C12_Att_01-Material_Equipment_In_Place_List.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- Bldg. 84 Remodel Restroom and Lunchroom
- Solicitation number
- N0025325Q0011
About this file
The file is an Excel spreadsheet (C12_Att_01-Material_Equipment_In_Place_List.xlsx) detailing equipment and materials for a Building 84 renovation project at Naval Undersea Warfare Center Keyport. The spreadsheet inventories specific assets to be replaced or installed, including two breathing air filters (Atlas Copco FTX345BU models) and approximately 300 square feet of Mohawk carpet across rooms 116, 117, and 118.
The associated solicitation (N0025325Q0011) is for a small business set-aside construction contract valued between $125,000-$175,000 to remodel Building 84's restroom and lunchroom. The project requires removing peeling paint, demolishing and installing plumbing fixtures, applying epoxy flooring, and repainting walls, ceiling, and window frames. The target award date is July 28, 2025, with performance at the Naval Undersea Warfare Center in Keyport, Washington. The procurement will use Low Price Technically Acceptable evaluation factors under FAR Parts 13 and 36, with NAICS code 238390 for Other Building Finishing Contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C26_WA20250109_20250606_Mod3.pdf | ||
| C24_N0025325Q00110002.pdf | ||
| C26_Attachment_Distro_A_rev2.pdf | ||
| C26_SOW_rev_2.pdf | ||
| C24_N0025325Q00110001.pdf | ||
| C26_Attachment_Distro_A_rev.pdf | ||
| C26_SOW_rev.pdf | ||
| C11_N0025325Q0011.pdf | ||
| C12_Att_03-Safety_Requirements_for_Contractors_and_Subcontractors.pdf | ||
| C12_Att_09-PPI_Form.docx | DOCX document | |
| C12_Att_10-Safety_Data_Sheet.docx | DOCX document | |
| C12_Att_11-OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf | ||
| C11b_Att_02_WD_WA20250109_03072025.pdf | ||
| C12_Att_08-Bid_Form.xlsx | XLSX spreadsheet | |
| C11d_Att_07-Past_Performance_References.docx | DOCX document | |
| C12_Att_05-OPSEC_Guide_for_Defense_Contractors.pdf | ||
| C12_Att_06-Schedule_of_Values.xlsx | XLSX spreadsheet | |
| C12_Att_04-Kpt_EV_Guide_for_Contractors_Jan_2025.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Installed Equipment
| Contract No: | |||||||||||||||
| Project Title: | Bldg. 84 Refresh Restroom and Lunchroom | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Notes: |
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. |
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. |
| 3. Enter equipment installed in column B and equipment removed in column O. |
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
Example
| Contract No: | NXXXXX-21-C-XXXX | ||||||||||||||
| Project Title: | Replace Breathing Air Filters and Install Carpet | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Breathing Air Filter | located behind cabinet next to AHU-1 op switch | 5094 | 101 | 1 | EA | $2,400.00 | Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/ | ||
| 360-123-4567 | Atlas Copco | FTX345BU | STB0004356 | 3/12/21 | 3/12/17 | 5094-0-101-154A-40-1H | |||
| Breathing Air Filter | located behind cabinet next to AHU-1 op switch | 5094 | 101 | 1 | EA | $2,400.00 | Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/ | ||
| 360-123-4567 | Atlas Copco | FTX345BU | STB0004357 | 3/12/21 | 3/12/17 | 5094-0-101-154A-40-1J | |||
| CARPET | 5094 | 116, 117, 118 | 300 | SQFT | $4,200.00 | Carpets - 156 Lumber Way, |
Bert WA 98317 carpets@msn.com
| 360-266-0154 | Mohawk | MOHAWH - STRBU | N/A | 3/21/19 | 3/12/17 | N/A |
| Notes: | ||||||
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. | ||||||
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. | ||||||
| 3. Enter equipment installed in column B and equipment removed in column O. | ||||||
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
File details come from the government source that posted it. Updated .