C04.0 Attachment J-2 Price Proposal Worksheet 15MWB9207 N4523A22R1060.xls

XLS spreadsheet 177 KB Posted

Attached to
Maintenance on 15 Meter Work Boat 9207 Federal contract opportunity
Solicitation number
N4523A22R1060
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This solicitation package includes a price proposal worksheet and labor hour breakdown template for a firm-fixed-price contract to perform maintenance, repair, and preservation on a 15-meter work boat.

The scope of work involves coordinating delivery of the vessel from Puget Sound Naval Shipyard to the contractor's facility, docking, cleaning, and preserving the exterior hull. Additional requirements include removing and replacing fender material and sea chest zinc anodes, blasting and preserving hull and void covers, conducting ultrasonic and visual hull inspections, opening and maintaining tanks/voids, replacing gaskets and fasteners, and removing and repairing propulsion and steering systems. The period of performance is from May 10, 2022 to July 26, 2022.

This is a 100% small business set-aside solicitation issued by the Department of the Navy with a NAICS code of 336611 and 1,250-employee size standard. Offerors must be registered in the System for Award Management to receive award.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instruction Sheet

Instructions for Contractors for Filling-out J-2 Price Proposal Worksheet
All yellow fields are to be filled out by the Contractor prior to submittal to The Government.
DO NOT FILL IN ANY CELL THAT IS NOT BRIGHT YELLOW.
Labor Mix & Rates Sheet
1Enter Company Name and Date
2Fill in each rate in its applicable yellow cell
3Fill in each labor category and ensure all yellow boxes are filled in
a.Example Labor Categories
Shipfitter
Sheetmetal
Welder/Burer
Electrician
Inside Machinist
Outside Machinist
Boilermaker
Pipefitter
Insulator/Lagger
Shipwright/Carpenter
EX/Ord
Painter/Blaster
Rigger/Laborer
QA/NDT
4Next, fill in each yellow cell for Regular Labor Hours and Overtime Labor Hours
5Your Total Direct Labor Rate Per Hour will autopopulate in each sheet. All other rates entered will also auto populate.
Price Proposal Worksheet
1All company and contract information and rates will be autopopulated from previous sheet.
2Fill in each yellow cell with its applicable information
3Anything that is not in yellow is locked, these cells will auto-calculate.
4Before submitting, ensure there are no more bright yellow cells.
IF USING FCCOM
Facilities Capital Cost of Money (FCCOM) is not required. If you are not inputting FCCOM please enter N/A in all cells. However, if your company is inputting FCCOM, it needs to be calculated based on the proper CASB-CMF form. Please include the CASB-CMF form with your submission.
Labor Hour Breakdown
1Enter each labor categoy will autofill from the "labor Mix & Rates" sheet
2Fill in each Regular and Overtime hour for each labor category and line item.

Labor Mix & Rates

Contractor/Company Name:
Project/Vessel Name:15MWB9207Date:
Base Rates:Regular Labor$0.00FringeOverheadG&AProfitFCCOM
Labor Mix and Rates
Labor CategoryRegular HoursOvertime HoursTotal Category HoursTotal Regular $/hourTotal Overtime $/hourTotal Category Dollars
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
Column Totals000$0.00$0.00$0.00
Direct Labor Rate Per Hour0

Example Labor Categories Shipfitter Sheetmetal Welder/Burer Electrician Inside Machinist Outside Machinist Boilermaker Pipefitter Insulator/Lagger Shipwright/Carpenter EX/Ord Painter/Blaster Rigger/Laborer QA/NDT

Price Proposal Worksheet

Contractor/Company Name:0
Project/Vessel Name:15MWB9207Date:12/31/99
Base Rates:Labor$0.00Fringe0.00%Overhead0.00%G&A0.00%Profit0.00%FCCOM0.00
Base Work Package Proposal
PARAGRAPH No.TITLEPRIMESUBCONTRACTOROther Direct Cost (ODC)*PRIMELine Item Total
M/HLabor CostMATERIAL PRICETOTALLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOM
3.1.1Personnel & EquipmentArrival Conference$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.2Docking ProcedureRequired Documents$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking PlanProgress Meetings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.4Crib & Brace BlockingAvailability Requirements$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.5Setting & Alignment of Docking BlocksTransport Vessels$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.6Docking ConferenceCare of Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.7Docking the VesselCFR Reports$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.8Post DockingSafety Requirements$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.9Undocking the VesselPreservation OQE$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.10Shifting the VesselEnvironmental/Hazwaste Management$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.11Docking Observer$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.12Final Docking Report$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.1Identify Distinguishing Figures and Markings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.2Rudder Fenders$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.3Zincs Anodes$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.4Hull Blasting and Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.5Hull Structural Opening VT$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.6Hull and Freeboard VT$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.7Hull and Freeboard UT Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.8Skeg Repairs$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.9Sea Chest Repairs$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.10Hull Docking Plugs$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.1Open, Pump, Clean, Ventilate and Gas Free Tanks$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.2Tank/Void Visual Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.3Preliminary Air Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.4Tank/void Touch Up Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.5Blast and Preserve Void Access Covers$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.6Tank/Void Cover Exterior Identification$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.7Watertight Hatch and Scuttle Repairs$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.8Final Air Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.9Tank/Void Closeout Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.10On-Load Fuel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.11Tank/Void Access Covers$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.1Non-Skid Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.1Waterborne Shaft$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.2Shaft Removals$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.3Inspections for Wear and Defects$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.4Shaft Assembly RepairMain Deck U/T Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.5Propulsion Equipment Assembly$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.8.1Initial Rudder Swing Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.8.2Steering Removals$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.8.3Reassembly$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.8.4Steering Installation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.8.5Final Rudder Swing Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.14.1Operational Responsibilities$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.14.2Sea Trail Baseline Testing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.14.3Final Sea Trail$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.14.4Post Sea Trial$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.5$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.6$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.7$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.8$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.9$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.10$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.11$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.12$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.13$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.14$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.15$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.16$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.17$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.18$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.19$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.20$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.21$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.22$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.23$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.24$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.25$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.26$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.27$0.00$0.00$0.00$0.00$0.00$0.00
3.7.28$0.00$0.00$0.00$0.00$0.00$0.00
3.7.29$0.00$0.00$0.00$0.00$0.00$0.00
3.7.30$0.00$0.00$0.00$0.00$0.00$0.00
3.7.31$0.00$0.00$0.00$0.00$0.00$0.00
3.7.32$0.00$0.00$0.00$0.00$0.00$0.00
3.7.33$0.00$0.00$0.00$0.00$0.00$0.00
3.7.34$0.00$0.00$0.00$0.00$0.00$0.00
3.7.35$0.00$0.00$0.00$0.00$0.00$0.00
3.7.36$0.00$0.00$0.00$0.00$0.00$0.00
3.7.37$0.00$0.00$0.00$0.00$0.00$0.00
3.7.38$0.00$0.00$0.00$0.00$0.00$0.00
3.7.39$0.00$0.00$0.00$0.00$0.00$0.00
3.7.40$0.00$0.00$0.00$0.00$0.00$0.00
3.7.41$0.00$0.00$0.00$0.00$0.00$0.00
3.7.42$0.00$0.00$0.00$0.00$0.00$0.00
3.7.43$0.00$0.00$0.00$0.00$0.00$0.00
3.7.44$0.00$0.00$0.00$0.00$0.00$0.00
3.7.45$0.00$0.00$0.00$0.00$0.00$0.00
3.7.46$0.00$0.00$0.00$0.00$0.00$0.00
3.7.47$0.00$0.00$0.00$0.00$0.00$0.00
3.7.48$0.00$0.00$0.00$0.00$0.00$0.00
3.7.49$0.00$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Base Work Package$0.00
TOTAL PROPOSED PRICE:$0.00

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

Labor Hour Breakdown

Contractor/Company Name:0
Project/Vessel Name:15MWB9207Date:12/31/99
Base Rates:Regular Labor Rate$0.00
NameRateTotal CostNameRateTotal Cost
Labor Hour Breakdown
PARAGRAPH No.TITLELabor CategoriesTotal Overall Labor Cost
000000000000000000Total Regular HoursTotal Overtime Hours
REGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOT
3.1.1Personnel & Equipment00$0.00
3.1.2Docking Procedure00$0.00
3.1.3Blocking Plan00$0.00
3.1.4Crib & Brace Blocking00$0.00
3.1.5Setting & Alignment of Docking Blocks00$0.00
3.1.6Docking Conference00$0.00
3.1.7Docking the Vessel00$0.00
3.1.8Post Docking00$0.00
3.1.9Undocking the Vessel00$0.00
3.1.10Shifting the Vessel00$0.00
3.1.11Docking Observer00$0.00
3.1.12Final Docking Report00$0.00
3.2.1Identify Distinguishing Figures and Markings00$0.00
3.2.2Rudder Fenders00$0.00
3.2.3Zincs Anodes00$0.00
3.2.4Hull Blasting and Preservation00$0.00
3.2.5Hull Structural Opening VT00$0.00
3.2.6Hull and Freeboard VT00$0.00
3.2.7Hull and Freeboard UT Inspection00$0.00
3.2.8Skeg Repairs00$0.00
3.2.9Sea Chest Repairs00$0.00
3.2.10Hull Docking Plugs00$0.00
3.4.1Open, Pump, Clean, Ventilate and Gas Free Tanks00$0.00
3.4.2Tank/Void Visual Inspection00$0.00
3.4.3Preliminary Air Test00$0.00
3.4.4Tank/void Touch Up Preservation00$0.00
3.4.5Blast and Preserve Void Access Covers00$0.00
3.4.6Tank/Void Cover Exterior Identification00$0.00
3.4.7Watertight Hatch and Scuttle Repairs00$0.00
3.4.8Final Air Test00$0.00
3.4.9Tank/Void Closeout Inspection00$0.00
3.4.10On-Load Fuel00$0.00
3.4.11Tank/Void Access Covers00$0.00
3.5.1Non-Skid Repair00$0.00
3.7.1Waterborne Shaft00$0.00
3.7.2Shaft Removals00$0.00
3.7.3Inspections for Wear and Defects00$0.00
3.7.4Shaft Assembly Repair00$0.00
3.7.5000$0.00
3.7.6000$0.00
3.7.7000$0.00
3.7.8000$0.00
3.7.9000$0.00
3.7.10000$0.00
3.7.11000$0.00
3.7.12000$0.00
3.7.13000$0.00
3.7.14000$0.00
3.7.15000$0.00
3.7.16000$0.00
3.7.17000$0.00
3.7.18000$0.00
3.7.19000$0.00
3.7.20000$0.00
3.7.21000$0.00
3.7.22000$0.00
3.7.23000$0.00
3.7.24000$0.00
3.7.25000$0.00
3.7.26000$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
Column Totals00000000000000000000000000000000000000$0.00
Base Work Package$0.00
OPTION YEAR TABLE IF NEEDED:
Labor Hour Breakdown
PARAGRAPH No.TITLELabor CategoriesTotal Overall Labor Cost
000000000000000000Total Direct HoursTotal Overtime Hours
REGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOT
0000$0.00
0000$0.00
0000$0.00
0000$0.00
Column Totals00000000000000000000000000000000000000$0.00
Total Option Items (O):$0.00
TOTAL DIRECT LABOR COSTS BY WORK ITEM$0.00

File details come from the government source that posted it. Updated .