C12_Att_01_-_Material_Equipment_In_Place_List.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- Bldg 514 Temporary Heat Federal contract opportunity
- Solicitation number
- N0025324Q0074
About this file
The provided document is an Excel spreadsheet titled "C12_Att_01_-_Material_Equipment_In_Place_List.xlsx" that contains a detailed list of installed equipment, materials, and associated cost information for a federal contract. The spreadsheet includes columns for asset number, description, building number, room number, quantity, unit of measure, replacement cost, supplier/vendor information, manufacturer details, warranty information, and installation date. This spreadsheet appears to be a deliverable or attachment required as part of a larger federal contract opportunity.
The related federal contract opportunity is for the installation of temporary heat in Building 514 at Keyport, WA. The solicitation number is N0025324Q0074, and the government estimate for the project is between $100,000 and $150,000. The contract will be a single firm-fixed-price construction type awarded under FAR Parts 13 and 36, utilizing a Low Price Technically Acceptable evaluation approach. An organized site visit is included in the solicitation requirements, and all responsible sources may submit proposals.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C11b_Att_02_-_WA20240109_09272024.pdf | ||
| C24_N0025324Q00740002.pdf | ||
| C11b_Att_02_-_WA20240109_09062024.pdf | ||
| N0025324Q00740001.pdf | ||
| C12_Att_10_-_Safety_Data_Sheet.docx | DOCX document | |
| C12_Att_06_-_Schedule_of_Values.xlsx | XLSX spreadsheet | |
| C12_Att_04_-_Contractors_Guide_to_Env_Compliance.pdf | ||
| C12_Att_03_-_Safety_Requirements_for_Contractors_and_Subcontractors.pdf | ||
| C12_Att_08_-_Bid_Form.docx | DOCX document | |
| C12_Att_05_-_OPSEC_Guide_for_Defense_Contractors.pdf | ||
| C12_Att_11_-_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf | ||
| C11b_Att_02_-_WD_WA20240109.pdf | ||
| C11_N0025324Q0074.pdf | ||
| C12_Att_09_-_PPI_Form.docx | DOCX document | |
| C12_Att_07_-_Past_Performance_References.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Installed Equipment
| Contract No: | |||||||||||||||
| Project Title: | KB Dock/Keyport Piers Ladder Replacement | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Notes: |
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. |
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. |
| 3. Enter equipment installed in column B and equipment removed in column O. |
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
Example
| Contract No: | NXXXXX-21-C-XXXX | ||||||||||||||
| Project Title: | Replace Breathing Air Filters and Install Carpet | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Breathing Air Filter | located behind cabinet next to AHU-1 op switch | 5094 | 101 | 1 | EA | $2,400.00 | Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/ | ||
| 360-123-4567 | Atlas Copco | FTX345BU | STB0004356 | 3/12/21 | 3/12/17 | 5094-0-101-154A-40-1H | |||
| Breathing Air Filter | located behind cabinet next to AHU-1 op switch | 5094 | 101 | 1 | EA | $2,400.00 | Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/ | ||
| 360-123-4567 | Atlas Copco | FTX345BU | STB0004357 | 3/12/21 | 3/12/17 | 5094-0-101-154A-40-1J | |||
| CARPET | 5094 | 116, 117, 118 | 300 | SQFT | $4,200.00 | Carpets - 156 Lumber Way, |
Bert WA 98317 carpets@msn.com
| 360-266-0154 | Mohawk | MOHAWH - STRBU | N/A | 3/21/19 | 3/12/17 | N/A |
| Notes: | ||||||
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. | ||||||
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. | ||||||
| 3. Enter equipment installed in column B and equipment removed in column O. | ||||||
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
File details come from the government source that posted it. Updated .