This is a set of technical specifications for road maintenance work on National Forest System lands, specifically detailing five sections of work: Mobilization/Equipment Moving (805), Blading (811), Spot Surfacing (813), Restore Drainage (839), and Cutting Roadway Vegetation (842).

Section 805 covers mobilization of personnel, equipment, supplies, and materials to project sites, measured in miles along the shortest feasible route and paid per mile. Section 811 addresses surface blading of native or aggregate roadbeds to facilitate traffic and drainage, with specific requirements for crown and cross-slope dimensions (minimum 1/2 inch to maximum 3/4 inch per foot of width), material loosening to at least 2 inches depth, and compaction by breaking track. Blading is measured in single-lane miles with payment differentiated between surfaced roads, native and pit-run roads, smooth blading, and berm maintenance or establishment. Section 813 covers spot surfacing with surface aggregate either government-furnished or contractor-supplied, measured in tons, cubic yards, or square yards, with layering requirements not exceeding 4 inches per layer and compaction by equipment operation. Section 839 addresses restoration of drainage function through removal of logs, limbs, and debris; blading and shaping of roadbeds; and cleaning of drainage facilities including ditches, dips, culverts, and overside drains, measured by mile and differentiated between work with or without water application. Section 842 specifies cutting of vegetative growth less than 4 inches in diameter to maximum height of 6 inches above ground, with specific cutting limits based on roadway configuration (fill sections, ditched sections, unditched cut sections) and measured in pass miles or side miles depending on methodology. All sections require Government inspection and acceptance prior to payment, with the Contracting Officer having authority to order and modify work scope.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

805 MOBILIZATION / EQUIPMENT MOVING (10/16)

1. DESCRIPTION

This Section consists of one or more mobilizations of personnel, equipment, supplies, and incidentals to the project site, or sites listed in the Schedule of Items.

2. REQUIREMENT

a. Make equipment available for inspection before it is used on National Forest System lands.

b. Moving is complete, when the contractor has moved from the present work site to the ordered work site and returned to the previous location.

c. Equipment will be clean and weed free before it arrives on National Forest System lands.

3. LOCATION OF WORK

As specified on roads listed on the Road Listing, Shown on the Plans, or as ordered by the Contracting Officer.

4. MEASUREMENT

Measurement under this Section will be made by the total number of units for each item listed in the Schedule of Items completed and accepted.

Mile: work activity will be measured along the shortest feasible route to the nearest one (1) mile, from the starting location of the move, to the ordered work site.

5. PAYMENT

a. The accepted quantities will be paid at the contract price per unit of measurement for the Section 805 pay items listed in the schedule of items. Mobilization is complete when all equipment, personnel, and materials are moved to the project site and work has been started. Payment will be full compensation for the work prescribed in this Section.

Mobilization is incidental unless ordered for a specific project at a specific time.

b. Payment will be made under:

Pay Item Description Pay Unit

805 (1) Mobilization Mile

811 BLADING (10/16)

This work consists of

a. Surface blading native or aggregate roadbed to a condition to facilitate traffic and provide proper drainage.

b. Smooth blading to remove loose surfacing materials from the wheel paths and store the removed materials in a recoverable windrow.

Blading includes shaping the crown or slope of traveled way, berms, and drainage dips in accordance with this specification. Compaction is required when ordered by the Contracting Officer.

2. MAINTENANCE REQUIREMENTS

a. Timing

Surface blading shall be performed during the contract period as ordered by the Government.

b. General

1) The existing traveled way and shoulders, including turnouts unless otherwise ordered, shall be bladed and shaped to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface unless otherwise shown in the Road Listing, to at least one half inch (1/2") per foot of width, but not more than three quarter inch (3/4") per foot of width. Surfacing materials shall be thoroughly loosened to no less than 2 inch depth or the depth of potholes or corrugations. Scarification to facilitate cutting to the full depth of potholes or corrugations may be elected by the Contractor but will be considered incidental to blading. Scarification shall not go deep enough to cause contamination of the surfacing.

2) When Section 891 is included in the Road Listing, the Contractor shall apply water during blading when sufficient moisture is not present to prevent segregation. Water supply, hauling, and application shall be in accordance with Section 891 and shall be incidental to blading unless Pay Items for Section 891 are included in the Schedule of Items.

3) Existing native, rock or aggregate surfaced drainage dips shall be shaped incidental to blading to divert surface runoff to existing outlet devices, ditches and discharge locations.

4) The Contractor shall establish a blading pattern which provides a uniform driving surface, retains the surfacing on the roadbed and provides a thorough mixing of the materials within the completed surface width. Upon final blading, no disturbed rock shall protrude more than two (2) inches above the adjacent surface unless otherwise provided in the contract. Material not meeting this dimension shall be removed and placed outside the roadbed so as not to obstruct drainage ways or structures. This material may be scattered off the roadbed if there is free drainage.

5) Watering will not be required for smooth blading. Smooth blading shall be accomplished without distorting the existing cross-slope or crown of the traveled way. Loose surfacing materials shall be moved and stored on the high side of super-elevated curves and sections with uniform inslope or outslope. In crowned sections, the material shall be stored on either or both sides as elected. Stored materials shall be windrowed and shall be placed to provide not less than eleven (11) feet of smoothed traveled way on one- lane segments or twenty (20) feet of smoothed traveled way on two-lane or sections with turnouts. Windrows which may collect water on the road shall have holes cut through for drainage at least every 500 feet.

c. Routine Blading

1) Upon completion of blading, the surfaces shall conform to the dimensions shown in the Special Project Specifications 811-3.

2) Roadbed width in excess of the dimensions shown shall be shaped only as needed to provide drainage away from the traveled way. Established grasses and other vegetation shall not be removed from the excess width except as incidental to providing drainage or unless otherwise provided in the contract.

d. Compaction

Roads requiring compaction will be included in the Road Listing. Unless otherwise specified, all traveled ways requiring compaction shall be compacted by breaking track while operating equipment on the traveled way.

e. Intrusions

Where the minimum width shown in the Special Project Specifications is not available, the Contractor will construct berms where ordered and marked on the ground. Material to provide berms will come from sources designated in the Special Project Specifications.

f. Undercutting

Roadway back slope shall not be undercut.

g. Intersections

1) At intersections, the roadbeds of side roads which are not closed or restricted from vehicular use shall be bladed to assure smooth transitions.

2) Field evidence of closure or restrictions shall be considered to be signing, cross ditching in the road surface (traveled way), earth berms or other devices placed to discourage or eliminate use by passenger cars, also roads listed for work under Sections 835 or 838 shall be considered restricted.

3) Side roads listed for work under this Section shall be considered as not restricted.

h. Cleaning of Structures

Materials resulting from work under this Section shall not be allowed to remain on or in structures, such as bridges, culverts, cattleguards, or drainage dips.

i. Berms

Existing berms shall be maintained to the condition of adjacent segments when ordered by the Government.

3. MEASUREMENT

a. Measurement under this Section will be made by the total number of units for each item listed in the Schedule of Items completed and accepted.

b. Measurement for blading will be single-lane mile measured along the centerline of the roadway (see quantity measurement terms). Two-lane roads will be measured as two

(2) single-lane miles. Measurement will be measured to the nearest one-tenth (0.1) mile.

c. Each intersection bladed under 2.g. will be equivalent to one-tenth (0.1) single-lane mile; however, when the intersecting side road is scheduled for subsequent blading under this Section, no measurement will be made.

d. Berm maintained or established will be measured by linear foot.

e. No measurement will be made under this Section for compaction method specified in 2.d. For roads needing compaction with special compaction equipment (ie. pneumatic or steel roller), use pay items in Section 807 for additional compaction efforts.

4. PAYMENT

a. The quantities measured and accepted will be paid for at the contract unit price shown in the Schedule of Items.

b. Payment will be made under:

Pay Item Description Pay Unit

811 (1) Blading Surfaced Roads Single-Lane Mile 811 (2) Blading Native and Pit Run Roads Single-Lane Mile

811 (3) Smooth Blading Single-Lane Mile

811 (4) Berm Maintained Linear Foot

811 (5) Establishing Berms Linear Foot

B la di ng

D im en si on s

R oa d N um be r St an da rd

W id th

M in im um

M ax im um

Ta ng en t

W

C ur ve

Tu rn ou t

W

Ag gr eg at e Ed ge

Sl op e

813 SPOT SURFACING (10/16)

This work consists of placing surface aggregate as staked on the ground, or designated by the Government. It includes preparing the area, furnishing, hauling, and placing all necessary materials and other work necessary to blend with the adjacent road cross section.

2. MATERIALS

a. Materials will be Government furnished when stated in the task order.

b. Materials furnished by the Contractor shall conform to the gradation requirements shown in the task order and the quality requirements of Section 893.

3. MAINTENANCE REQUIREMENTS

The area to be spot surfaced shall be thoroughly loosened to a minimum depth of one inch (1") prior to placement of aggregate.

4. MIXING AND PLACING

a. When scheduled coincident with work under Section 811, spot surfacing and existing aggregate, when ordered, shall be mixed with water until a uniform mixture is obtained prior to final shaping and compaction.

b. The material shall otherwise be spread on the prepared area in layers no more than four

(4) inches in depth. When more than one (1) layer is required, each layer shall be shaped and compacted before the succeeding layer is placed. Upon completion, the spot surfacing shall reasonably conform to the adjacent cross section and provide smooth transitions in the road profile.

c. Compaction shall be accomplished by breaking track while operating equipment on the traveled way

5. MEASUREMENT

a. The quantity will be the weight of the actual aggregate placed in tons, cubic yards of aggregate measured in place, or square yards of aggregate measured in place, whichever is shown in the Schedule of Items.

b. Hauling is considered incidental.

6. PAYMENT

a. The accepted quantities will be paid for at the contract unit prices shown in the Schedule of Items

b. For payment by weight, certified weight ticket shall be submitted to the Contracting Officer.

c. Payment will be made under:

Pay Item Description Pay Unit

813 (1) Spot Surfacing, Grading__, Commercial Source Ton

813 (2) Spot Surfacing, Grading__, Commercial Source Cubic Yard

813 (3) Spot Surfacing, Grading__, Commercial Source Square Yard

813 (4) Spot Surfacing, Grading__, Government Source Ton

813 (5) Spot Surfacing, Grading__, Government Source Cubic Yard

813 (6) Spot Surfacing, Grading__, Government Source Square Yard

839 RESTORE DRAINAGE (10/16)

This work consists of log, limb and debris removal; blading and shaping of the roadbed to restore drainage function. This work includes shoulders, ditches, drainage dips, leadoff ditches, turnouts, and intersections; cleaning drainage facilities; removing washes and sloughs that inhibit drainage.

2. MAINTENANCE REQUIREMENTS

a. General

The existing traveled way and shoulders, including turnouts unless otherwise ordered, shall be bladed and shaped to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface unless otherwise Marked on the Ground, to at least one half inch (1/2") per foot of width, but not more than three quarter inch (3/4") per foot of width. Surfacing materials shall be thoroughly loosened to a depth of no less than 2 inches or the depth of potholes or corrugations.

Corrugations are washboarding and similar defects.

Scarification to facilitate cutting to the full depth of potholes or corrugations may be elected by the Contractor but will be considered incidental to blading. Scarification shall not go deep enough to cause contamination of the surfacing.

When Section 891 is included in the Road Listing, the Contractor shall apply water during blading when sufficient moisture is not present to prevent segregation. Water supply, hauling, and application shall be in accordance with Section 891 and shall be incidental to blading unless Pay Items for Section 891 are included in the Schedule of Items.

Existing native, rock or aggregate surfaced drainage dips shall be cleaned and shaped incidental to blading to divert surface runoff to existing outlet devices, ditches and discharge locations.

The Contractor shall establish a blading pattern which provides a uniform driving surface, retains the surfacing on the roadbed and provides a thorough mixing of the materials within the completed surface width.

b. Drainage Facilities

Cleaning existing drainage facilities includes roadside drainage ditches, drainage dips, inlet and outlet ditches, overside drains and flumes, inverts and interiors of culverts, culvert catch basins, drop inlets, trash racks, and sediment basins. Slash and debris shall be disposed of as in 839e. Sediment basin clean out shall be disposed for the unit price as shown in the Schedule of Items for Section 832.

Drainage structures not included under this specification are bridges, cattle guards, and culverts over 72 inches in diameter.

c. Ditches, Lead Off and Roadside

Wood, rock, trees, brush and other debris shall be removed from ditches to provide unobstructed flow of water. Slash and debris (woody or organic) shall be scattered in such a manner as not to impede the flow of water. The backslope of ditches shall not be undercut by cleaning operations. Existing ditch blocks shall be restored, reshaped, and compacted as needed for effective drainage through culverts. Catch basins shall be cleaned of material above the invert of the culvert.

d. Dips (Also called intercepting dips or rolling dips)

Existing drainage dips shall be cleaned and the outslope gradient sufficiently restored to remove surface water from roadbed, conducting the water through drainage facilities.

e. Culverts

Inlet and outlet ends, as well as four feet inside each end, of existing culvert, shall be cleaned to provide unobstructed flow of water. Natural drain culvert channels shall be cleared of all down trees, limbs, stumps, brush, rocks and other debris, that restricts the flow of water, 6 feet in width for 15 linear feet at each end. Slash and debris (woody or organic) shall be scattered in such a manner as not to impede the flow of water. The channel shall be shaped to natural streambed with constant grade at inlet and outlet ends.

f. Overside Drains and Flumes

Overside drains shall be cleaned of debris to provide an unobstructed flow of water. Debris (woody or organic) shall be scattered in such a manner as not to impede the flow of water.

g. Designed Earth Berms

Berm breaches of less than 5 cubic yards shall be filled, shaped, and compacted by wheel rolling. Fill material shall be located within 500 feet of breach or by ripping to the depth and width necessary to obliterate such defects; providing a smooth transition to adjacent satisfactory roadbed. Filling with loose material will not be acceptable.

h. Settlements

Settlements 12 inches or less in depth shall be scarified and then repaired by cutting from the roadbed on each end of the settled area, filling and wheel rolling the material into the settled area providing a smooth transition to adjacent satisfactory roadbed.

i. Washouts

Washouts in roadway of less than five cubic yards shall be filled and compacted by wheel rolling. Fill material shall be located within 500 feet of washout or as directed by the Contracting Officer.

3. METHOD OF MEASUREMENT

Measurement for maintenance will be “by the mile”, measured by slope distance along the centerline of the roadway. Measurement will be to the nearest one-tenth mile. No separate measurement will be made for any of the elements of work described in the foregoing

4. PAYMENT

a. Payment will be made for all units inspected and accepted at the unit price shown on the schedule of items.

b. Payments will be made under:

Pay Item Description Pay Unit

839 (1) Restore Drainage Function, Without Water Mile

839(2) Restore Drainage Function, With Water Mile

842 CUTTING ROADWAY VEGETATION (10/16)

This work consists of cutting all vegetative growth including trees and other vegetation less than four (4) inches in diameter.

2. MAINTENANCE REQUIREMENTS

a. General

1) Brush, trees, and other vegetation less than four (4) inches in diameter within each area treated shall be cut to a maximum height of six (6) inches above the ground surface or obstruction such as rocks or existing stumps. When work is performed under this Section, the Contractor shall remove all limbs which extend into the treated area or over the roadbed to a height shown in the Special Project Specifications.

2) Signs, markers, and other road appurtenances are designated to be retained. Other items to remain will be marked on the ground.

3) The width of the vegetation to be cut shall be as shown in the Special Project Specifications.

4) Work may be performed either by hand or mechanically unless specifically shown in the Road Listing and Schedule of Items. Self-propelled equipment shall not be allowed on cut and fill slopes or in ditches.

5) Damage to trunks of standing trees caused by Contractor's operation shall be corrected by Contractor, either by treatment with a commercial nursery sealer or by removing the tree as directed by the Government.

6) Mechanical brush cutters shall not be operated when there are non-Contractor personnel or occupied vehicles within a hazardous distance of immediate operating area.

7) Trees within the cutting limits which are over four (4) inches in diameter shall be limbed in lieu of cutting

8) When trees are limbed, limbs shall be cut within four (4) inches of the trunk

b. Cutting Side Vegetation

1) Pass mile work cutting limits shall be established as follows:

a) Fill and daylighted (wide roadbed) section cutting shall commence at the edge of the traveled way and proceed away from the road centerline.

b) Drainage ditched section cutting shall commence at the bottom of the existing ditch and proceed away from the road centerline. Cutting on ditch foreslopes is not required.

c) Unditched cut section cutting shall commence at the intersection of the cutbank and the roadbed and proceed away from centerline.

2) Side mile work will be ordered in uniform width for the length of the listed segments of roads.

3) Unless otherwise included in Special Project Specifications work shall commence at the edge of the traveled way and proceed away from the road centerline. For roads without a defined traveled way the starting point for cutting will be marked in the field or defined in Special Project Specifications.

4) Transitions between differing increments of cutting width shall be provided. Transitions shall be accomplished in a taper length of not less than fifty (50) nor more than seventy

(70) feet

c. Requirement Table

The width and height of the vegetation cutting shall be:

Road No. From Mile To Mile Width Height

d. Debris

1) Materials resulting from the cutting operation in excess of one (1) foot in length or three

(3) inches in diameter, shall not be allowed to remain on roadway slopes within the treated area, in ditches, or within water courses.

2) Limbs and chunks in excess of three (3) inches in any dimension shall be removed from the traveled way and shoulders.

3) Materials may be scattered downslope from the roadbed, outside of the work area and drainages. Concentrations shall be rescattered or removed.

3. MEASUREMENT

a. Measurement for cutting vegetation by the pass mile will be determined by the number of four (4) foot passes ordered and accepted. Partial increments ordered to complete the outside edge of backslope or fill slope cutting and transitions will be measured as full passes. The length of each pass will be determined to the nearest one-tenth (1/10) mile on each road.

b. Measurement for cutting side vegetation by the side mile will be the length of roads or segments ordered and accepted. The length will be determined to the nearest one-tenth (1/10) mile on each side of each road.

c. No reduction in the mileage between road terminal shown on the road listing will be made for areas where there is little or no vegetation to be cut.

4. PAYMENT

a. The accepted quantities will be paid at the unit price shown in the Schedule of Items.

b. Payment will be made under:

Pay Item Description Pay Unit

842 (1) Cutting Side Vegetation Pass Mile

842 (2) Cutting Side Vegetation Side Mile

127EAY26Q0044 Attachment 4 Supplemental Specifications Road Maintenance LPNF.pdf
805-Mobilization.pdf
811-Blading
813-Spot Surfacing
839-Restore Drainage
842-Cutting Roadway Vegetation