C04.0 Attachment J-2b TWR-8 5-Way.xls

XLS spreadsheet 67 KB Posted

Attached to
Maintenance, Preservation, and Repair of TWR-7 and TWR-8
Solicitation number
N4523A20R1066
Issued by

About this file

This document contains details for two federal contract opportunities. The Regional Maintenance Center at Puget Sound Naval Shipyard & Intermediate Maintenance Facility intends to award firm-fixed price contracts to accomplish maintenance, preservation, and repair of two Naval vessels, TWR-7 and TWR-8. The work will be performed at the contractor's facility and includes tasks such as hull repairs, tank cleaning and inspection, engine maintenance, and sea trials. The period of performance is July 15, 2020 to November 17, 2020. Offerors must be registered in the System for Award Management and this is a 100% small business set-aside under NAICS code 336611 with a size standard of 1,250 employees. The solicitation number is N4523A20R1066 and the contracting agency is the Department of the Navy Naval Supply Systems Command.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TWR-8

INSERT CONTRACTOR/COMPANY NAME HERE
Project =TWR-8DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HMATERIAL PRICETOTALLabor CostMaterial CostTOTALOther Direct Cost (ODC)*G&APROFITLine Item Total
GENERAL REQUIREMENTS
1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00
1.5Required Documents$0.00$0.00$0.00$0.00$0.00
1.6Progress Meetings$0.00$0.00$0.00$0.00$0.00
1.7Availabillity Requirements$0.00$0.00$0.00$0.00$0.00
1.8Care of Vessel$0.00$0.00$0.00$0.00$0.00
1.13Safety Requirements$0.00$0.00$0.00$0.00$0.00
1.14Hot Work/Welding$0.00$0.00$0.00$0.00$0.00
1.16Preservation$0.00$0.00$0.00$0.00$0.00
1.17Environmental & Hazwaste Management$0.00$0.00$0.00$0.00$0.00
1.21Integrated Logistics Report$0.00$0.00$0.00$0.00$0.00
1.22Gas Free$0.00$0.00$0.00$0.00$0.00
1.24Process Control Procedure (PCP Requirements)$0.00$0.00$0.00$0.00$0.00
DOCKING & UNDOCKING THE VESSEL
3.1.1Personal & Equipment$0.00$0.00$0.00$0.00$0.00
3.1.2Docking Procedure$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking Plan$0.00$0.00$0.00$0.00$0.00
3.1.4Crib and Brace Blocking$0.00$0.00$0.00$0.00$0.00
3.1.5Setting & Alignment of Docking Blocks$0.00$0.00$0.00$0.00$0.00
3.1.6Stability Calculations$0.00$0.00$0.00$0.00$0.00
3.1.7Docking Conference$0.00$0.00$0.00$0.00$0.00
3.1.8Docking the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.9Post Docking$0.00$0.00$0.00$0.00$0.00
3.1.10Shifting the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.11Undocking the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.13Final Docking Report$0.00$0.00$0.00$0.00$0.00
HULL REPAIRS
3.2.1Identify Distinguishing Figures & Markings-Hull$0.00$0.00$0.00$0.00$0.00
3.2.2Rubber Fenders$0.00$0.00$0.00$0.00$0.00
3.2.3Zinc Anodes$0.00$0.00$0.00$0.00$0.00
3.2.4Hull & Freeboard Blasting & Preservation$0.00$0.00$0.00$0.00$0.00
3.2.5Hull Structural Opening-Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.2.6Hull & Freeboard Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.2.7Hull & Freeboard Ultrasonic Testing (UT Reports)$0.00$0.00$0.00$0.00$0.00
STRUCTURAL REPAIRS
3.3.1Hull/Structural Repairs$0.00$0.00$0.00$0.00$0.00
TANKS & VOIDS
3.4.1.Marine Sanitation Device (PCP)$0.00$0.00$0.00$0.00$0.00
3.4.2Open, Pump, Clean, Vent, Gas Free, & Close Tanks$0.00$0.00$0.00$0.00$0.00
3.4.3Tank & Void Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.4.4Tank & Void Preservation$0.00$0.00$0.00$0.00$0.00
3.4.5Preliminary Air Test$0.00$0.00$0.00$0.00$0.00
3.4.6Clean, Flush, & Disinfection of Fresh Water System$0.00$0.00$0.00$0.00$0.00
3.4.7Certification of Fresh Water Piping and Tank$0.00$0.00$0.00$0.00$0.00
3.4.8Start-Up Procedure for MSD System$0.00$0.00$0.00$0.00$0.00
3.4.9Final Air Test$0.00$0.00$0.00$0.00$0.00
3.4.10Tanks & Void Closeout Inspection$0.00$0.00$0.00$0.00$0.00
3.4.11Tanks & Void Gasket Repair$0.00$0.00$0.00$0.00$0.00
3.4.12On-Load Fuel$0.00$0.00$0.00$0.00$0.00
MAIN DECK REPAIRS AND PRESERVATION
3.5.1Identify Color Schemes & Markings- Main Deck$0.00$0.00$0.00$0.00$0.00
3.5.2Main Deck Non-skid Repair$0.00$0.00$0.00$0.00$0.00
3.5.3Visual Inspection for Structural Defects$0.00$0.00$0.00$0.00$0.00
3.5.4Ultrasonic Testing Inspections (UT Reports)$0.00$0.00$0.00$0.00$0.00
3.5.5Hatch Repairs$0.00$0.00$0.00$0.00$0.00
3.5.6Vent Trunk Inspections$0.00$0.00$0.00$0.00$0.00
SUPERSTRUCTURE REPAIRS
3.6.1Deck House - Top Non-skid Repairs$0.00$0.00$0.00$0.00$0.00
3.6.2Visual Inspection for Structural Defects$0.00$0.00$0.00$0.00$0.00
3.6.3Ultrasonic Testing Inspections (UT Reports)$0.00$0.00$0.00$0.00$0.00
3.6.4Pilot House - Top Non-skid Repairs$0.00$0.00$0.00$0.00$0.00
3.6.5Visual Inspection for Structural Defects$0.00$0.00$0.00$0.00$0.00
3.6.6Ultrasonic Testing Inspections (UT Reports)$0.00$0.00$0.00$0.00$0.00
3.6.7Deck House Exterior Preservation$0.00$0.00$0.00$0.00$0.00
3.6.8Pilot House Exterior Preservation$0.00$0.00$0.00$0.00$0.00
3.6.9Mast Exterior Preservation$0.00$0.00$0.00$0.00$0.00
3.6.10Main Mast Wire Seal Repair$0.00$0.00$0.00$0.00$0.00
MAIN PROPULSION REPAIRS
3.7.1Waterborne Shaft Position - Shaft Coupling Alignment$0.00$0.00$0.00$0.00$0.00
3.7.2Removal of Propellers, Shafts, Couplings, & Bearings$0.00$0.00$0.00$0.00$0.00
3.7.3Inspections for Wear & Defects$0.00$0.00$0.00$0.00$0.00
3.7.4Clean, Polish, Inspect, Balance Propellers$0.00$0.00$0.00$0.00$0.00
3.7.5Propulsion Re-Assembly$0.00$0.00$0.00$0.00$0.00
3.7.6Propulsion System(s) Operational Testing$0.00$0.00$0.00$0.00$0.00
STEERING REPAIRS
3.8.1Rudder Swing Test$0.00$0.00$0.00$0.00$0.00
3.8.2Steering Removals$0.00$0.00$0.00$0.00$0.00
3.8.2.1Rudder Stock Bearing$0.00$0.00$0.00$0.00$0.00
3.8.3Re-Assembly$0.00$0.00$0.00$0.00$0.00
3.8.4Rudder Swing Test - Final$0.00$0.00$0.00$0.00$0.00
MACHINERY SYSTEMS
3.9.1Hydraulic Power Systems & Component Operational Testing$0.00$0.00$0.00$0.00$0.00
3.9.2Diesel Engine/Generator System & Component Operational Testing & Top-End Overhaul$0.00$0.00$0.00$0.00$0.00
3.9.3Heat Exchanger & After Cooler Inspection & Repairs$0.00$0.00$0.00$0.00$0.00
ELECTRICAL SYSTEMS
3.10.1Electrical Systems & Components Operational Testing$0.00$0.00$0.00$0.00$0.00
3.10.2Lighting Systems Operational Testing$0.00$0.00$0.00$0.00$0.00
3.10.3Clean Electrical Contacts & Relays/Repairs$0.00$0.00$0.00$0.00$0.00
PIPING REPAIRS
3.11.1Rinse & Flush Potable Water & Piping$0.00$0.00$0.00$0.00$0.00
3.11.2Potable Water Piping Tightness Test$0.00$0.00$0.00$0.00$0.00
3.11.3Hull Valve Cycle/Inspections$0.00$0.00$0.00$0.00$0.00
DOCK & SEA TRIALS
3.12Dock & Sea Trials$0.00$0.00$0.00$0.00$0.00
Total0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Rate/MH:G&A Rate:Profit Rate:
Total Bid:$0.00

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

File details come from the government source that posted it. Updated .