C04a - Schedule of Items - 1240LT26Q0099.pdf

PDF 223 KB Posted

Attached to
UTE Look Tower Reroof Federal contract opportunity
Solicitation number
1240LT26Q0099
Issued by
Department of Agriculture Forest Service

About this file

This is a Schedule of Items for a federal contracting solicitation issued by the USDA Forest Service for the Ute Tower Reroof Project, with a final date of June 4, 2026.

The schedule contains two line items priced on a lump-sum (LS) basis. Item 001 covers mobilization costs. Item 002, valued at a quantity of one, encompasses the primary scope of work: removal and disposal of the existing cedar wood shingle roofing system, removal and reinstallation of the lightning protection system across the roof, installation of a synthetic cedar shingle roofing system, metal fabrication and installation of a stove pipe sleeved flashing piece, and reinstallation of the existing stove pipe. Both items are measured and quoted as lump-sum deliverables. The document provides a template for contractors to enter their proposed prices and calculate totals, though specific pricing information is not populated in this version.

View the file

Other files for this federal contract opportunity

Other files attached to UTE Look Tower Reroof, newest first.
File Type Posted
C04b - Drawings - UTE TOWER - 1240LT26Q0099.pdf PDF
C04c - SOW - SPECS- 1240LT26Q0099.pdf PDF
C04e WD UT20260079 - 5-18-2026 1240LT26Q0099.txt TXT text file
C04 SF1442 - 1240LT26Q0099 - Final.pdf PDF
C04d - Experience Questionnaire - 1240LT26Q0099.docx DOCX document
C04f - Past Performance Data Sheet 1240LT26Q0099.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA Forest Service

ITEM

NUMBER DESCRIPTION

METHOD

OF MEAS UNIT QUANTITY PRICE TOTAL

001 Mobilization LS LS

Remove & dispose of existing cedar wood shingle roofing system; Remove & reinstall lightning protection system across the roof; Install synthetic cedar shingle roofing system; Metal fabricate & install stove pipe sleeved flashing piece, and Reinstall existing stove pipe

LS LS 1

TOTAL

SCHEDULE OF ITEMS

UTE TOWER REROOF PROJECT

(Final - 06/04/2026)