C04a_FR 78 Dogway Bridge Replacements Schedule of Items.pdf
PDF 4 MB Posted
- Attached to
- Monongahela NF FR78 Dogway Bridge Replacement Federal contract opportunity
- Solicitation number
- 12445526Q0104
- Issued by
- Department of Agriculture Forest Service
About this file
This is a Schedule of Items (Part I, Section B) for a fixed-price construction solicitation covering three bridge replacement projects within the Monongahela National Forest, Gauley Ranger District, Webster County, West Virginia.
The solicitation (12445526Q0104) is divided into six contract line items (CLINs): CLIN 0001 and CLIN 0002 (optional) cover the Lower Dogway Fork Bridge Replacement (FR78-0.039); CLIN 0003 and CLIN 0004 (optional) address the Over Dogway Fork Bridge Replacement (FR 78-1.11); and CLIN 0005 and CLIN 0006 (optional) cover the Upper Dogway Fork Bridge Replacement (FR78-1.60). Each mandatory CLIN contains 25-29 line items with estimated quantities for construction activities including mobilization, surveying, clearing and grubbing, structural excavation, embankment placement, riprap installation, concrete work, structural steel erection, timber decking, bearing devices, and site restoration. Payment units vary by item type: lump sum for mobilization and specialty work, cubic yards for excavation and embankment, tons for aggregate base, feet for pile work and sealing, pounds for reinforcing steel, and each for bearing devices and markers. The optional CLINs (0002, 0004, and 0006) each contain a single line item to add painted finish to the base Structural Steel W40x183 item. All work references the Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition, and bond premiums must be included in mobilization pricing per FAR Clause 52.232-5. Payment is made on actual work performed as described in FP-14 109.01. Optional bid items will be awarded based on available funds, with contractors required to provide pricing for all optional items.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Dogway MP 1.11 existing structure 2.pdf | ||
| dogway mp 1.60 existing structure 1.pdf | ||
| dogway mp 1.60 existing structure 2.pdf | ||
| Dogway MP 0.39 Existing Structure.pdf | ||
| Sol_12445526Q0104_Amd_0002.pdf | ||
| SIGN IN SHEET FR 78 DOGWAY BRIDGES PROJECT.xlsx | XLSX spreadsheet | |
| 260827 Questions and Answers FR 78 Dogway Bridges Project.pdf | ||
| Dogway MP 1.11 existing structure 1.pdf | ||
| Sol_12445526Q0104_Amd_0001.pdf | ||
| C04b_FR 78 Dogway Bridge Replacements SOW.pdf | ||
| C04c_FR 78 Dogway Bridge Replacement Plans.pdf | ||
| C04_Sol_12445526Q0104.pdf | ||
| C04d_Upper Dogway - Supplemental Specs.pdf | ||
| C04e_Dogway - Supplemental Specs.pdf | ||
| C04g_FR 78 Dogway Bridge Replacements Map.pdf | ||
| C04f_Lower Dogway - Supplemental Specs.pdf | ||
| C04h_DBA WD WV20260061.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I -SCHEDULE OF ITEMS
SECTION B – SERVICES AND PRICES
FR78-0.039 - Lower Dogway Fork
Bridge Replacement
Gauley Ranger District Monongahela National Forest Webster County, West Virginia
CLIN 0001
ITEM
NO.
DESCRIPTION PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101 Mobilization Lump Sum 1 $________ $________
15201 Construction Survey and Staking, Method 1, Tolerance Class C Lump Sum 1 $________ $________
15702 Silt Sock Lump Sum 1 $________ $________
15706 Check Dams Lump Sum 1 $________ $________
20102 Clearing and Grubbing, Disposal Method A Lump Sum 1 $________ $________
20305 Removal of Old Structure, Disposal Method A Lump Sum 1 $________ $________
20401 Roadway Excavation, Disposal Method B Cubic Yard 125 $________ $________
20408 Removal of Stream Debris Lump Sum 1 $________ $________
20411 Embankment, Placement Method 1 Cubic Yard 879 $________ $________
20801 Structure Excavation Lump Sum 1 $________ $________
20803 Structural Backfill Cubic Yard 398 $________ $________
20805 Dewatering Lump Sum 1 $________ $________
25101 Riprap, Class VI, Machine Placed Cubic Yard 267 $________ $________
30103 Aggregate Base, Grading D, Compaction Method B Ton 277 $________ $________
50202 Joint Sealing Foot 36 $________ $________
55101 Steel, H-Pile, Furn and Driven Foot 448 $________ $________
Solicitation 12445526Q0104 MON FR78 Dogway Bridge Replacement Schedule of items Page 1
55115 Preboring Foot 416 $________ $________
55151 Furnish Pile Driving Equipment Lump Sum 1 $________ $________
55201 Structural Concrete Class AE Cubic Yard 94 $________ $________
55404 Epoxy Coated Reinforcing Steel Pounds 9036 $________ $________
55501 Structural Steel, W40x183, Furnished, Fabricated and Erected Lump Sum 1 $________ $________
55704 Treated Structural Timber, Deck Lump Sum 1 $________ $________
56401 Bearing Device Each 8 $________ $________
60501 Underdrain System, 6 Inch Foot 104 $________ $________
62501 Turf Establishment Lump Sum 1 $________ $________
63305 Post, Steel 3 lb Foot 44 $________ $________
63306 Object markers, Black and Yellow, Type 3 Each 4 $________ $________
63501 Temporary Traffic Control Lump Sum 1 $________ $________
Total: $________
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.
2. All clearing, grubbing, bedding, borrow, backfill, detours, diversions, signing, and other miscellaneous items not listed above with unique bid items shall be considered incidental to the contract. See 109.05
3. Quantities for aggregate are compacted in place volumes.
MON FR78 Dogway Bridge Replacement Schedule of items Page 2
PART I - SCHEDULE OF ITEMS
FR78-0.039 - Lower Dogway Fork
Bridge Replacement
Gauley Ranger District Monongahela National Forest Webster County, West Virginia
CLIN 0002 (OPTIONAL)
ITEM
NO.
DESCRIPTION PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
OPTION
55501
Add Painted to base item 55501 Lump Sum 1 $________ $________
Total: $________
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.
2. All clearing, grubbing, bedding, borrow, backfill, detours, diversions, signing, and other miscellaneous items not listed above with unique bid items shall be considered incidental to the contract. See 109.05
3. Quantities for aggregate are compacted in place volumes.
4. Optional bid items will only be awarded based on available funds. Zero or all items or a combination of items may be awarded. Contractor shall provide pricing for all optional items.
MON FR78 Dogway Bridge Replacement Schedule of items Page 3
FR 78-1.11 Over Dogway Fork
Bridge Replacement
Gauley Ranger District Monongahela National Forest Webster County, West Virginia
CLIN 0003
ITEM
NO.
DESCRIPTION PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101 Mobilization Lump Sum 1 $________ $________
15201 Construction Survey and Staking, Method 1, Tolerance Class C Lump Sum 1 $________ $________
15702 Silt Sock Lump Sum 1 $________ $________
20102 Clearing and Grubbing, Disposal Method A Lump Sum 1 $________ $________
20305 Removal of Old Structure, Disposal Method A Lump Sum 1 $________ $________
20401 Roadway Excavation, Compaction Method B Cubic Yard 77 $________ $________
20408 Removal and Salvage of Stream Debris Lump Sum 1 $________ $________
20411 Embankment, Placement Method 1 Cubic Yard 1045 $________ $________
20801 Structure Excavation Lump Sum 1 $________ $________
20803 Structural Backfill Cubic Yard 756 $________ $________
20805 Dewatering Lump Sum 1 $________ $________
25101 Riprap, Class VI, Machine Placed Cubic Yard 268 $________ $________
30103 Aggregate Base, Grading D, Compaction Method B Ton 287 $________ $________
50202 Joint Sealing Foot 36 $________ $________
55201 Structural Concrete Class AE Cubic Yard 175 $________ $________
55210 Seal Concrete Cubic Yard 110 $________ $________
MON FR78 Dogway Bridge Replacement Schedule of items Page 4
55404 Epoxy Coated Reinforcing Steel Pound 13891 $________ $________
55501 Structural Steel W40x183, Galv, Furnished, Fabricated and Erected Lump Sum 1 $________ $________
55704 Treated Structural Timber, Deck Lump Sum 1 $________ $________
56401 Bearing Device Each 8 $________ $________
60501 Underdrain System, 6 Inch Foot 104 $________ $________
62503 Turf Establishment Lump Sum 1 $________ $________
63305 Post, Steel, 3 lb Foot 44 $________ $________
63307 Object Markers, Black and Yellow, Type 3 Each 4 $________ $________
63501 Temporary Traffic Control Lump Sum 1 $________ $________
Total: $________
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.
2. All clearing, grubbing, bedding, borrow, backfill, detours, diversions, signing, and other miscellaneous items not listed above with unique bid items shall be considered incidental to the contract. See 109.05
3. Quantities for aggregate are compacted in place volumes.
MON FR78 Dogway Bridge Replacement Schedule of items Page 5
FR78-1.11 - Over Dogway Fork
Bridge Replacement
Gauley Ranger District Monongahela National Forest Webster County, West Virginia
CLIN 0004 (OPTIONAL)
ITEM
NO.
DESCRIPTION PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
OPTION
55501
Add Painted to base item 55501 Lump Sum 1 $________ $________
Total: $________
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.
2. All clearing, grubbing, bedding, borrow, backfill, detours, diversions, signing, and other miscellaneous items not listed above with unique bid items shall be considered incidental to the contract. See 109.05
3. Quantities for aggregate are compacted in place volumes.
4. Optional bid items will only be awarded based on available funds. Zero or all items or a combination of items may be awarded. Contractor shall provide pricing for all optional items.
MON FR78 Dogway Bridge Replacement Schedule of items Page 6
FR78-1.60 - Upper Dogway Fork
Bridge Replacement
Gauley Ranger District Monongahela National Forest Webster County, West Virginia
CLIN 0005
ITEM
NO.
DESCRIPTION PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101 Mobilization Lump Sum 1 $________ $________
15201 Construction Survey and Staking, Method 1, Tolerance Class C Lump Sum 1 $________ $________
15702 Silt Sock Lump Sum 1 $________ $________
15706 Check Dams Lump Sum 1 $________ $________
20102 Clearing and Grubbing, Disposal Method A Lump Sum 1 $________ $________
20305 Removal of Old Structure, Disposal Method A Lump Sum 1 $________ $________
20401 Roadway Excavation, Disposal Method B Cubic Yard 76 $________ $________
20408 Removal of Stream Debris Lump Sum 1 $________ $________
20411 Embankment, Placement Method 1 Cubic Yard 879 $________ $________
20801 Structure Excavation Lump Sum 1 $________ $________
20803 Structural Backfill Cubic Yard 338 $________ $________
20805 Dewatering Lump Sum 1 $________ $________
25101 Riprap, Class VI, Machine Placed Cubic Yard 151 $________ $________
30103 Aggregate Base, Grading D, Compaction Method B Ton 287 $________ $________
50202 Joint Sealing Foot 36 $________ $________
55101 Steel, H-Pile, Furn and Driven Foot 360 $________ $________
MON FR78 Dogway Bridge Replacement Schedule of items Page 7
55115 Preboring Foot 328 $________ $________
55151 Furnish Pile Driving Equipment Lump Sum 1 $________ $________
55201 Structural Concrete Class AE Cubic Yard 84 $________ $________
55404 Epoxy Coated Reinforcing Steel Pounds 8078 $________ $________
55501 Structural Steel, W40x183, Galv, Furnished, Fabricated and Erected Lump Sum 1 $________ $________
55704 Treated Structural Timber, Deck Lump Sum 1 $________ $________
56401 Bearing Device Each 8 $________ $________
60501 Underdrain System, 6 Inch Foot 104 $________ $________
62501 Turf Establishment Lump Sum 1 $________ $________
63305 Post, Steel 3 lb Foot 44 $________ $________
63306 Object markers, Black and Yellow, Type 3 Each 4 $________ $________
63501 Temporary Traffic Control Lump Sum 1 $________ $________
Total: $________
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.
2. All clearing, grubbing, bedding, borrow, backfill, detours, diversions, signing, and other miscellaneous items not listed above with unique bid items shall be considered incidental to the contract. See 109.05
3. Quantities for aggregate are compacted in place volumes.
MON FR78 Dogway Bridge Replacement Schedule of items Page 8
FR78-1.60 - Upper Dogway Fork
Bridge Replacement
Gauley Ranger District Monongahela National Forest Webster County, West Virginia
CLIN 0006 (OPTIONAL)
ITEM
NO.
DESCRIPTION PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
OPTION
55501
Add Painted to base item 55501 Lump Sum 1 $________ $________
Total: $________
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.
2. All clearing, grubbing, bedding, borrow, backfill, detours, diversions, signing, and other miscellaneous items not listed above with unique bid items shall be considered incidental to the contract. See 109.05
3. Quantities for aggregate are compacted in place volumes.
4. Optional bid items will only be awarded based on available funds. Zero or all items or a combination of items may be awarded. Contractor shall provide pricing for all optional items.
Company Name:
SAM UEI:
Signature:
MON FR78 Dogway Bridge Replacement Schedule of items Page 9
| 101 - Lower Dogway FR 78-0.39 - 100 pct Schedule of Items |
| 101 - Lower Dogway FR 78-0.39 - 100 pct Schedule of Items Bid Alternate |
| 102 - Middle Dogway FR 78-1.11 - 100 pct Schedule of Items |
| 102 - Middle Dogway FR 78-1.11 - 100 pct Schedule of Items Bid Alternate 1 |
| 103 - Upper Dogway FR 78-1.60 - 100 pct Schedule of Items |
| 103 - Upper Dogway FR 78-1.60 - 100 pct Schedule of Items Bid Alternate |
| undefined: |
| undefined_2: |
| undefined_3: |
| undefined_4: |
| undefined_5: |
| undefined_6: |
| undefined_7: |
| undefined_8: |
| undefined_9: |
| undefined_10: |
| undefined_11: |
| undefined_12: |
| undefined_13: |
| undefined_14: |
| undefined_15: |
| undefined_16: |
| undefined_17: |
| undefined_18: |
| undefined_19: |
| undefined_20: |
| undefined_21: |
| undefined_22: |
| undefined_23: |
| undefined_24: |
| undefined_25: |
| undefined_26: |
| undefined_27: |
| undefined_28: |
| undefined_29: |
| undefined_30: |
| undefined_31: |
| undefined_32: |
| undefined_33: |
| undefined_34: |
| undefined_35: |
| undefined_36: |
| undefined_37: |
| undefined_38: |
| undefined_39: |
| undefined_40: |
| undefined_41: |
| undefined_42: |
| undefined_43: |
| undefined_44: |
| undefined_45: |
| undefined_46: |
| undefined_47: |
| undefined_48: |
| undefined_49: |
| undefined_50: |
| undefined_51: |
| undefined_52: |
| undefined_53: |
| undefined_54: |
| undefined_55: |
| undefined_56: |
| undefined_57: |
| undefined_58: |
| undefined_59: |
| undefined_60: |
| undefined_61: |
| undefined_62: |
| undefined_63: |
| undefined_64: |
| undefined_65: |
| undefined_66: |
| undefined_67: |
| undefined_68: |
| undefined_69: |
| undefined_70: |
| undefined_71: |
| undefined_72: |
| undefined_73: |
| undefined_74: |
| undefined_75: |
| undefined_76: |
| undefined_77: |
| undefined_78: |
| undefined_79: |
| undefined_80: |
| undefined_81: |
| undefined_82: |
| undefined_83: |
| undefined_84: |
| undefined_85: |
| undefined_86: |
| undefined_87: |
| undefined_88: |
| undefined_89: |
| undefined_90: |
| undefined_91: |
| undefined_92: |
| undefined_93: |
| undefined_94: |
| undefined_95: |
| undefined_96: |
| undefined_97: |
| undefined_98: |
| undefined_99: |
| undefined_100: |
| undefined_101: |
| undefined_102: |
| undefined_103: |
| undefined_104: |
| undefined_105: |
| undefined_106: |
| undefined_107: |
| undefined_108: |
| undefined_109: |
| undefined_110: |
| undefined_111: |
| undefined_112: |
| undefined_113: |
| undefined_114: |
| undefined_115: |
| undefined_116: |
| undefined_117: |
| undefined_118: |
| undefined_119: |
| undefined_120: |
| undefined_121: |
| undefined_122: |
| undefined_123: |
| undefined_124: |
| undefined_125: |
| undefined_126: |
| undefined_127: |
| undefined_128: |
| undefined_129: |
| undefined_130: |
| undefined_131: |
| undefined_132: |
| undefined_133: |
| undefined_134: |
| undefined_135: |
| undefined_136: |
| undefined_137: |
| undefined_138: |
| undefined_139: |
| undefined_140: |
| undefined_141: |
| undefined_142: |
| undefined_143: |
| undefined_144: |
| undefined_145: |
| undefined_146: |
| undefined_147: |
| undefined_148: |
| undefined_149: |
| undefined_150: |
| undefined_151: |
| undefined_152: |
| undefined_153: |
| undefined_154: |
| undefined_155: |
| undefined_156: |
| undefined_157: |
| undefined_158: |
| undefined_159: |
| undefined_160: |
| undefined_161: |
| undefined_162: |
| undefined_163: |
| undefined_164: |
| undefined_165: |
| undefined_166: |
| undefined_167: |
| undefined_168: |
| undefined_169: |
| undefined_170: |
| undefined_171: |
| undefined_172: |
| undefined_173: |
| undefined_174: |
| Text2: |
| 0: |
| 1: |
File details come from the government source that posted it. Updated .