C04b_Attachment 2 - Performance Work Statement.pdf
PDF 1 MB Posted
- Solicitation number
- 12443926Q0100
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Performance Work Statement (PWS) for the U.S. Department of Agriculture (USDA) Forest Service addressing non-native invasive species (NNIS) eradication in the Tell City Ranger District of the Hoosier National Forest in south-central Indiana. The project encompasses approximately 203,000 acres across two ranger districts (Brownstown and Tell City) spanning multiple counties. The primary objective is to remove or reduce Eurasion watermilfoil (MYSP) and other invasive plant populations through aquatic herbicide treatment to minimize threats to native plant communities and wildlife.
The contractor must provide all labor, expertise, herbicides, equipment, materials, transportation, and licensing necessary to complete the work. Herbicide applicators must possess current Indiana commercial pesticide applicator certification with an OISC Category 5 Aquatic Pest Management license, with a licensed applicator required on-site at all times during treatments. Work must utilize only EPA-approved, non-restricted use chemicals applied according to manufacturer specifications and label directions. The contractor must treat mapped Eurasion milfoil infestations and nuisance vegetation around boat ramps and beach areas using selective aquatic herbicides such as Procella COR, Sonar, or equivalent products. Applications must achieve a minimum 90 percent kill rate of target NNIS infestations with at least 95 percent of mapped areas treated. Post-treatment surveys must be conducted one to three months after application, with detailed post-survey reports submitted to the Contracting Officer's Representative (COR). Aerial spraying and drones are prohibited; only vehicle, ATV/UTV/OHV, or boat-mounted sprayers are permitted. The contractor is responsible for all travel costs, cleanup of spills with immediate COR notification, placement of caution signs per label requirements, and reapplication at contractor expense if minimum acceptable quality levels are not achieved.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C04a_Attachment 1 - SOI.xlsx | XLSX spreadsheet | |
| C04c_Attachment 3 - Maps.pdf | ||
| C04_12443926Q0100.pdf | ||
| C04d_Attachment 4 - WD 1981-1257 R72.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Performance Work Statement
Contents Project Title
General Information
1.0 Background and Purpose
2.0 Definitions
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Deliverable / Schedule
5.0 Government Furnished
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 - Electronic and Information Technology Standards
11.0 Performance Requirement Measures
Attachment
Project Title NNIS Eurasion Watermilfoil Eradication Tell City District
General Information
1.0 Background and Purpose
The Hoosier National Forest is in south-central Indiana and contains approximately 203,000 acres of National Forest System (NFS) lands. The two zones are the Brownstown Ranger District and the Tell City Ranger District. Brownstown Ranger District includes Brown, Jackson, Lawrence, Martin, Monroe, and Orange Counties. Tell City Ranger District includes Dubois, Crawford, Orange, and Perry Counties. Prior to the acquisition of lands by the Forest Service, nearly all forests had undergone repeated clearing to create small farms, logging, burning, and grazing by domestic livestock. This history of disturbance has contributed both directly and indirectly to the establishment of non-native invasive plant species (NNIS) throughout the Hoosier. The primary objective of this solicitation is to remove or reduce the vigor and size of invasive plant populations, thereby minimizing the threat to native plant communities and wildlife.
2.0 Definitions
COR – Contracting Officer’s Representative NNIS – Non-Native Invasive Species MYSP - Myriophyllum spicatum (Eurasion Milfoil)
Contractor Requirements
3.0 Technical Requirements / Tasks
- Only Environmental Protection Agency (EPA) approved, non-restricted use chemicals are to be used.
- The Contractor shall provide all expertise, labor, supervision, services, herbicides, carriers or adjuvants, materials, equipment, tools, supplies, transportation, licenses, permits, worker personal protective equipment (PPE), and incidentals necessary to perform the required work, for which the desired outcome is in strict accordance with the standards in the contract. The Contractor shall perform and accomplish the work in accordance with all applicable federal, state, and local laws, regulations, and ordinances.
- Herbicide applicators shall use typical herbicide concentrations according to all EPA approved manufacturer herbicide directions. The Contractor will mix herbicides in accordance with manufacturer’s instructions and any applicable laws or regulations. Application operations shall be conducted as indicated on the herbicide label, including approved concentrations, rates/acre, and environmental conditions. Only chemicals for aquatic use in or adjacent to streams shall be used whenever directed at or adjacent to waterways and wetlands.
- The Contractor is responsible for the cleanup of any spills and will notify the COR immediately of any spills that occur. The contractor must have herbicide labels and copies of material safety data sheets (MSDS) of chemicals used on site. The contractor must provide copies or notification by telephone or email of herbicide labels and MSDS of chemicals to the COR prior to the start of work.
- This contract does not allow any indiscriminate broadcast applications or aerial spraying. Where appropriate, vehicle or ATV/UTV/OHV/boat mounted sprayers is permissible. There is no restriction on the volume of tanks used in UTVs. Aerial spraying, including the use of drones is prohibited.
- Contractor will place caution signs around the sprayed areas according to the appropriate interval per label directions of the chemical used in application areas where the public may have contact with herbicide (e.g. trails, parking areas). Where necessary per label directions, caution signs may include temporary closure of treatment areas.
- All herbicide applicator staff must be able to identify target NNIS plant species in the field, including during dormant seasons, to a sufficient degree without exceeding the maximum acceptable levels of mortality to desirable non-target native species and to meet minimum kill rates to target NNIS infestations.
- The Contractor and/or whoever will supervise the herbicide treatment must possess a current Indiana commercial pesticide applicators certification and license at the time of any herbicide treatments. This contract requires an OISC Category 5 Aquatic Pest Management license. The Contractor, or subcontractor, shall ensure that there is either an Indiana pesticide licensed applicator on-site at all times of treatments or ALL on-site personnel applying herbicide MUST be registered technicians AND have access to immediate voice communication by telephone or radio with the licensed supervisor.
- The boat ramps can be used for access. These are no-wake lakes with only trolling motors permitted for the public, but an outboard motor could be used for the lake if the operator stays at a no-wake speed. Boat and motor must be clean and inspected by COR or technical FS staff before launching.
4.0 Deliverable / Schedule
Eurasion Milfoil – Aquatic Herbicide (as needed) - (Selective and/ or Non-selective Herbicide):
Contractor will treat NNIS infested areas of the lake. Work shall occur in specified locations and times as requested in the Performance Work Statement (PWS). Contractor will apply herbicide at a sufficient interval and concentration to meet or exceed the kill rate on target NNIS infestations and nuisance vegetation at ramp/beach and not exceed the maximum specified mortality to non-target plant species in other areas as indicated in the QASP/AQL.
Treat mapped areas for Eurasion Milfoil with additional treatment for nuisance vegetation around the boat ramps and beach areas. See attached maps for locations where herbicide applications are to occur. GIS shapefiles are available from the COR upon request.
Application should be done during the week while public usage is low
Post treatment surveys will need to be conducted no less than one month and no more than two months after the treatments are completed to ensure initial treatment was effective and to re-treat any missed vegetation. A post-survey report is required and is to be submitted to the COR.
Typically, the contractor will apply selective aquatic herbicide such as (Procella COR, Sonar ® or equivalent product) and/or other non-restricted use selective aquatic herbicides as indicated in the PWS. Other EPA approved herbicides not mentioned may be acceptable with prior approval of the COR.
The beach and boat launch areas (“All Aquatic Veg”) should be treated to kill all weeds to maintain a safe and open swimming and boating area.
Application should be completed during the week and at times with low public use. Post survey of treatment needs to be done no later than three months after the initial treatment to ensure initial treatment was effective and to treat any missed vegetation. A post-survey report is required for submission to the COR before payment will be approved. A map of areas where secondary treatments were conducted will need to be provided to the COR.
See Attachment 1 – Schedule of Items (SOI)
5.0 Government Furnished
-Key for FS gates will be provided if necessary.
-Geo Referenced PDF maps will be provided.
6.0 Travel
Contractor is responsible for all travel arrangements and expenses incurred.
7.0 Contractor’s Key Personnel
(a) The Contractor shall assign to this contract the following key personnel: Project Manager(s)/On-Site Foremen/Lead and ensure they have proper licensure according to state requirement: http://www.isco.purdue.edu/.
(b) The Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment.
The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
8.0 Security Requirements
No special clearance required.
9.0 Data Rights
Contractor shall not distribute Government provided data to third parties outside of approved subcontractors.
10.0 Section 508 - Electronic and Information Technology Standards Contractor must have a GPS enabled device with the capability of using georeferenced PDF files or .shp files for navigation.
11.0 Performance Requirement Measures
Contract Line Item No.
Work Requirement Task / Critical Sub-tasks Inspection requirements
*Acceptable Quality Level (AQL)
Monitoring Method
Lake Vegetation Treatments
Contractor will treat mapped infestations of aquatic NNIS and nuisance vegetation in the areas delineated in the attached maps. Applicators will apply herbicide in a manner that will meet or exceed the kill rate on target NNIS and nuisance vegetation.
At least 95% of target NNIS of all areas mapped to be treated and Nuisance Vegetation (ramp) infestation(s) treated.
AQL determinations are made by the COR/Technical lead upon inspection of the work.
These determinations are unilateral and not protestable
Minimum 90% kill of target NNIS/Nuisance infestation(s) Visual
Schedule (non-Line Item)
Timely Completion of the contract work
Per the Work Schedule, the Contractor will complete all work prior to the contract end date.
AQL determinations are made by the COR upon inspection of the work.
These determinations are unilateral and not protestable
All work must be complete by the end date of the contract and meet the AQL.
Visual
Contractor(s) must reapply the required herbicide, or mechanical work, at their expense upon failure to meet AQL values at the final inspection for each contract line item where the work performed failed to reach the minimum acceptable target kill ratio of the NNIS infestation(s).
Attachment
See Evaluation and Basis for Award section on RFQ.