C05_01_140R2024Q0106_Gate___Tunnel_House_Door_Replacements_Exhibit_1_07_15_24.pdf
PDF 4 MB Posted
- Solicitation number
- 140R2024Q0106
About this file
This document contains drawings and specifications for the replacement of the existing gate house door and tunnel house door at Stampede Dam in California. The drawings provide details on the dimensions of the door openings, anchoring requirements, and installation specifications. The specifications outline the scope of work, including removing the existing doors and installing new doors as specified. The federal contract opportunity relates to this project, with solicitation number 140R2024Q0106 issued by the Department of the Interior's Bureau of Reclamation for the Stampede Dam Gate and Tunnel House Door Replacement. The objective of the project is to perform the necessary work to replace the existing doors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
V.I.F. AFTER DEMO OF EXISTING DOOR
R.O.
4'-4 1/2"
GATEHOUSE
V.
I.F
. A
FT
ER
D
EM
O
O F
EX
IS
TI
N
G D
O O
R
R .O
3'
-4
/2
TUNNEL HOUSE
EX
H
IB
IT
EXHIBIT
EXHIBIT 1
EXHIBIT 1
B.O. TUNNEL
HOUSE WALLS
5738'-0"
H1
J1
3'-4 1/2"
V.
I.F
. A
FT
ER
(E
) D O
O R
R
EM
O
VE
D
7' -2
B.O. GATE HOUSE
WALLS
5728'-0 15/16"
H1
J1
V.
I.F
. A
FT
ER
(E
) D O
O R
R
EM
O
VE
D
8' -2
4'-4 1/2"
EXISTING
CONCRETE WALL
INSTALL BACKER ROD AND
SEALANT AS REQUIRED, BOTH
SIDES
DOOR AND FRAME AS
SCHEDULED
EXPANDING CONCRETE ANCHOR.
LOCATE AND PRE-DRILL RE:
DOOR/FRAME MFR DIRECTION
CAP SCREW/BOLT HOLES RE:
FRAME MFR.
DOOR FRAME, CAP
ANCHOR HOLES RE:
MFR.
EXPANDING CONCRETE ANCHOR.
LOCATE AND PRE-DRILL RE: MFR.
DIRECTIONS
DOOR AS
SCHEDULED
INSTALL BACKER ROD AND SEALANT
AS REQUIRED, BOTH SIDES
EXISTING CONCRETE WALL
J1
H1 Head anchoring detail
Jamb anchoring detail
No Scale
No Scale
D
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U R
EA
U O F R
EC
LA
M A
TI
O N
U .S D
EP
A R
TM
EN
T O F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
W A S H O E
PR
O
JE
C T
S
TA
M
PE
D E D
IV
IS
IO
N N
EV
A D A C A
LI
FO
R N
IA
S
TA
M
PE
D E D A M
G A
TE
H O U S E A N D T U N N
EL
H O U S E D O O R
R
EP
LA
C
EM
EN
TS
B. Barkey
B. Barkey
B. Tripp
M. Shepherd, 8/16/2023
GATE HOUSE AND
TUNNEL HOUSE
DOOR REPLACEMENT
DETAILS &
SPECIFICATIONS
320-D-EXHIBIT
3/8" = 1'-0"1 B.O. GATE HOUSE WALLS
3/8" = 1'-0"2 B.O. TUNNEL HOUSE WALLS
3/16" = 1'-0"3 GATEHOUSE AND TUNNEL HOUSE PLAN
3/8" = 1'-0"4 ELEVATION - TUNNEL HOUSE DOOR
3/8" = 1'-0"5 ELEVATION - GATE HOUSE DOOR
SPECIFICATIONS (CONT.)
D
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U R
EA
U O F R
EC
LA
M A
TI
O N
U .S D
EP
A R
TM
EN
T O F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
W A S H O E
PR
O
JE
C T
S
TA
M
PE
D E D
IV
IS
IO
N N
EV
A D A C A
LI
FO
R N
IA
S
TA
M
PE
D E D A M
B. Barkey
B. Barkey
B. Tripp
M. Shepherd, 9/6/2023
GATE HOUSE AND
TUNNEL HOUSE
SPECIFICATIONS
320-D-EXHIBIT
| EXHIBIT 1 - GATE HOUSE & TUNNEL HOUSE DOOR REPLACEMENT DETAILS |
| EXHIBIT 2 - SPECIFICATIONS |
| C05.01 140R2024Q0106 Gate & Tunnel House Door replacements_Exhibit 1_pg2_07.15.24.pdf |
| EXHIBIT 1 - GATE HOUSE & TUNNEL HOUSE DOOR REPLACEMENT DETAILS |
| EXHIBIT 2 - SPECIFICATIONS |
File details come from the government source that posted it. Updated .