C04a_Attachment A - Statement of Work_12444526Q0058.pdf
PDF 755 KB Posted
- Attached to
- Clean Agent System Repairs
- Solicitation number
- 12444526Q0058
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Work (SOW) from the US Department of Agriculture for fire suppression system repairs at the Forest Products Laboratory (FPL) facility.
The project, titled "Clean Agent Repairs 2026," requires contractor-provided labor, supervision, and all necessary resources to repair and maintain clean agent and dry chemical fire suppression systems in compliance with OSHA CFR 1910 General Industry Standards and NFPA 10 regulations. The work encompasses two primary scopes: Building 34 Clean Agent Fire Systems repairs, including disarming system panels, removing and troubleshooting solenoid assemblies in Room 215, reviewing and adjusting panel programming, conducting function tests, inspecting and replacing horn strobes in Rooms G11, G9, and G4, installing five missing 4x4 junction box covers in Room 209, and rearm procedures with documentation; and Hazardous Waste Building 46 Dry Chemical Fire System repairs, involving disarming the Ansul system, removing and shop-servicing two 50lb ABC dry chemical tanks with internal inspection and valve rebuild, installing two new 12V 7Ah batteries in the electrical panel, providing a new 101-10 Ansul firing cartridge, reconnecting piped systems and wall brackets, and rearm procedures with documentation. All work must be performed between 7:00 AM and 5:00 PM, Monday through Friday, with specific work dates to be scheduled after contract award. The contractor must obtain a building access card and report to the FPL Health and Safety Manager prior to commencing work. The project completion deadline is August 31, 2026. The government will furnish no tools, supplies, or employee assistance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| C04b_Attachment B - Schedule of Items_12444526Q0058.xlsx | XLSX spreadsheet | |
| C04b_Attachment B - Schedule of Items_12444526Q0058.xlsx | XLSX spreadsheet | |
| C04c_Attachment C - Wage Determination_12444526Q0058.pdf | ||
| C04d_Attachment D - Continuation of 1449_124445260058.pdf | ||
| C04_12444526Q0058.pdf | ||
| C04b_Attachment B - Schedule of Items_12444526Q0058.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents Project
General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
Project Clean Agent Repairs 2026
General Information
1.0 Scope of Work
The contractor shall provide all labor, supervision, and all other resources required to deliver the requirements stated herein, except as may otherwise be specified in this statement of work.
2.0 Background
The Occupational Safety and Health Administration (OSHA) as well as the National Fire Prevention Association (NFPA) require that clean agent and Ansul extinguishing systems shall be maintained in accordance with OSHA regulations under CFR 1910 General Industry Standards and NFPA 10. The Forest Products Laboratory adopts the latest edition of the OSHA and NFPA regulations.
Contractor Requirements
3.0 Technical Requirements / Tasks
Building 34 Clean Agent Fire Systems
1. Disarm Building 34 Clean agent fire suppression system panels.
2. Room 215 remove solenoid assembly from fire system tank and troubleshoot wire and connections for proper locations per manufacture manual.
3. Room 215 review panel program and make adjustment as needed for proper operation of panel release circuit.
4. Room 215 once above work has been completed function test solenoid for proper operation and reinstall on fire system tank.
5. Room G11, G9, and G4 review panel programming and wiring to horn strobes that did not operate correctly during inspection and replace as necessary.
6. Room 209 provide and replace 5 missing 4 X 4 Junction box covers on fire system conduit wiring.
7. Rearm system and provide documentation of the above repairs.
Hazardous Waste Building 46 Dry Chemical Fire System
1. Disarm Ansul Dry system at control box before starting below repairs.
2. Remove actuation and supply Line piping to two 50lb Dry Chemical fire system ranks and remove from mounting brackets
3. Return to shop discharge, and internally inspect two 50lb ABC dry chemical fire system tanks, clean and rebuild valve assembly, fill tanks and recharge to operating pressure.
4. Return to site and reconnect tanks to existing actuation and supply lines, and wall brackets.
5. Provide and install two new 12v 7ah batteries in electrical fire suppression panel.
6. Provide new 101-10 Ansul firing cartridge in Ansul actuation control box.
7. Rearm system and provide documentation of the above repairs.
FPL will furnish no tools, supplies, or employees to assist with repair work.
4.0 Government Furnished
N/A
5.0 Deliverables / Schedule
1. All work is to be done between the hours of 7:00 AM and 5:00 PM, Monday through Friday unless otherwise specified.
2. Work dates shall be scheduled with the point of contact after contract is awarded.
3. Contractor will report to the Health and Safety Manager to obtain a contractor building access card.
4. Contractor will report to the FPL Health and Safety Manager prior to starting any work to complete any required documents and sign in for the day.
Project is to be completed no later than August 31st, 2026.