C05_2022-12-21_Chilled_Water_Hydronic_Schematic_and_Sequence_-_Attach_003.pdf

PDF 179 KB Posted

Attached to
PD POWERPLANT HVAC CHILLER Federal contract opportunity
Solicitation number
140R3023Q0049
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document includes a chilled water hydronic schematic and sequence of work for an HVAC modernization project at Parker Dam in Lake Havasu City, Arizona. The schematic diagrams and sequence outline the chilled water system components including a chiller, chilled water pumps, buffer tank, cooling coils, valves, piping, and controls. The sequence specifies that the chiller and pumps will operate in a variable primary mode to maintain chilled water supply temperature at 43 degrees Fahrenheit. Differential pressure will be controlled via a bypass valve and building return valve modulation. Pump speed will be adjusted to maintain setpoint pressure. Lead/lag functionality between multiple pumps is described. The related federal contract opportunity is solicitation number 140R3023Q0049 for an HVAC chiller plant at the Parker Powerplant, issued by the Department of the Interior Bureau of Reclamation.

View the file

Other files for this federal contract opportunity

Other files attached to PD POWERPLANT HVAC CHILLER, newest first.
File Type Posted
C05_SOW_-_Attach_001.pdf PDF
C05_Clauses___Provisions.pdf PDF
Sol_140R3023Q0049.pdf PDF
C05_SF-18.pdf PDF
C05_Salient_Characteristics_-_Attach_002.pdf PDF
C05_Parker_Dam_s_Current_Mainstream_mlr-176X122X2_0-HD_Installation_and_Maintenance_Manual_-_Attach_005.pdf PDF
C05_140R3023Q0049.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES

A. ALL WORK SHOWN SHALL COMPLY WITH ALL NATIONAL, STATE AND LOCAL CODES

AND ORDINANCES.

B. REFERENCE ALL OTHER DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL WORK

OR CLARIFICATION OF NECESSARY WORK.

MAIN LEVEL

4" CWS

BUFFER TANK

MIN. 600 GAL

SCALE: NO SCALE

CHILLED WATER SCHEMATIC DIAGRAM1

ANALOG THERMOMETER

CHILLER

PUMP

CH-1 CHILLER PACKAGE WITH PUMP(S)

4" CWR

4" CWS

AHU-1

200GPM

4" CWR

COOLING COIL

CWS MAIN

CWR MAIN

PROVIDE HOSE CONNECTION WITH

SCREW-ON CAP WITH RETAINER CHAIN

1/2" BALL VALVE (AIR VENT)

ROUTE MANUAL AIR VENT OUTLET WITH

2 ELBOWS TURNED DOWN AT LOCATION

WHERE THERE IS BUCKET ACCESS

PRESSURE & TEMPERATURE TEST

PORTS (TYPICAL OF 4)

AUTO FLOW VALVE

REDUCER TO SIZE OF COIL CONNECTION

BRASS BALL

VALVE (TYPICAL OF 2)

NOTE: AUTO FLOW VALVES SHALL BE

SIZED BASED ON SCHEDULED FLOW.

COOLING COIL

DRAIN VALVE DISCHARGE TO FLOOR DRAIN.

TERMINATE WITH AIR GAP

MANUAL BALANCING VALVE, TYP.

NOTE:

DIAGRAM PROVIDED IS SCHEMATIC IN

NATURE. PROVIDE ALL OFFSETS,

FITTINGS, VALVES, AND PIPING WITHIN

AIR HANDLER AS REQUIRED.

MULTIPLE COOLING COIL PIPING

SCALE: NO SCALE

MULTIPLE COOLING COIL PIPING SCHEMATIC2

HYDRONIC (CHILLED WATER) CONTROL SEQUENCE

1. CHILLERS SHALL BE ENABLED BY AHU STATUS INDICATING A CALL FOR COOLING AND BUILDING OCCUPANCY SCHEDULE.

2. CHILLER SHALL BE STAGED UNDER FACTORY CONTROL.

3. CHILLED WATER PUMPING SYSTEM SHALL OPERATE IN A VARIABLE PRIMARY MODE.

ENABLE MODE:

1. THE FACTORY PUMP CONTROL SHALL ENABLE THE CHILLED WATER PUMPING SYSTEM WHEN AHU-1 (THE BUFFALO UNIT) IS PROVEN ON.

2. ONCE THE PUMP(S) ARE ENABLED, THE PUMP BYPASS VALVE SEQUENCE SHALL BE THE PRIMARY MEANS OF CONTROLLING DIFFERENTIAL PRESSURE.

3. VERIFY PUMPS ARE RUNNING BY WAY OF PUMP STATUS AND WATER FLOW METER.

4. UPON VERIFICATION THAT PUMP(S) ARE ON AND WATER IS FLOWING, ENABLE THE PUMP CONTROL SEQUENCE.

5. CHILLED WATER PUMPS SHALL BE STAGED UNDER FACTORY CONTROL.

CHILLER CONTROL:

1. IF THE CHILLED WATER SUPPLY TEMPERATURE RISES 4°F ABOVE THE CHILLED WATER SUPPLY SET POINT, THEN THE CHILLER SHALL BE ALLOWED TO OPERATE.

2. ONCE FLOW THROUGH THE CHILLER IS PROVEN BY ITS FLOW SWITCH, THE CHILLER SHALL BE ENERGIZED AND SHALL MAINTAIN THE CHILLED WATER SUPPLY TEMPERATURE AT 43°F (ADJUSTABLE).

3. THE CHILLER CONTROL SEQUENCE WILL BEGIN WHEN CHILLED WATER PUMP HAS A STATUS OF ON. WHEN A CHILLER ENABLE COMMAND IS SENT, THE CHILLER CONTROL VALVE WILL BE FULLY OPENED AND THE CHILLER WILL OPERATE

UNDER FACTORY CONTROL TO MAINTAIN THE CHILLED WATER SUPPLY TEMPERATURE AT A SETPOINT 43°F (ADJ.). THE CHILLERS SAFETIES CIRCUIT WILL BE MONITORED AND THE SYSTEM WILL REPORT A GENERAL ALARM CONDITION IF A SAFETY IS TRIPPED. A MANUAL RESET OF THE CHILLER SAFETY WILL BE REQUIRED BEFORE THE CHILLER CAN BE RESTARTED.

INSULATED FLEXIBLE HOSE

CONNECTION (TYPICAL OF 4)

ROUTE CONDENSATE DRAIN AND EXISTING COOLING COIL DRAIN PAN

DRAIN VALVE

INSULATED FLEXIBLE HOSE

(TYP.)

1. ONCE ENABLED, OPEN THE BYPASS VALVE AND MODULATE THE BUILDING RETURN VALVE TO MAINTAIN DIFFERENTIAL PRESSURE SETPOINT (ADJUSTABLE).

BYPASS VALVE CONTROL:

1. ONCE ENABLED THE PUMP SPEED SHALL BE MODULATED TO MAINTAIN THE DIFFERENTIAL PRESSURE SETPOINT (ADJUSTABLE).

2. FOR HYDRONIC PACKAGES FEATURING MULTIPLE PUMPS:

2.1. SOFTWARE LEAD/LAG FUNCTION SHALL ALLOW EITHER OF THE CHILLED WATER PUMPS TO ACT AS THE LEAD PUMP.

2.2. ALARM ON PUMP FAILURE DETECTED BY CURRENT SENSING SWITCH. UPON FAILURE OF THE LEAD PUMP, THE LAG PUMP SHALL START AUTOMATICALLY.

2.3. PUMP CONTROL SYSTEM SHALL ROTATE LEAD/LAG PUMP BASED ON PUMP RUN TIME. THE PUMP WITH THE LOWEST CALCULATED RUN TIME SHALL ACT AS LEAD PUMP.

3. CHILLED WATER PUMPS SHALL BE STAGED UNDER FACTORY CONTROL.

PUMP CONTROL:

4" Ø

C W

R

4" Ø

C W

R 3"Ø CWR

3"Ø CWR

3"Ø CWS

3"Ø CWS

Fo r

In te rn al

U se

O nl y D ra ft

N ot F or D is tr ib ut io n

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E C H

IL

LE

D W

A

TE

R H

YD

R O

N

IC

S C H

EM

A

TI

C A

N D

S

EQ

U

EN

C E.

D W

G

LA

S T

S A V

ED

D A

TE

-1 2-

LA

S T

S A V

ED

B Y

C

YO

U N

G

H V A C M

O D

ER

N

IZ

A

TI

O N

P R O

JE

C T

PA

R K

ER

D A M

CHILLED WATER

SCHEMATIC DIAGRAM

HVAC

PARKER, LAKE HAVASU CITY, AZ

PRJ-STA-SEQ

2022-12-21

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

ADMIN APPROVAL -

X

X

X

Sheets and Views
22 x 34

File details come from the government source that posted it. Updated .