C12_Att_01_-_Material_Equipment_In_Place_List.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Bird Deterrent Federal contract opportunity
Solicitation number
N0025324Q0070
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document appears to be a Material Equipment In Place List for a federal contract opportunity. The key details are:

The contract is for the KB Dock/Keyport Piers Ladder Replacement project, with installed equipment including breathing air filters and carpeting. The contract number is not provided. The government is requesting proposals to install bird deterrents, including bird netting and spike strips, in various buildings at the Keyport, WA location. This is a firm fixed-price construction type contract with a target award date of January 15, 2024. The NAICS code is 236210 Industrial Building Construction with a $45 million small business size standard. The contract is 100% set aside for small businesses and will use a Low Price Technically Acceptable evaluation approach. Interested parties must submit proposals electronically in response to the solicitation numbered N0025324Q0070. The contracting office is the Department of the Navy Naval Sea Systems Command.

View the file

Other files for this federal contract opportunity

Other files attached to Bird Deterrent, newest first.
File Type Posted
N0025324Q00700001.pdf PDF
C12_Att_06__Distro_A_Drawings.pdf PDF
C12_Att_09_-_Bid_Form.xlsx XLSX spreadsheet
C12_Att_05_-_OPSEC_Guide_for_Defense_Contractors.pdf PDF
C11b_Att_02_-_WA20240109_10242024.pdf PDF
C12_Att_12_-_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf PDF
C12_Att_11_-_Safety_Data_Sheet.docx DOCX document
C12_Att_07_-_Schedule_of_Values.xlsx XLSX spreadsheet
C12_Att_04_-_Contractors_Guide_to_Env_Compliance.pdf PDF
C12_Att_03_-_Safety_Requirements_for_Contractors_and_Subcontractors.pdf PDF
C11_N0025324Q0070.pdf PDF
C12_Att_10_-_PPI_Form.docx DOCX document
C11d_Att_08_-_Past_Performance_References.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Installed Equipment

Contract No:
Project Title:KB Dock/Keyport Piers Ladder Replacement
Asset NumberDescriptionLong DescriptionBuilding No.Room No.Asset QtyUOMReplacement CostSupplier/VendorManufactureModel No.Serial No.Manufacture Warranty Expiration DateInstallation DateEquipment Removed
New Asset Number
(Note 4)Description of Equipment or materials Installed
(Note 3)Additional Relevant Information (e.g. size, capacity, limits, etc…)Building #Room Number of installed equipmentQuantity
(Note 1)Standard Unit of Measure for asset installedCost (material and labor to remove (if applicable) and install asset
(Note 2)Name/Address/Email/
Phone NumberManufacturerModel number of installed equipmentSerial number of installed equipmentMM/DD/YYYY
(Where no Manufacture Warranty use Contract Warranty Date)MM/DD/YYYY
Asset Number of removed asset

(if no label present on asset this column is Not Applicable) (Note 3)

Notes:
1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset.
2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset.
3. Enter equipment installed in column B and equipment removed in column O.
4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government.

Example

Contract No:NXXXXX-21-C-XXXX
Project Title:Replace Breathing Air Filters and Install Carpet
Asset NumberDescriptionLong DescriptionBuilding No.Room No.Asset QtyUOMReplacement CostSupplier/VendorManufactureModel No.Serial No.Manufacture Warranty Expiration DateInstallation DateEquipment Removed
New Asset Number
(Note 4)Description of Equipment or materials Installed
(Note 3)Additional Relevant Information (e.g. size, capacity, limits, etc…)Building #Room Number of installed equipmentQuantity
(Note 1)Standard Unit of Measure for asset installedCost (material and labor to remove (if applicable) and install asset
(Note 2)Name/Address/Email/
Phone NumberManufacturerModel number of installed equipmentSerial number of installed equipmentMM/DD/YYYY
(Where no Manufacture Warranty use Contract Warranty Date)MM/DD/YYYY
Asset Number of removed asset

(if no label present on asset this column is Not Applicable) (Note 3)

Breathing Air Filterlocated behind cabinet next to AHU-1 op switch50941011EA$2,400.00Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/
360-123-4567Atlas CopcoFTX345BUSTB00043563/12/213/12/175094-0-101-154A-40-1H
Breathing Air Filterlocated behind cabinet next to AHU-1 op switch50941011EA$2,400.00Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/
360-123-4567Atlas CopcoFTX345BUSTB00043573/12/213/12/175094-0-101-154A-40-1J
CARPET5094116, 117, 118300SQFT$4,200.00Carpets - 156 Lumber Way,

Bert WA 98317 carpets@msn.com

360-266-0154MohawkMOHAWH - STRBUN/A3/21/193/12/17N/A
Notes:
1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset.
2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset.
3. Enter equipment installed in column B and equipment removed in column O.
4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government.

File details come from the government source that posted it. Updated .