C04 Attachment 1 Statement of Work.pdf
PDF 105 KB Posted
- Attached to
- HVAC upgrade at the USDA ARS PPRL in Logan, UT
- Solicitation number
- 1232SA26Q0549
About this file
This is a Statement of Work (SOW) for a federal construction project at the United States Department of Agriculture, Agricultural Research Service facility in Logan, Utah.
The project involves HVAC modernization and animal welfare building repairs at the Poisonous Plant Research Laboratory (Building #59), with Project Number 1165675 and a location at 1150 E 1400 N, Logan, UT 84322-6300. The Contracting Officer is Michael Sherlock (Michael.Sherlock@usda.gov), with Dr. Daniel Cook serving as the Location Monitor. The contract duration is 180 calendar days from Notice to Proceed. The contractor must provide all labor, equipment, and materials to complete the HVAC portion of work as outlined in attached drawings and specifications, including four referenced PDF documents: the 2025-07-11 USU PPRL Surgical CD Set (drawings), USU PPRL Surgical Specifications CD (project manual), and Addendum #1 for Mechanical Requirements. Work must comply with all applicable federal, state, and local codes (IBC, NEC, NSPC, NFPA, EPA, ASTM, GSA, AASHTO) and industry standards. Site access is restricted to 7:00 AM–5:00 PM, Monday through Friday, excluding federal holidays. The contractor is responsible for obtaining all required permits and licenses, coordinating with existing facility operations to prevent disruption to research activities, properly disposing of replaced materials, protecting adjacent equipment from damage, and conducting a pre-bid site visit to assess existing conditions. Submittals of manufacturer literature and shop drawings are required for review and approval by the Location Monitor prior to material procurement. The contractor must provide a standard one-year warranty on workmanship and materials, submit a release of liens, and provide a final invoice prior to final payment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture Agricultural Research Service
STATEMENT OF WORK
Poisonous Plant Research Laboratory (PPR)
Animal Welfare, Modernization HVAC
Logan, UT
Date: February 18, 2026
STATEMENT OF WORK
1.0 CONTRACT PROJECT:
a. Project Number: 1165675
b. Project Title: Poisonous Plant Research Laboratory (PPR) Animal Welfare, Modernizaiton, Building #59
c. Project Location: Poisonous Plant Research Laboratory
1150 E 1400 N, Logan, UT 84322-6300
2.0 PROJECT CONTACT PERSONS:
a. CONTRACTING OFFICER (CO)
Michael Sherlock
USDA-ARS
Email: Michael.Sherlock@usda.gov
b. CONTRACTING SPECIALIST (CS)
TBD
USDA-ARS-PWA
Email: Tel. No.:
c. LOCATION MONITOR (LM)
Dr. Daniel Cook, RL Poisonous Plant Research Laboratory 1150 E 1400 N; Logan, UT 84322
d. ADMINISTRATIVE OFFICER
Pauleen Owen Poisonous Plant Research Laboratory 1150 E 1400 N; Logan, UT 84322
e. SUPERVISORY ENGINEER Carolyn Williams
f. AREA SAFETY AND HEALTH MANAGER Ken Cushman
800 Buchanan Street Albany, CA 94710
3.0 PROJECT DESCRIPTION:
Animal Welfare, Building Repair
4.0 PROJECT REQUIREMENTS:
a. The Contractor’s work shall adhere to the criteria stated within these project requirements, drawings, and specifications. All construction shall comply with applicable federal, state, and local code requirements as well as current industry standards, (i.e., IBC, NEC, NSPC, NFPA, EPA, ASTM, GSA, AASHTO, etc.) and health and safety codes, in effect at the time of contract award.
b. Access the site between 7:00 am and 5:00 pm Monday through Friday excluding federal holidays. Contractor staff must sign-in on the first day of arrival and then sign-out on the final day of the project, upon completion.
c. In the event that any hazardous materials may be found, report condition immediately to the Contracting Officer’s Representative (COR) regarding potentially hazardous conditions that are uncovered. Stop work in the area of the questionable material or condition until identification and direction is provided.
4.1 Background & Site Description:
The work to be completed is at the Poisonous Plant Research Laboratory at the southwest corner of 1400 N and 1200 E in Logan, UT.
4.2 Bid Schedule:
Provide all labor, equipment and materials to perform this Statement of Work and Schedule of Items.
4.3 Description of Work:
a. See attached
The project is modernization of facilities associated with Building #59
Four PDF documents are attached that outline the work requirements.
2025-07-11 USU PPRL Surg. CD Set_original (Drawings describing the requirements)
USU PPRL Surg. Specifications CD (project manual)
230100 - Mechanical Requirements_Addendum #1 (Added specification section for clarity and additional instructions regarding submittals, standards, and general requirements associated with this project)
We are requesting that the bid outline the HVAC portion of the work outlined in the drawings.
4.4 Description of Work
a. The contractor will provide a turn-key project satisfying all Local, State, and Federal requirements.
b. The contractor will provide and install the necessary material per Section 4.2 and properly dispose of all material being replaced.
c. Contractor is responsible for any damage to adjacent equipment and miscellaneous objects that may become damaged during installation. The contractor is responsible for making repairs to meet or exceed conditions prior to damage.
d. The Contractor is responsible for visiting the site prior to submitting a bid to observe existing conditions. No compensation will be provided for conditions that would be visible during an on-site visit for persons experienced performing this type of work.
4.5 Government Furnished Equipment\Services
a. Government will furnish a reasonable amount of electricity and water.
5.0 GENERAL REQUIREMENTS:
5.1 Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor.
5.2 Existing Installations / Demolition: Contractor shall modify existing installations as needed to accommodate the new installation. Contractor shall coordinate modification of existing installations with Government. All disturbances of existing systems shall be thoroughly coordinated with the Government to prevent disturbances that might jeopardize on-going operations and research. Government reserves the right to retain any equipment / materials removed as part of the scope of work. Contractor shall coordinate any equipment / materials to be retained with Government prior to starting demolition operations.
Contractor shall legally dispose all any materials removed that will not be retained.
5.3 Installation: It shall be the responsibility of the Contractor to complete work in accordance with Federal, State, and Local Code Standards. Additional procedures and materials may be required than is indicated herein. If any item specified herein conflicts with the applicable codes and recommendations, the Contractor shall bring it to the attention of the Contracting Officer Representative for immediate resolution.
5.4 Submittals: Provide manufacturer’s descriptive literature/shop drawings for all materials to the Location Monitor for review. The descriptive literature shall be annotated/ highlighted to show its conformance with contract requirements. Submittals are required for new materials and will be stamped and/or signed by the general contractor prior to submission to the Government. Contractor is responsible for any costs incurred for equipment ordered without prior approval.
5.5 Quality Control: The work performed under this contract shall be subject to continuous audit by the Location Monitor. Quality control is the exclusive responsibility of the Contractor. The Contractor shall retain and pay for the services of an independent inspector or testing laboratory to perform all tests expressly required by this contract.
5.6 Protection of Work and Property/Safety Requirements:
a. The Contractor shall protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired at the Contractor’s expense, to pre-damaged condition to the satisfaction of the Location Monitor.
b. Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities of the protection and security.
c. Contractor is responsible for verifying location of any underground utilities and is responsible for any damaged caused to such utilities.
5.7 Temporary Facilities:
a. Temporary utilities (water and electricity) may be furnished to the Contractor by the Government, if so requested. The Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through its own negligence.
b. Should the Contractor require any power or utility shutdowns during construction, the
Contractor shall obtain approval for such shutdown from the Location Monitor fourteen
(14) calendar days prior to the need.
5.8 Materials and Equipment:
a. The material and equipment to be furnished under these contract documents shall be the standard products of manufacturers regularly engaged in the production of such materials and equipment and shall be the manufacturer’s latest standard design.
b. All materials and equipment to be incorporated in the work shall be handled and stored by the manufacturer, fabricator, supplies and Contractor before during and after shipment in a manner to prevent any injury, theft or damage of any kind to the materials and equipment. All materials and equipment furnished by the Contractor shall be subject to inspection and approval by the CO/Location Monitor.
c. Government will not furnish any labor or equipment to unload or move materials or supplies.
5.9 Cleanup: The construction site shall be kept clean and free of debris at all times. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the Location Monitor.
5.10 Warranty:
a. Submit data concerning the standard one year warranty for workmanship and materials including extended warranties associated with certain equipment unless otherwise noted in the project manual, including the warranty periods (dates), and warranty contacts with names, addresses and telephone numbers.
5.11 Final Payment/Contract Closeout: The following documents are REQUIRED PRIOR TO
FINAL PAYMENT (other documents may also be required):
a. General contractor’s minimum one (1) year warranty on work.
b. Release of liens
c. Final Invoice
6.0 Project Schedule:
The Contract time for this project is 180 calendar days from Notice to Proceed.