C04A_Performance Work Statement_NTDP_AEDs_12444326Q0068.pdf
PDF 314 KB Posted
- Attached to
- AED Medical Oversight and Management Services
- Solicitation number
- 12444326Q0068
- Issued by
-
Department of Agriculture Forest Service
About this file
Summary of USDA Performance Work Statement: NTDP AED Medical Oversight and Management
This Performance Work Statement (PWS) outlines medical oversight and management services for Automated External Defibrillators (AEDs) at two Forest Service National Technology and Development Program (NTDP) centers located in Missoula, Montana and San Dimas, California. The contractor must provide comprehensive medical direction and oversight for both states, including AED prescriptions, state registrations, training plans, emergency protocols, and post-event clinical reviews. The contractor is required to procure and deliver one Physio-Control Stryker CR2 AED (or most recent model) with wall mount and CPR Pak to the Missoula Training Center within 14 days of contract award. The contractor must also develop and provide access to a web-based platform capable of tracking CPR responder training certifications, AED inspections, and equipment expiration dates across both locations, with delivery required within 30 days of award.
Ongoing support services include providing replacement batteries and pads for all nine AEDs as needed, delivering timely reminders for equipment inspections and expirations, notifying points of contact of regulatory and manufacturer updates, and operating a customer service line available during business hours (0800-1700) in one of four designated time zones. The government will furnish eight existing AEDs and provide replacement devices at no cost to the vendor if devices become unusable. All deliverables must meet specific performance standards with acceptable quality levels ranging from 95–100%, monitored through direct observation. No travel is required. Key points of contact are Lisa Outka-Perkins (Missoula, 406-329-3849) and Gregory Williford (San Dimas, 909-929-7101).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C04a_12444326Q0068.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Performance Work Statement
Contents Project Title General Information
1.0 Background and Purpose
2.0 Definitions
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Deliverable / Schedule
5.0 Government Furnished
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Performance Requirement Measures
Project Title National Technology and Development Program (NTDP) AED Medical Oversight and Management
General Information
1.0 Background and Purpose
The Forest Service National Technology and Development Program (NTDP) has two centers, one is Missoula, MT and one in San Dimas, CA. The Missoula Center currently has 4 AEDs that require medical oversight and equipment replacement, as needed. The Missoula center needs one AED procured for its Training Center. The San Dimas center has 4 AEDs that require medical oversight and equipment replacement, as needed. NTDP is seeking medical oversight and management services to include:
• Medical direction and oversight for the states of Montana and California.
• Prescription and Authorization to purchase and use AEDs for each facility.
• An AED Training plan.
• AED registration with local agencies, if needed.
• An emergency plan with protocol and response procedures and procedure documents for each type of device.
• Post event clinical review or event data and rescuer debriefing.
• One AED brought and supplied under this contract for the Missoula Training Center.
• A web platform that tracks CPR Responder training certifications, AED regular inspections, and equipment expiration dates.
• A web platform that manages multiple devices across multiple locations.
• Replacement batteries and pads for all 9 AEDS, as needed.
• Reminders for expiring parts and inspections.
• Notification of regulatory and manufacturer updates.
• A customer service line for questions and after-use support when an AED is deployed.
2.0 Definitions
Medical Direction or Medical Oversight: Refers to state requirements to have a physician managing an AED program. Each state has its own requirements.
Contractor Requirements
3.0 Technical Requirements / Tasks
3.1 Task 1: Medical Direction and Oversight
The contactor will provide medical direction and oversight (California and Montana) for the AEDS in Table 1. This oversight and direction will include:
• A prescription for each AED, if needed.
• An overall training plan for each center.
• AED registration with local agencies and the states of Montana and California, if needed.
• An emergency plan with protocol and response procedures and procedure documents for each type of device.
• Post event clinical review or event data and rescuer debriefing.
Table 1.
AED Location Make and Model Serial Number Equipment Expiration Schedule
AED 1—San Dimas Philips HeartStart A19G-10694 Battery: 5/31/2027 Adult Pad: 4/29/2027
AED 2—San Dimas Philips HeartStart A19G-09485 Battery: 5/31/2027 Adult Pad: 4/29/2027
AED 3—San Dimas Philips HeartStart A21H-02126 Battery: 5/31/2027 Adult Pad: 4/29/2027
AED 4—San Dimas Philips HeartStart FRx B2211-02942 Battery: 4/22/2027 Adult Pad: 3/31/2028
AED 5—Missoula Physio-Control Stryker CR2 48736025 Battery: 6/25/2029 Adult Pad: 3/5/2029
AED 6—Missoula Physio-Control Stryker CR2 48734385 Battery: 6/25/2029 Adult Pad: 3/5/2029
AED 7—Missoula Physio-Control Stryker CR2 50220696 Battery: 4/13/2027 Adult Pad: 8/30/2027
AED 8—Missoula Physio-Control Stryker CR2 50221023 Battery: 4/13/2027 Adult Pad: 8/30/2027
AED 9—Missoula TBD TBD TBD
3.2 Taks 2: AED
The contractor will procure and provide one AED (Physio-Control Stryker CR2 or most recent model) for the Missoula Center Training Center. The AED must include a wall mount and an AED/CPR Pak (CPR Mask, two pairs of protective gloves, emergency shears, prep razor, absorbent dry towel, antiseptic towelette, equipment towelette, biohazard bag).
3.2 Task 3: Web Platform
The contract will provide an easy-to-use web platform to manage the devices across the two centers (Missoula, MT and San Dimas, CA). This will include the ability to track CPR responder training certifications, AED regular inspections, and equipment expiration dates.
3.3 Task 4: Equipment Support
The contractor will provide equipment to support both centers (Missoula, MT and San Dimas, CA). This support will include replacement of expiring batteries and adult pads (as needed), reminders for expiring equipment, inspections reminders, and notifications of regulatory and manufacturer updates or recalls.
3.4 Take 5: Customer Service
The contractor will provide a reasonable customer service line that is available to Forest Service employees for questions and after-use support when an AED is deployed. The customer service line must be available during routine working hours from 0800-1700 in one of these four time zones-Eastern, Central, Mountain, or Pacific.
4.0 Deliverable / Schedule
PWS No. Deliverable Description Distribution Due 4.0 Deliverable 1
Medical Direction and Oversight
Contractor will provide documentation of AED prescriptions, AED state registrations, an AED training plan, an emergency plan, and instructions for post event clinical review and rescuer debriefing.
Submit the documents electronically to the COR and project manager for review and approval.
Due 14 days after contract award.
4.0 Deliverable 2
AED (Physio-Control Stryker CR2 or most recent model)
The contractor will procure and deliver the preferred AED and accessories to the Missoula Center.
Ship the AED and accessories directly to the Missoula Center, attention Lisa Outka- Perkins.
Due 14 days after contract award or as documented in order estimated delivery date.
4.0 Deliverable 3
Web Platform The contractor shall provide a web platform.
Provide the COR and project manager with the link to the web platform, the log in information, and user instructions.
Due 30 days after contract award.
4.0 Deliverable 4
Equipment Support
The contractor will provide replacement equipment, as needed.
Ship to either the Missoula or San Dimas Centers, as needed.
Due as needed per device expiration dates.
4.0 Deliverable 5
Equipment Support
The contractor will provide reminders for equipment inspections, equipment expirations, and notification of regulatory and manufacture updates and recalls.
Provide to the points of contact for each center via email or the web platform.
Due as needed.
4.0 Deliverable 6
Customer Service
The contractor will provide a customer service line.
Provide to the points of contact for each center via email or the web platform.
Due 30 days after contract award.
5.0 Government Furnished
The government will furnish the 8 AEDs listed in 3.1 Table 1.
If an AED becomes unusable or unserviceable, the government will furnish a replacement for the main device (excluding pads and batteries) at no cost to the vendor.
The government will provide a point of contact for both centers.
6.0 Travel
No travel is required for this contract.
7.0 Contractor’s Key Personnel
The points of contact for each center are as follows:
Missoula-Lisa Outka-Perkins, 406-329-3849; lisa.outka-perkins@usda.gov San Dimas-Gregory Williford, 909-929-7101; Gregory.WillifordJr@usda.gov
8.0 Performance Requirement Measures
PWS No. Performance Objective
Performance Standard
Acceptable Quality Level
Method of Surveillance
8.1 Medical Oversight and Direction
Documents are delivered to COR and project manager 14 days after contract award.
Prompt delivery with no delay in due date. No more than one revision of deliverable based on government comments.
95% Direct observation. Will review the documents to ensure the requirements of the Government have been met.
8.1
AED
AED is delivered to the Missoula Center within 14 days of contract award.
Prompt delivery with no delay in due date. No more than one revision of deliverable based on government comments.
100% Direct observation.
mailto:lisa.outka-perkins@usda.gov
8.2
Web Platform
Link to web platform, log in information, and user instructions are delivered 30 days after contract award.
Prompt delivery with no delay in due date. No more than one revision of deliverable based on government comments.
95% Direct observation. Will review the information ensure requirements of the Government have been met.
8.2
Equipment Support
Replacement equipment is provided for each device, as needed.
Prompt delivery before expiration date of the equipment. No more than one revision of deliverable based on government comments.
100% Direct observation.
8.4
Equipment Support
Equipment inspection reminders, equipment expiration reminders, and pertinent notifications provided for each device.
Prompt delivery with no delay in due date or before expiration date of the equipment. No more than one revision of deliverable based on government comments.
95% Direct observation.
8.4 Customer Service
Customer service line information is delivered to COR and project manager 30 days after contract award.
Prompt delivery with no delay in due date.
95% Direct observation. Will review the information ensure requirements of the Government have been met.
| Project Title |
| General Information |
| 1.0 Background and Purpose |
| 2.0 Definitions |
| Contractor Requirements |
| 3.0 Technical Requirements / Tasks |
| 4.0 Deliverable / Schedule |
| 5.0 Government Furnished |
| 6.0 Travel |
| 7.0 Contractor’s Key Personnel |
| 8.0 Performance Requirement Measures |
File details come from the government source that posted it. Updated .