This is a Schedule of Items for a fixed-price construction contract involving outhouse replacement and campsite improvement work at multiple Alaska locations. The contract is structured with base items and five optional items that may be exercised if sufficient funds are available at the time of award.
The base work encompasses two primary projects: Alaganik Outhouse Replacement and 18 Mile and One Eyed Pond Outhouse Replacement. Alaganik base items include mobilization, clearing and grubbing, outhouse removal, unclassified excavation (50 cubic yards), aggregate base course (30 cubic yards), installation of one double vault toilet, and concrete pads. The 18 Mile and One Eyed Pond project includes similar preparatory work plus installation of two single vault toilets and two sets of concrete pads. Optional items include: Option 1—100 cubic yards of aggregate base course at Mile 22; Option 2—one picnic structure with yellow cedar materials and installation at Mile 22; Option 3—20 cubic yards of aggregate and two picnic structures at Alaganik; Option 4—clearing, grubbing, 15 cubic yards of aggregate, and two timber frames for a new Alaganik campsite; and Option 5—50 cubic yards of aggregate surface course for regrading existing Alaganik campsites. Offerors must submit unit pricing for all line items to be considered responsive. Bond premiums may be included under mobilization costs. Quantities provided are in-place amounts without shrinkage or swell factors applied, and contractors must verify quantities independently.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF ITEMS
ITEM
NO. DESCRIPTION PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
ALAGANIK OUTHOUSE REPLACEMENT
15101-B1 MOBILIZATION ALL LS
20101-B1 CLEARING AND GRUBBING, DISPOSAL
METHOD F
ALL LS
20304-B1 REMOVAL OF OUTHOUSE, DISPOSAL
METHOD J
ALL LS
20903-B1 UNCLASSIFIED EXCAVATION 50 CY *
30112-B1 AGGREGATE BASE COURSE, GRADING E 30 CY *
72601B-B1 INSTALL DOUBLE VAULT TOILET 1 EA
72602-B1 OUTHOUSE CONCRETE PADS ALAGANIK 1 EA
ALAGANIK TOTAL
18 MILE AND ONE EYED POND OUTHOUSE REPLACEMENT
15101-B2 MOBILIZATION ALL LS
20102-B2 CLEARING AND GRUBBING, DISPOSAL
METHOD F
ALL LS
20304-B2 OUTHOUSE DECOMMISSIONING ALL LS
30101-B2 EXCAVATION 50 CY*
20903-B2 AGGREGATE BASE COURSE, GRADING E 60 CY*
72601A-B2 INSTALL SINGLE VAULT TOILET 2 EA
72602-B2 OUTHOUSE CONCRETE PADS 2 EA
18 MILE AND ONE EYED POND TOTAL
OPTION ITEM 1: MILE 22 AGGREGATE
30101-O1 AGGREGATE BASE COURSE, GRADING E 100 CY*
OPTION ITEM 1 TOTAL
OPTION ITEM 2: MILE 22 PICNIC STRUCTURE
72603M-O2 PICNIC STRUCTURES MATERIALS (YELLOW
CEDAR) & INSTALLATION MILE 22
1 EA
OPTION ITEM 2 TOTAL
OPTION ITEM 3: ALAGANIK PICNIC STRUCTURES
30101-O3 AGGREGATE BASE COURSE, GRADING E 20 CY*
72603A-O3 PICNIC STRUCTURES MATERIALS (YELLOW
CEDAR) & INSTALLATION ALAGANIK
2 EA
OPTION ITEM 3 TOTAL
OPTION ITEM 4: ALAGANIK NEW CAMP SITE
20102-O4 CLEARING AND GRUBBING, DISPOSAL
METHOD F
ALL LS
30101-O4 AGGREGATE BASE COURSE, GRADING E 15 CY*
55704-O4 TIMBER FRAMES 2 EA
OPTION ITEM 4 TOTAL
OPTION ITEM 5:ALAGANIK REGRADING EXISTING CAMPSITES
30101-O5 AGGREGATE SURFACE COURSE, GRADING E 50 CY*
OPTION ITEM 5 TOTAL
BASE ITEMS TOTAL
OPTION ITEMS TOTAL
TOTAL BASE + OPTION ITEMS
* Denotes Contract Quantity
SCHEDULE OF ITEMS
NOTES:
1. Offerors must submit pricing on all items to be considered responsive. Must quote on all items.
2. Payment for bond premiums in accordance with FAR 52.232-5. Payments under Fixed-Price Construction Contracts shall not be in addition to the contract price but can be included under Mobilization.
3. Quantities are provided for information only and are in-place quantities. No shrinkage or swell factors have been applied. Contractor shall verify quantities.
4. Items labeled as optional are not required to be exercised by the government. If exercised, the contractor will be required to perform the optional work in accordance with the terms and conditions of this contract. If sufficient funds available, the government will exercise the option item(s) at award.
Price Quotation Furnished By:
Name: ______________________________
Phone: ______________________________