C5_Attach 4_Gravel FSSS.pdf

PDF 302 KB Posted

Attached to
Columbine Gravel Pit Crushing and Development Federal contract opportunity
Solicitation number
1240LT26Q0064
Issued by
Department of Agriculture Forest Service

About this file

This document is Forest Service Supplemental Specifications (FSSS) that modify FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, specifically for the Columbine Gravel Crushing project. The FSSS comprises seven primary specifications with 2025 revisions (FSSS 101-109, 153, 204, 314, 625, and 703) plus Handbook 44 for Belt Conveyor Scale Systems (2016 revision).

Key requirements include: Crushing operations at the Columbine Gravel Pit are restricted to May 15 through November 15, with no work permitted on federal holidays unless written Contracting Officer approval is obtained. All equipment must be cleaned prior to moving onto Forest Service lands to ensure weed-free status, with fluid leaks repaired beforehand. Contractors must submit a plan of operation and comply with Mine Safety and Health Administration regulations (30 CFR Part 56). Turf establishment using specified seed types (Mountain Bromegrass, Slender Wheatgrass, Thick Spike Wheatgrass, Candy Bluegrass, and Blue Wildrye totaling 19 lbs/acre pure live seed) must be applied within ten days of project completion. Aggregate quality standards are defined in Table 703-1 with specific gradation designations (F, G, H, S, T, U) and plasticity index requirements. Contract payment measurement includes decimal accuracy standards ranging from 0.01 to 1.0 depending on unit type, with contract quantities adjustable only when errors exceed 15 percent. Excess material produced from government lands remains government property and must be placed at approved locations at no additional cost.

View the file

Other files for this federal contract opportunity

Other files attached to Columbine Gravel Pit Crushing and Development, newest first.
File Type Posted
1240LT26Q0064_A0001.pdf PDF
Attach 9_Columbine Gravel Crushing QA_Agenda.pdf PDF
Attach 10_Pre Bid Sign.pdf PDF
C5_Attach 8 - WD_20260003.pdf PDF
C5_Attach 3_Gravel Pit Drawings 02.pdf PDF
C5_1240LT26Q0064_Final.pdf PDF
C5_Attach 7_Sustainable Products.pdf PDF
C5_Attach 1_Columbine Gravel SOW.pdf PDF
C5_Attach 6_SOI.xlsx XLSX spreadsheet
C5_Attach 2_Gravel Pit Drawings 01.pdf PDF
C5_Attach 5_Belt Conveyor Scale Sys.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND

BRIDGES ON FEDERAL HIGHWAY PROJECTS

FP-24

COLUMBINE GRAVEL CRUSHING

FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (FSSS)

SPECIFICATION NUMBER TITLE LATEST

REVISION

FSSS 101-109 GENERAL REQUIREMENTS 2025

FSSS 153 CONTRACTOR QUALITY CONTROL 2025

FSSS 204 EXCAVATION AND EMBANKMENT 2025

FSSS 314 STOCKPILED AGGREGATES 2025

FSSS 625 TURF ESTABLISHMENT 2025

FSSS 703 AGGREGATE 2025

HANDBOOK 44 BELT CONVEYOR SCALE SYSTEMS 2016

PREFACE

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-24 for construction of National Forest System Roads. The Forest Service Supplemental Specifications (FSSS) shall be incorporated in FP-24. The applicable specifications for the project will be FP-24 as modified by the FSSS.

Section 101. – TERMS, FORMAT, AND DEFINITIONS

Add the following paragraph to Subsection 101.01 Meaning of Terms:

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

Add the following to Subsection 101.03 Abbreviations:

(a) Acronyms.

AGAR — Agriculture Acquisition Regulations

AFPA — American Forest and Paper Association

FSSS – Forest Service Supplemental Specifications

MSHA — Mine Safety and Health Administration

NESC — National Electrical Safety Code

WCLIB — West Coast Lumber Inspection Bureau

(d) Miscellaneous unit abbreviations.

MP - Milepost location ppm - parts per million volumes

STA – station location

MFBM - thousand feet board measure volumes

Section 104. – CONTROL OF WORK

Delete Subsection 104.07 Coordination of Contract Documents.

Add the following Subsection 104.12 Use of Roads by Contractor:

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

Section 105. – CONTROL OF MATERIAL

Add the following to Subsection 105.02(a) Material Sources, Government-furnished sources:

Government-provided sources for this project are identified as follows:

(1) Government-furnished mandatory sources.

Pay Item Description Material source number or name

31401 Stockpiled Aggregates Columbine Gravel Pit

70301 Aggregate Columbine Gravel Pit

The following restrictions apply: Crushing operations can be conducted between May 15th through November 15th. No work shall occur during Federal holidays unless otherwise authorized and approved in writing by the Contracting Officer (CO).

Add the following to Subsection 105.02(c) Material Sources, Contractor-located sources:

All material (e.g., soil, gravel, sand, borrow, aggregate, etc.) transported onto National Forest System land or incorporated into the work shall be weed-free. The Contracting Officer may request written documentation of methods used to determine the weed-free status of all materials furnished by the contractor. Contractor-provided means and methods to establish weed-free status must be appropriate for the weeds of concern in the local area. The following applies to this contract: All equipment shall be cleaned by the contractor prior to moving equipment onto public lands and project area. Equipment shall be cleaned of mud, dirt, and accumulations of organic material which may harbor seed or plant parts of noxious weeds. Fluid leaks shall be repaired prior to moving onto Forest lands.

Delete second paragraph and subparagraphs (a) and (b) in Subsection 105.05 Use of Material Found in the Work and replace it with the following:

The right to use and process material found in the work excludes the use and processing of material for nongovernment contract work, except for the disposal of waste material.

Materials produced or processed from Government lands more than the quantities required for performance of this contract are the property of the Government. Place excess material at government-approved agreed to location(s), at no additional cost to government.

Section 106. – ACCEPTANCE OF WORK

Delete the 3rd and 4th paragraphs in Subsection 106.01 Conformity with Contract Requirements.

Section 108. - PROSECUTION AND PROGRESS

Delete Section 108 Prosecution and Progress in its entirety.

Section 109. - MEASUREMENT AND PAYMENT

Delete Subsections 109.06 Pricing and Adjustments, 109.07 Estimated Work, 109.08 Progress Payments, and 109.09 Final Payment.

Delete Table 109-1 of Subsection 109.01 Measurement of Work and replace them with the following:

Table 109-1

Decimal Accuracy of Quantities for Payment

Pay Item Level of Precision Acre 0.01 Cubic Foot 1 Cubic Yard 1 Cubic Yard Exception - Structure Excavation;

Sheathing; Materials; Bedding, Bed Course, and Backfill, Materials; Gabions;

0.1

Cubic Yard Exception – Concrete; Masonry 0.01 Day 1 Each 1 Gallon 1 Hour 0.1 Linear Foot 1 Linear Foot Exception - Timber, Steel, and Concrete Piles

0.1

M-Gallon 0.1 Mile 0.01 Month 0.1 Pound 1 Square Foot 0.1 Square Yard 0.1 Station 0.1 Thousand Board Feet Measure 0.01 Ton 0.1 Ton Exception - Calcium Chloride; Sodium Chloride;

Hydrated Lime; Bituminous Materials; Pavements; Bed Course Materials

0.01

Week 0.1

Delete Subsection 109.02(c) Measurement Terms and Definitions, Contract quantity and replace with:

(c) Contract quantity. The quantity to be paid is the quantity listed in the bid schedule. The contract quantity will be adjusted for authorized changes that affect the quantity or for errors made in computing this quantity when that error exceeds 15% or more. If there is evidence that a quantity specified as a contract quantity is incorrect by 15% or more, submit calculations, drawings, or other evidence indicating why the quantity is in error and request in writing that the quantity be adjusted.

Add the following to Subsection 109.03(c) Weighing Procedures and Devices, Project weighing system:

For aggregates weighed for payment, adjust scale weights of material to deduct the daily average moisture content more than 2 percentage points over optimum moisture as determined by AASHTO T 99 or the designated compaction method. If moisture determination is necessary, determine the daily average moisture content in accordance with AASHTO T 255, from not less than three representative samples of aggregate taken at random intervals each day that aggregate is weighed.

Manual scales may be used if approved in writing by the CO and if the method of weighing meets all other contract requirements.

Section 153. – CONTRACTOR QUALITY CONTROL

Delete Subsection 153.08 Records and Control Charts and replace them with the following:

Maintain complete testing and inspection records by pay-item number and make them accessible to the CO.

Section 204. – EXCAVATION AND EMBANKMENT

Delete Subsection 204.06 Roadway Excavation and replace with the following:

204.06 Roadway Excavation. Excavate as follows:

(a) Rock cuts. Verify the top portion of the rock cuts during pioneer access or initial excavation. Construct the final soil cut before starting drilling for rock blasting or other rock excavation methods unless approved. Blast rock according to Forest Service Supplemental Specification Section 205 if approved by the CO. Excavate rock cuts to 6 inches below subgrade within the roadbed limits. Backfill to subgrade with select borrow. Compact the material according to Subsection 204.11.

(b) Earth cuts. Scarify earth cuts to 6 inches below subgrade within the roadbed limits.

Compact the scarified material according to Subsection 204.11.

(c) Drainage Feature. Drainage feature includes construction of all ditches, minor channel changes, drainage dips, catch basins, surface water deflectors, and other minor drainage structures. Compact the material according to Subsection 204.11. Excavate on a uniform grade between control points.

Remove snow or ice in advance of work and deposit beyond the roadway limits in a manner to prevent resource damage.

Conserve 6-inch minus material from the roadway excavation to use for finishing the roadbed.

Dispose of unsuitable or excess excavation material according to Subsection 204.14. Replace shortage of suitable material caused by premature disposal of roadway excavation.

At the end of each day’s operations, shape to drain and compact the work area to a uniform cross-section.

Delete 204.16(a)(1)(a) Measurement, Roadway Excavation and replace with the following:

(a) Roadway Prism excavation.

Add the following to Subsection 204.16(g) Measurement:

(g) Drainage features. Measurement includes all excavation, embankment, shaping, and grading necessary for a completed drainage feature.

Section 314. - STOCKPILED AGGREGRATES

Add the following to Subsection 314.01 Description:

Pit or quarry development work consists of clearing, grubbing, stripping topsoil, removing overburden, constructing access roads, conducting restoration activities, and performing other incidental work required for pit or quarry development. Includes processing and crushing material to produce specified aggregates.

Add the following to Subsection 314.04 Stockpile Site after the first sentence of second paragraph:

Submit a plan of operation according to Section 105.02. Perform the work in accordance with MSHA 30 CFR, part 56.

Delete the following paragraph of Subsection 314.05 Stockpile:

Section 625. - TURF ESTABLISHMENT

Delete and replace Subsection 625.03 General with the following:

625.03 General. Apply turf establishment to disturbed areas within ten (10) days after completion of gravel crushing operations.

Areas that have already been seeded and then damaged by construction activities shall be reseeded within ten (10) days of the damage. Do not seed during windy weather or when the ground is excessively wet, frozen, or snow covered.

Assure that all seed and mulch used in the work conforms to the weed free requirements of Section 713.

Do not allow vehicles or equipment onto newly seeded areas.

Furnish and apply the following kinds and amounts of pure live seed:

Type of Seed Quantity of Pure Live Seed (Lbs/Acre)

1. Mountain Bromegrass 5

2. Slender Wheatgrass 3

3. Thick spike Wheatgrass 3

4. Candy Bluegrass 3

5. Blue Wildrye 5 Total 19

Use the following equation to determine pounds of seed required:

PLS= Pounds of pure live seed

Ac=Acre

%PY= Percent purity

%GN= Percent germination

𝐿𝐿𝐿𝐿𝐿𝐿. 𝑜𝑜𝑜𝑜 𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝑡𝑡𝑡𝑡 𝑏𝑏𝑏𝑏 𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑒𝑒𝑒𝑒 𝑝𝑝𝑝𝑝𝑝𝑝 𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎 = �

𝑃𝑃𝑃𝑃𝑃𝑃

𝐴𝐴𝐴𝐴

𝑃𝑃𝑃𝑃 ∗ 𝐺𝐺𝐺𝐺

Section 703. - AGGREGATE

Delete Subsection 703.05(c)(3) Subbase, Base, and Surface Coarse aggregate, Surface coarse aggregate and replace with the following:

(3) Plastic Index, AASHTO T 90

If the percentage passing the No. 200 sieve is less than or equal to 12% - 2 to 16

If the percentage passing the No. 200 sieve is greater than 12% - Less than 2

Delete Surface Columns F, G, and H in Table 703-1 in Subsection 703.05 Subbase, Base, and Surface Coarse Aggregate and replace with the following F, G, H, S, T, and U columns:

Ta bl e

3-

Ta rg et V al ue

R an ge s f or S ur fa ce G ra da tio n

Pe rc en t b y M as s P as si ng D es ig na te d Si ev e

(A

AS

HT

O

T an d T

G ra di ng

D es ig na tio n

Su rf ac e

U

8.

.0

If th e pl as tic ity in de x (P

I) is gr ea te r t ha n

0, th e

TV

ra ng e fo r t he

N o.

si ev e siz e is

8-

(4

T

8.

S 10

8.

H

9.

G

.0

6.

F 10

-1

-8

-6

-5

-3

-2

.0

-1 6.

Si ev e S iz e

1/ in ch

3/

1/

3/

N o.

N o.

N o.

STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS
FP-24
COLUMBINE GRAVEL CRUSHING
FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (FSSS)
PREFACE
Section 101. – TERMS, FORMAT, AND DEFINITIONS
Section 104. – CONTROL OF WORK
Section 105. – CONTROL OF MATERIAL
Section 106. – ACCEPTANCE OF WORK
Section 108. - PROSECUTION AND PROGRESS
Section 109. - MEASUREMENT AND PAYMENT
Section 153. – CONTRACTOR QUALITY CONTROL
Section 204. – EXCAVATION AND EMBANKMENT
Section 314. - STOCKPILED AGGREGRATES
Section 625. - TURF ESTABLISHMENT
Section 703. - AGGREGATE