This is a Statement of Work for contract 140R2026Q0030 describing radio upgrades for the Bureau of Reclamation's Data Collection Platform (DCP) systems. The project requires upgrading 15 H-522 Data Control Platforms from Design Analysis H-522 (Certification Standard 1) to H-522P-V2 (Certification Standard 2) satellite radios to comply with NOAA requirements by May 31, 2026. The equipment upgrades are necessary because NOAA will cease demodulating Certification Standard 1 transmitters after the deadline, placing non-compliant operators outside the legal framework for GOES DCS access. The existing Xylem Analytics YSI H-522+ DCPs are functional but require internal radio component replacement with YSI-T satellite radios to maintain compliance with Water Rights Order 90-5, Long-Term Operations mandates, and related Memorandums of Understanding.

The contractor must complete five sequential tasks over a six-month period from contract award, processing DCPs in batches of three to four units at a time. Each task requires retrofitting dataloggers with new YSIT GOES Radios, providing repair estimates for Reclamation approval, performing approved repairs to ensure functionality, and transporting completed batches back to the Northern California Area Office in a timely manner. The contractor shall provide all parts, labor, special tools, and safety equipment for upgrades and repairs. The government will award a firm fixed-price contract conditioned on pricing not exceeding maximum line-item or total prices in the schedule. Work performance is expected to occur at the contractor's facility, with deliverable milestones scheduled monthly from award date plus one month through award date plus five months. The work must be inspected and certified as compliant with NOAA's Certification Standard 2 by USBR's Contracting Officer's Representative and subject matter expert upon completion.

View the file

Other files for this federal contract opportunity

Other files attached to NCAO 15 Data Collection Systems-Data Control Platf, newest first.
File Type Posted
Sol_140R2026Q0030.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140R2026Q0030 DCS DCP Radio Upgrades

Attachment 1

STATEMENT OF WORK

Data Collection System Data Control Platform Radio Upgrade

1.0 Scope:

Purchase of 15 Data Control Platforms (DCP) upgrades (National Environmental Satellite, Data, and Information Service – NESDIS – Geo-Stationary Operational Environmental Satellite Data

Collection System) site satellite radios from Design Analysis H-522 (Certification Standard 1) to

H-522P-V2 (Certification Standard 2) to meet the requirement to transition to the new standard/updated transmitters by May 31, 2026.

2.0 Background:

NESDIS Geo-Stationary Operational Environmental Satellite (GOES) Data Collection Systems

(DCS) are used to transmit data from Continuous Monitoring Sites (CMS). The Design Analysis

H-522+ DCP is manufactured by Xylem Analytics and is designed to integrate seamlessly with the Xylem Analytics YSI EXO Water Quality sondes to collect, store, and transmit water quality data. This combination of field equipment allows the Bureau of Reclamation’s (USBR) Northern

California Area Office (NCAO) to provide effective and efficient delivery of information, and to comply with requirements in Water Rights Order 90-5 (WRO 90-5, SWRCB 1990), the Long-

Term Operations of the Central Valley Project and State Water Project (LTO) (USBR 2024), and the Memorandum of Understanding Among State Resources Control Board, US Water and Power

Resources Group and Department of Fish and Game to Implement Actions to Protect the

Sacramento River System from Heavy Metal Pollution from Spring Creek and Adjacent

Watersheds (MOU) (SRCB, USBR, CDFW 1980).

USBR relies upon the DCPs to transmit data for compliance. USBR has up to 15 DCPs that would be upgraded because of USBR’s reliance on the DCPs for continued work, USBR intends to send the DCPs in batches of three or four (3 or 4) at a time, which will require rapid upgrade/repair and return to USBR for USBR to send the next batch.

2.1 Justification of DCP Upgrade

H-522P-V2 (Certification Standard 2) transmitters are certified to a new standard. At this point, no Certification Standard 1 transmitters should be deployed or re-deployed to the field, and by

May 31, 2026, all Certification Standard 1 transmitters should have been replaced with

Certification Standard 2 transmitters (NOAA GOES 2025). There is no waiver, and National

Oceanic and Atmospheric Administration (NOAA) will cease demodulating Certification

Standard 1. Operators that continue to use Certification Standard 1 will be outside the legal framework for GOES DCS access (Dronen 2024). The equipment (DCPs) currently being used is functional and satisfactory, but the radio component is required to be updated for us to transmit the data and comply with WRO 90-5, LTO and MOU. The radio is an internal component of the

DCPs and requires the contractor to replace and install with the updated radio transmitter. The existing Xylem Analytics YSI H-522+ DCPs can only be integrated internally with the YSI-T satellite radios.

3.0 Tasks:

The principal scope of work to be performed by the service provider will consist of the following

Tasks.

Task 1 – Upgrade the first batch of three to four (3 to 4) H-522 DCPs and repair

• Task 1a - Retrofit three to four (3 to 4) H-522 Dataloggers with new YSIT GOES Radio to the new specification, H-522P-V2. The contractor shall provide the parts and labor, special tools, and safety equipment.

• Task 1b - Provide an estimate to Reclamation of necessary repairs for the DCPs to be functional for review and approval by Reclamation prior to repairs being made.

• Task 1c– Upon Reclamation approval, repair the DCPs to the agreed upon repairs so the

DCPs are functional. The contractor shall provide the parts and labor, including any special tools and safety equipment.

• Task 1d - Return the batch of DCPs to NCAO in a timely manner to allow for the rapid deployment of the next batch of DCPs to be upgraded and repaired. The contractor shall supply the cost of transport of the DCPs back to Reclamation when upgrades/repairs are completed for each batch.

Task 2 – Upgrade next three to four (3 to 4) H-522 DCPs and repair

• Task 2a - Retrofit three to four (3 to 4) H-522 Dataloggers with new YSIT GOES Radio to the new specification, H-522P-V2. The contractor shall provide the parts and labor, special tools, and safety equipment.

• Task 2b – Provide an estimate to Reclamation of necessary repairs for the DCPs to be functional for review and approval by Reclamation prior to repairs being made.

• Task 2c– Upon Reclamation approval, repair the DCPs to the agreed upon repairs so the

DCPs are functional. The contractor shall provide the parts and labor, including any special tools and safety equipment.

• Task 2d - Return the batch of DCPs to NCAO in a timely manner to allow for the rapid deployment of the next batch of DCPs to be upgraded (and repaired as per Task 1). The contractor shall supply the cost of transport of the DCPs back to Reclamation when upgrades/repairs are completed for each batch.

Task 3– Upgrade next three to four (3 to 4) H-522 DCPs and repair

• Task 3a - Retrofit three to four (3 to 4) H-522 Dataloggers with new YSIT GOES Radio to the new specification, H-522P-V2. The contractor shall provide the parts and labor, special tools, and safety equipment.

• Task 3b – Provide an estimate to Reclamation of necessary repairs for the DCPs to be functional for review and approval by Reclamation prior to repairs being made.

• Task 3c– Upon Reclamation approval, repair the DCPs to the agreed upon repairs so the

DCPs are functional. The contractor shall provide the parts and labor, including any special tools and safety equipment.

• Task 3d - Return the batch of DCPs to NCAO in a timely manner to allow for the rapid deployment of the next batch of DCPs to be upgraded (and repaired as per Task 1 and

Task 2). The contractor shall supply the cost of transport of the DCPs back to

Reclamation when upgrades/repairs are completed for each batch.

Task 4 – Upgrade next three to four (3 to 4) H-522 DCPs

• Task 4a - Retrofit three to four (3 to 4) H-522 Dataloggers with new YSIT GOES Radio to the new specification, H-522P-V2. The contractor shall provide the parts and labor, special tools, and safety equipment.

• Task 4b – Provide an estimate to Reclamation of necessary repairs for the DCPs to be functional for review and approval by Reclamation prior to repairs being made.

• Task 4c– Upon Reclamation approval, repair the DCPs to the agreed upon repairs so the

DCPs are functional. The contractor shall provide the parts and labor, including any special tools and safety equipment.

• Task 4d - Return the batch of DCPs to NCAO in a timely manner to allow for the rapid deployment of the next batch of DCPs to be upgraded (and repaired as per Task 1, 2, and

Task 3). The contractor shall supply the cost of transport of the DCPs back to

Reclamation when upgrades/repairs are completed for each batch.

Task 5 – Upgrade the remaining H-522 DCPs and repair

• Task 5a - Retrofit the remaining H-522 Dataloggers with new YSIT GOES Radio to the new specification, H-522P-V2. The contractor shall provide the parts and labor, special tools, and safety equipment.

• Task 5b – Provide an estimate to Reclamation of necessary repairs for the DCPs to be functional for review and approval by Reclamation prior to repairs being made.

• Task 5c– Upon Reclamation approval, repair the DCPs to the agreed upon repairs so the

DCPs are functional. The contractor shall provide the parts and labor, including any special tools and safety equipment.

• Task 5d - Return the batch of DCPs to NCAO in a timely manner to allow for the rapid deployment of the next batch of DCPs to be upgraded (and repaired as per Task 1-4). The contractor shall supply the cost of transport of the DCPs back to Reclamation when upgrades/repairs are completed for each batch.

4.0 Type of Contract:

The government will award a firm fixed price contract. This is a firm order ONLY if your price does not exceed the maximum line item or total price in the Schedule. Submit invoices to the

Contracting Officer. If you cannot perform in exact accordance with this order, Withhold

Performance, and notify the Contracting Officer immediately, giving your quotation.

5.0 Milestones/Timeline/Schedule:

This project will be completed from the time of award plus 6 months.

Period Start Date Completion Date

Contract Award Date Award Date plus 6 months

Deliverable per Task Schedule

Task 1 – Upgrade the first 3 to 4 H-522 DCPs and repair Award Date + 1 month

Task 2 – Upgrade next 3 to 4 H-522 DCPs and repair Award Date + 2 months

Task 3 – Upgrade next 3 to 4 H-522 DCPs and repair Award Date + 3 months

Task 4 – Upgrade next 3 to 4 H-522 DCPs and repair Award Date + 4 months

Task 5 – Upgrade remaining H-522 DCPs and repair Award Date + 5 months

6.0 Deliverables and Reporting:

The contractor shall upgrade and repair (if necessary and agreed upon) to a functional state as intended for use and compliance with NOAA's Certification Standard 2. The work must be inspected by USBR’s COR and the subject matter expert upon completion.

7.0 Place of Performance

The tasks associated are expected to occur at the Contractor’s own facility.

8.0 Government Furnished Property Services

Reclamation owns the DCPs.

9.0 Administrative Information:

(a) Recognized Holidays – The Contractor is not required to work on the following Federal

Holidays:

New Year’s Day

Martin Luther King Jr.’s Birthday

President’s Day

Memorial Day

Juneteenth National Independence Day

Independence Day

Labor Day

Columbus Day

Veteran’s Day

Thanksgiving Day

Christmas Eve/Christmas Day

10.0 Real Property:

No Real Property is acquired in whole or in part under this contract.

11.0 Research Agreement:

No patents and inventions will result from this contract.

References

Bureau of Reclamation 2024 [USBR]. Long-Term Operations of the Central Valley Project and

State Water Project Record of Decision and Final Environmental Impact Statement.

Sacramento, CA : Bureau of Reclamation, California-Great Basin Region.

California State Water Resources Control Board 1990 [SWRCB]. Water Rights Order 90-5.

Order Setting Terms and Conditions for Fishery Protection and Setting a Schedule for

Completion of Tasks.

https://www.waterboards.ca.gov/waterrights/board_decisions/adopted_orders/orders/1990/wr o90-05.pdf

State Resources Control Board, US Water and Power Resources Group and Department of Fish and Game 1980 [SRCB, USWPRB {USBR}, DFG {CDFW}]. Memorandum of

Understanding Among State Resources Control Board, US Water and Power Resources

Group and Department of Fish and Game to Implement Actions to Protect the Sacramento

River System from Heavy Metal Pollution from Spring Creek and Adjacent Watersheds.

Dronen, W. 2024. GOES Data Collection System (DCS) Overview and Planned Upgrades

National Oceanic and Atmospheric Administration. National Environmental Satellite, Data, and Information Service. April 2, 2024. 0910 GOES DCS Update Dronen.pdf (accessed July

23, 2025)

NOAA GOES 2025. National Oceanic and Atmospheric Administration GOES Data Collection

System. DCS Administration and Data Distribution System (DADDS).

https://dcs4.noaa.gov/ (accessed July 23, 2025).

https://www.waterboards.ca.gov/waterrights/board_decisions/adopted_orders/orders/1990/wro90-05.pdf https://www.waterboards.ca.gov/waterrights/board_decisions/adopted_orders/orders/1990/wro90-05.pdf https://www.noaasis.noaa.gov/pdf/docs/TWG2024/0910%20GOES%20DCS%20Update%20Dronen.pdf https://dcs4.noaa.gov/