C04a_FR 78 Dogway Bridge Replacements Schedule of Items.pdf

PDF 4 MB Posted

Attached to
Monongahela NF FR78 Dogway Bridge Replacement Federal contract opportunity
Solicitation number
12445526Q0104
Issued by
Department of Agriculture Forest Service

About this file

This is a Schedule of Items (Part I, Section B) for a fixed-price construction solicitation covering three bridge replacement projects within the Monongahela National Forest, Gauley Ranger District, Webster County, West Virginia.

The solicitation (12445526Q0104) is divided into six contract line items (CLINs): CLIN 0001 and CLIN 0002 (optional) cover the Lower Dogway Fork Bridge Replacement (FR78-0.039); CLIN 0003 and CLIN 0004 (optional) address the Over Dogway Fork Bridge Replacement (FR 78-1.11); and CLIN 0005 and CLIN 0006 (optional) cover the Upper Dogway Fork Bridge Replacement (FR78-1.60). Each mandatory CLIN contains 25-29 line items with estimated quantities for construction activities including mobilization, surveying, clearing and grubbing, structural excavation, embankment placement, riprap installation, concrete work, structural steel erection, timber decking, bearing devices, and site restoration. Payment units vary by item type: lump sum for mobilization and specialty work, cubic yards for excavation and embankment, tons for aggregate base, feet for pile work and sealing, pounds for reinforcing steel, and each for bearing devices and markers. The optional CLINs (0002, 0004, and 0006) each contain a single line item to add painted finish to the base Structural Steel W40x183 item. All work references the Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition, and bond premiums must be included in mobilization pricing per FAR Clause 52.232-5. Payment is made on actual work performed as described in FP-14 109.01. Optional bid items will be awarded based on available funds, with contractors required to provide pricing for all optional items.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I -SCHEDULE OF ITEMS

SECTION B – SERVICES AND PRICES

FR78-0.039 - Lower Dogway Fork

Bridge Replacement

Gauley Ranger District Monongahela National Forest Webster County, West Virginia

CLIN 0001

ITEM

NO.

DESCRIPTION PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101 Mobilization Lump Sum 1 $________ $________

15201 Construction Survey and Staking, Method 1, Tolerance Class C Lump Sum 1 $________ $________

15702 Silt Sock Lump Sum 1 $________ $________

15706 Check Dams Lump Sum 1 $________ $________

20102 Clearing and Grubbing, Disposal Method A Lump Sum 1 $________ $________

20305 Removal of Old Structure, Disposal Method A Lump Sum 1 $________ $________

20401 Roadway Excavation, Disposal Method B Cubic Yard 125 $________ $________

20408 Removal of Stream Debris Lump Sum 1 $________ $________

20411 Embankment, Placement Method 1 Cubic Yard 879 $________ $________

20801 Structure Excavation Lump Sum 1 $________ $________

20803 Structural Backfill Cubic Yard 398 $________ $________

20805 Dewatering Lump Sum 1 $________ $________

25101 Riprap, Class VI, Machine Placed Cubic Yard 267 $________ $________

30103 Aggregate Base, Grading D, Compaction Method B Ton 277 $________ $________

50202 Joint Sealing Foot 36 $________ $________

55101 Steel, H-Pile, Furn and Driven Foot 448 $________ $________

Solicitation 12445526Q0104 MON FR78 Dogway Bridge Replacement Schedule of items Page 1

55115 Preboring Foot 416 $________ $________

55151 Furnish Pile Driving Equipment Lump Sum 1 $________ $________

55201 Structural Concrete Class AE Cubic Yard 94 $________ $________

55404 Epoxy Coated Reinforcing Steel Pounds 9036 $________ $________

55501 Structural Steel, W40x183, Furnished, Fabricated and Erected Lump Sum 1 $________ $________

55704 Treated Structural Timber, Deck Lump Sum 1 $________ $________

56401 Bearing Device Each 8 $________ $________

60501 Underdrain System, 6 Inch Foot 104 $________ $________

62501 Turf Establishment Lump Sum 1 $________ $________

63305 Post, Steel 3 lb Foot 44 $________ $________

63306 Object markers, Black and Yellow, Type 3 Each 4 $________ $________

63501 Temporary Traffic Control Lump Sum 1 $________ $________

Total: $________

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.

1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.

2. All clearing, grubbing, bedding, borrow, backfill, detours, diversions, signing, and other miscellaneous items not listed above with unique bid items shall be considered incidental to the contract. See 109.05

3. Quantities for aggregate are compacted in place volumes.

MON FR78 Dogway Bridge Replacement Schedule of items Page 2

PART I - SCHEDULE OF ITEMS

FR78-0.039 - Lower Dogway Fork

Bridge Replacement

Gauley Ranger District Monongahela National Forest Webster County, West Virginia

CLIN 0002 (OPTIONAL)

ITEM

NO.

DESCRIPTION PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

OPTION

55501

Add Painted to base item 55501 Lump Sum 1 $________ $________

Total: $________

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.

1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.

2. All clearing, grubbing, bedding, borrow, backfill, detours, diversions, signing, and other miscellaneous items not listed above with unique bid items shall be considered incidental to the contract. See 109.05

3. Quantities for aggregate are compacted in place volumes.

4. Optional bid items will only be awarded based on available funds. Zero or all items or a combination of items may be awarded. Contractor shall provide pricing for all optional items.

MON FR78 Dogway Bridge Replacement Schedule of items Page 3

FR 78-1.11 Over Dogway Fork

Bridge Replacement

Gauley Ranger District Monongahela National Forest Webster County, West Virginia

CLIN 0003

ITEM

NO.

DESCRIPTION PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101 Mobilization Lump Sum 1 $________ $________

15201 Construction Survey and Staking, Method 1, Tolerance Class C Lump Sum 1 $________ $________

15702 Silt Sock Lump Sum 1 $________ $________

20102 Clearing and Grubbing, Disposal Method A Lump Sum 1 $________ $________

20305 Removal of Old Structure, Disposal Method A Lump Sum 1 $________ $________

20401 Roadway Excavation, Compaction Method B Cubic Yard 77 $________ $________

20408 Removal and Salvage of Stream Debris Lump Sum 1 $________ $________

20411 Embankment, Placement Method 1 Cubic Yard 1045 $________ $________

20801 Structure Excavation Lump Sum 1 $________ $________

20803 Structural Backfill Cubic Yard 756 $________ $________

20805 Dewatering Lump Sum 1 $________ $________

25101 Riprap, Class VI, Machine Placed Cubic Yard 268 $________ $________

30103 Aggregate Base, Grading D, Compaction Method B Ton 287 $________ $________

50202 Joint Sealing Foot 36 $________ $________

55201 Structural Concrete Class AE Cubic Yard 175 $________ $________

55210 Seal Concrete Cubic Yard 110 $________ $________

MON FR78 Dogway Bridge Replacement Schedule of items Page 4

55404 Epoxy Coated Reinforcing Steel Pound 13891 $________ $________

55501 Structural Steel W40x183, Galv, Furnished, Fabricated and Erected Lump Sum 1 $________ $________

55704 Treated Structural Timber, Deck Lump Sum 1 $________ $________

56401 Bearing Device Each 8 $________ $________

60501 Underdrain System, 6 Inch Foot 104 $________ $________

62503 Turf Establishment Lump Sum 1 $________ $________

63305 Post, Steel, 3 lb Foot 44 $________ $________

63307 Object Markers, Black and Yellow, Type 3 Each 4 $________ $________

63501 Temporary Traffic Control Lump Sum 1 $________ $________

Total: $________

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.

1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.

2. All clearing, grubbing, bedding, borrow, backfill, detours, diversions, signing, and other miscellaneous items not listed above with unique bid items shall be considered incidental to the contract. See 109.05

3. Quantities for aggregate are compacted in place volumes.

MON FR78 Dogway Bridge Replacement Schedule of items Page 5

FR78-1.11 - Over Dogway Fork

Bridge Replacement

Gauley Ranger District Monongahela National Forest Webster County, West Virginia

CLIN 0004 (OPTIONAL)

ITEM

NO.

DESCRIPTION PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

OPTION

55501

Add Painted to base item 55501 Lump Sum 1 $________ $________

Total: $________

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.

1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.

2. All clearing, grubbing, bedding, borrow, backfill, detours, diversions, signing, and other miscellaneous items not listed above with unique bid items shall be considered incidental to the contract. See 109.05

3. Quantities for aggregate are compacted in place volumes.

4. Optional bid items will only be awarded based on available funds. Zero or all items or a combination of items may be awarded. Contractor shall provide pricing for all optional items.

MON FR78 Dogway Bridge Replacement Schedule of items Page 6

FR78-1.60 - Upper Dogway Fork

Bridge Replacement

Gauley Ranger District Monongahela National Forest Webster County, West Virginia

CLIN 0005

ITEM

NO.

DESCRIPTION PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101 Mobilization Lump Sum 1 $________ $________

15201 Construction Survey and Staking, Method 1, Tolerance Class C Lump Sum 1 $________ $________

15702 Silt Sock Lump Sum 1 $________ $________

15706 Check Dams Lump Sum 1 $________ $________

20102 Clearing and Grubbing, Disposal Method A Lump Sum 1 $________ $________

20305 Removal of Old Structure, Disposal Method A Lump Sum 1 $________ $________

20401 Roadway Excavation, Disposal Method B Cubic Yard 76 $________ $________

20408 Removal of Stream Debris Lump Sum 1 $________ $________

20411 Embankment, Placement Method 1 Cubic Yard 879 $________ $________

20801 Structure Excavation Lump Sum 1 $________ $________

20803 Structural Backfill Cubic Yard 338 $________ $________

20805 Dewatering Lump Sum 1 $________ $________

25101 Riprap, Class VI, Machine Placed Cubic Yard 151 $________ $________

30103 Aggregate Base, Grading D, Compaction Method B Ton 287 $________ $________

50202 Joint Sealing Foot 36 $________ $________

55101 Steel, H-Pile, Furn and Driven Foot 360 $________ $________

MON FR78 Dogway Bridge Replacement Schedule of items Page 7

55115 Preboring Foot 328 $________ $________

55151 Furnish Pile Driving Equipment Lump Sum 1 $________ $________

55201 Structural Concrete Class AE Cubic Yard 84 $________ $________

55404 Epoxy Coated Reinforcing Steel Pounds 8078 $________ $________

55501 Structural Steel, W40x183, Galv, Furnished, Fabricated and Erected Lump Sum 1 $________ $________

55704 Treated Structural Timber, Deck Lump Sum 1 $________ $________

56401 Bearing Device Each 8 $________ $________

60501 Underdrain System, 6 Inch Foot 104 $________ $________

62501 Turf Establishment Lump Sum 1 $________ $________

63305 Post, Steel 3 lb Foot 44 $________ $________

63306 Object markers, Black and Yellow, Type 3 Each 4 $________ $________

63501 Temporary Traffic Control Lump Sum 1 $________ $________

Total: $________

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.

1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.

2. All clearing, grubbing, bedding, borrow, backfill, detours, diversions, signing, and other miscellaneous items not listed above with unique bid items shall be considered incidental to the contract. See 109.05

3. Quantities for aggregate are compacted in place volumes.

MON FR78 Dogway Bridge Replacement Schedule of items Page 8

FR78-1.60 - Upper Dogway Fork

Bridge Replacement

Gauley Ranger District Monongahela National Forest Webster County, West Virginia

CLIN 0006 (OPTIONAL)

ITEM

NO.

DESCRIPTION PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

OPTION

55501

Add Painted to base item 55501 Lump Sum 1 $________ $________

Total: $________

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.

1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.

2. All clearing, grubbing, bedding, borrow, backfill, detours, diversions, signing, and other miscellaneous items not listed above with unique bid items shall be considered incidental to the contract. See 109.05

3. Quantities for aggregate are compacted in place volumes.

4. Optional bid items will only be awarded based on available funds. Zero or all items or a combination of items may be awarded. Contractor shall provide pricing for all optional items.

Company Name:

SAM UEI:

Signature:

MON FR78 Dogway Bridge Replacement Schedule of items Page 9

101 - Lower Dogway FR 78-0.39 - 100 pct Schedule of Items
101 - Lower Dogway FR 78-0.39 - 100 pct Schedule of Items Bid Alternate
102 - Middle Dogway FR 78-1.11 - 100 pct Schedule of Items
102 - Middle Dogway FR 78-1.11 - 100 pct Schedule of Items Bid Alternate 1
103 - Upper Dogway FR 78-1.60 - 100 pct Schedule of Items
103 - Upper Dogway FR 78-1.60 - 100 pct Schedule of Items Bid Alternate
undefined:
undefined_2:
undefined_3:
undefined_4:
undefined_5:
undefined_6:
undefined_7:
undefined_8:
undefined_9:
undefined_10:
undefined_11:
undefined_12:
undefined_13:
undefined_14:
undefined_15:
undefined_16:
undefined_17:
undefined_18:
undefined_19:
undefined_20:
undefined_21:
undefined_22:
undefined_23:
undefined_24:
undefined_25:
undefined_26:
undefined_27:
undefined_28:
undefined_29:
undefined_30:
undefined_31:
undefined_32:
undefined_33:
undefined_34:
undefined_35:
undefined_36:
undefined_37:
undefined_38:
undefined_39:
undefined_40:
undefined_41:
undefined_42:
undefined_43:
undefined_44:
undefined_45:
undefined_46:
undefined_47:
undefined_48:
undefined_49:
undefined_50:
undefined_51:
undefined_52:
undefined_53:
undefined_54:
undefined_55:
undefined_56:
undefined_57:
undefined_58:
undefined_59:
undefined_60:
undefined_61:
undefined_62:
undefined_63:
undefined_64:
undefined_65:
undefined_66:
undefined_67:
undefined_68:
undefined_69:
undefined_70:
undefined_71:
undefined_72:
undefined_73:
undefined_74:
undefined_75:
undefined_76:
undefined_77:
undefined_78:
undefined_79:
undefined_80:
undefined_81:
undefined_82:
undefined_83:
undefined_84:
undefined_85:
undefined_86:
undefined_87:
undefined_88:
undefined_89:
undefined_90:
undefined_91:
undefined_92:
undefined_93:
undefined_94:
undefined_95:
undefined_96:
undefined_97:
undefined_98:
undefined_99:
undefined_100:
undefined_101:
undefined_102:
undefined_103:
undefined_104:
undefined_105:
undefined_106:
undefined_107:
undefined_108:
undefined_109:
undefined_110:
undefined_111:
undefined_112:
undefined_113:
undefined_114:
undefined_115:
undefined_116:
undefined_117:
undefined_118:
undefined_119:
undefined_120:
undefined_121:
undefined_122:
undefined_123:
undefined_124:
undefined_125:
undefined_126:
undefined_127:
undefined_128:
undefined_129:
undefined_130:
undefined_131:
undefined_132:
undefined_133:
undefined_134:
undefined_135:
undefined_136:
undefined_137:
undefined_138:
undefined_139:
undefined_140:
undefined_141:
undefined_142:
undefined_143:
undefined_144:
undefined_145:
undefined_146:
undefined_147:
undefined_148:
undefined_149:
undefined_150:
undefined_151:
undefined_152:
undefined_153:
undefined_154:
undefined_155:
undefined_156:
undefined_157:
undefined_158:
undefined_159:
undefined_160:
undefined_161:
undefined_162:
undefined_163:
undefined_164:
undefined_165:
undefined_166:
undefined_167:
undefined_168:
undefined_169:
undefined_170:
undefined_171:
undefined_172:
undefined_173:
undefined_174:
Text2:
0:
1:

File details come from the government source that posted it. Updated .