C2 26Q5702 Attachment 1 SOW Redacted.pdf
PDF 403 KB Posted
- Attached to
- Fiber Blow Machine - Intent to Sole Source Federal contract opportunity
- Solicitation number
- N4523A26Q5702
About this file
This Statement of Work (SOW) details a one-year Fiber Blow Machine Equipment Rental for PSNS&IMF, located in Bremerton, WA, covering the period from 1/25/2026 to 1/24/2027. The contractor is required to provide a complete fiber blow machine package, including a pI/AC Unit, Blowhead, fiber inlet guides, fiber inlet guide, pavoff case, and a tripod, with the machine to be stored and operated by S/51 licensed personnel for installing fiber optics. The rental period begins when the equipment leaves the contractor's facility and ends when the machine is received back at their facility.
The SOW includes a Quality Assurance Surveillance Plan (QASP) that establishes performance measurement standards, requiring 100% compliance across several key objectives: ensuring repaired equipment functions as intended, maintaining good communication with the government (addressing issues within 24 hours), providing assessment reports, and complying with FAR Clause 52.222-50 regarding combat trafficking in persons. The contractor must also report all labor hours via a secure Navy data collection site (https://doncmra.nmci.navy.mil) for each government fiscal year, with data to be submitted no later than October 31 of each calendar year.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOLE SOURCE SAT MEMORANDUM Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9. OTHER CONSIDERATIONS:
9.1. Technical Clarifications: All technical clarifications shall be coordinated through the Engineering Rep and Technical Subject Matter Experts.
9.2. Lay-down and Utilities Requirements: Vendor to coordinate with the COR and Project Subject Engineer for delivery(s) of parts to designated lay-down area.
9.3. POC Clarification: Government Technical Point of Contact is the primary point of contact is charge of reporting equipment status and receipt inspection.
QUALITY ASSURANCE SURVEILLANCE PLAN
Purpose: To ensure that the Government has an effective and systematic method of surveillance for the services in the SOW. The QASP will be used primarily as a tool to verify that the contractor is performing all services and delivery/installation of replacement parts required by the SOW in a timely, accurate and complete fashion.
Performance Measurement: Performance will be measured in accordance with the following table:
Services
Primary Performance Objectives
Performance Standard/AQL Performance Assessment Method
Services provided such that repaired equipment functions as intended
100% compliance Contractor shall provide assessment report to GSO
Contractor maintain close liaison and good communication with Government
Any problems or questions encountered by either party are addressed within 24 hours (1 business day)
Proved GSO with written report of discrepancies
Final condition report of assessment
100% compliance Provide GSO final assessment condition report
Contractor Compliance with FAR Clause 52.222-50, Combat Trafficking In Persons
100% Compliance and immediate notification of any violation
Inspection of contractor's policy by Government Representative
"The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Fiber Blower Machine Rental via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil.