This is a Performance Work Statement for non-commercial thinning and grapple pile services on the Wallowa Whitman National Forest in Oregon. The U.S. Department of Agriculture Forest Service seeks a contractor to perform fuels reduction activities over approximately 377 base acres in the BCW Thin and Grapple #2 project units within the Whitman Ranger District. The contract period runs from June 15, 2026, to November 30, 2026. The project encompasses nine base units (17, 22F, 324A, 326, 328, 628, 628A, 644, and 667A) consisting of open ponderosa pine stands with scattered pockets of natural regeneration. The contractor must furnish all labor, supervision, equipment, transportation (except government-furnished items), and associated materials for fuels reduction work.

The primary objectives are to alter fuel bed continuity by addressing slash created by non-commercial thinning, natural woody debris buildup, and hazardous live fuels (ladder fuels) to enable rapid wildfire containment, enhance firefighter safety, reduce natural resource damage, and protect adjacent private property. The contractor must submit a work plan within 14 calendar days of award that includes a project milestone plan depicting 35%, 70%, and 100% completion dates; key personnel information; safety and fire plans; a quality control plan per FP-03 153.02; Forest Service overload permits; and an equipment storage request (Deliverable 01). Additional deliverables include a contractor property plan (Deliverable 02) and key personnel contact information (Deliverable 03), both due within 14 calendar days of award. No government property is furnished. The work must comply with detailed unit information standards with an acceptable quality level of 95%. No thinning shall occur prior to June 15 in pine stands to prevent pine beetle infestation, and the contractor must identify and report wet or moist soil conditions to the Contracting Officer's Representative for appropriate buffering.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Performance Work Statement

Non-Commercial Thinning and Grapple Pile Service for the Wallowa Whitman National Forest

BCW Thin and Grapple #2

Solicitation: TBD Contract:

Contents Project General Information

1.0 Scope of Work

Contractor Requirements

3.0 Performance Tasks

4.0 Property

4.1 Government Furnished

4.2 Contractor Property

5.0 Deliverables / Schedule

6.0 Travel. Not used

7.0 Contractor’s Key Personnel

8.0 Security Requirements. Not Used

9.0 Data Rights. Not Used

10.0 Section 508 – Electronic and Information Technology Standards. Not Used Attachments

Project Baker City Watershed (BCW) Thin and Grapple #2 Non-Commercial Thinning and Grapple Pile Service for the Wallowa Whitman National Forest

General Information

1.0 Scope of Work

The Wallowa Whitman National Forest requires Non-Commercial Thinning and Grapple Pile Service over approximately 377 Base acres in the BCW Thin and Grapple #2 project units of the Whitman Ranger District to reduce hazardous fuels. Specific performance tasks are listed in paragraph 3.

2.0 Background

2.1 Project Location

The project is located on the Whitman Ranger District.

1550 Dewey Avenue Baker City, OR 97814-3825 541-523-6391 Attn: Trevor Lewis, Cell 541-403-0759, Desk 541-523-1394 trevor.j.lewis@usda.gov .

2.2 Period of Performance

Base Period: June 15th, 2026, to November 30th, 2026.

Contractor Requirements

3.0 Performance Tasks

3.1 General:

3.1.a. This is a non-Personnel Services Contract: The Contractor shall furnish all labor, supervision, equipment, transportation, (except those designated as Government-furnished), and incidentals for Fuels reduction activities within the Wallowa Whitman National Forest within the scope of this contract.

3.1.b. Objective: The overall objective of this project is to alter the continuity of the fuel bed in predominately ponderosa pine and juniper stands with natural regenration understory; 1) slash created by non-commercially thinned units, 2) natural buildup of woody debris on the forest floor, and 3) hazardous live fuels (ladder fuels). The end result of activities performed under this call order would produce areas where a wildfire (should it occur) could be contained quickly.

Providing a safer working environment for firefighters to improve their probability of success in suppressing wildfires on Forest Service lands, produces less damage to natural resources, and to reduce the impact of wildfire to adjacent private citizens property, structures, and other values at risk.

3.1.c. Contractor Work Plan: The contractor shall submit a work plan for acceptance to the COR within 14 calendar days of award. (Deliverable 01). At a minimum the work plan shall include: 1) project milestone plan depicting 35%, 70% and 100% dates. 2) Key Personnel. 3) Safety Plan. 4) Fire Plan. 5) Contractor’s Quality Control Plan iaw FP-03

153.02 and 6) FS Overload Permits. 7) Contractor equipment storage request.

3.2 Project Area: BCW Thin & Grapple Pile #2 consisting of BCW Base units 17, 22F, 324A, 326, 328, 628, 628A, 644, and 667A. See BCW Thin and Grapple #2 maps.

3.2.a. Area Description: Open Ponderosa Pine stands, scattered pockets of natural Ponderosa Pine regeneration, with some scattered pockets of mixed conifer regeneration.

3.2.b. Tasks: The contractor shall be required to non-commercially thin, treat slash, and grapple pile identified units within the project area. Units are identified by pink flagging and Yellow Milex tags labeled BCW with associated unit number. (see attached pdf maps for unit numbers and locations).

mailto:trevor.j.lewis@usda.gov

3.2.c. Access: The BCW project area has multiple access points. Best access for these areas is to travel to Hwy 7 to Old Auburn Lane to FS road 7220 and associated spur roads, Hwy 7 to Elk Creek Lane and associated spur roads, and Pocahontas Road to Washington Gulch and associated spur roads. See Unit Specifics Sheet.

3.2.d. Special Considerations: No thinning shall be done prior to June 15th in pine stands to help limit the possibility of Pine Beetle infestation to residual leave trees.

Should wet or moist soil conditions be observed in the form of seeps, springs, bogs, etc. within the cutting unit, it shall be brought to the attention of the COR who will then buffer appropriately.

For special considerations regarding machinery/equipment, see the Detailed Unit Information Sheet (DUIS).

3.2.e. BCW Thin and Grapple #2 Project Area, Unit Specific spreadsheet

Whitman Ranger District

Baker City Watershed Thin & Grapple #2 Base Units

Base Unit Name

Unit Number Acres Latitude Longitude Legal Road Access

Boundary Flagging/Tag

Color Special Features to Project

BCW 17 81 44.7208 117.9348 T9S R39E Sec 21 Pocahontas Rd, Washington Gulch Rd, FS 7140-030

Pink Flag Yellow Tag

BCW 22F 21 44.7109 117.9927 T10S R39E Sec 7 Hwy 7, Old Auburn Ln, FS 7220

Pink Flag Yellow Tag Stream Channel

BCW 324A 11 44.7445 117.9344 T9S R39E Sec 33 Hwy 7, Elk Creek Ln.

To private road system

Pink Flag Yellow Tag Stream Channel

BCW 326 34 44.7086 117.9750 T10S R39E Sec 7 Hwy 7, Old Auburn Ln, FS 7220, 7225, 7225-010

Pink Flag Yellow Tag Stream Channel

BCW 328 27 44.7094 118.0024 T10S R38E Sec 12 Hwy 7, Old Auburn Ln, FS 7220, 7220-450

Pink Flag Yellow Tag Stream Channel

BCW 628 85 44.7511 117.9186 T9S R39E Sec 27 Hwy 7, Elk Creek Ln.

To private road system, 7140-150

Pink Flag Yellow Tag Stream Channel

BCW 628A 9 44.7626 117.9129 T9S R39E Sec 22 Hwy 7, Elk Creek Ln.

To private road system

Pink Flag Yellow Tag Stream Channel

BCW 644 47 44.7468 117.9448 T9S R39E Sec 28 Hwy 7, Elk Creek Ln.

FS 7140, To private road system, 7140-200

Pink Flag Yellow Tag

BCW 667A 62 44.7169 117.9964 T10S R38E Sec 1 Hwy 7, Old Auburn Ln, FS 7220, 7220-100

Pink Flag Yellow Tag

Total 377

Some units in this call order may have heritage sites that will require minimal mitigation measures to protect the sites. The awarded contractor will be given a list of the units and the mitigation measures at the post award meeting.

Standard: Work shall comply with Detailed Unit Information, (DUIS) listed Appendix A of in the Quality Assurance Surveillance Program (QASP) at Attachment 2.

Acceptable quality level, AQL: 95%

4.0 Property

4.1 Government Furnished. None

4.2 Contractor Property

(a) The contractor may store equipment and materials within the Wallowa Whitman National Forest as approved by the COR. The contractor shall submit an equipment and materials storage to the COR for approval within 7 calendar days of contract award. (Deliverable 02)

(b) The contractor stores equipment and material at its own risk and is responsible for the security of any contractor property stored on Government lands and facilities. The contractor holds the Government harmless for property security and damage.

5.0 Deliverables / Schedule

DELIVERABLE REFERENCE DUE SUBMIT TO

(1) Contractor work Plan

PWS Paragraph 3.1.b. At a minimum the work plan shall include: 1) project milestone plan depicting 35%, 70% and 100% dates. 100% shall be complete NLT 30 November 2024. 2) Key Personnel. 3) Safety Plan. 4) Fire Plan. 5) Contractor’s Quality Control Plan iaw FP-03 153.02 and 6) FS Overload Permits. 7) Contractor equipment storage request.

Within fourteen (14) calendar days after contract award

Contracting Officer’s Representative

(2) Contractor Property Plan

PWS Paragraph 4.2, Contractor Property.

Within fourteen (14) calendar days after contract award

Contracting Officer’s Representative

(3) Key Personnel PWS Paragraph 7, Contractor’s Key Personnel.

Within fourteen (14) calendar days after contract award

Contracting Officer’s Representative

6.0 Travel

Not Used

7.0 Contractor’s Key Personnel

The Contractor shall provide a Contract Manager and designated alternate, as applicable, who has full authority to act for the Contractor on all contract matters relating to this contract. The Contract Manager or alternate shall be available during the Government's regular working hours and shall be available on site within one hour after the Government's regular working hours. The Contractor shall submit the name and contact information of the contract manager in writing to the COR within 7 calendar days of award. (Deliverable 03)

8.0 Security Requirements

9.0 Data Rights

10.0 Section 508 – Electronic and Information Technology Standards

See Attached maps

Project
Baker City Watershed (BCW) Thin and Grapple #2
General Information
1.0 Scope of Work
Contractor Requirements
3.0 Performance Tasks
3.2.b. Tasks: The contractor shall be required to non-commercially thin, treat slash, and grapple pile identified units within the project area. Units are identified by pink flagging and Yellow Milex tags labeled BCW with associated unit number. (see ...
4.0 Property
5.0 Deliverables / Schedule
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards
See Attached maps