CA NP PINN PMS(1)_plans.pdf
PDF 5 MB Posted
- Solicitation number
- 69056723R000009
About this file
This document package includes plans and specifications for a federal contract opportunity to perform pavement preservation work at Pinnacles National Park in California. The work includes chip sealing, microsurfacing, crack sealing, asphalt patching, pavement markings, and temporary traffic control on various road segments and parking areas throughout the park totaling over 180 miles. The solicitation number is 69056723R000009 and was issued by the Department of Transportation Federal Highway Administration. The plans provide details on the locations and quantities of work items, material application rates, and temporary traffic control requirements. Maps show the individual work areas and routes. Schedules include unit pricing for items such as fog sealing, chip sealing, asphalt quantities, and traffic control. Specifications cover protection of structures, removal of existing markings, and other work notes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRENT L COE Digitally signed by BRENT L COE Date: 2023.02.16 09:57:21 -08'00' misbah.afshari Sticky Note Accepted set by misbah.afshari
Sheet and Description
SECTION D SECTION E SECTION F -
PLANS TEMPORARY TRAFFIC
CONTROL
PERMANENT TRAFFIC
CONTROL ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0060 15401-0000 CONTRACTOR TESTING LPSM ALL
A0080 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0100 40601-0000 FOG SEAL TON 61.4 3.1 64.5
A0140 40702-0300 CHIP SEAL, TYPE 1C SQYD 95,619 4,781 100,400
A0160 40711-0000 EMULSIFIED ASPHALT TON 171.4 8.6 180.0
A0180 40901-2000 MICRO SURFACING, TYPE 2 SQYD 36,554 1,246 37,800
A0200 41402-2000 CRACKS, CLEANING AND SEALING MILE 10.89 0.41 11.30
A0220 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1 SQYD 180 27 207
A0240 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2 SQYD 2,149 321 2,470
A0260 50202-0000 SEALING JOINTS AND CRACKS LNFT 460 20 480
A0280 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 20
A0300 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH HOUR 20
A0320 62201-2360 VACUUM SWEEPER HOUR 80
A0340 62301-0000 GENERAL LABOR HOUR 80
A0360 63401-0000 PAVEMENT MARKINGS (Type B) LNFT 334,572 3,348 337,920
A0380 63405-0050 PAVEMENT MARKINGS, SYMBOLS (Type B) EACH 50 2 52
A0400 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 220 220
A0420 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN EACH 4 4
A0440 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 33,369 3,341 36,710
A0460 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 180.5 69.5 250.0
A0480 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 880 880
A0500 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 100 100
A0520 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 51 51
MileStone: 100% Date Completed: 03/02/23 Report Date: 03/02/23
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-S ep -2
:5
PM
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities
H
W or k Fi le s\
Pr oj ec ts
\C A N
P
PI
N N
P M
S (1
0% S ub m it ta l f ile s\ B_
Sh ee ts
B .1
S um m ar y of
Q ua nt it ie s.
xl sm ]S he et
STATE PROJECT
B.1NP PINN PMS(1)CA
SHEET
NUMBER
misbah.afshari Sticky Note Completed set by misbah.afshari
40601-0000 40702-0300 40711-0000 40901-2000 41402-2000 41801-1000 41801-2000 50202-0000
FT FT
TON SQYD TON SQYD MILE SQYD SQYD LNFT
0010 Bear Gulch / East Entrance Road 35145 0.00 4.73 24,974 22.4 40.0 62,158 111.4 4.73 164 428
0010 (1) Pullout 35145 0.1 222 0.4 0.02 0011 Chalone Creek Road 35126 0.00 0.63 3,326 22.0 5.2 8,130 14.6 0.63 150 0011 (1) Pullout 35126 0.1 44 0.1 0.01
0100AZ Pinnacles Campground Road A 101138 0.00 0.96 5,069 14.2 7,998 0.96 138 0100AZ (1) Pullout 101138 33 0.01 0100BZ Pinnacles Campground Road B 101138 0.00 0.42 2,218 14.7 3,623 0.42 27 0100BZ (1) Pullout 101138 167 0.01 0100CZ Pinnacles Campground Road C 101138 0.00 0.10 528 12.2 716 0.10 18 0100DZ Pinnacles Campground Road D 101138 0.00 0.14 739 12.2 1,002 0.14 0100EZ Pinnacles Campground Road E 101138 0.00 0.03 158 11.3 198 0100FZ Pinnacles Campground Road F 101138 0.00 0.15 792 11.1 977 0100GZ Pinnacles Campground Road G 101138 0.00 0.09 475 13.3 702 0.09 0100GZ (1) Pullout 101138 200 0.02
0200 Chalone Residence Road 59594 0.00 0.14 739 20.3 1,667 0.14 0200 (2) Driveways 59594 328 0.03
0202 Chaparral Road 35134 0.00 2.51 13,253 16.5 15.6 24,297 43.5 2.51 1,005 460
0202 (2) Pullouts 35134 0.1 167 0.3 0.01 0203 Chaparral Overlook Road 235457 0.00 0.06 317 11.1 0.3 391 0.7 0.06
0401 Headquarters Service Road 89622 693 130
0402 Condor Gulch Road 35140 0.00 0.03 150 12.6 210 0.4 210 0.03 20
0900 Bear Gulch Parking Area 59596 2,314 0.18 16 59 0903 Condor Gulch Restroom Parking 59599 460 0.04 0904 Moses Springs Picnic Parking 59600 365 0.03 0905 Residence 2 Parking 59601 526 0.04 9 0906 Residence 19 Parking 59602 405 0.03 0907 Moses Springs Parking 59603 883 0.07 22
0908AZ Chalone Creek Employee Housing Parking Area 59604 47 0.00 0908BZ Chalone Creek Employee Housing Parking Area B 59604 944 36 0908CZ Chalone Creek Employee Housing Parking Area C 59604 63 0.00 0908DZ Chalone Creek Employee Housing Parking Area D 59604 89 0.01
145.2 = Hot Asphalt Concrete (lbs/cuft) 0.43 = Emulsified Asphalt (Gal./sqyd)
0.15 = Fog Seal (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)
233.0 = Fog Seal (Gal./ton) 0.10 = Tack Coat (Gal./sqyd)
233.0 = Tack Coat (Gal./ton) c:\pw-work\d0547974\[10_BAY AREA Proj_Sum_Shts.xlsm]PINN
PROJECT SHEET
NUMBER
CA NP PINN PMS(1) D.1
SURFACING TABULATION SHEET - BASE
STATE
EMULSIFIED
ASPHALT
MICRO
SURFACING,
TYPE 2
BID ITEM NUMBER
Remarks
R O
U
TE
N U
M B
ER
ROUTE NAME FMSS No.
MILE TO MILE LE
N G
TH
W
ID
TH
MILES SQFT
SEALING
JOINTS AND
CRACKS
CRACK ,
CLEANING AND
SEALING
ASPHALT
CONCRETE
PAVEMENT
PATCH, TYPE 1
ASPHALT
CONCRETE
PAVEMENT
PATCH, TYPE
FOG SEAL CHIP SEAL,
TYPE 1C
Begin work at intersection with highway 25; Do not treat concrete at entrance station; Concrete bridge MP
3.8 no work
Low water crossing no work
1,500
6,237 Patch quantity includes new asphalt between edge of pavement and ADA accessible building entrance
Seal joints and cracks but no surface treatment on concrete low water crossings
4,139 3,285
Chip Seal and Micro Surfacing;
Only treat from milepost 0.0 up to the end of route 903
20,825
8,495
4,731 3,649 7,948
Material Application Rates and Weights Used for Estimating Purposes
TABULATION OF
SURFACING
QUANTITIES
These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.
PINNACLES NATIONAL
PARK
46010.32 180 2,042SHEET TOTAL 61.4 95,619 171.4 24,610
NOTE: Protect curbs, manhole covers, curb and gutter, concrete gutters, walls, inlets, sidewalks, wheel stops, mower ramps, grates, historic trolley tracks, fire hydrants, wood bollards, stone pillars, gates, cattle guards, asphalt curbs, low water crossings, buildings, etc. Remove existing thermoplastic pavement markings.
Parking Areas
2,000
1,500
1,800
2,950
9/20/22 8:03 AM NPS PMIS No. 257020
40601-0000 40702-0300 40711-0000 40901-2000 41402-2000 41801-1000 41801-2000 50202-0000
TON SQYD TON SQYD MILE SQYD SQYD LNFT
0909 Chalone Creek Maintenance Area 59605 2,873 0.22 0912 Chaparral Day Use Area Parking 59608 2,236 0.17 53 0915 Pinnacles Campground Parking 101139 1,208 0.09 12 0917 Fire Wayside Parking 235455 348 0.03 9
0918 West Pinnacles Visitor Contact Station Parking Area 116811 2,484 0.06 33
0921AZ West Pinnacles Maintenance Accessible Parking A
1,620
0921AZ Driveway 1,080
0921BZ West Pinnacles Maintenance Accessible Parking B
145.2 = Hot Asphalt Concrete (lbs/cuft) 0.43 = Emulsified Asphalt (Gal./sqyd)
0.15 = Fog Seal (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)
233.0 = Fog Seal (Gal./ton) 0.10 = Tack Coat (Gal./sqyd)
233.0 = Tack Coat (Gal./ton) c:\pw-work\d0547974\[10_BAY AREA Proj_Sum_Shts.xlsm]PINN (2) NPS PMIS No.
Material Application Rates and Weights Used for Estimating Purposes
TABULATION OF
SURFACING
QUANTITIES
These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.
PINNACLES NATIONAL
PARK
2,149 46036,554 10.89 180
NOTE: Protect curbs, manhole covers, curb and gutter, concrete gutters, walls, inlets, sidewalks, wheel stops, mower ramps, grates, historic trolley tracks, fire hydrants, wood bollards, stone pillars, gates, cattle guards, asphalt curbs, low water crossings, buildings, etc. Remove existing thermoplastic pavement markings.
95,619 171.4
2570209/20/22 8:10 AM
PROJECT TOTAL 61.4
3,132
22,355
14,580
0.57 0 107 0
9,720
FOG SEAL CHIP SEAL,
TYPE 1C
25,853 20,122 10,872
MILES SQFT
SEALING
JOINTS AND
CRACKS
CRACK ,
CLEANING AND
SEALING
ASPHALT
CONCRETE
PAVEMENT
PATCH, TYPE 1
ASPHALT
CONCRETE
PAVEMENT
PATCH, TYPE
CA NP PINN PMS(1) D.2
SURFACING TABULATION SHEET - BASE
STATE PROJECT SHEET
NUMBER
SHEET TOTAL 0.0 0 0.0 11,944
EMULSIFIED
ASPHALT
MICRO
SURFACING,
TYPE 2
BID ITEM NUMBER
Remarks
R O
U
TE
N U
M B
ER
ROUTE NAME FMSS No.
MILE TO MILE
LE
N
G
TH
W
ID
TH
PINNACLES
NATIONAL PARK
KEY MAP
J
Tr an sp or ta tio n\ W
7Y
1_
W
FL
_P P
_C A
B ay
A re a\
0F H
W A
\2 1F
\R oa dw ay \C
A D
D _S he et s\ D
\P
IN
N _K
E Y
M A
P.
m xd
/2 /2
9:
:0
A M
NPS PMIS NO.: 257020
0 3 6 Miles
STATE
NP (1)
SHEET
NUMBER
CA
PROJECT
D.
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
NOTE:
See Road Inventory Program (RIP) data for Pinnacles National Park Cycle 6 Report for additional maps and route information.
Unique colors and shades used to differentiate routes and surface treatment.
Chip Seal
LEGEND:
AREA MAP 1
AREA MAP 2
AREA MAP 3
To Hollister 30 milesHwy 25
Pinnacles Parkway
AREA MAP 4
AREA MAP 5
Hwy 146
Micro Surfacing Type 2
No Work Unless Noted Otherwise
To Soledad 12 miles
ROUTE 0921BZ
WEST PINNACLES MAINTENANCE
PARKING B
ROUTE 0918
WEST PINNACLES VISITOR CONTACT
STATION PARKING AREA
ROUTE 0912
CHAPARRAL DAY
USE AREA PARKING
ROUTE 0921AZ
WEST PINNACLES
MAINTENANCE
PARKING A
ROUTE 0203
CHAPARRAL OVERLOOK ROAD
ROUTE 0202
CHAPARRAL ROAD
q
PINNACLES
NATIONAL PARK
AREA MAP 1
C :\M yF ile s\ D ow nl oa ds
\P ro je ct s\ C
A_ P
IN
N
\P
IN
N _A
R E
A _M
A P
1.
m xd
/1 9/
2:
:3
P M
NPS PMIS NO.: 257020
0 1,000 2,000 Feet
STATE
NP 1)
SHEET
NUMBER
CA
PROJECT
D.
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
NOTE:
1. See Road Inventory Program (RIP) data for Pinnacles National Park Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
Chip Seal
Micro Surfacing Type 2
LEGEND:
No Work Unless Noted Otherwise
ROUTE 0921 AZ
DRIVEWAY
ROUTE 0906
RESIDENCE 19 PARKING
ROUTE 0917
FIRE WAYSIDE
PARKINGROUTE 0011
CHALONE CREEK ROAD
ROUTE 0010
BEAR GULCH / EAST
ENTRANCE ROAD q
PINNACLES
NATIONAL PARK
AREA MAP 2
C :\M yF ile s\ D ow nl oa ds
\P ro je ct s\ C
A_ P
IN
N
\P
IN
N _A
R E
A _M
A P
2.
m xd
/2 5/
:0
6:
A M
NPS PMIS NO.: 257020
0 3,000 6,000 Feet
STATE
NP
SHEET
NUMBER
CA
PROJECT
D.
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
NOTE:
1. See Road Inventory Program (RIP) data for Pinnacles National Park Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
LEGEND:
AREA MAP 4 AREA MAP 5
AREA MAP 3
Chip Seal
Micro Surfacing Type 2
No Work Unless Noted Otherwise
ROUTE 0401
HEADQUARTERS
SERVICE ROAD
ROUTE 0902
CONDOR GULCH PARKING
NO WORK
ROUTE 0903
CONDOR GULCH
RESTROOM PARKING
ROUTE 0905
RESIDENCE 2 PARKING
ROUTE 0900
BEAR GULCH PARKING AREA
ROUTE 0904
MOSES SPRINGS PICNIC PARKING
ROUTE 0907
MOSES SPRINGS PARKING
ROUTE 0402
CONDOR GULCH ROAD
NO WORK
ROUTE 0010
BEAR GULCH / EAST
ENTRANCE ROAD q
PINNACLES
NATIONAL PARK
AREA MAP 3
C :\M yF ile s\ D ow nl oa ds
\P ro je ct s\ C
A_ P
IN
N
\P
IN
N _A
R E
A _M
A P
3.
m xd
/2 6/
:0
0:
P M
NPS PMIS NO.: 257020
0 300 600 Feet
STATE
NP (1)
SHEET
NUMBER
CA
PROJECT
D.
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
NOTE:
1. See Road Inventory Program (RIP) data for Pinnacles National Park Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
Chip Seal
LEGEND:
Micro Surfacing Type 2
No Work Unless Noted Otherwise
ROUTE 0402
CONDOR GULCH ROAD
WORK
ROUTE 0908DZ
CHALONE CREEK EMPLOYEE HOUSING
PARKING AREA D
ROUTE 0908BZ
CHALONE CREEK EMPLOYEE HOUSING
PARKING AREA B
ROUTE 908CZ
CHALONE CREEK EMPLOYEE HOUSING
PARKING AREA C
ROUTE 0909
CHALONE CREEK MAINTENANCE AREA
ROUTE 0908AZ
CHALONE CREEK EMPLOYEE
HOUSING PARKING AREA
ROUTE 0200
CHALONE RESIDENCE ROAD
ROUTE 0011
CHALONE CREEK ROAD
q
PINNACLES
NATIONAL PARK
AREA MAP 4
C :\M yF ile s\ D ow nl oa ds
\P ro je ct s\ C
A_ P
IN
N
\P
IN
N _A
R E
A _M
A P
4.
m xd
/2 5/
:0
7:
A M
NPS PMIS NO.: 257020
0 300 600 Feet
STATE
NP 1)
SHEET
NUMBER
CA
PROJECT
D.
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
NOTE:
1. See Road Inventory Program (RIP) data for Pinnacles National Park Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
Chip Seal
LEGEND:
Micro Surfacing Type 2
No Work Unless Noted
ROUTE 0915
PINNACLES CAMPGROUND
PARKING
ROUTE 0100EZ
PINNACLES
CAMPGROUND
ROAD E
ROUTE 0100GZ
PINNACLES
CAMPGROUND ROAD G
ROUTE 0100CZ
PINNACLES
CAMPGROUND ROAD C
ROUTE 100DZ
PINNACLES CAMPGROUND
ROAD D
ROUTE 0100FZ
PINNACLES
CAMPGROUND ROAD F
ROUTE 0010
BEAR GULCH / EAST
ENTRANCE ROAD
ROUTE 0100BZ
PINNACLES CAMPGROUND ROAD B
ROUTE 0100AZ
PINNACLES CAMPGROUND ROAD A q
PINNACLES
NATIONAL PARK
AREA MAP 5
C :\M yF ile s\ D ow nl oa ds
\P ro je ct s\ C
A_ P
IN
N
\P
IN
N _A
R E
A _M
A P
5.
m xd
0/
/2
8:
:4
A
M
NPS PMIS NO.: 257020
0 500 1,000 Feet
STATE
NP P (1)
SHEET
NUMBER
CA
PROJECT
D.
Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
NOTE:
1. See Road Inventory Program (RIP) data for Pinnacles National Park Cycle 6 Report for additional maps and route information.
2. Unique colors and shades used to differentiate routes and surface treatment.
Chip Seal
LEGEND:
Micro Surfacing Type 2
No Work Unless Noted
63504-1000
SQFT Each SQFT 36 x 18 4.5 4 18.0 36 x 36 9 4 36.0 24 x 24 4 4 16.0 36 x 36 9 2 18.0 36 x 36 9 6 54.0 36 x 18 4.5 1 4.5 36 x 18 4.5 2 9.0 30 x 30 6.25 4 25.0
QUANTITY
c:\pw-work\d0 c:\pw-work\d0547974\[10_BAY AREA Proj_Sum_Shts.xlsm]TTC 9/20/22 8:27 AM NPS PMIS No.
MUTCD Reference
TEMPORARY TRAFFIC CONTROL, CONE
257,020
EACH
TABULATION OF
TEMPORARY TRAFFIC
CONTROL QUANTITIES
63506-0600
63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY
HOUR
63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR
TEMPORARY TRAFFIC CONTROL, PILOT CAR
63502-2000
Item Number
CONSTRUCTION SIGN QUANTITIES
180.5
EACH
CA E.1NP PINN PMS(1)
ITEM NO.
63502-0700
UNIT
STATE
NOTES
TEMPORARY TRAFFIC CONTROL
SHEET
NUMBERPROJECT
W13-1P
TOTAL
Inches
Sign Message
End Road Work Road Work Ahead
25 MPH
TEMPORARY TRAFFIC
CONTROL,
CONSTRUCTION
SIGN
Panel Size Area Quantity
Unit
Drawing Reference
635-1 635-1
635-6, 635-7 635-6, 635-7
635-6
G20-2 W20-1
W20-4 W20-7A G20-4 Pilot Car Follow Me G24-B W8-7
Wait For Pilot Car Loose Gravel
One Lane Road Ahead Flagger Symbol
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
OTHER TRAFFIC CONTROL QUANTITIES
DESCRIPTION Notes
0010 24,974 0011 3,326
0100AZ 5,069
9/20/2022 8:59 NPS PMIS No. 257020
LNFT
Pinnacles National Park Bear Gulch / East Entrance Road
PROJECTSTATE
CA
TEMPORARY TRAFFIC CONTROL
NP PINN PMS(1)
Pinnacles Campground Road A
SHEET
NUMBER
E.2
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
63503-0700
RemarksRoute Number Route Name
Chalone Creek Road c:\pw-work\d0551775\[E.2 SFBA_TTC-2 .xlsm]TTC (2)
TABULATION OF
TEMPORARY TRAFFIC
CONTROL QUANTITIES
NOTES:
1. Temporary pavement markings include only centerline stripes.
33,369
63401-0000 63401-0000 63401-0000 63405-0050
(TYPE B) (TYPE B) (TYPE B)
YELLOW WHITE WHITE
BLUE/
RED/GREEN WHITE
BLUE/
RED/GREEN YELLOW WHITE WHITE BLUE/RED/
GREEN YELLOW WHITE (TYPE B)
LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT EACH
0010 Bear Gulch / East Entrance Road 100,096 99,896 300 3,060 0 3,840 240 216 0 103,936 103,712 3 2 5
0011 Chalone Creek Road 13,304 13,304 24 0 0 0 0 120 0 13,304 13,448 1 1 0100AZ Pinnacles Campground Road A 20,276 0 0 1,500 0 0 0 192 0 20,276 1,692 2 1 3 0100BZ Pinnacles Campground Road B 0 0 0 0 0 0 0 0 0 0 0 0 0100CZ Pinnacles Campground Road C 0 0 0 0 0 0 0 0 0 0 0 0 0100DZ Pinnacles Campground Road D 0 0 0 0 0 0 0 0 0 0 0 0 0100EZ Pinnacles Campground Road E 0 0 0 0 0 0 0 0 0 0 0 0 0100FZ Pinnacles Campground Road F 0 0 0 0 0 0 0 0 0 0 0 0 0100GZ Pinnacles Campground Road G 0 0 0 0 0 0 0 0 0 0 0 0
0200 Chalone Residence Road 0 0 0 0 0 0 0 72 0 0 72 1 1
0202 Chaparral Road 1,600 53,012 0 1,500 0 0 0 240 0 1,600 54,752 1 2 3
0203 Chaparral Overlook Road 0 0 0 0 0 0 0 72 0 0 72 1 1 0401 Headquarters Service Road 0 80 240 0 0 0 0 0 0 0 320 0 0402 Condor Gulch Road 0 0 0 750 0 0 0 72 0 0 822 1 1
0900 Bear Gulch Parking Area 0 0 1,360 120 1,350 720 0 480 120 840 0 3,310 2 1 4 7 0903 Condor Gulch Restroom Parking 0 0 160 80 0 240 0 0 0 320 0 160 1 1 0904 Moses Springs Picnic Parking 0 0 360 0 0 0 0 0 0 0 360 0 0905 Residence 2 Parking 0 0 0 0 0 0 0 0 0 0 0 0 0906 Residence 19 Parking 0 0 0 420 0 0 0 0 0 0 420 0 0907 Moses Springs Parking 0 600 520 0 0 0 0 0 0 0 1,120 3 3
0908AZ Chalone Creek Employee Housing Parking Area 0 0 40 0 0 0 0 0 0 0 40 0 0908BZ Chalone Creek Employee Housing Parking Area B 0 0 400 160 0 240 0 0 0 400 0 400 2 2 0908CZ Chalone Creek Employee Housing Parking Area C 0 0 80 0 0 0 0 0 0 0 80 0 0908DZ Chalone Creek Employee Housing Parking Area D 0 0 40 40 0 240 0 0 0 280 0 40 1 1
0909 Chalone Creek Maintenance Area 0 0 760 40 0 120 0 0 0 160 0 760 0
0912 Chaparral Day Use Area Parking 80 1,360 1,840 0 960 0 240 0 960 80 3,440 3 1 4 8
0915 Pinnacles Campground Parking 0 0 680 240 0 720 0 0 72 960 0 752 1 2 2 5
0917 Fire Wayside Parking 0 0 400 0 0 0 1,920 0 0 0 2,320 0
0918 West Pinnacles Visitor Contact Station Parking Area 0 0 1,320 40 0 384 0 0 0 424 0 1,320 1 2 2 5
0921AZ West Pinnacles Maintenance Accessible Parking A 0 0 0 0 480 0 0 0 480 0 0 1 1 2
0921BZ West Pinnacles Maintenance Accessible Parking B 0 0 0 900 240 0 0 0 240 0 900 1 1 c:\pw-work\d0547974\[10_BAY AREA Proj_Sum_Shts.xlsm]Striping PINN
TOTAL QUANTITY 334,572
PAVEMENT MARKING SUMMARY
STATE PROJECT SHEET
NUMBER
CA NP PINN PMS(1) F.1
C R O
S S
W A
LK
S
TR
IP
IN
G
(T
YP
E B
H A
TC
H
ED
A R
EA
S (T
YP
E
B
PA
R K
TA
LL
L
ES
E
B
BID ITEM NUMBER FIO(2)(4) FIO(4)
Remarks
R O
U
TE
N U
M B
ER
ROUTE NAME YE
LL
O W
C
EN
TE
R
LI
N E an d
M
IS
C
M A R K
IN
G S
S O
LI
D
E D
G E
LI
N
ES
a nd
M
IS
C
M A R K
IN
G S
1)
A R R O
W S
PA
R K
TA
LL
L
ES
E
B
) PAVEMENT
MARKINGS(3)
PAVEMENT
MARKINGS(3)
M
IS
C S
YM
B O
LS
A D
A A
C C
ES
S
IB
LE
YM
B O
L
S
TO
P
LE
TT
ER
IN
G
H A
TC
H
ED
A R
EA
S (T
YP
E
B
H A
TC
H
ED
A R
EA
S (T
YP
E
B
S
TO
P
LI
N E
PAVEMENT
MARKINGS(3)
EACH
Remove - do not replace RPMS Route 10
No pavement markings
PAVEMENT
MARKINGS,
SYMBOLS
Misc. Text Symbols: (1) "KEEP CLEAR" text;
No pavement markings No pavement markings No pavement markings No pavement markings No pavement markings
No pavement markings
Add ADA hatch
Parking Areas
Add ADA hatch
Add ADA hatch
Misc. Text Symbols: (1) "LARGE" text; Add ADA hatch; Add arrows (2) Misc. Text Symbols: (2) "NO PARKING" text
Misc. Text Symbols: (3) "NO PARKING" text;
Misc. Text Symbols: (1) EV symbol; Add stop line; Add ADA hatch (2)
8,524 5,064 139,196SHEET TOTAL 135,356 168,252 1,1769,480 4,344 3,840
NOTES:
(1) Solid Edge Lines & Misc. Markings include edge (fog) lines, parallel parking lines, lane separation lines, transverse stall lines for parking areas & curb paint.
(2) Match existing pavement markings or as directed by the CO.
(3) Quantities shown include 2 coats of pavement markings when paid by LNFT.
(4) FIO = For Information Only.
50190,312 7 13 12 182,880
TABULATION OF
PERMANENT
PAVEMENT
MARKINGS
PINNACLES NATIONAL
PARK
NPS PMIS No. 257020
File details come from the government source that posted it. Updated .