This is a Statement of Work (SOW) from the US Department of Agriculture (USDA) National Resources Conservation Service (NRCS) for furnace replacement at the Big Flats Plant Materials Center in Corning, New York.
The project scope requires removal of an existing 1990 Rheem natural gas furnace (131,000 BTU) and installation of a new high-efficiency furnace (minimum 95% AFUE rating) serving a 2,851 square-foot warehouse/shop building. Pre-installation tasks include site inspection and load calculation using Manual J or equivalent engineering methodology, gas supply pressure verification, and venting path confirmation per NFPA 54. The contractor must remove and dispose of the existing furnace and solar system piping in compliance with local regulations. Equipment specifications mandate a furnace with modulating heat stages sized appropriately for the space, reuse of existing ductwork with sealed connections and upgraded insulation, installation of a programmable thermostat, and a carbon monoxide detector compliant with NFPA 720 and ANSI/UL 2034. Installation tasks include mounting on existing or new platform, natural gas line connection with leak-free fittings, Category IV venting using PVC/CPVC piping, condensate drain installation, and electrical connection to a dedicated 120V circuit with proper grounding. Testing and commissioning require combustion analysis, verification of CO levels below 100 ppm, thermostat operation verification, temperature rise measurement within manufacturer specifications, and static pressure and airflow verification. The contractor must provide as-built drawings, equipment manuals, warranty documentation, and a final inspection report with installation date, equipment model and serial numbers, gas adjustment readings, firing rate, temperature readings, and venting system verification. Deliverables include 10-year parts warranty and 20-year heat exchanger warranty from the manufacturer, plus 1-year labor warranty from completion. The estimated project duration is 1-2 business days. Facility access is limited to 8:00 a.m. to 4:30 p.m. Monday through Friday, with coordination required for outside hours. The contractor must be trained and qualified personnel only, maintain a superintendent on-site during work, and comply with all applicable OSHA regulations, NFPA codes, NEC standards, and ASHRAE requirements. Equipment registration is required within 60 days of installation. The NAICS code is 238220 (Plumbing, Heating, and Air-Conditioning Contractors) and PSC code is N045 (Installation of Equipment: Plumbing, Heating, and Waste Disposal). County permits are not required. Proposals must include the unit type, size, model number, lower temperature rating, and a full manufacturer brochure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents Project Location:
General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Key Personnel
7.0 Security Requirements
8.0 Safety:
9.0 Additional Information:
10.0 Attachment(s)
Project Replace Existing Furnace with New High-Efficiency Natural Gas Furnace at Big Flats, NY Plant Materials Center, Shop/Warehouse Building.
Location:
USDA NRCS Big Flats Plant Materials Center 3266 State Route 352 Corning, NY 14830
General Information
1.0 Scope of Work
This project covers the removal of the existing heating unit and installation of a new, high-efficiency (AFUE rating of 95% or more) natural gas furnace to provide reliable heating for the 2851 sq. ft. warehouse/shop building, at the location mentioned above. The work will include all necessary labor, materials, and testing to ensure safe and optimal operation.
Removal and disposal will be off-site by contractor. Pictures are in attachment. All work shall be performed in accordance with all applicable codes, and standards (OSHA, NEC, NFPA, ASHRAE).
2.0 Background
The current system, installed in 1990, is a Rheem up flow, natural gas furnace (model number-RGDA-17EA-JR/ serial number EN3D107 M3989 6972). The current unit is not functioning properly and upon inspection as well as age of unit, needs to be replaced with a new, high-efficiency natural gas unit. Current unit is 131,000 BTU’s.
Contractor Requirements
3.0 Technical Requirements / Tasks
Note: All waste material and debris shall become the property of the contractor. The contractor shall remove and dispose of all waste in accordance with all codes and regulations
Pre-Installation:
Site inspection and load calculation to confirm capacity. Use Manual J from American Society of Heating, Refrigerating, and Air-Conditioning Engineers; or other approved engineering method to calculate heating load estimates and select the furnace.
Verify gas supply pressure.
Confirm venting path per NFPA 54 (National Fuel Gas Code) and manufacturer specs.
Removal & Disposal Disconnect and remove the existing furnace.
Properly dispose of old equipment in compliance with local regulations..
Remove solar system piping that is no longer needed and cap and pipes and lines correctly. See photos on attachment.
Equipment Supply Furnace-Provide and deliver an adequate natural gas furnace for space and square footage.
Minimum AFUE rating of 95% BTU input/output-
Modulating heat stages Ductwork
Reuse as-is, seal all connections, and make sure insulation is adequate and upgrade where necessary.
Inspect piping for leaks prior to installing insulation.
iii. Clean existing ducts.
iv. If the existing ductwork is undersized for the new equipment, recommend modification and include in quote.
c. Thermostat
i. Install a programmable thermostat that is compatible with new furnace and rewire as needed.
ii. Keep in current position.
d. Install CO detector
i. Each carbon monoxide detector as required shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.
4. Installation
a. Install furnace on existing or new platform, as required.
b. Connect to existing natural gas line, ensuring leak-free fittings.
c. Integrate with existing ductwork; modify or seal as needed for efficiency and compliant with local building codes and standards
d. Connect to electrical supply and thermostat controls.
e. Connect Category IV venting with PVC/CPVC piping and condensate drain.
f. Install gas shut-off valve, sediment trap, and flexible connector.
g. Wire to dedicated 120V circuit with proper grounding.
h. Installations must adhere to the clearances to combustible materials to which the furnace has been design certified. Clearances must also accommodate an installation’s gas, electrical, and drain trap and drain line connections.
i. It is the responsibility of the installer to follow the manufacturers’ recommendations and to verify that all vent/flue piping and connectors are compatible with furnace flue products.
j. Additionally, it is the responsibility of the installer to ensure that all piping and connections possess adequate structural integrity and support to prevent flue pipe separation, shifting, or sagging during furnace operation.
5. Testing & Commissioning
a. Perform combustion analysis and adjust for optimal efficiency.
b. Test safety controls, ignition system, and airflow.
i. Before proceeding with electrical connections, ensure that the supply voltage, frequency, and phase correspond to that specified on the unit rating plate. Power supply to the furnace must be NEC Class 1 and must comply with all applicable codes.
ii. The furnace must be electrically grounded in accordance with local codes or, in their absence, with the latest edition of The National Electric Code, ANSI NFPA 70 and/or The Canadian Electric Code CSA C22.1.
c. Verify thermostat operation and temperature output.
d. Combustion analysis to verify CO levels < 100 ppm.
e. Measure temperature rise within manufacturer’s range.
f. Verify static pressure and airflow per design.
6. Cleanup & Handover
a. Remove and dispose of old equipment and debris from the work, daily.
b. Provide operation instructions and maintenance recommendations.
c. Site cleanup- Broom-clean work area upon completion
d. Filters must be provided, sized and installed properly by the installer. Filters must comply with UL900 standards.
7. Documentation:
a. Provide as-built drawings, equipment manuals, and warranty forms.
b. Complete inspection checklist.
c. Include manufacturer’s warranty documentation.
4.0 Government Furnished
The contractor will have access to the shop/warehouse building where the furnace is located and have access to bathroom facilities in same building.
5.0 Deliverables / Schedule
1. Fully operational furnace meeting all codes and performance requirements.
2. Supply manufacturer's catalog sheets or brochures with diagrams, schedules, or performance charts.
Manufacturer’s product information provided shall clearly identify pertinent materials or models, dimensions, clearances, and all other applicable specification as required in this solicitation and resulting contract.
3. The installation must comply with regulations of the serving gas supplier, local building, heating, plumbing, and other codes.
4. The installation must comply with the national codes listed below and all authorities having jurisdiction, but not limited to:
a. Current edition of National Fuel Gas Code NFPA 54/ANSI Z223.1 and the Installation Standards, Warm Air Heating and Air Conditioning Systems ANSI/NFPA 90B as tested by UL Standard 181 for Class I Rigid Air Ducts Gas Piping and Gas Pipe Pressure Testing
b. Section 9.3 of the current edition of NFPA54/ANSI Z223.1 Air for Combustion and Ventilation
c. Current edition of American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE)
Fundamentals Handbook
d. Chapters 5, 6, 7, and 8 and national plumbing codes.
5. Contractor registers equipment within 60 days of install.
6. Equipment warranty.
a. 10 years parts.
b. 20 years heat exchanger (per manufacturer).
7. Labor warranty
a. 1 year from completion date.
8. Final inspection report, checklist and efficiency test results to include:
a. Installation Date with Equipment Model and Serial numbers for furnace, thermostat etc.
b. Gas Adjustments (inlet supply pressure and manifold pressure readings.
c. Firing Rate.
d. Leaving and air return air temperature readings (high and low in Fahrenheit) as well as temperature rise.
e. Venting system sealed and functioning.
9. Timeline
a. Estimated project duration: 1–2 business days from start date.
6.0 Key Personnel
1. Owner: Shawnna Clark, BFPMC Manager
2. NRCS Contract Specialists,
3. NRCS Contract Officer Representative (COR), Shawnna Clark
4. Contractor, TBD
a. Only trained and qualified personnel will be used.
b. Untrained personnel can perform basic maintenance functions such as cleaning and replacing air filters.
All other operations must be performed by trained service personnel.
c. Superintendent on site at all times while work is being performed.
d. The Government will control access to the facilities and will perform an inspection and acceptance of the completed work.
7.0 Security Requirements
Shop/warehouse Building is locked at all times. Facility access will be available from 8:00 am to 4:30 pm Mon- Fri.
Work outside these hours shall be coordinated with the Contracting Officer Representative (COR).
8.0 Safety:
All work undertaken under this Statement of Work shall be performed in compliance with all applicable OSHA Regulations for protection of the workers and public.
9.0 Additional Information:
1. Clearly state in the proposal summary the type, size, model number, and lower temperature rating of the equipment to be installed.
2. Provide a brochure of the unit that your company will be providing for this contract. If you fail to provide a full brochure, your company will not be evaluated for award.
3. North American Industry Classification Standard Code is 238220 (Plumbing, Heating, and Air-Conditioning Contractors).
4. PSC Code N045 — Installation of Equipment: Plumbing, Heating, and Waste Disposal
5. County permits are not required.
10.0 Attachment(s)
1. Project photos.