This document is a Schedule of Values (SOV) pricing submission for the City and County of Denver's Bison Corral System Renovation project at Daniels Park. The project involves the procurement and installation of a comprehensive corral system, including hydraulic equipment, gates, panels, and supporting technology, with specific quantities detailed for each component. The project will be located at 8682 Daniels Park Rd in Sedalia, Colorado, and includes 110 screw piles, multiple gate types (swing, manual slide, safety), corral panels of varying lengths and heights, and specialized equipment like a hydraulic bison squeeze, load bars, and an electric power pack. The supplier is required to provide on-site delivery, unloading, and a 10-day setup period between 7:00 am and 7:00 pm, Monday through Friday, with coordination managed by the Denver Parks and Recreation project manager.
The SOV indicates that all unit prices include materials, labor, and equipment for installation, with quantities provided for informational purposes only and contractors responsible for verifying actual requirements. While the current document shows $0.00 for unit costs, it serves as a comprehensive inventory and specification sheet for the corral system components. The pricing submission emphasizes that plan quantities will take precedence in case of discrepancies, and unit prices will be used for potential additions or deletions from the contract. The document suggests a detailed, structured approach to procuring a specialized bison management infrastructure for the Daniels Park location.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Corral System SOV
| DANIELS PARK CORRAL SYSTEM RENNOVATIONS | |||||||||
| Schedule of Values (SOV) | |||||||||
| Plan Set: 100% CD - PURCHASING - | |||||||||
| Plan Date: April 24, 2024 | |||||||||
| Instructions to Bidders: Complete the unit cost of each item indicated below. Cost will include all materials, labor, and equipment for installation in accordance with the Plans and Specifications. Unit prices will be used for adjustments in the case of additions or deletions of items from this contract. Contractor is responsible for verifying quantities. If there is a discrepancy between plan quantities and SOV quantities, plan quantities will take precedence. Quantities will not be measured but paid for by the percent complete according to the bid schedule. **Quantities and units are provided for Information ONLY. Contractor is responsible for verifying all quantities and bidding appropriately | |||||||||
| BASE BID | |||||||||
| INFORMATION ONLY** | |||||||||
| SPEC SECTION | BID ITEM | PRODUCT CODE | PRODUCT NAME / ITEM DESCRIPTION | Proposed Manufacturer (or approved equal) | Proposed Model/Part Number (or approved equal) | QTY. | UNIT | UNIT COST | EXTENDED ITEM COST |
| 1 | HBSLH | Hyd. Bison Squeeze Left Hand Controls | 1.0 | EA | $0.00 | ||||
| 2 | HRC | Hydraulic Ready Chute | 1.0 | EA | $0.00 | ||||
| 3 | 8-SGM6 | Manual Slide Gate - 6' L X 8' H - Sheeted | 4.0 | EA | $0.00 | ||||
| 4 | 8-SGM9 | Manual Slide Gate - 9' L X 8' H - Sheeted | 2.0 | EA | $0.00 | ||||
| 5 | 8-SGM12 | Manual Slide Gate - 12' L X 8' H - Sheeted | 1.0 | EA | $0.00 | ||||
| 6 | CP8 | Corral Panel - 8' L X 6' H with 6 Horizontal Bars | 2.0 | EA | $0.00 | ||||
| 7 | CP12 | Corral Panel - 12' L X 6' H with 6 Horizontal Bars | 4.0 | EA | $0.00 | ||||
| 8 | CP16 | Corral Panel - 16' L X 6' H with 6 Horizontal Bars | 35.0 | EA | $0.00 | ||||
| 9 | CPS8 | Corral Panel - 8' L X 6' H with 5 Horizontal Bars - Sheeted | 3.0 | EA | $0.00 | ||||
| 10 | CPS12 | Corral Panel - 12' L X 6' H with 5 Horizontal Bars - Sheeted | 7.0 | EA | $0.00 | ||||
| 11 | CPS16 | Corral Panel - 16' L X 6' H with 5 Horizontal Bars - Sheeted | 15.0 | EA | $0.00 | ||||
| 12 | 7-CPS8 | Corral Panel - 8' L X 7' H with 7 Horizontal Bars - Sheeted | 5.0 | EA | $0.00 | ||||
| 13 | 7-CPS10 | Corral Panel - 10' L X 7' H with 7 Horizontal Bars - Sheeted | 3.0 | EA | $0.00 | ||||
| 14 | 7-CPS12 | Corral Panel - 12' L X 7' H with 7 Horizontal Bars - Sheeted | 6.0 | EA | $0.00 | ||||
| 15 | 7-CPS16 | Corral Panel - 16' L X 7' H with 7 Horizontal Bars - Sheeted | 2.0 | EA | $0.00 | ||||
| 16 | SG12 | Swing Gate - 12' L X 6' H with 6 Horizontal Bars - 2" Square Tube | 14.0 | EA | $0.00 | ||||
| 17 | SGS12 | Swing Gate - 12' L X 6' H with 6 Horizontal Bars - 2" Square Tube - Sheeted | 11.0 | EA | $0.00 | ||||
| 18 | 7-GS6 | Safety Gates for 3-Way Sorting – 6’ L x 6’ H with 5 Horizontal Bars – 2” Square Tube - Sheeted | 2.0 | EA | $0.00 | ||||
| 19 | 7-SGS4 | Swing Gate - 4' L X 7' H with 7 Horizontal Bars - 2" Square Tube - Sheeted | 1.0 | EA | $0.00 | ||||
| 20 | 7-SGS6 | Swing Gate - 6' L X 7' H with 7 Horizontal Bars - 2" Square Tube - Sheeted | 3.0 | EA | $0.00 | ||||
| 21 | 7-SGS10 | Swing Gate - 10' L X 7' H with 7 Horizontal Bars - 2" Square Tube - Sheeted | 1.0 | EA | $0.00 | ||||
| 22 | 7-SGS12 | Swing Gate - 12' L X 7' H with 7 Horizontal Bars - 2" Square Tube - Sheeted | 1.0 | EA | $0.00 | ||||
| 23 | SGF12 | Swing Gate Frame - 12' L X 14' H - Drive Through | 25.0 | EA | $0.00 | ||||
| 24 | SP10 | 10' Screw pile, 2-3/8" Pipe | 110.0 | EA | $0.00 | ||||
| 25 | CPMB | Corral Panel Mounting Brackets | 110.0 | EA | $0.00 | ||||
| 26 | HD5TLB | Tru-Test HD5T Load Bars | 1.0 | EA | $0.00 | ||||
| 27 | TTXR5 | Tru-Test XR 5000 | 1.0 | EA | $0.00 | ||||
| 28 | SRS2 | SRS 2 EID Stick Reader | 1.0 | EA | $0.00 | ||||
| 29 | EPP | 7.5 Electric Power Pack | 1.0 | EA | $0.00 | ||||
| 30 | RHK | Remote Controlled Hydraulic Kit for 4 Gates Leading Up To Squeeze Chute | 1.0 | EA | $0.00 | ||||
| 31 | Freight | Corral system transport includes properly carton, crate, cover, and protect materials, products and equipment for shipping, handling, and storing. Use appropriate means for hoisting and loading which will prevent damage or overstress to items being handled or shipped. Protect all items from rain, snow, moisture, wind, cold, heat, frost, sun, staining, discoloration, deterioration, and physical damage from any cause. | 1.0 | LS | $0.00 | ||||
| 32 | Labor | The supplier shall have employees on site to receive and unload the equipment. Once the delivery is complete, set-up will take place utilizing the supplier's employees, equipment and machines, with a set-up time period of up to 10-days. Set-up to occur between 7:00am and 7:00pm, Monday-Friday. Scheduling to be coordinated with the Denver Parks and Recreation (DPR) project manager. Corral system set-up and use and maintenance overview for DPR staff. | 1.0 | LS | $0.00 | ||||
| Total Cost of Project | $0.00 |