This is a solicitation document for asbestos abatement and floor installation at the Keswick Powerplant in Redding, California, issued by the Bureau of Reclamation's Northern California Area Office. The total small business set-aside contract is valued between $100,000 and $250,000, with a 90-calendar day performance period after notice to proceed. The project involves removing asbestos-containing vinyl tile, mastic, and baseboards from Rooms 506, 508, 509, and the Security Room, followed by installing new vinyl composition tile in Rooms 506, 508, and 509, and carpet tiles in the Security Room.
Key details include a mandatory site visit scheduled for April 2, 2025, from 10:00 AM to 12:00 PM PDT, with contractors required to register in advance and wear appropriate safety gear. The solicitation is being procured under Simplified Acquisition Procedures with NAICS code 236220 and a size standard of $45 million. Contractors must be certified in asbestos abatement, comply with specific safety and health regulations, and follow strict protocols for asbestos removal, including containment, air monitoring, and proper disposal of hazardous materials.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 140R2025Q0009
Keswick Powerplant Asbestos Abatement and Floor Installation
Shasta Division, Central Valley Project, California
Northern California Area Office (NCAO)
U.S. Department of the Interior – Bureau of Reclamation
TABLE OF CONTENTS
SECTION A - Solicitation, Offer and Award Form (SF 1442)
SECTION B - Pricing Schedule
SECTION C - Specifications
SECTION D - Packaging and Marking
SECTION E - Inspection and Acceptance
SECTION F - Deliveries or Performance
SECTION G - Contract Administration Data
SECTION H - Special Contract Requirements
SECTION I - Contract Clauses
SECTION J - List of Documents, Exhibits, and Other Attachments
SECTION K - Representations, Certifications and Other Statements of Offerors
SECTION L - Instructions, Conditions and Notices to Offerors
SECTION M - Evaluation Factors for Award
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0044001588
Bureau of Reclamation
Mid-Pacific Region
Regional Office Division of Acquisition Services
R20
2800 Cottage Way, Room E-1815
Sacramento CA 95825-1898
8. ADDRESS OFFER TO
Bureau of Reclamation - Interior Region 10 2800 Cottage Way, Rm. E-1815
Sacramento, CA 95825-1898 rgamo@usbr.gov
Ronald Gamo 916-978-4304
103/19/2025
140R2025Q0009
INVITATION FOR BID
REQUEST FOR PROPOSAL
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
A. Keswick Powerplant Asbestos Abatement and Floor Installation
B. Work Site Location: Work is located at Redding, CA.
C. Estimated Price Range: $100,000.00 to $250,000.00.
D. Set-aside Information: This requirement is being procured as a Total Small
Business set-aside under the Simplified Acquisition Procedures, Federal Acquisition
Regulation (FAR) Part 13. NAICS Code: 236220 and applicable size standard $45 million.
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
7 90 calendar days and complete it within ________________ ________________ calendar days after receiving
Section F
04/18/2025
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
X
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Bureau of Reclamation Mid-Pacific Region
Regional Office Division of Acquisition Services
R20
2800 Cottage Way, Room E-1815
Sacramento CA 95825-1898
Matthew Thomas
28. NEGOTIATED AGREEMENT 29. AWARD
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
10 U.S.C. 3204(a) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 12/2022) BACK
Continued...
and return
(Contractor is not required to sign this document.) Your offer on this
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140R2025Q0009
00010
Section B - Supplies and Services and Prices "AU" - Activity Unit is used solely for the purpose of allowing progress payments under the Department of Interior's Financial Business System (FBMS)
Keswick Powerplant Asbestos Abatement and Floor Installation
(Price Schedule CLINS 1 through 3)
See following continuation page(s)
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
1 AU
Price Schedule
B - 1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 PRICE SCHEDULES
(a) Quotes will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.
(b) Quotes are subject to the terms and conditions of this solicitation.
(c) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory
Work, for CLIN 0010.
B.2 DEFINITIONS
(a) CLIN – Contract Line Item Number.
CLIN Section Supplies or Services Quantity and Unit
Unit
Price
Amount
0010 WBR
1452.232-81
Mobilization
& Preparation
For the lump sum of $
0020 C-SOW Floor Removal & Asbestos
Abatement For the lump sum of $
0030 C-SOW Floor and Carpet Installation For the lump sum of $
TOTAL FOR PRICE SCHEDULE $ ______________
END OF SUPPLIES OR SERVICES AND PRICES
STATEMENT OF WORK
Keswick Powerplant Asbestos Abatement & Floor Installation
Northern California Area Office, Bureau of Reclamation
1. BACKGROUND/PROJECT CONDITIONS
1.1. Background: The Keswick powerplant has four locations for asbestos abatement and new floor installation: Rooms 506, 508, 509, and the Security Room (entered from Room 509).
1.1.1. Phase 1: The powerplant floor is concrete. In Rooms 506, 508, and 509, the concrete floor is covered with vinyl tile and mastic adhesive that has tested positive for the presence of asbestos. This flooring tile, baseboards, and mastic must be removed. The
Security Room has residual asbestos in the mastic that’s beneath the carpeting. The baseboard and carpeting must be removed and disposed of, and the mastic on the concrete floor must be removed.
1.1.2. Phase 2: Once all existing flooring has been removed and the space has been cleared of asbestos, new vinyl composition tile (VCT, color: “classic white” or equivalent) suitable for high-traffic areas shall be installed in Room 506, 508, and 509; carpet tiles (color: “startled” or equivalent) shall be installed in the Security Room.
Approximately 600 feet of new vinyl baseboard shall also be installed.
1.2. Access. Government personnel will remove existing furniture that doesn’t impact facility operations from all flooring surfaces prior to Contractor’s work. Contractor to verify from plans and at pre-construction site visit.
1.3. Testing. All flooring has not been tested for asbestos or other contaminants. Contractor shall assume that all flooring and adhesive material subject to this work contains asbestos.
2. SCOPE OF WORK
2.1. Contractor shall
2.1.1. Prevent contamination from dust and debris generated by flooring removal activities by providing containment:
• immediately around the work area
• for all fire alarm devices
• for all HVAC vents or grates such that contaminated air does not enter the
HVAC equipment
• for all stationary furniture and equipment that cannot be removed from the work area o Some of the stationary equipment contains circulation fans which need to be protected from distributing any dust generated by the asbestos removal process.
o Room 509 contains high voltage electrical equipment. This equipment must be contained such that no moisture enters the equipment. Extreme caution must be taken when using fluids to remove asbestos-containing material in this area.
2.1.2. Stage the asbestos removal process in Room 509 such that portions of the room are accessible for Government workers to pass through to Room 512.
2.1.3. Remove contaminated and potentially contaminated material from surfaces designated by the government. The approximate floor surface areas are as follows, but must be confirmed prior to bid:
Location Area (ft2)
Room 506 110
Room 508 230
Room 509 2,140
Security Room 760
The surfaces are mostly accessible. There is ancillary equipment that may prevent direct access to some surfaces where flooring is to be removed. Contractor to verify from plans and at pre-construction site visit. Appendix A Asbestos Abatement and
Reflooring shows the approximate areas where flooring will be removed.
2.1.4. Employ asbestos material removal techniques that avoid unduly damaging the underlying building material.
2.1.5. Remove all asbestos containing materials within a full containment under negative air pressure of at least negative 0.020 inches of water. All removed materials and debris generated during removal (including but not limited to carpet) shall be properly packaged and labeled.
2.1.6. Properly encapsulate asbestos-containing surfaces that cannot be completely removed due to existing ancillary equipment.
2.1.7. Properly dispose of all removed materials in the Government-provided Hazardous
Waste Containers.
• The Government shall be responsible for the disposal of the waste placed in the
Hazardous Waste Containers.
2.1.8. After material removal, clean all surfaces inside the containment area to remove all particulate matter.
2.1.9. Provide an air-monitoring specialist (AMS) certified by EPA and California
Department of Safety and Health (DOSH) to conduct a final visual inspection and clearance air monitoring at the conclusion of abatement activities in each work area.
The Contractor shall contact the AMS a minimum of 24 hours prior to applying encapsulant for a visual inspection. Clearance air monitoring will be completed within 48 hours after the visual inspection and application of encapsulant. In the event that the AMS arrives on-site at the request of the Contractor and the area is identified to require additional cleaning or that the encapsulant requires additional drying time, the cost of the additional time required for the AMS will be the contractor’s responsibility. A minimum of 5 samples and 2 blanks will be collected from each work area and will be analyzed by phase-contrast microscopy (PCM). A copy of the Air Clearance shall be provided to the COR.
• The project is considered complete if all samples collected are less than 0.01 f/cc using the NIOSH 7400 method.
2.1.10. Properly prepare the space for installation of VCT (Rooms 506, 508, and 509), carpeting (Security Room only), and vinyl baseboard throughout each room and complete the installation.
3. ADMINISTRATIVE INFORMATION
This section covers the basics of day-to-day operations and normal hours of work.
3.1. Place of Performance. The work to be performed under this contract shall be performed at
Keswick Powerplant (16515 Keswick Dam Rd, Redding, CA 96003).
3.2. Period of Performance. The performance period shall be 90 calendar days after Notice to
Proceed. Period of Performance includes submittals, mobilization, demolition, disposal, installation, and de-mobilization.
3.3. Hours of Operations. The Contractor is responsible for conducting business, between the hours of 7:00 am-5:00 pm Pacific Standard Time, Monday thru Friday. The Contractor shall, at all times, maintain an adequate workforce for the uninterrupted performance of all tasks defined within this Statement of Work when the Government facility is not closed during the daily schedule above. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
3.4. Definitions. The follow acronyms, terms, and wording will be used throughout this
Statement of Work (SOW).
NCAO – Northern California Area Office
CO – Contracting Officer
COR – Contracting Officers Representative
Offeror – Prime Contractor
OGR – Onsite Government Representative
RSHS – Reclamation Safety and Health Standards
3.5. Post Award Meeting. A brief post award meeting will be held prior to commencement of work via Teams. The Contractor shall meet with the designated Bureau of Reclamation
Field Engineer and or Onsite Government Representative. The post award meeting shall provide the Contractor an opportunity to discuss and outline both the safety and work plans, ask any questions relative to the project, and to review the proposed time schedule.
3.6. Security. The Contractor shall be responsible for safeguarding all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.
3.6.1. All vehicles entering the worksite may be subject to search by government security forces.
3.6.2. The Contractor shall maintain a current and updated list of authorized persons, including subcontractors, and provide a copy to the COR.
3.6.3. A list of ALL employees and copies of their driver’s license shall be provided to the COR before they are permitted on site.
4. CONTRACTOR REQUIREMENTS
The contractor and contractor personnel shall possess licenses, certificates, and training appropriate for removal of asbestos material.
4.1 Asbestos Abatement Activities. All asbestos abatement activities shall be carried out by a contractor with a current California C-22 Asbestos Abatement licensing classification.
Asbestos removal or repair work shall be performed by trained workers, knowledgeable in the hazards of asbestos, and properly trained in the use of personal protective equipment and engineering controls prior to the start of this project. The Contractor shall assume full responsibility and liability for any identified Asbestos Containing materials
(ACMs) that may be impacted during renovation activities that shall be removed or impacted and complying with all applicable federal, state, and local regulations pertaining to work practices, and protection of workers, visitors to the site, and persons occupying areas adjacent to abatement activities. The Contractor is responsible for providing medical examinations and maintaining medical records of personnel as required by the applicable Occupational Safety and Health Administration (OSHA) regulations. The Contractor shall hold the Bureau of Reclamation harmless for failure to comply with any applicable work, safety, health, or other regulations on the part of the
Contractor, the Contractor’s employees, or subcontractors. Where conflict between the regulations and this SOW exist, the most stringent requirements shall be followed.
Contractor shall be responsible to ensure all asbestos workers are compliant with state regulatory laws and federal laws regarding respiratory protection and asbestos abatement work.
4.2 Air Monitoring: Conduct daily monitoring that is representative of each employee working in the regulated area, unless all employees use supplied-air respirators operated in positive-pressure mode or a negative exposure assessment is performed.
4.3 Agencies: Impact to asbestos-containing materials is administered by state and federal regulatory agencies: (1) the California Department of Ecology, under the EPA’s National
Emission Standards for Hazardous Air Pollutants (NESHAP); (2) the California Division of Occupational Safety and Health (DOSH) for construction work and California
Department of Industrial Relations for exposure and worker relations and (3) the
Occupational Safety and Health Agency (OSHA); Contractor shall abide to these state and federal regulatory agencies.
4.4 Removal: The removal of asbestos-containing tile and mastics are regulated by DOSH as
Class II activities. Class II activities require that removal and disposal be conducted in accordance with 8 CCR §1529 and 8 CCR §5208. Workers must have a minimum of eight hours training regarding the hazards and proper removal methods specific to the material being abated, as specified in 8 CCR §1529 and 8 CCR §5208; or must be
California State Certified Asbestos Workers.
4.5 Certificates: A California State Certified Asbestos Supervisor must be present during abatement activities. Maintain a copy of this SOW on-site at all times during construction activities.
4.6 Other Materials: If additional suspect ACMs are encountered during renovation, demolition and/or construction activities, the material shall be treated as asbestos-containing until PLM analysis is conducted to characterize the material.
4.7 Hazardous Waste Training. Contractor personnel on the work site must possess current training certificates for HAZWOPER Supervisor training (40 hour) under 29 CFR
1910.120 (e) (4), and Worker training (24-hour; under 29 CFR 1910.120(e)(3)), as appropriate. All training documentation shall be provided to Contracting Officer
Representative (COR).
4.8 Deliverables. Deliverables to Reclamation will consist of electronic copies of the items specified below. Email address(es) will be provided upon Notice to Proceed.
List of Submittals:
RSN Submittal SOW
Section
Due # of sets to COR
1 Contractor Safety Program, including Certifications and JHA.
6.3, 6.5, 7.5.1
Prior to start of work 1
2 Licenses and Certifications 4.4, 4.5, 4.7, 6.5
Prior to start of work 1
3 Schedule 7.5.3 Prior to start of work 1
4 Abatement Plan to include CA and
EPA Abatement Notifications.
4.2, 7.5.4
Prior to start of work 1
5 Waste Disposal Plan 6.10, 7.5.5
Prior to start of work 1
6 VCT, carpet tile, and baseboard datasheets
2.1.10, 7.5.6
Prior to start of work 1
7 Final Report containing the post-abatement sample results for asbestos.
7.5.4 10 business days after completion
5. COMPLETION REQUIREMENTS
The Contractor’s schedule and plan of work may differ from the order of items described below except where specified.
5.1. Site Cleanup. Remove all construction waste/debris for recycle/disposal at appropriate facilities.
5.2. Final Acceptance Inspection of All Items
5.2.1. Review completion of work with OGR.
5.2.2. Make any corrective actions determined as required during Final Acceptance
Inspection.
5.2.3. Final Inspection may uncover items not discovered during previous inspections.
Contractor shall correct all pertinent items upon discovery.
6. GENERAL REQUIREMENTS
6.1. Cleanup and Disposal of Waste Material. The Contractor shall be responsible for all proper waste materials cleanup and disposal of rubbish generated by their work.
Hazardous Waste Containers will be provided by NCAO and will be checked weekly and removed weekly or as needed. All Hazardous Waste (ACM materials) will be collected in
NCAO-provided Hazardous Waste containers and sealed. NCAO will be responsible for the disposal of the Hazardous Waste generated. This does not include general construction waste for which the contractor is responsible.
6.2. Waste Characterization, Handling and Disposal Plan. Provide this plan in accordance with paragraph 6.5.3.
6.3. Safety and Health.
6.3.1. All contractor employees shall attend the local Hazardous Energy Control Program
(HECP) training before starting any work on site. This training takes approximately ½-hour.
6.3.2. Do not allow Contractor employees (including subcontractors), Government personnel, or the Public to be exposed to, or work under, conditions which are unsanitary, physically hazardous, or a potential exposure danger to their health or safety during performance of the contract.
6.3.3. Since this project will involve removal of asbestos material, ensure Contractor employees (including their subcontractors) and government personnel on site in the vicinity are protected from exposure to these compounds during the removal and disposal process.
6.3.4. The minimum work crew at any time on the construction site shall consist of no less than two people and shall be in accordance with other contractual obligations.
6.3.5. When violations of safety and health requirements contained in these specifications or referenced standards are called to the Contractor’s attention by the CO, COR, or the OGR, immediately correct the condition to which attention has been directed.
6.3.6. When the Contractor fails or refuses to promptly correct a compliance directive, the CO or the COR may issue an order to stop all or any part of the work.
• When satisfactory corrective action is taken, an order to resume work will be issued.
• The Contractor shall not be entitled to extension of time, nor to claim for damage or to additional compensation by reason of either the directive or the stop order.
• Failure of the CO, COR, or the OGR to order discontinuance of any or all of the Contractor’s operations shall not relieve the Contractor of the responsibility for the safety of personnel and property.
6.3.7. Maintain an accurate record of, and report to the COR in the manner prescribed by the CO for all near misses, accidents or incidents, occupational diseases, traumatic injury, cases of death to Contractor employees (including subcontractors), Government personnel, or the Public, and any property damage occurring during the performance of work under this contract.
6.3.8. In the event there is a conflict between requirements contained in the Reclamation
Safety and Health Standards (RSHS), specification paragraphs, Contractor’s approved Safety Program, referenced safety and health codes, and standards, or the
U.S. Department of Labor Construction Safety and Health Standards, promulgated under Section 107 of the Contract Work Hours and Safety Standards Act (40
U.S.C. 327 et seq.), as amended, the more protective requirement having jurisdiction shall prevail.
6.4. First Aid and Communication:
6.4.1. Provide first-aid kits in accordance with Reclamation RSHS Section 5.
6.4.2. Make first aid and communication services available for providing emergency aid to employees and subcontractor employees.
6.5. Contractor's Onsite Safety Personnel:
6.5.1. Maintain records to comply with all applicable portions of CA Dept of Health, OSHA and EPA requirements, and other requirements of this specification.
6.5.2. Ensure Contractor (and/or subcontractor) personnel are currently licensed and registered with the State of California and have necessary training and personnel to perform Class II asbestos abatement work under the laws and regulations of
Title 8, Section 1529 of the California Code of Regulations (CCR) as a certified asbestos worker and as a Competent Person defined under 29 CFR 1926.1101.
• Contractor must demonstrate that they have (or will have) a sufficient number of skilled trades and licensed abatement workers who have successfully completed EPA model curriculum training in asbestos material abatement, so as to be able to complete all aspects of work covered.
• Contractor shall specify an on-site supervisor/competent person who is fully qualified in all aspects of asbestos abatement practices and procedures and meets all EPA/OSHA supervisor/competent person requirements.
6.5.3. Contractor shall ensure they have a respiratory protection program and current fit testing for all personnel and are providing medical examinations as per 29
CFR1926.1101, in addition the Contractor’s physician shall perform an evaluation of each workers ability to work in heat stress environments.
6.5.4. Contractor to perform air monitoring and sampling in accordance with California
Code of Regulations for ensuring compliance and providing copies of these reports upon request to the COR.
• Air sampling monitoring activities must be conducted by the Contractor or his duly authorized representative during asbestos abatement work or any other work involving asbestos-containing materials. The air monitoring frequency for Contractor operations shall at least be established in accordance with the requirements set forth in 29 CFR 1910.1001 and 29 CFR 1926.1101(f). The results of such sampling shall be posted and provided to the COR upon request within 24 hours after Contractor receipt of results. Contractor must ensure analytical result receipt no later than 5 calendar days after sample collection.
• The Contractor's air sample testing lab shall be an independent third party and certified for testing. Air sample analyses will be by methods described in the
CCR, and the results document must include interpretation of results.
• Air samples shall be taken every shift for the duration of the work shift at the
Contractor's expense. Additional samples must also be taken every time there is a change in the removal operation, either in terms of the location, the type of work, method of abatement, method of engineering control, change in the personnel completing abatement or other change in abatement process that might affect the exposure to asbestos of the workers. Sampling will be used to determine eight-hour exposure in accordance with the CCR. Copies of any air sampling will be provided to the COR.
• There is a need for an on-site safety representative, with at least 3-years of experience, 40-hour OSHA Construction Certification, first-aid, CPR, and
Blood Borne certifications. This person’s certifications need to be submitted with all certifications for approval.
6.6. Temporary Utilities: Applies to utilities available for use by the Contractor.
6.6.1. Electricity.
• Contractor shall coordinate with OGR for use of facility electrical power. If facility power is unavailable, Contractor shall provide required electrical power for construction.
• Remove temporary equipment and facilities upon completion of work.
6.6.2. Water.
• Government shall provide water required for abatement purposes. Contractor shall provide a backflow preventer at point of connection. Location to be coordinated with the OGR.
• Provide means of conveying water to points of use.
• Remove temporary equipment and facilities upon completion of work.
6.7. Vehicular Access and Parking.
6.7.1. Parking is available next to the jobsite building for one vehicle for Contractor use;
all other vehicles will be parked near the abandoned guard station on the access road
6.8. Protection of Existing Installations.
6.8.1. Provide protection for personnel and existing facilities from harm due to the
Contractor's operations. Protection shall be subject to approval of the Government.
6.8.2. Arrange protective installations to permit operation of existing equipment and facilities by the Government while work is in progress.
6.8.3. Do not discharge anything but clear water into onsite drainage system.
6.8.4. Repair, at Contractor's expense, damage to existing installations due to
Contractor's operations or Contractor's failure to provide proper protection. At the
Government's option, damage may be repaired by the Government, and the
Contractor will be charged for the repair costs.
6.9. Protection of Existing Utilities.
6.9.1. Dust Abatement.
• Contractor shall be responsible for damages resulting from dust originating from Contractor operations in accordance with clause at FAR 52.236-7
"Permits and Responsibilities."
6.9.2. Noise Control.
• Comply with all applicable Federal laws and regulations, and with applicable requirements of RSHS regarding the prevention, control, and abatement of harmful noise levels.
6.10. Hazardous Materials and Wastes. Remove and dispose of all hazardous materials and waste products encountered during construction.
6.10.1. Provide a Waste Characterization and Handling Disposal Plan. Include desired location of the Government-furnished hazardous waste container(s).
6.10.2. The Contractor will dispose of waste in Government-furnished hazardous waste containers and the Government will be responsible for the removal of the containers and appropriate disposal of the hazardous waste.
6.11 Emergency Services. In the event of an emergency, cellular service is limited.
Call 8588 Operations in the event of an emergency on any project phone or
9- 911. Provide the operator with the following address: KESWICK POWER
PLANT-16515 Keswick Dam Road, Redding, CA 96003.
7. SUBMITTALS
7.1. Schedule. The Contractor shall submit Required Submittal Notices (RSN) necessary to start work within 14 calendar days of the Notice to Proceed.
7.2. Review. The Government will review the Required Submittal Notices within 14 calendar days of official receipt.
7.2.1. Submittals will be returned as Approved, Conditionally Approved, or Not
Approved.
7.2.2. The Contractor shall resubmit Required Submittal Notices within 14 calendar days of receipt for Required Submittal Notices that are Conditionally Approved or Not
Approved.
7.2.3. The Government will review resubmitted Required Submittal Notices within 14 days of official receipt.
7.3. Address submittal.
7.3.1. Email to: Contracting Officer and COR. Email addresses will be provided with
Notice to Proceed.
7.4. Preparation:
7.4.1. Prepare in English.
7.4.2. Label with contract number, title, and RSN.
7.4.3. Measurement units: US Customary Units.
7.4.4. Sign and seal submittals requiring certification by a California registered professional.
7.4.5. Submittals must be reviewed by Contractor. Submittals without evidence of
Contractor's approval will be returned for resubmission.
7.4.6. Include the following information in transmittal letters:
• Contract number and title.
• RSN for each attached submittal.
• Responsible code.
• Identify submittal as initial or resubmittal.
7.4.7. More than one RSN may be submitted under a transmittal letter, provided the responsible code is the same.
7.4.8. Submittals not listed in this Statement of Work
• Submit in accordance with this section.
7.5. Submittal List and Requirements:
7.5.1. RSN-1, Safety Plan: Written Safety Program in accordance with Section 3 of the
RSHS.
• List of Employees:
Country of citizenship.
Duration and frequency on site.
Company affiliation and title/classification
• Cover all aspects of on-site and applicable off-site operations and activities associated with this contract.
• Program shall follow the format of the outline in Appendix 1.03C of RSHS
2024. Submittal will not be accepted for review by the COR/OGR unless it addresses, in order, lettered and numbered per Appendix B, a narrative for each applicable item in the outline.
• For items in the outline that do not apply to this contract write “Not
Applicable to Contract” next to the number/letter.
• Provide a list of Job Hazard Analyses (JHA) – outlines of work safety regarding protective equipment to be used/ required for removal of hazardous material.
7.5.2. RSN-2, Licenses and Certifications. Provide a list of licenses and certifications held by all employees and subcontractors.
7.5.3. RSN-3, Schedule. Provide a schedule showing all aspects of the work, from mobilization through demobilization.
7.5.4. RSN-4, Abatement Plan. Provide a plan according to regulatory requirements that removes the contaminated material safely and efficiently.
7.5.5. RSN-5, Waste Characterization and Handling Disposal Plan. Provide a waste characterization, handling, and disposal plan for asbestos-containing hazardous material, plus any additional materials that must be disposed.
7.5.6. RSN-6, VCT, Carpet Tile, and Baseboard Datasheets. Provide datasheets for the products to be installed.
7.5.7. RSN-7, Final Report. Report shall include copies of all change requests, sample results, and notes pertaining directly to abatement actions.
8. INSPECTIONS
8.1. Approvals. The COR will make a minimum of four (4) mandatory inspections during the abatement work. Each inspection must be requested by the Contractor to be performed by the COR. The COR must approve the inspected work before work may begin for the next phase of work. Failure on the part of the Contractor to obtain the CORs approval before proceeding to the next phase is regarded as a violation of the contract. The four inspections are as follows:
8.1.1. Work area preparation completed - Contractor shall have all Pre-Abatement preparations of the work area completed and approved by the COR before proceeding to the next step.
8.1.2. Completion of asbestos abatement – Contractor shall have all abatement work completed, inspected, certified clean by test results, and approved before moving to the next step.
8.1.3. Completion of final cleaning inspection - Contractor shall have the final cleanup of all visible debris, waste, dust, and residue approved before moving to the next step. The
Contractor shall perform final cleaning techniques in accordance with CCR requirements before requesting final clearance sampling. Final clearance sampling will not occur until all surfaces are completely dry.
8.1.4. Final Clearance Sampling. COR/Reclamation Safety Office will perform final clearance wipe testing after final clean-up activities are completed The Contractor shall notify the COR at least 24 hours in advance of the need for clearance wipe sampling.
8.1.5. A final punch list inspection is also required after all work is completed.
9. EXECUTION
9.1. Damages. All damages to the structure or property occurring as a result of any and all contract work and/or sub-Contractor work activities or actions shall be repaired or replaced at the Contractor’s sole expense, to the satisfaction of the COR/OGR Representative with no additional cost to the COR/OGR Representative. The Contractor will not be allowed any additional time allowances or extensions for any such circumstance or event.
9.2. General Removal. Procedures in accordance with 29 CFR 1926.1101
9.2.1. Flooring or its backing shall not be sanded.
9.2.2. Vacuums equipped with HEPA filter, disposable dust bag, and metal floor tool
(no brush) shall be used to clean floors.
9.2.3. Resilient sheeting shall be removed by cutting with wetting of the snip point and wetting during delamination. Rip-up of resilient sheet floor material is prohibited.
9.2.4. All scraping of residual adhesive and/or backing shall be performed using wet methods.
9.2.5. Dry sweeping is prohibited.
9.2.6. Mechanical chipping is prohibited.
9.2.7. Tiles shall be removed intact, unless the Contractor demonstrates that intact removal is not possible.
9.2.8. When tiles are heated and can be removed intact, wetting may be omitted.
9.2.9. Resilient flooring material including associated mastic and backing shall be assumed to be asbestos-containing unless an industrial hygienist determines that it is asbestos-free using recognized analytical techniques.
9.2.10. The material shall be thoroughly wetted with amended water prior to and during its removal.
9.2.11. The material shall be removed in an intact state unless the employer demonstrates that intact removal is not possible.
9.2.12. Cutting, abrading or breaking the material shall be prohibited unless the employer can demonstrate that methods less likely to result in asbestos fiber release are not feasible.
9.2.13. Asbestos-containing material removed shall be immediately bagged or wrapped, or kept wetted until transferred to a closed receptacle, no later than the end of the work shift.
9.3 General Installation The Contractor shall be responsible to follow the manufacturer’s recommendations for installing or using their product, including but not limited to surface preparation prior to use, required clearances for product installation, and appropriate safety measures.
9.3.1 Install carpet tiles and baseboard in the Security Room
9.3.2 Install VCT and baseboard in Rooms 506, 508, and 509.
9.3.2.1 After installation, clean VCT and apply protective sealer while following manufacturer’s recommendations.
https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=603344483c0fc536631c2bc904245b56&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=a7a786a167b63129a13d8b14c5465881&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=603344483c0fc536631c2bc904245b56&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=9053e4af44f9304ae664312df0bf0c88&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=603344483c0fc536631c2bc904245b56&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=603344483c0fc536631c2bc904245b56&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=603344483c0fc536631c2bc904245b56&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=d27e27807c140075daa088ba5d188a4e&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=98ab81808c05b3195400c14802d3d6d0&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=d27e27807c140075daa088ba5d188a4e&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=603344483c0fc536631c2bc904245b56&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=8ccef255a3f454011e3f8a805dfac967&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=5f19ed6d7d14e1d02b0d0e3d021bdf85&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=8ccef255a3f454011e3f8a805dfac967&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=603344483c0fc536631c2bc904245b56&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=07030e400428045ca51acfbd1a30e14b&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=15c6db3a551363fa59c8046cdd43c44d&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=603344483c0fc536631c2bc904245b56&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=d27e27807c140075daa088ba5d188a4e&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=98ab81808c05b3195400c14802d3d6d0&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=d27e27807c140075daa088ba5d188a4e&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=15c6db3a551363fa59c8046cdd43c44d&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=603344483c0fc536631c2bc904245b56&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=8ccef255a3f454011e3f8a805dfac967&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=35e5e9032da788ecceadced58014c742&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=8ccef255a3f454011e3f8a805dfac967&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=603344483c0fc536631c2bc904245b56&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=13fcc9ce7e3476bbfe8f4d4eeded939e&term_occur=999&term_src=Title:29:Subtitle:B:Chapter:XVII:Part:1926:Subpart:Z:1926.1101
9.3.3 Remove all construction waste and dispose of properly.
10. REFERENCES
10.1. Bureau of Reclamation Documents:
10.1.1. Reclamation Safety and Health Standards (RSHS) may be downloaded at https://www.usbr.gov/safety/rshs/index.html.
10.2. Code of Federal Regulations:
10.2.1. 29 CFR 1956.1101
Available at https://www.law.cornell.edu/cfr/text/29/1926.1101
10.3. California Code of Regulations:
10.3.1. Title 8 Section 1529
Available at https://www.dir.ca.gov/title8/1529.html https://www.dir.ca.gov/title8/1529.html
Room
Room
Red = Asbestos Tile
ASBESTOS ABATEMENT & REFLOORING
Blue = Carpeting with Mastic
Room 509 Control Room
Security Room j
Keswick Powerplant Asbestos Abatement and Floor Installation
D-1
SECTION D - PACKAGING AND MARKING
There are no clauses in this section.
E-1
SECTION E - INSPECTION AND ACCEPTANCE
Clause
Title
Date
52.246-12
Inspection of Construction
AUG 1996
F-1
SECTION F - DELIVERIES OR PERFORMANCE
Clause
52.242-14
Suspension of Work
APR 1984
FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND APR 1984
COMPLETION OF WORK
The Contractor shall be required to
(a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 90 calendar days after the date the
Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
FAR 52.211-12 LIQUIDATED DAMAGES – CONSTRUCTION SEP 2000
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $200.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
G-1
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 This contract shall be administered by the California Great Basin Regional Office, 2800
Cottage Way, Sacramento, California 95825-1898.
G.2 DIAR 1452.201-70 AUTHORITIES AND DELEGATIONS SEP 2011
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
The COR will be named at time of award.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction
(written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the
Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the
COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting
Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
G-2
G.3. WBR 1452.201-80 CONTRACTING OFFICER’S MAY 2018
REPRESENTATIVE’S AUTHORITIES
AND LIMITATIONS – BUREAU OF
RECLAMATION
(a) Performance of the work under this contract shall be subject to the technical direction of the
Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:
(1) Inspecting and accepting or rejecting work performed under the contract.
(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.
(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.
(b) The Contractor will receive a copy of the written COR designation from the Contracting
Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting
Officer.
(c) Technical direction must be within the scope of work stated in the contract. Only the
Contracting Officer is authorized to determine if a change is within the scope of the contract;
therefore, the COR does not have the authority to, and may not, issue any technical direction that
(1) Constitutes a direction of additional work outside the Contract requirements;
(2) Constitutes a change as defined in the contract clause entitled…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .