C04b Attachment 2 SOW 1240LT26Q0107.docx
DOCX document 65 KB Posted
- Solicitation number
- 1240LT26Q0107
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Work (SOW) for the Crystal Lakes Water and Septic Systems Resuscitation project located at the Crystal Lakes Work Center near Leadville, Colorado, with an additional facility location in Salida, Colorado. The work center is situated at 10553 US Highway 24, Leadville, CO 80461, approximately 6 miles south of Leadville at an elevation of approximately 10,000 feet.
The scope of work encompasses comprehensive utility infrastructure improvements including: (1) performing Subsurface Utility Engineering and obtaining Colorado Department of Transportation permits to bore a 2-inch HDPE waterline under Colorado Highway 24; (2) installing a 2-inch SDR11 HDPE water pipe from Dwelling 1's basement to the existing east-side distribution system; (3) removing and replacing the existing well pump to achieve 15 GPM supply with new control panel and level sensors; (4) installing a dual-stage booster pump with basement water storage; (5) significant electrical work including meter relocation by Sangre de Cristo Electric Association, burying service lines, upgrading Dwelling 1's service from 100 to 200 amps with new circuit breaker panels, installing sub-panels, and upgrading electrical infrastructure at the Salida facility; (6) complete replacement of the septic system serving the Blue and Brown House including new sewer lines, septic tank, leach field, underground electrical connection, pump, and dosing system; (7) replacing septic tanks for the Bunkhouse and Shop; and (8) asphalt removal with road and gate installation. The contract period extends from the date of award until September 30, 2027, with anticipated winter weather constraints from October through April. Key deliverables include a construction schedule (due at the pre-work conference), material and equipment submittals (during construction), quality control reports (during construction as indicated), and as-built drawings (prior to final inspection). The contractor must provide temporary facilities including porta-potties and implement a weekly trash abatement program. All travel costs, equipment mobilization, and materials are the contractor's responsibility.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNITED STATES DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 2
PIKE - SAN ISABEL NATIONAL FORESTS & CIMARRON AND COMANCHE NATIONAL GRASSLANDS
LEADVILLE RANGER DISTRICT
May 18th 2026
Crystal Lakes Water and Septic Systems Resuscitation
Statement of Work
Project Crystal lakes Water and Septic Systems Resuscitation Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands Leadville and Salida Ranger District
General Information
1.0 Project Location
The majority of the work will take place at the Crystal Lakes Work Center located off Colorado Highway 24 approximately 6 mile south of Leadville, CO. The work center is located on both sides of the CO HWY 24. The address is below 10553 US Hwy 24 Leadville CO, 80461
The facility for Option Item 4.A is located in Salida, CO at the following address:
348 E 3rd St.
Salida, CO 81201
These sites are open and accessible year-round by highway legal vehicles. Winter conditions (freezing temperatures, snow fall, frozen ground, etc.) can be anticipated approximately October through April.
2.0 Scope of Work
The project scope of work generally consists of the following:
1. Perform all requirements (including producing a Subsurface Utility Engineering (SUE)) to attain a permit from the Colorado Department of Transportation to bore a 2-inch HDPE (SDR-11) waterline under Colorado HWY 24
2. Install 2-inch SDR11 HDPE water pipe from the basement of Dwelling 1 to the existing 2-inch schedule 40 PVC water distribution system located on the East side of HWY 24
3. Removal of existing well pump and installation of a new Well pump to attain 15 GPM supply flowrate to Dwelling 1. Install new well pump control panel, connect new well pump to existing electrical supply, provide level sensor in water storage tanks to energize well pump on and off
4. Installation of duel stage boost pump with water storage in basement of dwelling 1
5. Electric work
a. Sangre de Cristo electric association to relocate existing meters from dwelling 1 and dwelling 2 to new location at utility pole and remove existing overhead service lines.
b. Bury electrical lines from utility pole to dwelling 1 and dwelling 2
c. Upgrade service to dwelling 1 from 100 amps to 200 amps including installation of new 200-amp circuit breaker panel
d. 100-amp sub-panel and proper wiring of duel stage boost pump
e. Install all electrical for septic pump
f. Option item includes upgrading electrical service and panel from 100-amps to 200-amps at a facility located in Salida, CO. Run some new circuit and two new window fans controlled by thermostats.
6. Complete replacement of the septic system that services the Blue and Brown House.
a. Replacement of the sewer lines, septic tank and leach field.
b. Installation of a new underground electrical connection
c. Installation of pump and dosing system
7. Replacement of the septic tank that services the Bunkhouse
8. Replacement of the septic tank that services the Shop
9. Asphalt removal
10. Road and gate installation
3.0 Background
a. Currently (February 2025) there exist two separate water systems. One water system on the West side of Colorado Highway 24 serves Dwelling 1 and Dwelling 2. There is another well and water distribution system that serves drinking water to the shop/garage and the bunkhouse on the east side of HWY 24. The water quality on the East side of the highway is poor compared with the West side of the highway. This project will include the installation of a water treatment system in the basement of dwelling one located on the West side of Colorado highway 24. The east side well (permit # 117217) will be decommissioned. This project will include directional boring underneath HWY 24 to connect the west side water distribution with the east side water distribution. The west side well (permit 268119) will ultimately serve clean drinking water to the entire work center (both sides of HWY 24).
a. The existing septic system that serves the blue and brown house is no longer function well enough to serve the residents that live in these buildings. The effluent is backing up and a full system replacement is required.
b. The septic tank that serves the Bunkhouse is no longer watertight and is leaking this tank is in need of replacement.
c. There are no known issues with the septic system that serves the shop but the age of the tank is unknown so it will be replaced as well.
d. These sites are open and accessible year-round by highway legal vehicles.
e. Approximate site elevations is 10,000 feet.
f. Winter conditions (freezing temperatures, snow fall, frozen ground, etc.) can be anticipated approximately October through April.
g. Cellular phone service is generally available at both sites.
General Information
4.0 Technical Requirements / Tasks
Generally work will consist of the following tasks:
· Mobilization;
· Quality Control, Survey, and Staking;
· Construction and upgrading of utilities including sanitary sewer, water, and electric;
· Site/utility demolition and abandonment, grading, temporary erosion control, and surfacing replacement;
Construction includes furnishing all labor, materials, equipment, tools, transportation, supplies, storage, other incidentals and all work required to complete the proposed addition, remodel and associated items in accordance with the approved final drawings, specifications and provisions of the contract.
Construction quality control includes supplying all the personnel, equipment, special inspections, tests, and reports necessary to ensure that construction is completed in compliance with the drawings, specifications, and provisions of the contract.
The Contractor shall provide temporary toilet facilities (porta-potty) at the site during all construction work.
A trash abatement program shall be initiated during pre-construction phases of the project and shall continue through the duration of the project. All construction refuse shall be removed from the site and disposed of properly on a weekly basis and upon project completion.
5.0 Government Furnished
a. Water and electricity are available at the site(s) for construction purposes.
b. Work shall not be scheduled on holidays, weekends, and between the hours of 6pm and 7am.
c. Refer to Project Manual/Specifications for additional information.
6.0 Period of Performance
The contract period of performance shall be from date of award until September 30th, 2027. Winter conditions which may impede utility and earthwork activities can be anticipated approximately from October to April.
7.0 Deliverables / Schedule
Key Deliverables
| Item No. |
| Deliverable |
| Objective |
| Due |
| 1 |
| Construction Schedule |
| Defining the responsibilities, timeline, risks, and milestones of contract objectives. |
| No later than the date of the prework conference |
| 2 |
| Material and Equipment Submittals |
| All material specifications, product data, manufacturer’s instructions, and material safety data sheets |
| During construction according to schedule |
| 3 |
| Quality Control Reports |
| Materials testing, construction observation, and special inspections documenting compliance with the Contract Documents. |
| During construction as indicated |
| 4 |
| As-built Drawings |
| Drawings that recognize any changes in the plans, specifications, and/or approved submittal of equipment supplied |
| Prior to final inspection |
8.0 Travel
All costs associated with travel to and from the job site, including mobilization of all equipment and materials shall be included in the Contractor’s cost proposal.
9.0 Contractor’s Key Personnel
Project Manager – individual designated by the General Contractor, serves as primary points of contact and shall have overall responsibility for managing and coordinating the performance of the Contractor’s obligations under this contract, including performance of all Subcontractors, and be authorized to act for and bind Contractor and Subcontractors in connection with all aspects of this contract.
Project Superintendent – onsite representative of the General Contractor, responsible for overall management of the project and capable of discussing technical aspects of the project. Project Superintendent may also fill Project Manager role at the Contractor’s discretion.
10.0 Site Visit
Contact Landon Wigton (307)-760-9172; landon.wigton@usda.gov and Phillip Krieble at (303)514-9751;
phillip.krieble@usda.gov for the site visit that will be held on (Date), at (Time) a.m. Mountain Time.
Location of Site Visit: 10553 Hwy 24 S LEADVILLE, COLORADO 80461
10.0 Attachments
1. Project Manual/Specifications
2. Construction drawings
3. Schedule of Items
4. Test Pits 2026.03.18
5. Site map
6. Well Permits
a. See File Well Permit Number 268119 (West side HWY 24).pdf
b. See file Permit Number 117217 (East side HWY 24).pdf image1.png image2.png