This is a Statement of Work (SOW) for HVAC system replacement at the Greenbrier Ranger Station, a USDA facility.
The contractor must install a new 4-ton heat pump and 15 KW air handler with connection to existing ductwork, install a new concrete pad for the heat pump at the office location, and install all necessary wiring and electrical disconnect boxes with component placement as specified by the Contracting Officer's Representative (COR). Additionally, the contractor must install a new 7-day programmable thermostat at a location specified by the COR and remove and legally dispose of the existing furnace system, including all components, connections, and controls, with repair of wall penetrations. All work must comply with applicable electrical and building codes, which supersede other documentation. The contractor must be licensed in West Virginia and maintain liability insurance. All three deliverables are due by the end of the period of performance. The government will provide facility access during regular business hours (Monday-Friday, 8:00 AM to 5:00 PM) and restroom facilities; no weekend or federal holiday work is permitted without written CO approval. Any government-provided property must be returned prior to payment of the final invoice.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C04_CSS_Commerical Products and Services_12444326Q0027.pdf | ||
| C04d_Wage Determination_12444326Q0027.pdf | ||
| C04b_Attachment2_Specifications_12444326Q0027.pdf | ||
| C04c_Attachment3_Area Map_12444326Q0027.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Greenbrier Ranger Station HVAC Replacement Statement of Work
Contents Project General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Photographs
Project Greenbrier Ranger Station HVAC Replacement
General Information
1.0 Scope of Work
The project will include the installation of 1 new 15 KW air handler, and a 4-ton heat pump with a new thermostat, wiring, connection to existing ductwork, electrical disconnects, set on existing pad for the heat pump. The project will also include the removal and disposal of the existing furnace system.
2.0 Background
System check found that the outdoor unit was not running. Testing determined that the compressor has failed. Due to the cost of repairing, recommendation is for full equipment replacement.
Contractor Requirements
3.0 Technical Requirements / Tasks
Contractor shall be licensed in the state of West Virginia and maintain liability insurance. All work must comply with applicable electrical and building codes. All applicable codes will supersede any other documentation or requirements provided.
4.0 Government Furnished
Government shall provide access to the facility during regular business hours (Monday-Friday 8:00am to 5pm), as well as restroom facilities onsite. No work shall be permitted on weekends or on federal holidays without the written permission of the CO. Any government provided property shall be returned prior to payment of the final invoice.
5.0 Deliverables / Schedule
Key Deliverables
Item No. Deliverable Objective Due 0001 Install 4 Ton Heat Pump and 15 KW air hander.
Install new 4 Ton Heat pump and 15 KW air handler and connect to existing ductwork. Install 1 new pad for heat pump at the office location using concrete pavers. Install all necessary new wiring to power the unit and electrical disconnect boxes. Placement of all components as specified by the COR.
End of Period of Performance
0002 Install New Thermostat Install a new 7-day programmable thermostat at a location specified by the COR.
End of Period of Performance
0003 Remove and dispose of 1 Existing Furnace
Remove all existing components, connections, and controls for the existing unit. All demoed materials shall be removed from the project site and legally disposed of off Government property in an approved landfill. Repair wall penetrations where material is removed.
End of Period of Performance
6.0 Photographs
| Project |
| General Information |
| 1.0 Scope of Work |
| 2.0 Background |
| Contractor Requirements |
| 3.0 Technical Requirements / Tasks |
| 4.0 Government Furnished |
| 5.0 Deliverables / Schedule |
| 6.0 Photographs |
File details come from the government source that posted it. Updated .