DBH and Piling 14 acres

Wexfo rd Co unty, Selma To w nship , T22N R10W Sect 21 N44.29049 W-85.53713

0 0.4 0.80.2 Miles

Legend Optional Item #4

Private Land

12363N23Q4286 R-9 CadMan Habitat Improvement Page 20 of 31

T21N,R12W

18 17

1 1 /2 R

D

HUSIER RD

1 1 /2

RD

MI

-37

MI-55

USDA-FPAC in partnership with USFS-FS

Base Item #5. Job Area 17-58

Mechanical Brushing <3" DBH 15 acres

Wexford County, South Branch Township, T21N R12W Sect 5 N44.24564 W-85.79316

0 0.6 1.20.3 Miles

Legend Base Item #5

12363N23Q4286 R-9 CadMan Habitat Improvement Page 21 of 31

T21N,R10W

Lake Mitchell

R

D

R

D

LAKE MITCHELL RD

SUNSET POINT RD

R

D

MI-55

USDA-FPAC in partnership with USFS-FS

Base Item #5. Job Area 124-3

Mechanical Brushing <3" DBH 9 acres

Wexford County, Cherry Grove Township, T21N R10W Sect 10 N44.23164 W-85.50854

0 0.55 1.10.275 Miles

Legend Base Item #5

12363N23Q4286 R-9 CadMan Habitat Improvement Page 22 of 31

T23N,R10W

21 22

28 27

16 15

9 7280

RD

20 RD

22 1/2 RD

22 RD

1/

2 R D

1/

4 R D

20 RD

USDA-FPAC in partnership with USFS-FS

Base Item #5. Job Area 150-4

Mechanical Brushing <3" DBH 6 acres

Wexford County, Colfax Township, T23N R10W Sect 22 N44.37456 W-85.51852

0 0.55 1.10.275 Miles

Legend Base Item #5

12363N23Q4286 R-9 CadMan Habitat Improvement Page 23 of 31

T22N,R13W

T23N,R13W

34 3633

UP

PE

R

RI

VE

R

RD

SHEEP RANCH RD

COTTAGE RD

CO

AT

ES

H

WY

POLE RD

USDA-FPAC in partnership with USFS-FS

Option Item #5. Job Area 408-12 Mechanical Brushing <3" DBH

10 acres Manistee County, Dickson Township, T22N R13W Sect 10

N44.32280 W-85.86292

0 0.9 1.80.45 Miles

Legend Optional Item #5

12363N23Q4286 R-9 CadMan Habitat Improvement Page 24 of 31

T21N,R15W

SK

OC

EL

AS

R D

MA

RZ

IN

SK

I R

DSTEINBERG RD

MI-55

USDA-FPAC in partnership with USFS-FS

Base and Option Item #6.

Brushing <3" DBH and herbicide Base Item #6 is 5 acres

Optional Item #6 is 14 acres Manistee County, Stronach Township, T21N R15W Sect 17

N44.21686 W-86.15863

0 0.6 1.20.3 Miles

Legend Base Item # 6

Optional Item #6

12363N23Q4286 R-9 CadMan Habitat Improvement Page 25 of 31

T20N,R18W T20N,R17W

24 19

25 30

USDA-FPAC in partnership with USFS-FS

Base and Option Item #7.

Mechanical and/or Manual Tree Felling <10" DBH and Piling Base Item #7 is 4 acres

Optional Item #7 is 4 acres Mason County, Grant Township, T20N R18W Sect 24

N44.11889 W-86.40181

0 0.3 0.60.15 Miles

West Forest Trail Road (Paved)

Legend Optional Item #7

Base Item #7

12363N23Q4286 R-9 CadMan Habitat Improvement Page 26 of 31

"REGISTER OF WAGE DETERMINATIONS UNDER U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT I EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary of Labor I

Daniel w. Simms Director

I I I I I

Division of I Wage Determinations!

WAGE AND HOUR DIVISION

WASHINGTON D.C. 20210

Wage Determination No.: 1981-0136 Revision No.: 65

Date Of Last Revision: 06/30/2023

Note: Contracts subject to the Service Contract Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

IIf the contract is entered into on or !after January 30, 2022, or the !contract is renewed or extended (e.g., Ian option is exercised) on or after !January 30, 2022:

I I

IIf the contract was awarded on or !between January 1, 2015 and January 29, 12022, and the contract is not renewed lor extended on or after January 30, 12022:

I I

Executive Order 14026 generally applies to the contract.

I I

The contractor must pay all covered workers I at least $16.20 per hour (or the applicable I wage rate listed on this wage determination, I if it is higher) for all hours spent I performing on the contract in 2023. I

Executive Order 13658 generally applies to the contract.

The contractor must pay all covered workers

I I I at least $12.15 per hour (or the applicable I wage rate listed on this wage determination, I if it is higher) for all hours spent I performing on the contract in 2023. I

The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the Executive Orders is available at www.dol.gov/whd/govcontracts.

State: Michigan Area: Michigan Statewide

**Fringe Benefits Required Follow the Occupational Listing**

Forestry and Logging:

OCCUPATION CODE - TITLE

08010 - Brush/Precommercial Thinner 08040 - Choker Setter 08070 - Faller/Bucker 08100 - Fire Lookout 08130 - Forestry Equipment Operator 08160 - Forestry/Logging Heavy Equipment Operator 08190 - Forestry Technician 08200 - Forestry Truck Driver 08250 - General Forestry Laborer 08280 - Nursery Specialist 08310 - Slash Piler/Burner 08340 - Tree Climber 08370 - Tree Planter 08400 - Tree Planter, Mechanical

FOOTNOTE RATE

18.07 21.20 23.72 18.07 24.90 27.01 27.01 27.01 19.54 24.68 18.07 20.53

14.82*** 14.82***

12363N23Q4286 R-9 CadMan Habitat Improvement Page 27 of 31

12363N23Q4286 R-9 CadMan Habitat Improvement Page 28 of 31

12363N23Q4286 R-9 CadMan Habitat Improvement Page 29 of 31

12363N23Q4286 R-9 CadMan Habitat Improvement Page 30 of 31

R-9 CadMan Habitat Improvement Page 31 of 3112363N23Q4286

The following solicitation provisions apply to this acquisition:

52.212-1, “Instructions to Offerors–Commercial Items” 52.212-2, “Evaluation – Commercial Items” using Best Value 52.212-3, “Offerors Representations and Certifications–Commercial Items”

Provisions:

52.204-7 System for Award Management (OCT 2018) 52.204-16 Commercial and Government Entity Code Reporting (AUG 2020) 52.237-1 Site Visit (APR 1984) Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

MAPS CADMAN.pdf
ContractVicinityMap2023
Base_and_Option_1_and_2
Base3
Base4_AllJobAreas
Optional4_JobArea133_8
Base5_JobArea17_58
Base5_JobArea124_3
Base5_JobArea150_4
Option5
Base_Option6_FY23
Base_Option7_10InchMechanical
Blank Page
Blank Page
Blank Page

File details come from the government source that posted it. Updated .