C04 - 6 - Project Specs Lists.pdf

PDF 148 KB Posted

Attached to
USFS - Route 1 Road Repair - V2.
Solicitation number
127EAW26Q0044
Issued by

About this file

This document is a specifications reference list for a federal highway construction contract. The solicitation incorporates the Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects (FP-14) issued in 2014, which serve as the baseline technical requirements for the contract. The applicable FP-14 sections cover essential construction and project management areas including terms and definitions, bid and award procedures, scope of work, work control, acceptance procedures, legal relations, prosecution and progress, measurement and payment, mobilization, construction surveying, quality control and testing, schedules, and public traffic management. Material-specific sections address minor crushed aggregate, cold in-place recycled asphalt base course, asphalt concrete, asphalt tack coat, asphalt concrete pavement patching, and general aggregate requirements.

Additionally, the solicitation incorporates Forest Service Supplemental Specifications (FSSS) to the FP-14, which provide Forest Service-specific modifications and clarifications to the standard specifications. These supplemental specifications address the same general categories as the FP-14 but include revisions dated between November 2016 and April 2023, with the most recent updates to Section 703.05 (Subbase, Base, Surface Course, and Screened Aggregate) from April 25, 2023, and Section 302.05 (Compacting and Finishing Crushed Aggregate) from June 11, 2020. All requirements contained in both the FP-14 standard specifications and the FSSS are made part of the solicitation and any resulting contract.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Special Project Specifications are physically incorporated within this solicitation, beginning after the list of applicable Standard Project Specifications.

The following Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects issued in 2014 (FP-14) are applicable to this contract:

APPLICABLE FP-14 STANDARD SPECIFICATIONS DATE

Section 101. — TERMS, FORMAT, AND DEFINITIONS 2014 Section 102. — BID, AWARD, AND EXECUTION OF CONTRACT 2014 Section 103. — SCOPE OF WORK 2014 Section 104. — CONTROL OF WORK 2014 Section 106. — ACCEPTANCE OF WORK 2014 Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC 2014 Section 108. — PROSECUTION AND PROGRESS 2014 Section 109. — MEASUREMENT AND PAYMENT 2014 Section 151. — MOBILIZATION 2014 Section 152. — CONSTRUCTION SURVEY AND STAKING 2014 Section 153. — CONTRACTOR QUALITY CONTROL 2014 Section 154. — CONTRACTOR SAMPLING AND TESTING 2014 Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS 2014 Section 156. — PUBLIC TRAFFIC 2014 Section 302. — MINOR CRUSHED AGGREGATE 2014 Section 310. — COLD IN-PLACE RECYCLED ASPHALT BASE COURSE 2014 Section 403. — ASPHALT CONCRETE 2014 Section 412. — ASPHALT TACK COAT 2014 Section 418. — ASPHALT CONCRETE PAVEMENT PATCHING 2014 Section 703. — AGGREGATE 2014

The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract.

The following Forest Service Supplemental Specifications (FSSS) to the FP-14 are applicable to this contract:

Description Revision Date Preface 5/14/2020 101 - Terms, Format, and Definitions 11/9/2016

101.01 Meaning of Terms 11/9/2016

101.03 Abbreviations. 11/9/2016

101.04 Definitions. 1/22/2020

102 - Bid, Award, and Execution of Contract 11/9/2016 103 - Scope of Work 11/9/2016 104 - Control of Work 11/9/2016

104.06 Use of Roads by Contractor 11/9/2016

106 - Acceptance of Work

106.01 Conformity with Contract Requirements. 7/18/2017

106.02 Visual Inspection 11/9/2016

106.07 Partial and Final Acceptance 11/1/2016

107 - Legal Relations and Responsibility to the Public

107.05 Responsibility for Damage Claims. 7/18/2017

108 - Prosecution and Progress 11/9/2016 109 - Measurement and Payment 11/9/2016

109.01 Measurement of Work 2/22/2019

109.02 Measurement Terms and Definitions 11/9/2016

155 - Schedules for Construction Contracts 11/9/2016 203 - Removal of Structures and Obstructions

203.04 (b) General. 11/2/2016

203.05 Disposing of Material. 9/10/2018

302 – Minor Crushed Aggregate

302.04 Placing Crushed Aggregate 7/18/2017

302.05 Compacting and Finishing Crushed Aggregate 6/11/2020

412 – Asphalt Tack Coat

412.05 Weather Limitations 11/4/2016

703 – Aggregate

703.05 Subbase, Base, Surface Course, and Screened Aggregate 4/25/2023

File details come from the government source that posted it. Updated .