C006475 EXHIBIT B - Bid Pricing Form.xlsx
XLSX spreadsheet 48 KB Posted
- Solicitation number
- ITB-06884
- Issued by
- Orange County, Florida
About this file
This document is an Exhibit B - Bid Pricing Form for the ECEP Boiler Hot Pass Re-Tube Services with On-Hand Stocking Inventory project for the State of Florida, Orange County, and Lakeland City. The scope of work includes labor, materials, equipment, and tools necessary to replace straight boiler tubes for the hot passes of three Cleaver Brooks Model CB 800-125 fire tube boilers at the EPCOT Central Energy Plant. The bid pricing form consists of two parts - Part A for on-hand stock material and Part B for labor and equipment for the boiler hot pass re-tube services. Bidders are required to fill in the pink areas for unit prices and quantities, and the totals will automatically calculate. The not-to-exceed fee total for the project is provided.
The pricing form does not contain any information on response dates, due dates, site visits, bidder's meetings and conferences, award dates, or the term of the contract. Regarding pricing terms, the document outlines the required materials and quantities for the three boiler re-tube services, as well as the labor and equipment needed. There is no mention of any set asides, incumbents, funding requirements or sources, or other salient information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C006475 ITB.pdf | ||
| C006475 Addendum 1.pdf | ||
| C006475 MFMP ITB Flyer.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| EXHIBIT B – Bid Pricing Form (REVISED 10/30/2023) | |
| Bid # | C006475 |
| Project: | ECEP Boiler Hot Pass Re-Tube Services with On-Hand Stocking Inventory |
| Bidder: |
PART A. ON-HAND STOCK MATERIAL FOR ECEP BOILER HOT PASS RE-TUBES
| Fill In All Pink Areas And Totals Should Automatically Tabulate. | |||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| 1.1 | 2.5” x .105”, SA 178A Straight Boiler Tubes (Minimum of 126 EA Functioning) (1st Re-Tube) | 1 | EA | $ - 0 | $ - 0 |
| 1.2 | OEM Boiler Waterside Gaskets (1st Re-Tube) | 1 | EA | $ - 0 | $ - 0 |
| 1.3 | OEM Boiler Fireside Gaskets (1st Re-Tube) | 1 | EA | $ - 0 | $ - 0 |
| 1.4 | 2.5” x .105”, SA 178A Straight Boiler Tubes (Minimum of 126 EA Functioning) (2nd Re-Tube) | 1 | EA | $ - 0 | $ - 0 |
| 1.5 | OEM Boiler Waterside Gaskets (2nd Re-Tube) | 1 | EA | $ - 0 | $ - 0 |
| 1.6 | OEM Boiler Fireside Gaskets (2nd Re-Tube) | 1 | EA | $ - 0 | $ - 0 |
| 1.7 | 2.5” x .105”, SA 178A Straight Boiler Tubes (Minimum of 126 EA Functioning) (3rd Re-Tube) | 1 | EA | $ - 0 | $ - 0 |
| 1.8 | OEM Boiler Waterside Gaskets (3rd Re-Tube) | 1 | EA | $ - 0 | $ - 0 |
| 1.9 | OEM Boiler Fireside Gaskets (3rd Re-Tube) | 1 | EA | $ - 0 | $ - 0 |
| SUBTOTAL | $ - 0 | ||||
| NOT-TO-EXCEED FEE TOTAL | $ - 0 |
PART B. LABOR AND EQUIPMENT FOR ECEP BOILER HOT PASS RE-TUBES
| Fill In All Pink Areas And Totals Should Automatically Tabulate. | |||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| 2.1 | Boiler Hot Pass Re-Tube Service (1st Re-Tube)* | 1 | EA | $ - 0 | $ - 0 |
| 2.2 | Boiler Hot Pass Re-Tube Service (2nd Re-Tube)* | 1 | EA | $ - 0 | $ - 0 |
| 2.3 | Boiler Hot Pass Re-Tube Service (3rd Re-Tube)* | 1 | EA | $ - 0 | $ - 0 |
| SUBTOTAL | $ - 0 | ||||
| NOT-TO-EXCEED TOTAL | $ - 0 | ||||
| *All labor, incidental materials (not covered in Part A), equipment, tools, testing and reports for a complete re-tube shall be included |
| GRAND TOTAL | $ - 0 |
| V.2 (October 30, 2023) |
image1.png
File details come from the government source that posted it. Updated .