C02_Attachment B - SOW FPL Sprinkler_12444526Q0080.pdf

PDF 149 KB Posted

Attached to
FY26 FPL Wet Sprinkler Fire Suppression Inspections
Solicitation number
12444526Q0080
Issued by

About this file

This is a Statement of Work (SOW) issued by the US Department of Agriculture for quarterly sprinkler inspection and maintenance services at the Forest Products Laboratory during 2026.

The contractor shall provide all labor, supervision, and resources to inspect, test, and maintain automatic sprinkler systems in compliance with OSHA regulations (29 CFR 1910.159) and NFPA 25 Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, 2026 Edition. The work covers five buildings containing a total of three sprinkler systems: Building 1 (wet pipe and dry pipe, 5 risers), Building 29 (wet pipe, 1 riser), Building 33 (wet pipe, 4 risers), Building 34 (wet pipe, 3 risers), and Building 50 (wet pipe and antifreeze, 1 riser). Quarterly and annual inspections will occur approximately every three months beginning September 30, 2026, and concluding August 31, 2027. All work must be performed between 7:00 AM and 5:00 PM, Monday through Friday, with specific work dates to be scheduled after contract award. The contractor must report to the FPL Health and Safety Manager upon arrival and prior to commencing work each day. The Government will furnish a building access card and the facility; however, the contractor must provide all tools, supplies, and equipment necessary for inspection and testing. No key personnel designations, travel requirements, security requirements, data rights, or Section 508 accessibility standards apply to this contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Contents

Project

General Information

1.0 Scope of Work

2.0 Background

Contractor Requirements

3.0 Technical Requirements / Tasks

4.0 Government Furnished

5.0 Deliverables / Schedule

6.0 Travel

7.0 Contractor’s Key Personnel

8.0 Security Requirements

9.0 Data Rights

10.0 Section 508 – Electronic and Information Technology Standards

Attachment

Project

Sprinkler Quarterly Services 2026

General Information

1.0 Scope of Work

The contractor shall provide all labor, supervision, and all other resources required to deliver the requirements stated herein, except as may otherwise be specified in this statement of work.

2.0 Background

The Occupational Safety and Health Administration (OSHA) as well as the National Fire Prevention

Association (NFPA) require that sprinklers be inspected, tested, and maintained in accordance with OSHA regulations under CFR 1910 General Industry Standards and NFPA 10. The Forest Products Laboratory adopts the latest edition of the OSHA and NFPA regulations, 29 CFR 1910.159 Automatic Sprinkler Systems NFPA

25 Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, 2026

Edition.

Contractor Requirements

3.0 Technical Requirements / Tasks

1. All work is to be done between the hours of 7:00 AM and 5:00 PM, Monday through Friday unless otherwise specified.

2. Work dates shall be scheduled with the point of contact after contract is awarded.

3. Contractor will report to the Health and Safety Manager to obtain contractor building access card.

4. Contractor will report to the FPL Health and Safety Manager prior to starting any work to complete any required documents and sign in for the day.

FPL will furnish no tools, supplies, or employees to assist with inspection and test work.

Site visits can be scheduled through Contracting Officer Representative Office, prefer not to do virtual walkthroughs.

4.0 Government Furnished

Contractors will be given a building access card upon arrival at jobsite.

Total buildings covered: 5

Sprinkler systems: 3

Building 1 systems: Wet pipe and dry pipe, 5 risers

Building 29: Wet pipe, 1 riser

Building 33: Wet pipe, 4 risers

Building 34: Wet pipe, 3 risers

Building 50: Wet pipe and antifreeze, 1 riser

5.0 Deliverables / Schedule

Quarterly and annual inspections/servicing will occur approximately 3 months apart starting on September 30th, 2026, and completing approximately on August 31st, 2027.

6.0 Travel

N/A

7.0 Contractor’s Key Personnel

8.0 Security Requirements

9.0 Data Rights

10.0 Section 508 – Electronic and Information Technology Standards