C04_1-12445526Q0087-Att7-DBAWD-IL20260011.pdf

PDF 6 MB Posted

Attached to
MPF Grant Creek Culvert Replacement Federal contract opportunity
Solicitation number
12445526Q0087
Issued by
Department of Agriculture Forest Service

About this file

This is a General Decision wage determination document issued by the U.S. Department of Labor (IL20260011, dated 05/21/2026) establishing prevailing wage rates for heavy and highway construction projects in Illinois counties including Boone, De Kalb, Du Page, Kane, Kendall, Lake, McHenry, and Will. The determination excludes landscape projects and includes three modifications with publication dates of 01/02/2026, 05/18/2026, and 05/21/2026.

The document provides comprehensive wage classifications and rates for multiple construction trades organized by project identifier and effective date. Key wage classifications include carpenters (ranging from $48.60 to $52.01 per hour), electricians ($41.00 to $62.61 per hour), ironworkers ($41.37 to $62.71 per hour), laborers ($47.04 to $55.40 per hour with various specializations), painters ($45.15 to $53.05 per hour), truck drivers (ranging from $44.12 to $48.93 per hour depending on axle configuration), and equipment operators with multiple group classifications ($49.76 to $63.00 per hour). Fringe benefits are listed separately for each classification, typically ranging from 19.86% to 51.05% of the base rate. The determination includes detailed specifications for equipment operator categories, underground work allowances, and special pay provisions for specific equipment such as cranes with boom extensions, concrete pumps, and mining machines. The document also references Executive Orders 13706 and 13658 regarding paid sick leave and minimum wage requirements for covered federal contractors, with additional wage determination appeal procedures directed to the Department of Labor's Wage and Hour Division.

View the file

Other files for this federal contract opportunity

Other files attached to MPF Grant Creek Culvert Replacement, newest first.
File Type Posted
C05_1-12445526Q0087-Att6-SuppSpecs2_A0001.pdf PDF
C05_1-12445526Q0087-Att8-FillableSOI_A0001.xlsx XLSX spreadsheet
C08_QAmemo-12445526Q0087.pdf PDF
C05_0-SF30-12445526Q0087_A0001.pdf PDF
C04_1-12445526Q0087-Att1-SOW.pdf PDF
C04_1-12445526Q0087-Att4-Map.pdf PDF
C04_1-12445526Q0087-Att5-SuppSpecs1.pdf PDF
C04_1-12445526Q0087-Att2-PlansColdwater.pdf PDF
C04_1-12445526Q0087-Att8-FillableSOI.xlsx XLSX spreadsheet
C04_0-RFQ-12445526Q0087.pdf PDF
C04_1-12445526Q0087-Att3-PlansNWBoundary.pdf PDF
C04_1-12445526Q0087-Att6-SuppSpecs2.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .