This is a Statement of Work (SOW) for the Cranberry Mountain Nature Center (CMNC) Generator Replacement project issued by the US Department of Agriculture (USDA).
The project requires removal and disposal of an existing 45kw propane standby generator and 200-amp transfer switch installed at the facility in 2003, located at the junction of FR 150 and WV 39 in West Virginia (coordinates: 38.183539, -80.252786). The contractor must provide and install a new 30kw propane standby generator and 200-amp automatic transfer switch on the existing concrete pad, connecting to existing propane lines and the new transfer switch. All work must comply with applicable electrical and building codes, which supersede other documentation. The contractor must be licensed in West Virginia and maintain liability insurance. Two key deliverables are specified: (1) Replace Generator—remove the existing unit and ancillary components, legally dispose of all demolition materials off-site, install the new 30kw generator, test functionality, and provide staff training; and (2) Replace Transfer Switch—remove the existing switch and ancillary components, provide and install a new automatic transfer switch connected to the new generator, test all equipment, ensure code compliance, and train staff. Both deliverables are due at the end of the period of performance. Power disruptions must occur outside normal operating hours with one week's notice. The facility operates mid-April through mid-October with limited hours (closed Tuesdays and Wednesdays). The government will provide facility access during business hours (Monday-Friday 9:00 am to 4:30 pm) and restroom facilities. One week notice is required before onsite work, and no weekend or federal holiday work is permitted without written contracting officer approval. All government-provided property must be returned prior to final invoice payment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Project Cranberry Mountain Nature Center (CMNC) Generator Replacement
General Information
1.0 Scope of Work
The following project shall include the removal and disposal of the existing standby generator at the Cranberry Mountain Nature Center and the transfer switch. The project shall include the installation of new 30kw propane standby generator and 200-amp automatic transfer switch. See Photographs below for information on the existing system and existing site conditions.
2.0 Background
The Cranberry Mountain Nature Center is located at the junction of FR 150 and WV 39. The site coordinates are:
Latitude: 38.183539, Longitude: -80.252786
If you would like to conduct a site visit, please reach out to:
Ben Shaffer benjamin.shaffer@usda.gov 304-635-4473
The Cranberry Mountain Nature Center currently has a 45kw propane standby generator and 200-amp transfer switch.
The unit was installed in 2003 when the building was rewired to accommodate the generator and to come into compliance with National Electrical Code.
Contractor Requirements
3.0 Technical Requirements / Tasks
Contractor shall be licensed in the state of West Virginia and maintain liability insurance. All work must comply with applicable electrical and building codes. All applicable codes will supersede any other documentation or requirements provided.
Power disruptions to the facility should be planned to occur outside of normal operating hours. One week’s notice is necessary prior to disruptions in power to ensure minimal to no impact on operations.
4.0 Government Furnished
Government shall furnish access to the facility during regular business hours (Monday-Friday 9:00am to 4:30pm), as well as restroom facilities onsite. Facility operational season is Mid-April through Mid-October and the operational hours are:
Sunday – 9:00 am – 4:00 pm Monday – 9:00 am – 4:30 pm Tuesday – Closed Wednesday – Closed Thursday – 9:00 am – 4:30 pm Friday – 9:00 am – 4:30 pm Saturday – 9:00 am – 4:30 pm
One week notice is necessary prior to any onsite work, to ensure access to the facility is available. No work shall be permitted on weekends or on federal holidays without the written permission of the CO. Any government provided property shall be returned prior to payment of the final invoice.
mailto:benjamin.shaffer@usda.gov
5.0 Deliverables / Schedule
Key Deliverables
Item No. Deliverable Objective Due 0001 Replace Generator Remove the existing generator and any ancillary components not needed. All demoed materials shall be removed from the project site and legally disposed of off Government property. The existing protective cage may be removed during replacement but shall be reinstalled upon installation of the new generator. Provide and install a new 30kw propane standby generator on the existing concrete pad. Make connection to existing propane lines and new transfer switch. Test functionality of newly installed equipment. Demonstrate and train Government staff on proper operation of new generator.
End of Period of Performance
0002 Replace Transfer Switch Remove the existing transfer switch and any ancillary components not needed. All demoed materials shall be removed from the project site and legally disposed of off Government property. Provide and install a new automatic transfer switch and connect to new standby generator. Test functionality of all newly installed equipment. The system must meet all applicable electrical and building codes and be in working order upon completion of the installation. Demonstrate and train Government staff on proper operation of new transfer switch.
End of Period of Performance
6.0 Photos of Existing System
Existing generator with transfer switch on building wall.
Existing generator with protective cage. Cage clear dimensions: 78” L x 36” W x 64” H.
Tank shown in background is excess property and not the propane tank for the generator.
Existing generator on concrete pad with propane piping.
Existing generator on concrete pad with propane piping.
Electric meter, breaker box, and transfer switch.
Existing transfer switch.
Existing transfer switch.
Access to generator. Looking toward CMNC from generator.
Access to generator looking away from CMNC.
Access towards parking lot. Existing propane tank shown for reference only.
Vicinity Map 38°11'0.73"N 80°15'9.78"W
Legend
Cranberry Mountain Nature Center
3 mi
N
N
| Project |
| General Information |
| 1.0 Scope of Work |
| 2.0 Background |
| Contractor Requirements |
| 3.0 Technical Requirements / Tasks |
| 4.0 Government Furnished |
| 5.0 Deliverables / Schedule |
| 6.0 Photos of Existing System |
File details come from the government source that posted it. Updated .