This is a Statement of Work for a FY 2023 Emergency Road Fund Obligation (ERFO) construction project administered by the US Department of Agriculture Forest Service on the Sequoia National Forest in California.

The project encompasses road and infrastructure maintenance and repair across three ranger districts: Hume Lake (six sites), Western Divide (ten sites), and Kern River (three sites) in Fresno, Tulare, and Kern counties. The contractor must furnish all labor, equipment, and materials to complete approximately 1,837 cubic yards of slide and washout removal, earthwork, ditch reconditioning, roadway surface reconditioning, construction of 46 square yards of dry stack rock retaining wall (approximately 82 feet long by 5 feet high), placement of 315.3 tons of aggregate at 16 sites, and placement of 82.7 tons of asphalt at six sites. The contractor must possess a current California State Contractors License (C-12 or equivalent) and maintain all required professional licenses and permits. Work is estimated to begin in August 2026 and must be completed within 150 calendar days from the Notice to Proceed, including allowances for weather delays, material procurement, and final cleanup.

Work hours are 7:00 a.m. to 5:00 p.m., Monday through Friday, with no weekend or federal holiday work permitted without prior written approval. The contractor is responsible for site safety, emergency communications and medical evacuation planning, securing highway permits for oversize loads, providing toilet facilities, equipment security, burning permits, noxious weed equipment cleaning certification, spill response planning, and complete site cleanup including proper disposal of all construction debris and petroleum product spills in compliance with local, state, and federal regulations. Applicable specifications include FP-14 Federal Highway Standards and 31 primary project specifications addressing site preparation, excavation, aggregate placement, asphalt paving, drainage structures, and erosion control. Required submittals include concrete and asphalt mix designs, culvert and spillway materials, erosion control plans, spill response plans, safety plans, traffic control plans, and aggregate gradation documentation.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture

FY 2023 ERFO Project

Sequoia National Forest

Hume Lake, Western Divide, and the Kern River Ranger Districts

STATEMENT OF WORK

1. DESCRIPTION OF WORK

This project is located in the State of California, in Fresno, Tulare, and Kern County, Sequoia National Forest, Hume Lake, Western Divide, and Kern River Ranger Districts. The project includes six sites, including trail 28E05, on the Hume Lake Ranger District, ten sites on the Western Divide Ranger District, and three sites on the Kern River Ranger District.

• Furnish all labor, equipment, and material to accomplish the work under this task order.

Incidental vegetation and slough removal as required for aggregate base and asphalt placement, rock wall construction, fill slope repairs, and other specified work.

• Remove slide/slough material from roadways and repair washouts on listed sites.

Estimated volume of slide removal and washout repair is approximately 1837 CY for the base bid.

• Complete earthwork as outlined in drawings and work list.

• Recondition ditches where specified.

• Recondition Roadway as specified for surface replacement at multiple sites.

• Reconstruct 46 SY of Dry Stack rock retaining wall (approximately 82’L by 5’ H).

• Place 315.3 tons of Aggregate at 16 sites for base bid.

• Place 82.7 tons of Asphalt at six sites for base bid.

NOTES:

The Contractor should refer to the SCHEDULE OF ITEMS and project plans and specifications when making estimates of quantities or work.

The Contractor must have a current State Contractors License, C-12 or equivalent to the Description of Work listed in the SOW. The Contractor shall possess and maintain all professional licenses required to perform the work specified under this construction contract.

Pursuant to FAR 52.236 7, Permits and Responsibilities (July 2025), the Contractor is solely responsible for obtaining and maintaining all permits and licenses necessary to ensure full compliance and proper performance throughout the contract period.

The contractor shall provide all personnel, equipment, supplies, facilites, transportation, tools, materials, supervision, testing, nonpersonal services, and all incidental items necessary to perform the requirements of this SOW and associated contract award.

All work shall be done in accordance with applicable Specifications and Industry Standards.

Where one or more of these conflict, the most stringent shall apply to the prosecution of work. The attachments to the RFQ/Statement of Work are hereby made part of this solicitation and any resultant contract.

2. APPLICABLE SPECIFICATIONS AND DRAWINGS

In addition to the specifications which are part of the base contract, the following specifications and drawings apply:

a) Drawings/Plans for FY 2023 ERFO Projects.

b) Fire plan for construction contracts.

c) "Standard Specifications for Construction of Roads & Bridges of Federal Highway

Projects" (FP-14, U.S. Customary Units) are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made part of this solicitation and any resultant contract.

d) The Supplemental Project Specifications listed in the Supplemental Specification List are applicable to this contract and are included in this Section.

Note that the specification list below includes the primary specifications applicable to this project. Other specifications referred to within these specifications and in other contract documents (even though not specifically listed herein) are also fully applicable to this request for proposals and any resultant contract.

Primary Project Specifications Spec. No. Specification Title

101 Term, Format and Definitions 102 Bid, Award and Execution of Contract 103 Scope of Work 104 Control of work 105 Control of Material 106 Acceptance of Work 107 Legal Relations and Responsibility to the Public 108 Prosecution and Progress 109 Measurement and Payment 151 Mobilization 152 Construction Survey and Staking 153 Contractor Quality Control 155 Schedule for Construction Contract

Public Traffic 157 Soil Erosion and Sediment Control 170 Develop Water Supply and Watering 201 Clearing and Grubbing 203 Removal of Structures and Obstructions 204 Excavation and Embankment 251 RipRap 252 Rockery, Special Rock Embankment, and Rock Buttress 301 Untreated Aggregate Courses 303 Road Reconditioning 403 Hot Asphalt Concrete Pavement 413 Pavement Milling 418 Asphalt Concrete Pavement Patching 602 Culverts and Drains 606 Corrugated Metal Spillways 607 Cleaning, Relaying, and Repairing Existing Drainage Structures 703 Aggregate

3. PRODUCTS SUBMITTALS

Title Referenced Specification No.

Concrete Mix Design FP-14 601 Culvert Material FP-14 602 Metal Spillway Material FP-14 606 GeoTextile FP-14 714 Asphalt Mix Design FP-14 418 Erosion Control Plan FP-14 107 Spill Response Plan FP-14 107 Project Safety Plan FP-14 107 Traffic Control Plan FP-14 156 Riprap Composition FP-14 251 Aggregate Gradation FP-14 301

4. PROJECT LOCATION

This project is located in the State of California,Hume, Tulare, & Kern Counties, Sequoia National Forest, Hume Lake, Western Divide & Kern River Ranger Districts.

The project includes six sites on the Hume Lake Ranger District, and ten sites on the Western Divide Ranger District, and three sites on the Kern River Ranger District.

Kings River east of Pine Flat reservoir; at MP 0.23 of 13S23 Little Boulder starting from 14S02 Burton; Sites are located at MP 2.0, 2.4, and 3.09 of 12S01 Davis Road starting from the Bailey Bridge over the and at MP 9.57, 17.3, and 17.4 of 21S94 Crawford starting from Tulare County Mtn Road 107 Western Divide Highway, and Hume Lake Trail at MP 0.02.

(See Vicinity Map)

5. CONTRACT TIME

The estimated start date for the Work is August 2026. The Contractor shall complete all Work within 150 calendar days from the date of issuance of the Notice to Proceed. The contract time includes allowances for weather-related delays, procurement and delivery of materials and equipment, and completion of final site cleanup.

6. PROJECT SITE CLEAN UP

Project site cleanup includes the removal and proper disposal of all construction trash, debris, and residue off of National Forest Land.

All spills of petroleum products including leak spots from parked vehicles shall be removed and properly disposed according to all Local, State, and Federal rules, regulations, and laws governing such disposal.

During the Work the Contractor is required to furnish dumpsters or other trash receptacles and to empty such containers either as they become full or weekly, whichever is more frequent. The Contractor shall not place materials of any kind into private or Government trash bins or dumpsters.

7. SPECIAL CONDITIONS AFFECTING THE WORK

a. Physical Conditions. The indications of physical conditions on the drawings and in the specifications are the result of site investigations and surveys performed by the Government.

b. Weather. Low temperatures at the project sites range from temperatures of less than 20

ºF in December and January to lows of 65 ºF in July and August. High temperatures range from 45 ºF in December and January to over 100 ºF in July and August. The annual precipitation at the project sites varies from less than 12 inches per year including snow fall in the valley to several feet of snow in the mountains. Winter snow storms and freezing temperatures will occur during the winter months that result in a winter project shutdown at higher elevations. Icy conditions on local roads and highways can occur during the fall, winter and spring. Highway curves in shaded areas will remain covered with ice or frost for weeks. The project location may have a winter shutdown.

c. Work Hours. Work hours are 7:00 a.m. to 5:00 p.m., Monday through Friday. No weekend or federal-holiday work is permitted unless prior written approval is obtained from the Contracting Officer. Dogs and other pets are prohibited on the project site at all times, except as otherwise permitted under applicable federal or state law.

d. Safety, Emergency Communications and Evacuation. Contractor is responsible for the safety of the Contractor’s employees including Subcontractors employees, Government employees associated with the project, and any visitors to the site both Government and private. The Contractor shall submit a project safety plan to the Contracting Officer for review prior to commencement of Work. The project safety plan shall comply with the appropriate California OSHA and Federal OSHA rules and regulations and must include a medical evacuation and emergency communications plan.

e. Highway Permits. Contractor is responsible for securing any overload or over width limit permits required for the transport of materials or equipment to the project site. The Contractor is responsible for conducting a thorough reconnaissance of all routes leading to the site.

f. Toilets. No toilet or shower facilities are available on site. Contractor shall provide toilet facilities for its employees.

g. Camping. Contractor may use a self-contained travel trailer or recreational vehicle to camp on National Forest System lands near the project site subject to the approval of the Contracting Officer. All waste material must be transported off-site to a station equipped to handle such waste.

h. Security. Contractor is responsible for the Contractor’s equipment and materials supplied to the site. All equipment not equipped with a key lock system shall be secured in such a manner as to make it inoperable to the average person at the end of each working day.

All hand tools and other equipment shall be secured at the end of each working day. On Fridays all construction debris, trash, and refuse shall be properly stored in dumpsters or trash bins or removed from the site.

i. Burning Permits. Contractor is subject to all rules and regulations governing the on site burning of slash and other debris. Contractor shall obtain a burning permit from the jurisdiction having control over burning. The Contractor shall comply with Fire Plan for Construction and Service Contracts included in the Contract.

j. Protection of Resources. Contractor shall thoroughly clean all equipment prior to delivery to the project site to remove weeds, mud, grease and oil buildup from the tires, wheels, tracks, engines and engine compartments, and other surfaces. Spills of petroleum products and other hazardous substances shall be reported, contained, and removed in accordance with all applicable rules, regulations and laws. Contractor shall submit a project spill response plan at the pre-work meeting for review by the Contracting Officer.

8. EQUIPMENT CLEANING

Unless the entire project area is already infected with noxious weeds, the contractor shall ensure that prior to moving on to another part of the project area all off-road equipment, which last operated in areas known by Forest Service to be infected with noxious weeds, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds.

Contractor shall certify in writing that off-road equipment is free of noxious weeds prior to each start-up of operations and for subsequent moves of equipment to other project areas. Measures taken to ensure that off-road equipment is free of noxious weeds will be identified. “Off-road equipment” includes all equipment operating off of paved roadways. A Current list of noxious weeks of concern to Forest Service is available at the Forest Supervisor’s office. Contractor shall clean off-road equipment prior to moving between project areas with known infestations with noxious weeds and other project areas, if any, which are free of such weeds. Project Area maps show areas known by Forest Service that contain specific noxious weeds species of concern. Contractor shall employ whatever cleaning methods are necessary to ensure that off-road equipment is free of noxious weeds. Equipment shall be considered free of soil, seeds, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools is not required.

Contractor shall notify Forest Service at least 24 hours prior to beginning of work in area designated as a noxious week area, unless otherwise agreed. Notification shall include the location of the equipment’s most recent operations. If the prior location of the off-road equipment cannot be identified, forest service may assume that it was infested with noxious weed seeds. Upon request of Forest Service, Contractor must arrange for forest Service to inspect each piece of off-road equipment prior to it being placed into service.

If Contractor desires to clean off-road equipment on National forest land, such as at the end of a project or prior to moving to a new unit that is free from noxious weeds, Contractor and Forest service shall agree on methods of cleaning, locations for the cleaning, and control of off-site impacts, if any.

New infestations of noxious weeds, of concern to Forest Service and identified by either Contractor or Forest Service, within the project area or on the haul route, shall be promptly reported to the other party.

3. PRODUCTS SUBMITTALS
5. CONTRACT TIME
6. PROJECT SITE CLEAN UP
7. SPECIAL CONDITIONS AFFECTING THE WORK
8. EQUIPMENT CLEANING