This file contains a solicitation for maintenance, repair, and preservation services for two open lighter barges, YC-1589 and YC-1634, located in the Puget Sound region of Washington state. The solicitation is seeking a firm-fixed-price contract to accomplish docking, inspection, testing, preservation and undocking services for the two barges. Scope of work includes hull cleaning and inspection, main deck non-skid application, tank/void cleaning and testing, zinc anode and fender replacement, and ultrasonic thickness measurements and repairs. The period of performance is July 6, 2023 to October 26, 2023. This is a 100% small business set-aside solicitation under NAICS code 336611 issued by the Department of the Navy Naval Supply Systems Command. The solicitation advises registration with the System for Award Management is required to receive award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instruction Sheet

Instructions for Contractors for Filling-out J-2 Price Proposal Worksheet
All yellow fields are to be filled out by the Contractor prior to submittal to The Government.
DO NOT FILL IN ANY CELL THAT IS NOT BRIGHT YELLOW.
Labor Mix & Rates Sheet
1Enter Company Name and Date
2Fill in each rate in its applicable yellow cell
3Fill in each labor category and ensure all yellow boxes are filled in
a.Example Labor Categories
Shipfitter
Sheetmetal
Welder/Burer
Electrician
Inside Machinist
Outside Machinist
Boilermaker
Pipefitter
Insulator/Lagger
Shipwright/Carpenter
EX/Ord
Painter/Blaster
Rigger/Laborer
QA/NDT
4Next, fill in each yellow cell for Regular Labor Hours and Overtime Labor Hours
5Your Total Direct Labor Rate Per Hour will autopopulate in each sheet. All other rates entered will also auto populate.
Price Proposal Worksheet
1All company and contract information and rates will be autopopulated from previous sheet.
2Fill in each yellow cell with its applicable information
3Anything that is not in yellow is locked, these cells will auto-calculate.
4Before submitting, ensure there are no more bright yellow cells.
IF USING FCCOM
Facilities Capital Cost of Money (FCCOM) is not required. If you are not inputting FCCOM please enter N/A in all cells. However, if your company is inputting FCCOM, it needs to be calculated based on the proper CASB-CMF form. Please include the CASB-CMF form with your submission.
Labor Hour Breakdown
1Enter each labor categoy will autofill from the "labor Mix & Rates" sheet
2Fill in each Regular and Overtime hour for each labor category and line item.

Labor Mix & Rates

Contractor/Company Name:
Project/Vessel Name:YC-1589 & YC-1634Date:
Base Rates:Regular Labor$0.00FringeOverheadG&AProfitFCCOM
Labor Mix and Rates
Labor CategoryRegular HoursOvertime HoursTotal Category HoursTotal Regular $/hourTotal Overtime $/hourTotal Category Dollars
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
Column Totals000$0.00$0.00$0.00
Direct Labor Rate Per Hour0

Example Labor Categories Shipfitter Sheetmetal Welder/Burer Electrician Inside Machinist Outside Machinist Boilermaker Pipefitter Insulator/Lagger Shipwright/Carpenter EX/Ord Painter/Blaster Rigger/Laborer QA/NDT

YC-1589 Price Proposal

Contractor/Company Name:0
Project/Vessel Name:YC-1589 & YC-1634Date:12/31/99
Base Rates:Labor$0.00Fringe0.00%Overhead0.00%G&A0.00%Profit0.00%FCCOM0.00
Base Work Package Proposal
PARAGRAPH No.TITLEPRIMESUBCONTRACTOROther Direct Cost (ODC)*PRIMELine Item Total
M/HLabor CostMATERIAL PRICETOTALLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOM
1.4Arrival ConferenceArrival Conference$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.5Required DocumentsRequired Documents$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.6Progress MeetingsProgress Meetings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.7Availability RequirementsAvailability Requirements$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.7.1Transport VesselsTransport Vessels$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.8Care of VesselCare of Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.11CFR ReportsCFR Reports$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.13Safety RequirementsSafety Requirements$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.16.1Preservation OQEPreservation OQE$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.17Environmental/Hazwaste ManagementEnvironmental/Hazwaste Management$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.22Gas FreeGas Free$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.23Develop & Maintain Test PlanDevelop & Maintain Test Plan$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.1Personnel & EquipmentPersonnel & Equipment$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.2Docking ProceduresDocking Procedures$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking PlanBlocking Plan$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.5Setting and Aligning Blocks$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.6Stability CalculationsSetting and Aligning Blocks$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.7Docking ConferenceDocking Conference$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.8Docking the VesselDocking the Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.9Post DockingPost Docking$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.10Shifting the Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.11Undocking the VesselUndocking$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.13Final Docking ReportFinal Docking Report$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.1Identify Distinguishing Figures and MarkingsIdentify Distinguishing Figures and Markings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.2Rubber FendersRubber Fenders$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.3Steel Half Pipe FendersZinc Replacement$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.4Final Air TestHull Blasting and Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.5Zinc AnodesHull & FB Visual Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.6Hull Blasting & PreservationHull & FB U/T Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.7Hull & Freeboard Visual InspectionOpen, Pump, Clean, Vent, Gas Free, Close all tanks$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.8Hull & Freeboard UT InspectionTank/ Void Visual Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.1Open, Pump, Clean, Ventilate, Gas Free Tanks/VoidsIdentify Color Schemes and Markings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.2Tank/Void Visual InspectionTank/Void Blast & Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.3Identify Color Schemes and Markings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.4Preliminary Air Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.5Tank/Void Touch Up Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.6Access Cover Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.7Watertight Hatch Repairs$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.8Final Air Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.9Tank/Void Closeout Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.1Stanchion Sockets Removal$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.2Port and Starboard Towing Pad Eyes ID$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.3Port and Starboard Lifting Lug ID$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.4Main Deck Non-Skid Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.5Visual Inspection for Structural Defects$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.6Main Deck UT Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Base Work Package for CLIN 0001 (UF-116)$0.00
OPTION YEAR TABLE IF NEEDED:
Option Item Proposal Package
PARAGRAPH No.TITLEM/HLabor CostMATERIAL PRICETOTALLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOMLine Item Total
0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Column Totals00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Option Items (O):$0.00
TOTAL PROPOSED PRICE:$0.00

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

YC-1634 Price Proposal

Contractor/Company Name:0
Project/Vessel Name:YC-1589 & YC-1634Date:12/31/99
Base Rates:Labor$0.00Fringe0.00%Overhead0.00%G&A0.00%Profit0.00%FCCOM0.00
Base Work Package Proposal
PARAGRAPH No.TITLEPRIMESUBCONTRACTOROther Direct Cost (ODC)*PRIMELine Item Total
M/HLabor CostMATERIAL PRICETOTALLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOM
1.4Arrival ConferenceArrival Conference$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.5Required DocumentsRequired Documents$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.6Progress MeetingsProgress Meetings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.7Availability RequirementsAvailability Requirements$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.7.1Transport VesselsTransport Vessels$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.8Care of VesselCare of Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.11CFR ReportsCFR Reports$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.13Safety RequirementsSafety Requirements$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.16.1Preservation OQEPreservation OQE$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.17Environmental/Hazwaste ManagementEnvironmental/Hazwaste Management$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.22Gas FreeGas Free$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.23Develop & Maintain Test PlanDevelop & Maintain Test Plan$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.1Personnel & EquipmentPersonnel & Equipment$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.2Docking ProceduresDocking Procedures$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking PlanBlocking Plan$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.5Setting and Aligning Blocks$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.6Stability CalculationsSetting and Aligning Blocks$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.7Docking ConferenceDocking Conference$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.8Docking the VesselDocking the Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.9Post DockingPost Docking$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.10Shifting the Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.11Undocking the VesselUndocking$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.13Final Docking ReportFinal Docking Report$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.1Identify Distinguishing Figures and MarkingsIdentify Distinguishing Figures and Markings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.2Rubber FendersRubber Fenders$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.3Steel Half Pipe FendersZinc Replacement$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.4Final Air TestHull Blasting and Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.5Zinc AnodesHull & FB Visual Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.6Hull Blasting and PreservationHull & FB U/T Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.7Hull & Freeboard Visual InspectionOpen, Pump, Clean, Vent, Gas Free, Close all tanks$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.8Hull & Freeboard UT InspectionTank/ Void Visual Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.1Open, Pump, Clean, Ventilate, Gas Free Tanks/VoidsIdentify Color Schemes and Markings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.2Tank/Void Visual InspectionTank/Void Blast & Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.3Identify Color Schemes and Markings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.4Preliminary Air Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.5Tank/Void Touch Up Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.6Access Cover Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.7Watertight Hatch Repairs$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.8Final Air Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.9Tank/Void Closeout Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.1Stanchion Sockets Removal$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.2Port and Starboard Towing Pad Eyes ID$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.3Port and Starboard Lifting Lug ID$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.4Main Deck Non-Skid Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.5Visual Inspection for Structural Defects$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.6Main Deck UT Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Base Work Package for CLIN 0003 (UF-127)$0.00
OPTION YEAR TABLE IF NEEDED:
Option Item Proposal Package
PARAGRAPH No.TITLEM/HLabor CostMATERIAL PRICETOTALLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOMLine Item Total
0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Column Totals00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Option Items (O):$0.00
TOTAL PROPOSED PRICE:$0.00

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

Labor Hour Breakdown

Contractor/Company Name:0
Project/Vessel Name:YC-1589 & YC-1634Date:12/31/99
Base Rates:Regular Labor Rate$0.00
NameRateTotal CostNameRateTotal Cost
Labor Hour Breakdown
PARAGRAPH No.TITLELabor CategoriesTotal Overall Labor Cost
000000000000000000Total Regular HoursTotal Overtime Hours
REGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOT
1.4Arrival Conference00$0.00
1.5Required Documents00$0.00
1.6Progress Meetings00$0.00
1.7Availability Requirements00$0.00
1.7.1Transport Vessels00$0.00
1.8Care of Vessel00$0.00
1.11CFR Reports00$0.00
1.13Safety Requirements00$0.00
1.16.1Preservation OQE00$0.00
1.17Environmental/Hazwaste Management00$0.00
1.22Gas Free00$0.00
1.23Develop & Maintain Test Plan00$0.00
3.1.1Personnel & Equipment00$0.00
3.1.2Docking Procedures00$0.00
3.1.3Blocking Plan00$0.00
3.1.6Stability Calculations00$0.00
3.1.7Docking Conference00$0.00
3.1.8Docking the Vessel00$0.00
3.1.9Post Docking00$0.00
3.1.11Undocking the Vessel00$0.00
3.1.13Final Docking Report00$0.00
3.2.1Identify Distinguishing Figures and Markings00$0.00
3.2.2Rubber Fenders00$0.00
3.2.3Steel Half Pipe Fenders00$0.00
3.2.4Final Air Test00$0.00
3.2.5Zinc Anodes00$0.00
3.2.6Hull Blasting & Preservation00$0.00
3.2.7Hull & Freeboard Visual Inspection00$0.00
3.2.8Hull & Freeboard UT Inspection00$0.00
3.4.1Open, Pump, Clean, Ventilate, Gas Free Tanks/Voids00$0.00
0000$0.00
3.4.2Tank/Void Visual Inspection00$0.00
3.4.3Identify Color Schemes and Markings00$0.00
3.4.4Preliminary Air Test00$0.00
3.4.5Tank/Void Touch Up Preservation00$0.00
3.4.6Access Cover Preservation00$0.00
3.4.7Watertight Hatch Repairs00$0.00
3.4.8Final Air Test00$0.00
3.4.9Tank/Void Closeout Inspection00$0.00
3.5.1Stanchion Sockets Removal00$0.00
3.5.2Port and Starboard Towing Pad Eyes ID00$0.00
3.5.3Port and Starboard Lifting Lug ID00$0.00
3.5.4Main Deck Non-Skid Repair00$0.00
3.5.5Visual Inspection for Structural Defects00$0.00
3.5.6Main Deck UT Inspection00$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
Column Totals00000000000000000000000000000000000000$0.00
Base Work Package$0.00
OPTION YEAR TABLE IF NEEDED:
Labor Hour Breakdown
PARAGRAPH No.TITLELabor CategoriesTotal Overall Labor Cost
000000000000000000Total Direct HoursTotal Overtime Hours
REGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOT
0000$0.00
0000$0.00
0000$0.00
0000$0.00
Column Totals00000000000000000000000000000000000000$0.00
Total Option Items (O):$0.00
TOTAL DIRECT LABOR COSTS BY WORK ITEM$0.00