This is a Statement of Work (SOW) for water testing and treatment services at the LBJ Work Center located within the National Forests and Grasslands in Texas (Caddo-LBJ National Grasslands), effective June 2026.
The contractor must provide all labor, materials, chemicals, and transportation necessary for sampling, testing, operation, and maintenance of the potable water supply. All work shall comply with the U.S. Environmental Protection Agency's National Primary Drinking Water Regulations (40 CFR 141). Potable water testing requirements include total coliform and E. coli coliform tests on all area sites one time per 30-day period, with immediate re-sampling of any positive results and Forest Service notification by phone. Annual nitrate sampling and testing is also required. Test results must be submitted to the Forest Service Contracting Officer's Representative (COR). For water system operations, the contractor must supply and operate an NSF-approved sodium hypochlorite chlorination system calibrated to maintain 0.5-1.5 ppm chlorine residual. Weekly residual samples must be taken, chlorine barrels kept full, and metering pumps maintained operational. The contractor must maintain daily logs at well houses documenting date, meter readings, chemical amounts added, chlorine residual, and operator initials. Well houses and facilities must be kept neat and clean. During the base year only, the contractor must conduct a pre-work conference within 10 days of contract award and fine-tune chlorinators within 30 days of award to achieve 0.5-1.5 mg/L free chlorine at the kitchen sink; the government will provide the initial 10 gallons of chlorine.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C04c_WD 5231 REV 34_12444026Q0224.pdf | ||
| C04a_SF1449pkg_12444026Q0224.pdf | ||
| C04d_PPE Questionnaire_12444026Q0224.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LBJ Work Center Water Testing and Treatment Statement of Work
NATIONAL FORESTS AND
GRASSLANDS IN TEXAS
LBJ WORK CENTER
CADDO-LBJ NATIONAL GRASSLANDS
WATER TESTING AND TREATMENT
STATEMENT OF WORK
June 2026
PART 1 - Potable Water Operations
A. Scope of Contract - Furnish all labor, incidental materials, chemicals and transportation necessary for sampling, testing, operation and maintenance of the LBJ Work Center potable water supply.
B. All water sampling and testing shall be performed in accordance with the U.S.
Environmental Protection Agency’s National Primary Drinking Water Regulations (40 CFR 141) for potable water.
PART 2 - TESTING REQUIREMENTS: POTABLE WATER
A. Collection of Samples for Testing of Potable Water
1. Contractor shall be responsible for sample containers, taking samples, and performing total coliform and E.coli coliform tests (as required) on the water samples.
2. All area sites shall be tested one time per 30-day period.
3. Re-sampling - All samples with one or more positive portions shall be re-sampled immediately. The Forest Service shall be notified immediately by phone of any need for the Contractor to resample.
4. All re-sampling shall be indicated on the State reporting forms before being forwarded to the Forest Service.
5. All re-sampling shall be done at the same unit price as indicated in the bid schedule for regular sampling.
6. A copy of the test results shall be submitted to the Forest Service COR.
7. Perform annual Nitrate sampling and testing.
PART 3 - OPERATION OF WATER SYSTEMS AND TESTING FOR CHLORINE
A. General
1. This section covers operation, maintenance and chlorine residual testing.
2. The Contractor shall furnish all necessary equipment, transportation, chemicals and manpower to operate the existing hypo-chlorinator.
B. Specific Operation and Testing Requirements
1. The chlorination system shall be supplied with NSF approved sodium hypochlorite solution, operated and calibrated to inject a chlorine solution into the water system that will provide a 0.5-1.5 ppm residual.
2. The Contractor shall be required to take a residual sample on a weekly basis and ensure that chlorine barrel is full, and metering pump is operational.
3. The Contractor shall also be required to keep a log of visits. The notebook shall be kept at the well houses. Each daily log shall include the date, meter reading, amount of chemical added, chlorine residual, and the initials of the attending Operator.
4. Keep well house and facility neat and clean.
PART 4 - PRE-WORK CONFERENCE & PLUMBING (BASE YEAR ONLY)
A. Within 10 days after award of the Contract the Contractor shall meet with the CORs to establish mutually agreeable schedules for accomplishment of the required items of work.
B. Within 30 days after award of the Contract the Contractor shall meet with FS staff and fine-tune chlorinator(s) so that water at kitchen sink is 0.5-1.5 mg/L free chlorine. Initial 10 gallons of chlorine will be provided by the government.