C04d-ATTACH 2-GMUG.Culverts SOW-1240LP26Q0137.pdf

PDF 222 KB Posted

Attached to
Grand Mesa, Uncompahgre, & Gunnison NF FY2026 Steel Culverts - Sol Amnd 1
Solicitation number
1240LP26Q0137
Issued by

About this file

This is a Statement of Work (SOW) from the U.S. Department of Agriculture (USDA) Forest Service for the procurement and delivery of corrugated steel pipe culverts to the North Delta Administrative site in Delta, Colorado.

The contractor must procure, deliver, and offload galvanized spiral corrugated steel pipes (CSP) in three sizes: 18-inch x 24-foot (16-gauge, 2 2/3 x 1/2), 24-inch x 24-foot (16-gauge, 2 2/3 x 1/2), and 36-inch x 20-foot (16-gauge, 2 2/3 x 1/2), along with corresponding H-12 annular bands and connecting bolts for each size. All pipes must conform to AASHTO M 36 and either AASHTO M 218, M 274, or M 289 standards. Specific quantities for each pipe size are identified in the Schedule of Items (Bid Schedule). The contractor is responsible for full delivery and offloading within 60 days of award. Delivery is permitted Monday through Thursday between 8:00 AM and 4:00 PM, with mandatory advance notice of at least 10 working days to coordinate with Forest Service personnel. The contractor is recommended to rent a forklift for safe offloading, and any culverts damaged prior to or during offloading will be rejected. No government-furnished property is provided. Key personnel, security requirements, data rights, Section 508 compliance, and attachments are not applicable to this contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT #1

US Department of Agriculture (USDA)

Statement of Work

Contents Project General Information

1.0 Scope of Work

2.0 Background

Contractor Requirements

3.0 Technical Requirements / Tasks

4.0 Government Furnished

5.0 Deliverables / Schedule

6.0 Travel

7.0 Contractor’s Key Personnel

8.0 Security Requirements

9.0 Data Rights

10.0 Section 508 – Electronic and Information Technology Standards Attachment

Project GMUG NF Culvert Contract

General Information

1.0 Scope of Work

The scope of this project is the purchase, delivery, and offloading of culverts as specified in the specifications and schedule of items.

2.0 Background

The general description of the requirement is the purchase and delivery of culverts. A similar contract of this scope was awarded in 2025.

Contractor Requirements

3.0 Technical Requirements / Tasks

The contractor must procure, deliver, and offload the culverts at the USDA Forest Service North Delta Administrative site at 1560 H 50 Road, Delta, Colorado.

It is recommended that the contractor rents a forklift capable of safely offloading the culverts at the administrative site.

Any culverts damaged prior to or during the offloading process will not be accepted. Culverts can be delivered Monday through Thursday between 8:00 AM and 4:00 PM. The contractor must contact the technical specialist a minimum of ten

(10) working days in advance of delivery to ensure there is a Forest Service employee that can accept the culverts.

Culvert requirements.

Section 707. — METAL PIPE

707.02 Metallic-Coated Corrugated Steel Pipe.

Provide pipe, special sections (such as elbows, branch connections, and prefabricated flared end sections) and coupling bands conforming to AASHTO M 36 and either AASHTO M 218, AASHTO M 274, or AASHTO M 289 for the dimensions, classification type, and thicknesses specified.

Fabricate underdrain pipe from steel sheets with a minimum thickness of 0.052 inch. Use any class of perforation specified in AASHTO M 36.

18-inch x 24-foot. 16-guage 2 2/3 x 1/2 galvanized spiral corrugated steel pipe (CSP) 18-inch band H-12 annular band with connecting bolts for spiral (CSP)

24-inch x 24-foot. 16-guage 2 2/3 x 1/2 galvanized spiral corrugated steel pipe (CSP) 24-inch band H-12 annular band with connecting bolts for spiral (CSP)

36-inch x 20-foot. 16-guage 2 2/3 x 1/2 galvanized spiral corrugated steel pipe (CSP) 36-inch band H-12 annular band with connecting bolts for spiral (CSP)

Refer to the schedule of items for quantities needed.

4.0 Government Furnished

There is NO government furnished property.

5.0 Deliverables / Schedule

Refer to the Schedule of Items (Bid Schedule) for deliverables. The contractor is responsible for delivering the culverts within 60 days of receipt of award.

6.0 Travel

Not applicable

7.0 Contractor’s Key Personnel

8.0 Security Requirements

Not applicable

9.0 Data Rights

Not applicable

10.0 Section 508 – Electronic and Information Technology Standards Not applicable

Attachments

Project
General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards
Attachments

File details come from the government source that posted it. Updated .