C05__PWS_Attachment_-_Reference_Manual_A.pdf
PDF 3 MB Posted
- Solicitation number
- 140R2025Q0020
About this file
This is an operation manual and parts list for a Black Bear brand electric wire rope hoist model PUIH-1500-60FT manufactured by Cheng Day Machinery Works Co., Ltd. The manual provides detailed safety instructions, specifications, installation procedures, and maintenance requirements for a 15-ton capacity electric wire rope hoist operating on 460V three-phase 60Hz power. Key technical specifications include a working temperature range of -5 to +40°C, IP54 protection rating, and Ø18mm wire rope with 195kg/mm2 tensile strength. The manual contains comprehensive maintenance schedules (daily, monthly, annual), troubleshooting guides, and detailed parts lists with exploded assembly diagrams for the gear box, motor, bottom block, hoist frame, and trolley frame assemblies. Special emphasis is placed on safety features including motor brake, mechanical load brake, hook latches, and limit switches. The document includes specific procedures for brake adjustment and inspection, requiring checks every 3 months with a 2mm air gap tolerance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140R2025Q0020.pdf | ||
| C05__Wage_Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SERIES:PUIH-1500-60FT
SAFETY-IMPORTANT
The use of any hoist and trolley presents some risk of personal injury or property damage.
hat risk is greatly increased if proper instructions and warnings are not followed. Before using this hoist, each user should become thoroughly familiar with all warnings, instructions and recommendations herein.
THIS SYMBOL POINTS OUT IMPORTANT SAFETY
INSTRUCTIONS WHICH IF NOT FOLLOWED COULD
ENDANGER THE PERSONAL SAFETY AND/OR
PROPERTY OF YOURSELF AND OTHERS. READ AND
FOLLOW ALL INSTRUCTIONS IN THIS MANUAL AND
ANY PROVIDED WITH THE EQUIPMENT BEFORE
ATTEMPTING TO OPERATE YOUR "BLACK BEAR"
ELECTRIC WIRE ROPE HOIST.
CONTENTS
Safety – Important …………………………………………………………………………………………… 1
1.Foreword………………………………………………………………………………………………………. 3
2.Main Specification….………………………………………………………………………………………… 4
2.1 Specification……………………………………………………………………………………………… 4
2.2 Mechanical Classification (Grade) and Life…………………………………………………… 5
2.3 Safety Device…………………………………………………………………………………………… 6
3.Safety Rules…….……………………………………………………………………………………………… 7
4.Installation……………………………………………………………………………………………………… 10
4.1 Unpacking Information.……………………………………………………………………………… 10
4.2 Voltage…………..………………………………………………………………………………………… 10
4.3 Installation………………………………………………………………………………………………… 10
5.Operation.……………………………………………………………………………………………………… 12
6.Maintenance and Inspection……………………………………………………………………………… 13
6.1 Maintenance….………………………………………………………………………………………… 13
6.2 Inspection………………………………………………………………………………………………… 13
7.Troubleshooting……………………………………………………………………………………………… 16
7.1 Troubleshooting and Remedial Action…………………………………………………………… 16
8.Wire rope reeving…………………………………………………………………………………………… 17
9.Parts List..…………………………………………………………………………………………………… 18
10. Adjust the air gap as follows ………………………………………………………………………… 30
1. FOREWORD
This manual contains important information to help you properly install, operate and maintain the Black Bear electric wire rope hoist for maximum performance, economy and safety.
Please study its contents thoroughly before putting the electric wire rope hoist into operation.
By practicing correct operation, procedures and by carrying out the preventative maintenance recommendations, you will be assured of dependable service. In order to help us to supply correct spare parts quickly, please always specify,
(1) Hoist model
(2) Serial number
(3) Part number, plus the description.
We will have your trust of Cheng Day’s long term satisfactory service as our belief.
Should you have any queries, please contact:
(Please ask for a company's stamp from your local agent)
2. MAIN SPECIFICATIONS
2.1 Specifications
The following specifications are common to all Black Bear electric wire rope hoists.
Table 2-1 Specifications
Item Detail
Working temperature range(℃) -5 to +40
Working humidity range (%) 85 or less
Protection Hoist IP 54
Electric power supply Three Phase, 460V , 60 Hz
Noise Level (dB) 81
Wire Rope diameter
WLL (working load limit)(t) Nominal diameter (mm)
15T (33000 lbs) Ø 18× 86M 19× 7(195kg/mm2)
Remarks:
(1) Contact an authorized Black Bear dealer for information on using the hoist outside the working temperature or humidity range.
(2) Intended use: This hoist has been designed for vertically lifting and lowering load under normal atmospheric conditions of work place.
(3) Noise levels were measured at a distance of 1m horizontally from the hoists during normal operation.
2.2 Mechanical Classification (Grade) and Life
Safety and life for electric wire rope hoists are guaranteed only when the said equipment is operated in accordance with the prescribed grade.
Black Bear electric wire rope hoists have been designed according to FEM-2m regulations (FEM 9.511).
Details are provided in Table 2-2.
Average daily operating time and total operating time are determined by load distribution.
Table 2-2 Mechanical classification
Load Spectrum (Load distribution)
Definitions Cubic mean value
Average daily operating time
(h)
Total operating time (h)
(light)
Mechanisms or parts thereof, usually subject to very small loads and in exceptional cases only to maximum loads.
k≦0.50 4 - 8 12500
(medium)
Mechanisms or parts thereof, usually subject to small loads but rather often to maximum loads.
0.50<k ≦0.63
2 - 4 6300
(heavy)
Mechanisms or parts thereof, usually subject to medium loads but frequently to maximum loads.
0.63<k ≦0.80
1 - 2 3200
(very heavy)
Mechanisms or parts thereof, usually subject to maximum or almost maximum loads.
0.80<k ≦1.00
0.5 - 1 1600
% operating time Load spectrum 1
% operating time Load spectrum 2
% operating time Load spectrum 3
% operating time Load spectrum 4
2.3 Safety Devices
(1) Motor brake
"AC Electro-Magnetic Brake" is of a unique design in its field. It features simultaneous motor braking upon removing power even under full load condition.
(2) Mechanical load brake
The mechanical load brake can hold a full capacity load independent of motor brake.
This brake assures that load does not accelerate while being lowered.
(3) Hook and hook latch
The hook is drop - forged from high tensile steel and heat treated for strength and toughness. The button hook is capable of 360°swivel and fitted with safety latch to ensure safe lifting.
(4) Limit Switches
Upper and optional lower limit switches are fitted for switching off power automatically in case of over lifting or over lowering.
(5) Emergency stop device (optional)
This button is used to stop the hoist in an emergency situation. It is a red, mushroom type button, located in the uppermost position on the pendant. When pressed, power to the equipment is switched off and the button locks automatically. Turning it to the right will release the lock and to enable re-starting. (Illust.1)
Illust.1
3. SAFETY RULES
(1) Only the trained personnel are allowed to operate the hoist.
(2)
(3) Prior to each lifting operation, it is essential to make sure that:
(a) the correct lifting sling is being used.
(b) the lifting sling is located in the hook as shown below (Illust.2) and that a safety latch has been fitted.
Illust.2
(c) the object to be hoisted is well secured for direct lifting (a proper lifting frame or apparatus is strongly recommended for direct lifting.)
The hoist herein is not designed for, and should not be used for, lifting, supporting, or transporting personnel.
Any modifications to upgrade , re-rate, or otherwise alter the hoist equipment must be authorized by either the original manufacturer or a qualified professional engineer.
Do not use the hoist in explosive atmosphere.
(4) Firm and steady button operation is required, avoid jogging.
(5) Avoid excessive inching operation.
(6) Always make sure the hoist motor completely stops before reversing.
(7) Always leave the pendant button switch cable and bottom hook vertically static after completion of operation, never leave them at any position, which may allow them swing or slip.
(8) Sling must be applied to load evenly and centrally to ensure correct balance. Never lift any object which is insecure or out of balance.
(9) Never Side load, back load, or tip load a hook. (Illust.3)
(10) Never wrap around and hook back the wire rope as a sling to lift a load. (Illust.4)
Illust.3 Illust.4
(11)
Do not use the Hoist’s wire rope as a welding electrode.
(12)
Illust.5
(13) Lifting must always be personally attended, never leave a raised load unattended.
(14) Over-capacity-load lifting is hazardous and should not be undertaken.
(15) Never lift a load when the wire rope is twisted.
(16) Regularly inspect and check the condition of wire rope. Do not operate with damaged wire rope.
Never stand under a raised load (Illust.5)
4. INSTALLATION
4.1 Unpacking Information
After removing the hoist from its packing box, carefully inspect the external condition of the electrical cables, contactor, gear box and motor casing for damage.
4.2 Voltage
4.3 Installation
If power supply deviates from standard by more than ± 10%, abnormal operation or damage to the motor may result. It is imperative to ensure correct voltage supply before commencing operation.
Connection to power supply before installation procedures having been completed is strictly prohibited.
(1) Prior to installation ,for the Top Running hoist, check dimension “C” & “K” to insure dimension is compatible to the rail size or the gauge between the rails;
for the monorail hoist-please insure trolley adjustment equal to beam’s width.
(Please refer to illustration 6)
Illust.6
(2) Connect power supply to hoist and operate the up push button switch. If the hoist goes down, release the button , go to power source and change (switch) any two wires. Do not modify or change any wires in the push button station.
Illust.7
Monorail Hoist Top Running Hoist
(3) Operation Test
(A) push switch button to lower bottom hook until the drum has only 3 wraps left on the drum.
(B) push switch button to check if the rope winds into the drum grooves.
(C) Check the emergency stop device function (if fitted):
While holding down either or button on the push button switch, push the emergency stop button. Check that the hook stops when the emergency stop button is pushed. Also, verify the hoist does not move in response to the push button switch.
Finally, check that the emergency stop device pops out when turned to the right and that operation can be resumed thereafter. If the equipment fails to pass either of the above checks, check the wiring and automatic locking function of the emergency stop device.
(D) Check to insure upper limit stop works properly by raising the lower block to a point just below engagement. Then carefully jog “UP” into engagement .
When engaged, the “UP” button should be inoperative.
5. OPERATION
After running test and checks have been completed, the hoist will be ready for normal operation.
(1) The operator must have a clear and unobstructed view of the entire working area before operating the hoist.
(2) The operator must check that the entire working area is safe and secure before operating the hoist.
(3) When using the hoist with a motorized trolley, the operator must take care to prevent excessive load swinging by careful use of the trolley controls.
Since dealing with heavy loads may involve unexpected danger, all of the "SAFETY RULES" (Ref 3.) must be followed and the operator must be aware of the following points while using the hoist.
6. MAINTENANCE AND INSPECTION
6.1 Maintenance
(1) Check the level of gearbox lubricant after first 500 hours of operation, thereafter every 3 months and lubricant accordingly.
Note: We recommend using lubricant oil equivalent to ISO VG460 as table of following annual inspection.
(2) Always keep the hoist unit dry and never misuse it in a manner likely to reduce its durability.
(3) When it is necessary to keep the unit outdoors, a protective covering should be fitted.
6.2 Inspection
(1) Daily inspection: Before starting daily operation, check the following,
(a) Correct power supply.
(b) "Up", "Down" and "Emergency stop" (where fitted) test runs under no load.
(c) Correct motor performance.
(d) No abnormal or excessive noise.
(e) No malfunction of the bottom hook safety latch.
(f) Proper function of moving/turning parts, limit switches and brake.
(g) The condition of wire rope and winding evenly over the drum.
(h) Wire rope in of the bottom block’s sheave.
Do not perform maintenance on the hoist while it is carrying a load except monthly checking for the brake or limit switch.
Before performing maintenance do not forget to affix tags to the power source and the push button switch reading: “DANGER”, “EQUIPMENT BEING REPAIRED”.
(2) Monthly inspection
(a) Wire rope:
a-1: Any single strain of wire breaking. Breaking of strains more than 10% should replace new wire rope.
a-2: Any distorted, deform , itching and rusty of wire rope.
a- 3: Wire rope fixing fasteners being deforming of loosing.
Rope Dia.
(m/m) d
Model Being Used Construction Specified Breaking Load(kN)
Ø 18 PUIH-1500
19× 7
(195kg/mm2)
Table 6-2-a
(b) Load hook:
Check hook with care. If hook shows crack deformation or wear in excess of 10% of its original size, it should be replaced (Ref. following table)
Always use the hoist manufacture's recommended parts when repairing a hoist.
Capacity
(ton)
Dimensions (mm) Tensile Strength
( kg/mm2) H1 B1 B2 H2 B3 B4 C g E
15 120 85 32 110 83 32 120 82 167 70
Table 6-2-b
(c) Limit Switches
A qualified electrician should perform this inspection.
Check correct operation of the limit switches to prevent the drum from over winding.
(3) Annual inspection
(a) Check gearing for any excessive wear or damage.
(b) Replace gearbox lubricant completely.
Oil volume of gearbox
Ton 15
Gear Box NO. UI
U.S. gal 9.24
Liter 35 Gear Oil No:COSMO #W460
NOTE: 1(U.S. gal)= 3.78537 Liter
Recommended oils according to DIN 51354
ISO-VGDIN 51519
viscosity At
40°C 2mm /s(cST)
Approximate viscosity of the VG Categories
50°C 2mm /s(cST)
ARAL BP ESSO MOBIL OIL
VG460 251
Aral Degol
BG
460-BMB
BP Energol
GR-XP 460
Spartan
EP-460
Mobilgear
ISO-VGDIN 51519
Viscosity At
40°C 2mm /s(cST)
Approximate viscosity of the VG Categories
50°C 2mm /s(cST)
SHELL TEXACO I.P. AGIP TOTAL
VG460 251
Omala oil
Meropa
Mellana
Blasia
Carter
EP 460
(c) Check brake lining and ratchet pawl for emergency braking any wear or damage.
(d) Check operation of pawl spring.
(e) After reassembly of above check, lifting a load several times to ensure good performance of the hoist before starting duty operation.
Your dealer should be asked to perform this inspection.
7. TROUBLESHOOTING
7.1 Troubleshooting and Remedial action
SITUATION CAUSE REMEDY
Hoist will not operate
(1) Blown power fuse or tripped power circuit breaker
(2) Blown control circuit fuse
(3) Broken/disconnected power or control circuit wire
(4) Low supply voltage
(5) Motor hums but does not rotate
(6) Emergency stop button release pushed (if fitted)
(7) Faulty contactor
Check supply requirements and refuse/reset breaker to meet requirements
Check fuse for correct rating and replace
Locate and repair/reconnect
Check if 10% reduction in voltage, have mains supply checked
Check phases to motor - insulate and repair
Check the cause as necessary
Operate manually if hoist runs then control circuit/coil is faulty - locate fault and repair.
If hoist does not run then check main supply. If input supply is correct but there is a faulty output supply then replace the contactor
Hoist will not stop Welded contacts in contactor
Replace contactor
Brake slips Abrasion of motor brake Replace
Abnormal sound on the hoist operation.
(1) Wire rope dry
(2) Twisting & bending of wire rope due to frequently side pull.
(3) Worn or deteriorated oil packing
Lubricate
Replace new wire rope.
Replace new wire rope.
Electric shock (1) Poor earth connection
(2) Accumulated foreign matter/ moisture on electrical parts
Provide correct earth connection
Remove foreign matter/dry electrical parts
Oil leak (1) No oil plug
(2) Loose fitting of oil plug
(3) No plug packing
(4) Worn or deteriorated oil packing
Attach the normal oil plug
Fasten the plug tightly
Attach normal packing
Attach the new packing
9. DRAWINGS AND PARTS LIST
(1) “UIT” TYPE GEAR BOX EXPLOSION DRAWING
(2) “UIT” BILL OF MATERIAL
(3) MOTOR EXPLOSION DRAWING
(4) MOTOR BILL OF MATERIAL
(5) BOTTOM BLOCK EXPLOSION DRAWING
(6) BOTTOM BLOCK BILL OF MATERIAL
(7) HOIST FRAME EXPLOSION DRAWING
(8) HOIST FRAME BILL OF MATERIAL
(9) TROLLEY FRAME EXPLOSION DRAWING
(10) TROLLEY FRAME BILL OF MATERIAL
"UIT" TYPE GEAR GEAR BOX EXPLOSION
GEAR BOX ASSEMBLY B.O.M
NO.
PARTS
CODE
DESCRIPTION
Q’TY REQ’D EACH UNIT
“UIT” TYPE
01 402646 Gasket(A) <t0.8× 540× 770L> 1
02 407741 Bearing <6213> 2
03 405947 Key <18× 11× 55L> 4
04 267910 Drum Pinion Gear <M5.5× 23T> 1
05 407714 Bearing <6209> 1
06 400651 Spring Washer <M14> 7
07 400442 Hex. Recess Bolt <M14× 2.0× 50L> 7
08 405945 Key <28× 16× 150L> 2
09 405946 Key <32× 18× 95L> 2
10 267621 Gear Case Base A 1
11 400929 Oil Seal <ø100× ø125× 13t> 1
12 400792 Bearing <6220 Z> 1
13 404154 Retaining Ring <R-68> 1
14 407773 Bearing <6008 Z> 1
15 268814 Drum Shaft 1
16 404513 Oil Seal <ø35× ø55× 11t> 1
17 405564 Bearing <6007 2RS> 1
18 267913 Drum Gear <M5.5× 89T> 1
19 407744 Bearing <6218> 1
20 404341 O Ring <ø20× ø26× 3> 1
21 206856 Lubricant Filling Plug 1
22 267622 Gear Case B 1
23 205327 Pin <ø12× ø8.5× 14L> 4
24 400919 Retaining Ring <S-60> 1
25 402645 Gasket (B) <t0.8× 540× 670L> 1
26 407750 Bearing <6308> 1
27 400991 Key <16× 10× 35L> 2
28 267967 Load Brake Gear Shaft <M3.5× 18T> 1
29 267966 Intermediate Gear <M2.5× 128T> 1
30 400197 Retaining Ring <S-50> 1
31 407759 Bearing <6208> 1
32 407203 Drain Plug <PT 3/4”> 1
GEAR BOX ASSEMBLY B.O.M
PARTS
CODE
DESCRIPTION
Q’TY REQ’D EACH UNIT
“UIT” TYPE
33 400096 Spring Washer <M10> 30
34 400432 Hex. Recess Bolt <M10× 1.5× 65L> 16
35 267909 Load Brake Gear <M3.5× 99T> 1
36 F19000796134 Motor Shaft Pinion 1
37 407748 Bearing <6305> 1
38 404487 Oil Seal <ø28× ø17× 6t> 1
39 F19000796139 Cover 1
40 F19000796136 Gear Case Cover 1
41 400450 Hex. Recess Bolt <M10× 1.5× 35L> 14
42 274702 Motor Shaft Pinion <M2.0× 60T> 1
43 400918 Retaining Ring <S-80> 1
44 407748 Bearing <6305> 2
45 400194 Retaining Ring <S-35> 1
46 274802 Connecting Rod Gear <M2.0× 60T> 1
47 400963 Key <6× 6× 15L> 2
48 268819 Connecting Rod 1
49 405900 Key <3× 3× 10L> 1
50 400940 Oil Seal <ø25× ø52× 8t> 1
51 F19000796103 Limit Pedestal Ass’ y 1
52 274957 Limit Pedestal <t9× 91× 115> 1
53 F19000796111 Limit Switch 1
54 400205 Screw <M5× 0.8× 8L> 2
55 F19000796140 Chain Wheel <1/4”×16T> 1
56 404459 O Ring <ø28× ø34× 3t> 1
57 201337 Sight Glass < M30× 1.5P > 1
58 F19000796102 Limit Frame <t2× 346> 1
408421 Chain Connection <1/4”> 1
400561 Chain <1/4”×300L> 0.4
MOTOR EXPLOSION (Ø 260 SERIES)
MOTOR ASSEMBLY B.O.M
KEY
PARTS
CODE
DESCRIPTION
Q’TY REQ’D EACH UNIT
Ø 260
13KW
1 101179 Flange 1
2 400651 Spring Washer <M14> 12
3 400440 Hex. Recess Bolt <M14× 2.0× 35> 6
4 400640 Nut <M20× 2.5> 6
5 400099 Spring Washer <M20> 12
6 400442 Hex. Recess Bolt <M14× 2.0× 50L> 6
7 F19000796192 Motor Component (Cable Box) 1
8 F19000796191 Motor Stator Ass’y 1
9 405628 Bearing <6308 2RU> 1
10 107340 Motor Rotor 1
11 405627 Bearing <6310 2RU> 1
12 105835 Brake Housing 1
13 207192 Stay Bolt < M2.0× 2.5× 232> 6
14 408531 Brake Spring 3
15 207196 Spacer 3
16 404183 Retaining Ring <S-24> 3
17 105519 Disc Hub 1
18 400197 Retaining Ring <S-50> 1
19 105520 Friction Disc 3
20 105894 Disc Plate 2
21 115323 Armature & Spring Base 1
22 105816 Brake Bracket 1
23 406418 Lock Nut <M20× 2.5> 6
24 408553 Auxiliary Spring 6
25 408471 Brake Spring 1
26 400447 Hex. Recess Bolt <M12× 1.75× 50L> 6
27 105924 AC Solenoid 1
28 105840 Brake Shim 6
29 105829 Brake Drum 1
30 400441 Hex. Recess Bolt <M14× 2.0× 45L> 6
31 207121 Release Bar 1
MOTOR ASSEMBLY B.O.M
PARTS
CODE
DESCRIPTION
Q’TY REQ’D EACH UNIT
Ø 260
13KW
32 400017 Hex. Recess Bolt <M8× 1.25× 35L> 1
33 400088 Lock Nut <M8× 1.25> 1
34 400097 Spring Washer <M12> 6
35 400091 Lock Nut <M12× 1.75> 6
36 105803 Brake End Cover 1
37 400178 Oil Seal < Ø 70× Ø 90× 10t> 1
38 216742 Bracket 1
39 404042 Fan 1
40 105767 Grids 1
BOTTOM BLOCK EXPLOSION
BOTTOM BLOCK B.O.M
PARTS
CODE
DESCRIPTION
Q’TY REQ’D EACH UNIT
PUIH-1500
01 207155 Bottom Hook Side Cover Ass'y 2
02 404188 Retaining Ring <S-110> 2
03 405575 Bearing <6022 Z> 4
04 268904 Sheave <Ø 408× 70L> 2
05 207154 Bottom Hook Side Cover 2
06 400097 Spring Washer <M12> 16
07 400435 Hex. Recess Bolt <M12× 1.75× 25L> 16
08 207158 Bottom Hook 1
09 400304 Safety Latch Ass’y 1
10 400584 Set Screw < M8× 1.25× 30L> 2
11 202046 Hex. Nut < M64× 6.0 Ø 137× 80L> 1
12 200303 Dust Proof Cover< Ø 139.7× Ø 127× 19L > 1
13 400155 Thrust Bearing <51314> 1
14 207157 Bearing Housing <t130× 170× 352L> 1
HOIST FRAME ASSEMBLY
HOIST FRAME ASSEMBLY B.O.M
PARTS
CODE
DESCRIPTION
Q’TY REQ’D EACH UNIT
PUIH-1500
01 F19000796161 Hoist Frame 1
02 407814 Bearing <6220 ZZ> 1
03 205468 Coupling <ø48× ø28× 62L> 2
04 F19000796141 Drum <Ø 356× Ø 298× 2214> 1
05 F19000796145 Drum Shaft <Ø 50× 2267> 1
06 407857 Bearing <6208 Z> 1
07 206468 Link Equalizer 1
08 200635 Keeper <t6× 38× 70L> 2
09 400095 Spring Washer <M8> 4
10 400012 Hex. Recess Bolt <M8× 1.25× 20L> 2
11 205471 Load Axle <Ø 50× 285L> 1
12 F19000796101 Pinroll Load Cell < Ø 60× 150> 1
13 205240 Washer < Ø 76× Ø 61× 5L> 2
14 407823 Bearing <6312 Z> 2
15 205207 Equalizer Sheave <Ø 400× Ø 130× 70> 1
16 400012 Hex. Recess Bolt <M8× 1.25× 20L> 2
17 271024 Mounting Bolts <1 1/2"× 6UNC× 560> 4
18 263561 Counter Weight Block 12
19 400012 Hex. Recess Bolt <M8× 1.25> 4
20 263392 Spacer Tube < Ø 60.5× Ø 39× 15L> 4
21 400106 Spring Washer <1 1/2"> 4
22 202012 Hex. Nut<1 1/2"× 6UNC > 4
300244 Load Monitor <D600> 1
TROLLEY FRAME EXPLOSION
1 3
TROLLEY FRAME ASSEMBLY B.O.M
PARTS
CODE
DESCRIPTION
Q’TY REQ’D EACH UNIT
PUIH-1500
1 202019 Nut <2 1/2× 4UNC> 4
2 400861 Spring Washer <2 1/2”> 4
3 F19000796177 Plain Frame Ass’y 2
4 407819 Bearing <6308 ZZ> 16
5 203522 Plain Wheel 4
6 400195 Retaining Ring <S-40> 8
7 203503 Transmission Wheel 4
8 F19000796173 Motor Frame Ass’y 2
9 408359 Stay Bolt <2 1/2”×4UNC×620> 2
10 203447 Spacer Sleeve <Ø 66× Ø 92× 6.35> 40
11 201674 Drive Pinion <M3.5× 15T > 2
12 F19000796193 Reduction Motor <0.75KW> 2
13 228584 Guide Wheel Axle 8
14 228583 Spacer < Ø 30× Ø 21× 10> 16
15 228597 Guide Wheel 8
16 407835 Bearing <6204 Z> 8
17 400198 Retaining Ring <R-47> 8
18 400191 Retaining Ring <S-20> 8
19 400097 Spring Washer <M12> 32
20 400023 Hex. Recess Bolt <M12× 1.75× 35L> 32
10. Adjust the air gap
#Routine Maintenance For Adjustable Brake:
1. Inspect every 3 months (for more frequently use, recommend to inspect monthly.)
2.Firstly, follow the arrow direction (the inspection hole) to install the 2mm thickness gauge to inspect the condition of wear out on the friction disc.
3.If the gap is smaller than 2mm, it's in the normal condition and can be use continuously.
4.If greater than 2mm, must take out (10) and adjust the brake shim FIG-1.
#How To Adjust The Brake Shim:
1.Loosen 4pcs of hex. recess bolt (9) for 2 circles, take out 1pc of brake shim from each side left and right. And tighten 4pcs of hex. recess bolt (9) afterward.
2.Repeat the procedure until the gap is smaller than 2mm, then it can be applied continuously.
3.Manual release bar is located inside of control box. Purpose : for gap or release the brake.
#Operation for manual release bar:
1.Ensure main power is off.
2.Remove hoisting motor end cover.
3.Fix the release bar with the hex. recess bolt as FIG-2.
4.Pull the release bar as FIG-3.
FIG-2 FIG-3.
Inspection Hole
1.Friction Disc
2.Armature Plate(B)
4.Spring Guide
3.Brake Spring
7.Stay Bolt
8.Brake Cap
6.Brake Bracket
5.Armature Plate(A)
10.Brake Shim
9.Hex. Recess Bolt
0.8
FIG-1.
hoist motor hex. recess bolt release bar end cover
File details come from the government source that posted it. Updated .