CA NP PINN PMS(1)_plans.pdf

PDF 5 MB Posted

Attached to
CA NP PINN PMS(1), Pavement Preservation Pinnacles
Solicitation number
69056723R000009
Issued by

About this file

This document package includes plans and specifications for a federal contract opportunity to perform pavement preservation work at Pinnacles National Park in California. The work includes chip sealing, microsurfacing, crack sealing, asphalt patching, pavement markings, and temporary traffic control on various road segments and parking areas throughout the park totaling over 180 miles. The solicitation number is 69056723R000009 and was issued by the Department of Transportation Federal Highway Administration. The plans provide details on the locations and quantities of work items, material application rates, and temporary traffic control requirements. Maps show the individual work areas and routes. Schedules include unit pricing for items such as fog sealing, chip sealing, asphalt quantities, and traffic control. Specifications cover protection of structures, removal of existing markings, and other work notes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRENT L COE Digitally signed by BRENT L COE Date: 2023.02.16 09:57:21 -08'00' misbah.afshari Sticky Note Accepted set by misbah.afshari

Sheet and Description

SECTION D SECTION E SECTION F -

PLANS TEMPORARY TRAFFIC

CONTROL

PERMANENT TRAFFIC

CONTROL ALLOWANCE Bid Schedule

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0060 15401-0000 CONTRACTOR TESTING LPSM ALL

A0080 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0100 40601-0000 FOG SEAL TON 61.4 3.1 64.5

A0140 40702-0300 CHIP SEAL, TYPE 1C SQYD 95,619 4,781 100,400

A0160 40711-0000 EMULSIFIED ASPHALT TON 171.4 8.6 180.0

A0180 40901-2000 MICRO SURFACING, TYPE 2 SQYD 36,554 1,246 37,800

A0200 41402-2000 CRACKS, CLEANING AND SEALING MILE 10.89 0.41 11.30

A0220 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1 SQYD 180 27 207

A0240 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2 SQYD 2,149 321 2,470

A0260 50202-0000 SEALING JOINTS AND CRACKS LNFT 460 20 480

A0280 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 20

A0300 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH HOUR 20

A0320 62201-2360 VACUUM SWEEPER HOUR 80

A0340 62301-0000 GENERAL LABOR HOUR 80

A0360 63401-0000 PAVEMENT MARKINGS (Type B) LNFT 334,572 3,348 337,920

A0380 63405-0050 PAVEMENT MARKINGS, SYMBOLS (Type B) EACH 50 2 52

A0400 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 220 220

A0420 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN EACH 4 4

A0440 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 33,369 3,341 36,710

A0460 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 180.5 69.5 250.0

A0480 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 880 880

A0500 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 100 100

A0520 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 51 51

MileStone: 100% Date Completed: 03/02/23 Report Date: 03/02/23

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES - Schedule A

-S ep -2

:5

PM

Remarks and/or Determination of Estimated

Quantity Pay Item Description Unit

Estimated Quantities

H

W or k Fi le s\

Pr oj ec ts

\C A N

P

PI

N N

P M

S (1

0% S ub m it ta l f ile s\ B_

Sh ee ts

B .1

S um m ar y of

Q ua nt it ie s.

xl sm ]S he et

STATE PROJECT

B.1NP PINN PMS(1)CA

SHEET

NUMBER

misbah.afshari Sticky Note Completed set by misbah.afshari

40601-0000 40702-0300 40711-0000 40901-2000 41402-2000 41801-1000 41801-2000 50202-0000

FT FT

TON SQYD TON SQYD MILE SQYD SQYD LNFT

0010 Bear Gulch / East Entrance Road 35145 0.00 4.73 24,974 22.4 40.0 62,158 111.4 4.73 164 428

0010 (1) Pullout 35145 0.1 222 0.4 0.02 0011 Chalone Creek Road 35126 0.00 0.63 3,326 22.0 5.2 8,130 14.6 0.63 150 0011 (1) Pullout 35126 0.1 44 0.1 0.01

0100AZ Pinnacles Campground Road A 101138 0.00 0.96 5,069 14.2 7,998 0.96 138 0100AZ (1) Pullout 101138 33 0.01 0100BZ Pinnacles Campground Road B 101138 0.00 0.42 2,218 14.7 3,623 0.42 27 0100BZ (1) Pullout 101138 167 0.01 0100CZ Pinnacles Campground Road C 101138 0.00 0.10 528 12.2 716 0.10 18 0100DZ Pinnacles Campground Road D 101138 0.00 0.14 739 12.2 1,002 0.14 0100EZ Pinnacles Campground Road E 101138 0.00 0.03 158 11.3 198 0100FZ Pinnacles Campground Road F 101138 0.00 0.15 792 11.1 977 0100GZ Pinnacles Campground Road G 101138 0.00 0.09 475 13.3 702 0.09 0100GZ (1) Pullout 101138 200 0.02

0200 Chalone Residence Road 59594 0.00 0.14 739 20.3 1,667 0.14 0200 (2) Driveways 59594 328 0.03

0202 Chaparral Road 35134 0.00 2.51 13,253 16.5 15.6 24,297 43.5 2.51 1,005 460

0202 (2) Pullouts 35134 0.1 167 0.3 0.01 0203 Chaparral Overlook Road 235457 0.00 0.06 317 11.1 0.3 391 0.7 0.06

0401 Headquarters Service Road 89622 693 130

0402 Condor Gulch Road 35140 0.00 0.03 150 12.6 210 0.4 210 0.03 20

0900 Bear Gulch Parking Area 59596 2,314 0.18 16 59 0903 Condor Gulch Restroom Parking 59599 460 0.04 0904 Moses Springs Picnic Parking 59600 365 0.03 0905 Residence 2 Parking 59601 526 0.04 9 0906 Residence 19 Parking 59602 405 0.03 0907 Moses Springs Parking 59603 883 0.07 22

0908AZ Chalone Creek Employee Housing Parking Area 59604 47 0.00 0908BZ Chalone Creek Employee Housing Parking Area B 59604 944 36 0908CZ Chalone Creek Employee Housing Parking Area C 59604 63 0.00 0908DZ Chalone Creek Employee Housing Parking Area D 59604 89 0.01

145.2 = Hot Asphalt Concrete (lbs/cuft) 0.43 = Emulsified Asphalt (Gal./sqyd)

0.15 = Fog Seal (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)

233.0 = Fog Seal (Gal./ton) 0.10 = Tack Coat (Gal./sqyd)

233.0 = Tack Coat (Gal./ton) c:\pw-work\d0547974\[10_BAY AREA Proj_Sum_Shts.xlsm]PINN

PROJECT SHEET

NUMBER

CA NP PINN PMS(1) D.1

SURFACING TABULATION SHEET - BASE

STATE

EMULSIFIED

ASPHALT

MICRO

SURFACING,

TYPE 2

BID ITEM NUMBER

Remarks

R O

U

TE

N U

M B

ER

ROUTE NAME FMSS No.

MILE TO MILE LE

N G

TH

W

ID

TH

MILES SQFT

SEALING

JOINTS AND

CRACKS

CRACK ,

CLEANING AND

SEALING

ASPHALT

CONCRETE

PAVEMENT

PATCH, TYPE 1

ASPHALT

CONCRETE

PAVEMENT

PATCH, TYPE

FOG SEAL CHIP SEAL,

TYPE 1C

Begin work at intersection with highway 25; Do not treat concrete at entrance station; Concrete bridge MP

3.8 no work

Low water crossing no work

1,500

6,237 Patch quantity includes new asphalt between edge of pavement and ADA accessible building entrance

Seal joints and cracks but no surface treatment on concrete low water crossings

4,139 3,285

Chip Seal and Micro Surfacing;

Only treat from milepost 0.0 up to the end of route 903

20,825

8,495

4,731 3,649 7,948

Material Application Rates and Weights Used for Estimating Purposes

TABULATION OF

SURFACING

QUANTITIES

These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.

PINNACLES NATIONAL

PARK

46010.32 180 2,042SHEET TOTAL 61.4 95,619 171.4 24,610

NOTE: Protect curbs, manhole covers, curb and gutter, concrete gutters, walls, inlets, sidewalks, wheel stops, mower ramps, grates, historic trolley tracks, fire hydrants, wood bollards, stone pillars, gates, cattle guards, asphalt curbs, low water crossings, buildings, etc. Remove existing thermoplastic pavement markings.

Parking Areas

2,000

1,500

1,800

2,950

9/20/22 8:03 AM NPS PMIS No. 257020

40601-0000 40702-0300 40711-0000 40901-2000 41402-2000 41801-1000 41801-2000 50202-0000

TON SQYD TON SQYD MILE SQYD SQYD LNFT

0909 Chalone Creek Maintenance Area 59605 2,873 0.22 0912 Chaparral Day Use Area Parking 59608 2,236 0.17 53 0915 Pinnacles Campground Parking 101139 1,208 0.09 12 0917 Fire Wayside Parking 235455 348 0.03 9

0918 West Pinnacles Visitor Contact Station Parking Area 116811 2,484 0.06 33

0921AZ West Pinnacles Maintenance Accessible Parking A

1,620

0921AZ Driveway 1,080

0921BZ West Pinnacles Maintenance Accessible Parking B

145.2 = Hot Asphalt Concrete (lbs/cuft) 0.43 = Emulsified Asphalt (Gal./sqyd)

0.15 = Fog Seal (Gal./sqyd) 240.0 = Emulsified Asphalt (Gal./ton)

233.0 = Fog Seal (Gal./ton) 0.10 = Tack Coat (Gal./sqyd)

233.0 = Tack Coat (Gal./ton) c:\pw-work\d0547974\[10_BAY AREA Proj_Sum_Shts.xlsm]PINN (2) NPS PMIS No.

Material Application Rates and Weights Used for Estimating Purposes

TABULATION OF

SURFACING

QUANTITIES

These values are for estimating purposes only and application rates and weight may change based on actual test strip and field results.

PINNACLES NATIONAL

PARK

2,149 46036,554 10.89 180

NOTE: Protect curbs, manhole covers, curb and gutter, concrete gutters, walls, inlets, sidewalks, wheel stops, mower ramps, grates, historic trolley tracks, fire hydrants, wood bollards, stone pillars, gates, cattle guards, asphalt curbs, low water crossings, buildings, etc. Remove existing thermoplastic pavement markings.

95,619 171.4

2570209/20/22 8:10 AM

PROJECT TOTAL 61.4

3,132

22,355

14,580

0.57 0 107 0

9,720

FOG SEAL CHIP SEAL,

TYPE 1C

25,853 20,122 10,872

MILES SQFT

SEALING

JOINTS AND

CRACKS

CRACK ,

CLEANING AND

SEALING

ASPHALT

CONCRETE

PAVEMENT

PATCH, TYPE 1

ASPHALT

CONCRETE

PAVEMENT

PATCH, TYPE

CA NP PINN PMS(1) D.2

SURFACING TABULATION SHEET - BASE

STATE PROJECT SHEET

NUMBER

SHEET TOTAL 0.0 0 0.0 11,944

EMULSIFIED

ASPHALT

MICRO

SURFACING,

TYPE 2

BID ITEM NUMBER

Remarks

R O

U

TE

N U

M B

ER

ROUTE NAME FMSS No.

MILE TO MILE

LE

N

G

TH

W

ID

TH

PINNACLES

NATIONAL PARK

KEY MAP

J

Tr an sp or ta tio n\ W

7Y

1_

W

FL

_P P

_C A

B ay

A re a\

0F H

W A

\2 1F

\R oa dw ay \C

A D

D _S he et s\ D

\P

IN

N _K

E Y

M A

P.

m xd

/2 /2

9:

:0

A M

NPS PMIS NO.: 257020

0 3 6 Miles

STATE

NP (1)

SHEET

NUMBER

CA

PROJECT

D.

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

NOTE:

See Road Inventory Program (RIP) data for Pinnacles National Park Cycle 6 Report for additional maps and route information.

Unique colors and shades used to differentiate routes and surface treatment.

Chip Seal

LEGEND:

AREA MAP 1

AREA MAP 2

AREA MAP 3

To Hollister 30 milesHwy 25

Pinnacles Parkway

AREA MAP 4

AREA MAP 5

Hwy 146

Micro Surfacing Type 2

No Work Unless Noted Otherwise

To Soledad 12 miles

ROUTE 0921BZ

WEST PINNACLES MAINTENANCE

PARKING B

ROUTE 0918

WEST PINNACLES VISITOR CONTACT

STATION PARKING AREA

ROUTE 0912

CHAPARRAL DAY

USE AREA PARKING

ROUTE 0921AZ

WEST PINNACLES

MAINTENANCE

PARKING A

ROUTE 0203

CHAPARRAL OVERLOOK ROAD

ROUTE 0202

CHAPARRAL ROAD

q

PINNACLES

NATIONAL PARK

AREA MAP 1

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ C

A_ P

IN

N

\P

IN

N _A

R E

A _M

A P

1.

m xd

/1 9/

2:

:3

P M

NPS PMIS NO.: 257020

0 1,000 2,000 Feet

STATE

NP 1)

SHEET

NUMBER

CA

PROJECT

D.

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

NOTE:

1. See Road Inventory Program (RIP) data for Pinnacles National Park Cycle 6 Report for additional maps and route information.

2. Unique colors and shades used to differentiate routes and surface treatment.

Chip Seal

Micro Surfacing Type 2

LEGEND:

No Work Unless Noted Otherwise

ROUTE 0921 AZ

DRIVEWAY

ROUTE 0906

RESIDENCE 19 PARKING

ROUTE 0917

FIRE WAYSIDE

PARKINGROUTE 0011

CHALONE CREEK ROAD

ROUTE 0010

BEAR GULCH / EAST

ENTRANCE ROAD q

PINNACLES

NATIONAL PARK

AREA MAP 2

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ C

A_ P

IN

N

\P

IN

N _A

R E

A _M

A P

2.

m xd

/2 5/

:0

6:

A M

NPS PMIS NO.: 257020

0 3,000 6,000 Feet

STATE

NP

SHEET

NUMBER

CA

PROJECT

D.

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

NOTE:

1. See Road Inventory Program (RIP) data for Pinnacles National Park Cycle 6 Report for additional maps and route information.

2. Unique colors and shades used to differentiate routes and surface treatment.

LEGEND:

AREA MAP 4 AREA MAP 5

AREA MAP 3

Chip Seal

Micro Surfacing Type 2

No Work Unless Noted Otherwise

ROUTE 0401

HEADQUARTERS

SERVICE ROAD

ROUTE 0902

CONDOR GULCH PARKING

NO WORK

ROUTE 0903

CONDOR GULCH

RESTROOM PARKING

ROUTE 0905

RESIDENCE 2 PARKING

ROUTE 0900

BEAR GULCH PARKING AREA

ROUTE 0904

MOSES SPRINGS PICNIC PARKING

ROUTE 0907

MOSES SPRINGS PARKING

ROUTE 0402

CONDOR GULCH ROAD

NO WORK

ROUTE 0010

BEAR GULCH / EAST

ENTRANCE ROAD q

PINNACLES

NATIONAL PARK

AREA MAP 3

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ C

A_ P

IN

N

\P

IN

N _A

R E

A _M

A P

3.

m xd

/2 6/

:0

0:

P M

NPS PMIS NO.: 257020

0 300 600 Feet

STATE

NP (1)

SHEET

NUMBER

CA

PROJECT

D.

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

NOTE:

1. See Road Inventory Program (RIP) data for Pinnacles National Park Cycle 6 Report for additional maps and route information.

2. Unique colors and shades used to differentiate routes and surface treatment.

Chip Seal

LEGEND:

Micro Surfacing Type 2

No Work Unless Noted Otherwise

ROUTE 0402

CONDOR GULCH ROAD

WORK

ROUTE 0908DZ

CHALONE CREEK EMPLOYEE HOUSING

PARKING AREA D

ROUTE 0908BZ

CHALONE CREEK EMPLOYEE HOUSING

PARKING AREA B

ROUTE 908CZ

CHALONE CREEK EMPLOYEE HOUSING

PARKING AREA C

ROUTE 0909

CHALONE CREEK MAINTENANCE AREA

ROUTE 0908AZ

CHALONE CREEK EMPLOYEE

HOUSING PARKING AREA

ROUTE 0200

CHALONE RESIDENCE ROAD

ROUTE 0011

CHALONE CREEK ROAD

q

PINNACLES

NATIONAL PARK

AREA MAP 4

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ C

A_ P

IN

N

\P

IN

N _A

R E

A _M

A P

4.

m xd

/2 5/

:0

7:

A M

NPS PMIS NO.: 257020

0 300 600 Feet

STATE

NP 1)

SHEET

NUMBER

CA

PROJECT

D.

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

NOTE:

1. See Road Inventory Program (RIP) data for Pinnacles National Park Cycle 6 Report for additional maps and route information.

2. Unique colors and shades used to differentiate routes and surface treatment.

Chip Seal

LEGEND:

Micro Surfacing Type 2

No Work Unless Noted

ROUTE 0915

PINNACLES CAMPGROUND

PARKING

ROUTE 0100EZ

PINNACLES

CAMPGROUND

ROAD E

ROUTE 0100GZ

PINNACLES

CAMPGROUND ROAD G

ROUTE 0100CZ

PINNACLES

CAMPGROUND ROAD C

ROUTE 100DZ

PINNACLES CAMPGROUND

ROAD D

ROUTE 0100FZ

PINNACLES

CAMPGROUND ROAD F

ROUTE 0010

BEAR GULCH / EAST

ENTRANCE ROAD

ROUTE 0100BZ

PINNACLES CAMPGROUND ROAD B

ROUTE 0100AZ

PINNACLES CAMPGROUND ROAD A q

PINNACLES

NATIONAL PARK

AREA MAP 5

C :\M yF ile s\ D ow nl oa ds

\P ro je ct s\ C

A_ P

IN

N

\P

IN

N _A

R E

A _M

A P

5.

m xd

0/

/2

8:

:4

A

M

NPS PMIS NO.: 257020

0 500 1,000 Feet

STATE

NP P (1)

SHEET

NUMBER

CA

PROJECT

D.

Service Layer Credits: Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community

NOTE:

1. See Road Inventory Program (RIP) data for Pinnacles National Park Cycle 6 Report for additional maps and route information.

2. Unique colors and shades used to differentiate routes and surface treatment.

Chip Seal

LEGEND:

Micro Surfacing Type 2

No Work Unless Noted

63504-1000

SQFT Each SQFT 36 x 18 4.5 4 18.0 36 x 36 9 4 36.0 24 x 24 4 4 16.0 36 x 36 9 2 18.0 36 x 36 9 6 54.0 36 x 18 4.5 1 4.5 36 x 18 4.5 2 9.0 30 x 30 6.25 4 25.0

QUANTITY

c:\pw-work\d0 c:\pw-work\d0547974\[10_BAY AREA Proj_Sum_Shts.xlsm]TTC 9/20/22 8:27 AM NPS PMIS No.

MUTCD Reference

TEMPORARY TRAFFIC CONTROL, CONE

257,020

EACH

TABULATION OF

TEMPORARY TRAFFIC

CONTROL QUANTITIES

63506-0600

63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY

HOUR

63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR

TEMPORARY TRAFFIC CONTROL, PILOT CAR

63502-2000

Item Number

CONSTRUCTION SIGN QUANTITIES

180.5

EACH

CA E.1NP PINN PMS(1)

ITEM NO.

63502-0700

UNIT

STATE

NOTES

TEMPORARY TRAFFIC CONTROL

SHEET

NUMBERPROJECT

W13-1P

TOTAL

Inches

Sign Message

End Road Work Road Work Ahead

25 MPH

TEMPORARY TRAFFIC

CONTROL,

CONSTRUCTION

SIGN

Panel Size Area Quantity

Unit

Drawing Reference

635-1 635-1

635-6, 635-7 635-6, 635-7

635-6

G20-2 W20-1

W20-4 W20-7A G20-4 Pilot Car Follow Me G24-B W8-7

Wait For Pilot Car Loose Gravel

One Lane Road Ahead Flagger Symbol

TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

OTHER TRAFFIC CONTROL QUANTITIES

DESCRIPTION Notes

0010 24,974 0011 3,326

0100AZ 5,069

9/20/2022 8:59 NPS PMIS No. 257020

LNFT

Pinnacles National Park Bear Gulch / East Entrance Road

PROJECTSTATE

CA

TEMPORARY TRAFFIC CONTROL

NP PINN PMS(1)

Pinnacles Campground Road A

SHEET

NUMBER

E.2

TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

63503-0700

RemarksRoute Number Route Name

Chalone Creek Road c:\pw-work\d0551775\[E.2 SFBA_TTC-2 .xlsm]TTC (2)

TABULATION OF

TEMPORARY TRAFFIC

CONTROL QUANTITIES

NOTES:

1. Temporary pavement markings include only centerline stripes.

33,369

63401-0000 63401-0000 63401-0000 63405-0050

(TYPE B) (TYPE B) (TYPE B)

YELLOW WHITE WHITE

BLUE/

RED/GREEN WHITE

BLUE/

RED/GREEN YELLOW WHITE WHITE BLUE/RED/

GREEN YELLOW WHITE (TYPE B)

LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT EACH

0010 Bear Gulch / East Entrance Road 100,096 99,896 300 3,060 0 3,840 240 216 0 103,936 103,712 3 2 5

0011 Chalone Creek Road 13,304 13,304 24 0 0 0 0 120 0 13,304 13,448 1 1 0100AZ Pinnacles Campground Road A 20,276 0 0 1,500 0 0 0 192 0 20,276 1,692 2 1 3 0100BZ Pinnacles Campground Road B 0 0 0 0 0 0 0 0 0 0 0 0 0100CZ Pinnacles Campground Road C 0 0 0 0 0 0 0 0 0 0 0 0 0100DZ Pinnacles Campground Road D 0 0 0 0 0 0 0 0 0 0 0 0 0100EZ Pinnacles Campground Road E 0 0 0 0 0 0 0 0 0 0 0 0 0100FZ Pinnacles Campground Road F 0 0 0 0 0 0 0 0 0 0 0 0 0100GZ Pinnacles Campground Road G 0 0 0 0 0 0 0 0 0 0 0 0

0200 Chalone Residence Road 0 0 0 0 0 0 0 72 0 0 72 1 1

0202 Chaparral Road 1,600 53,012 0 1,500 0 0 0 240 0 1,600 54,752 1 2 3

0203 Chaparral Overlook Road 0 0 0 0 0 0 0 72 0 0 72 1 1 0401 Headquarters Service Road 0 80 240 0 0 0 0 0 0 0 320 0 0402 Condor Gulch Road 0 0 0 750 0 0 0 72 0 0 822 1 1

0900 Bear Gulch Parking Area 0 0 1,360 120 1,350 720 0 480 120 840 0 3,310 2 1 4 7 0903 Condor Gulch Restroom Parking 0 0 160 80 0 240 0 0 0 320 0 160 1 1 0904 Moses Springs Picnic Parking 0 0 360 0 0 0 0 0 0 0 360 0 0905 Residence 2 Parking 0 0 0 0 0 0 0 0 0 0 0 0 0906 Residence 19 Parking 0 0 0 420 0 0 0 0 0 0 420 0 0907 Moses Springs Parking 0 600 520 0 0 0 0 0 0 0 1,120 3 3

0908AZ Chalone Creek Employee Housing Parking Area 0 0 40 0 0 0 0 0 0 0 40 0 0908BZ Chalone Creek Employee Housing Parking Area B 0 0 400 160 0 240 0 0 0 400 0 400 2 2 0908CZ Chalone Creek Employee Housing Parking Area C 0 0 80 0 0 0 0 0 0 0 80 0 0908DZ Chalone Creek Employee Housing Parking Area D 0 0 40 40 0 240 0 0 0 280 0 40 1 1

0909 Chalone Creek Maintenance Area 0 0 760 40 0 120 0 0 0 160 0 760 0

0912 Chaparral Day Use Area Parking 80 1,360 1,840 0 960 0 240 0 960 80 3,440 3 1 4 8

0915 Pinnacles Campground Parking 0 0 680 240 0 720 0 0 72 960 0 752 1 2 2 5

0917 Fire Wayside Parking 0 0 400 0 0 0 1,920 0 0 0 2,320 0

0918 West Pinnacles Visitor Contact Station Parking Area 0 0 1,320 40 0 384 0 0 0 424 0 1,320 1 2 2 5

0921AZ West Pinnacles Maintenance Accessible Parking A 0 0 0 0 480 0 0 0 480 0 0 1 1 2

0921BZ West Pinnacles Maintenance Accessible Parking B 0 0 0 900 240 0 0 0 240 0 900 1 1 c:\pw-work\d0547974\[10_BAY AREA Proj_Sum_Shts.xlsm]Striping PINN

TOTAL QUANTITY 334,572

PAVEMENT MARKING SUMMARY

STATE PROJECT SHEET

NUMBER

CA NP PINN PMS(1) F.1

C R O

S S

W A

LK

S

TR

IP

IN

G

(T

YP

E B

H A

TC

H

ED

A R

EA

S (T

YP

E

B

PA

R K

TA

LL

L

ES

E

B

BID ITEM NUMBER FIO(2)(4) FIO(4)

Remarks

R O

U

TE

N U

M B

ER

ROUTE NAME YE

LL

O W

C

EN

TE

R

LI

N E an d

M

IS

C

M A R K

IN

G S

S O

LI

D

E D

G E

LI

N

ES

a nd

M

IS

C

M A R K

IN

G S

1)

A R R O

W S

PA

R K

TA

LL

L

ES

E

B

) PAVEMENT

MARKINGS(3)

PAVEMENT

MARKINGS(3)

M

IS

C S

YM

B O

LS

A D

A A

C C

ES

S

IB

LE

YM

B O

L

S

TO

P

LE

TT

ER

IN

G

H A

TC

H

ED

A R

EA

S (T

YP

E

B

H A

TC

H

ED

A R

EA

S (T

YP

E

B

S

TO

P

LI

N E

PAVEMENT

MARKINGS(3)

EACH

Remove - do not replace RPMS Route 10

No pavement markings

PAVEMENT

MARKINGS,

SYMBOLS

Misc. Text Symbols: (1) "KEEP CLEAR" text;

No pavement markings No pavement markings No pavement markings No pavement markings No pavement markings

No pavement markings

Add ADA hatch

Parking Areas

Add ADA hatch

Add ADA hatch

Misc. Text Symbols: (1) "LARGE" text; Add ADA hatch; Add arrows (2) Misc. Text Symbols: (2) "NO PARKING" text

Misc. Text Symbols: (3) "NO PARKING" text;

Misc. Text Symbols: (1) EV symbol; Add stop line; Add ADA hatch (2)

8,524 5,064 139,196SHEET TOTAL 135,356 168,252 1,1769,480 4,344 3,840

NOTES:

(1) Solid Edge Lines & Misc. Markings include edge (fog) lines, parallel parking lines, lane separation lines, transverse stall lines for parking areas & curb paint.

(2) Match existing pavement markings or as directed by the CO.

(3) Quantities shown include 2 coats of pavement markings when paid by LNFT.

(4) FIO = For Information Only.

50190,312 7 13 12 182,880

TABULATION OF

PERMANENT

PAVEMENT

MARKINGS

PINNACLES NATIONAL

PARK

NPS PMIS No. 257020

File details come from the government source that posted it. Updated .