This Performance Work Statement (PWS) details a non-personal services contract for the rental/lease of electrical testing equipment at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF). The specific requirements include a 480VAC, 2.5MW (minimum) reactive/resistive load bank, a 4160VAC-480VAC 2.5MW step-down transformer, medium voltage portable cables, and a 500A 4160VAC overcurrent protection device. The equipment will be used to test 4160VAC diesel generators for the CVN 76, with a performance period from 1 September 2025 to 31 December 2025.
The contractor must provide all necessary personnel, equipment, and support to perform 5kV resistive/reactive load testing, including on-site training, 24/7 technical support, preventative maintenance, and a process control procedure. Key technical specifications include a load bank capable of providing load testing to 0.8 power factor, a 3-phase 4160VAC to 480VAC transformer, and specific cabling and connection requirements. The contract will be a firm-fixed price, with the contractor responsible for quality control, equipment maintenance, and compliance with naval base security requirements, including obtaining proper identification and access credentials for personnel.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Rental/Lease of 2.5MW Load bank, 4160V-480V Transformer, overcurrent protection, and MV
Cabling.
Part 1
General Information
1. GENERAL: This is a non-personal services contract to provide Rental/Lease of a 480VAC, 2.5MW (min.) reactive/resistive load bank, 4160VAC-480VAC step down transformer, medium voltage portable cables, and 500A (min) 4160V overcurrent protection device. The
Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn, is responsible to the Government.
1.1. Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform 5kV, resistive/reactive load testing as defined in this PWS except for those items specified as Government furnished items and support, if any. The contractor shall perform to the standards in this contract.
1.2. Background: Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF) requires resistive/reactive load bank and support equipment to test 4160V AC diesel generators.
1.3. Scope: Rent/lease 480VAC, 2.5MW (3.lMVA) (min.) load bank, 4160VAC-480VAC
2.5 MW (3. lMV A) (min) step down transformer, medium voltage portable cables, and 500A(min) 4160VAC, 3 phase, overcurrent protection device to serve as part of testing equipment to test 4160VAC diesel generators .
1 .4. JML:
1.5. Period of Performance: l-SEPTEMBER-2025 to 31 DECEMBER-2025
1.6. General Information
1.6.1. Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor's quality control program is the means by which he assures himself that his work complies with the requirement of the contract. After acceptance of the quality control plan the contractor shall receive the contracting officer's acceptance in writing of any proposed change to his QC system.
1.6.2. Quality Assurance: The Government will evaluate the contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).