This is a comprehensive construction design document for the North Carolina State Highway Patrol (NCSHP) Voice Interoperability Plan for Emergency Responders (VIPER) network expansion project, prepared by Engineered Tower Solutions, PLLC, and involving Granville County jurisdiction in Butner, North Carolina. The project entails constructing a new 380-foot self-support telecommunications tower at 300 Veasey Road, Butner, NC 27509 (HP-1040 site), with an associated 65-foot by 65-foot chain-link fenced compound containing an 11.5-foot by 19-foot prefabricated equipment shelter (VFP Model 3953), a 40-kilowatt diesel generator (Generac SD040), and gravel access facilities. The facility is unmanned and designed for carrier maintenance visits approximately twice monthly. The proposed antenna configuration includes multiple current and future RF installations across various elevation levels (80 feet through 380 feet) supporting NCSHP, Granville County, Department of Transportation, and broadband communications, with specific equipment including omni antennas, dipoles, microwave dishes with ice shields, and transmission line infrastructure. Construction documents include detailed structural specifications, electrical requirements, grounding systems, and foundation designs prepared under SCO Project Number 24-28062-01A, with revisions dated through June 20, 2025.
The project adheres to 2018 North Carolina Building Code standards, 2020 NEC electrical codes, and ANSI/TIA-222 structural requirements for antenna support design. All structural steel materials specify ASTM A36 angles, ASTM A500-50 pipe/tube, and hot-dip galvanized finishes per ASTM A123 and A153 standards, with foundation design based on 2000 PSF soil bearing capacity and 3000 PSI concrete specifications. The electrical scope includes service infrastructure, conduit and raceways, conductors, grounding systems, and testing protocols in accordance with the National Electrical Code and applicable utility company requirements. Specific torque requirements are mandated for RF connections, grounding hardware, and antenna mounts, with detailed installation procedures for coaxial cables, fiber optics, and weatherproofing. The design accommodates future antenna additions and includes provisions for ice shield installation on all microwave dishes, structural support for tower-mounted amplifiers, and comprehensive cable management systems utilizing ice bridges and trapeze supports to prevent water intrusion toward the shelter.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PREPARED BY:
3227 WELLINGTON COURT
RALEIGH, NC 27615
919-782-2710 www.ets-pllc.com
PREPARED FOR:
SEAL:
SITE ADDRESS:
300 VEASEY ROAD
BUTNER, NC 27509
SITE NAME:
HP-1040
SITE NUMBER:
BUTNER (NEW)
LATITUDE/LONGITUDE:
36.143244°, -78.767803°
SHEET # CURRENT REV #:
ETS #: 23124026
SHEET TITLE:
CHECKED BY: RBDRAWN BY: DF
06/20/2025
REV DATE DETAILS
FIRM #: P-1016
SCO PROJECT NUMBER:
24-28062-01A
08/30/2024 CONSTRUCTION
10/16/2024 CONSTRUCTION
02/24/2025 CONSTRUCTION
02/26/2025 CONSTRUCTION
06/20/2025 SCO COMMENTS
SITE NAME:
BUTNER (NEW)
SITE NUMBER:
HP-1040
SITE ADDRESS:
300 VEASEY ROAD
BUTNER, NC 27509
LATITUDE & LONGITUDE:
N 36° 08' 35.68" , W 78° 46' 04.09"
TITLE PAGE
T-1
INDEX OF SHEETS
SHEET #'S SHEET TITLES
T-1 TITLE PAGE
GN-1 - GN-3 GENERAL NOTES I - GENERAL NOTES III
GN-4 - GN-8 NC APPENDIX B I - NC APPENDIX B V
1 OF 1 SURVEY
C-1.0 OVERALL SITE PLAN (2500-FT. RADIUS)
C-1.1 OVERALL SITE PLAN
C-1.2 PROPOSED SITE PLAN
C-1.3 DIMENSIONED SITE PLAN
C-2 TOWER ELEVATION
C-3.1 PROPOSED ANTENNA SCHEDULE
C-3.2 ANTENNA LAYOUTS I
C-3.3 ANTENNA LAYOUTS II
C-3.4 ANTENNA LAYOUTS III
C-4.1 SHELTER DETAILS
C-4.2 SHELTER FOUNDATION DETAILS
C-4.3 GENERATOR DETAILS
C-4.4 ICE BRIDGE DETAILS
C-4.5 FENCE DETAILS
E-1 ELECTRICAL NOTES
E-2 ELECTRICAL PLAN AND DETAILS
E-3 PANEL SCHEDULES
E-4 ELECTRICAL ONE-LINE DIAGRAM
G-1 GROUNDING PLAN
G-2.1 GROUNDING DETAILS I
G-2.2 GROUNDING DETAILS II
G-2.3 GROUNDING DETAILS III
SITE SUMMARY
SITE TYPE: NEW CONSTRUCTION
STRUCTURE TYPE: SELF-SUPPORT TOWER
STRUCTURE OWNER: NCSHP
SITE NUMBER: HP-1040
STRUCTURE HEIGHT (AGL): 380' ±
OCCUPANCY TYPE: UTILITY & MISCELLANEOUS (U)
STRUCTURE LATITUDE (NAV 83): N 36° 08' 35.68" (36.143244°)
STRUCTURE LONGITUDE (NAV 83): W 78° 46' 04.09" (-78.767803°)
JURISDICTION: GRANVILLE COUNTY
COUNTY: GRANVILLE
PARCEL ID: 086700715936
GROUND ELEV. (AMSL): 385.19'
SITE
N
NW
W
SW
S
SE
E
NE
NNW
WNW
WSW
SSW SSE
ESE
ENE
NNE
GENERAL NOTES
THE FACILITY IS UNMANNED AND NOT FOR HUMAN HABITATION, THEREFORE HANDICAP ACCESS IS NOT REQUIRED FOR ROUTINE MAINTENANCE. THE PROJECT WILL NOT RESULT IN ANY SIGNIFICANT
DISTURBANCE OR EFFECT ON DRAINAGE; NO SANITARY SEWER SERVICE, POTABLE WATER, OR
TRASH DISPOSAL IS REQUIRED AND NO COMMERCIAL SIGNAGE IS PROPOSED.
SCOPE OF WORK
PROPOSED SCOPE OF WORK INCLUDES INSTALLING A NEW 380'-0" SELF-SUPPORT TOWER, WITH A 11'-6"x19'-0" PREFABRICATED EQUIPMENT SHELTER AND A GENERATOR, ALL WITHIN A NEW 65'-0"x65'-0" CHAIN-LINK FENCED COMPOUND.
CODE COMPLIANCE
SITE MAP SITE PHOTO
ALL WORK AND MATERIALS SHALL BE PERFORMED AND INSTALLED IN ACCORDANCE WITH THE
CURRENT EDITIONS OF THE FOLLOWING CODES AS ADOPTED BY THE LOCAL GOVERNING
AUTHORITIES. NOTHING IN THESE PLANS IS TO BE CONSTRUED TO PERMIT WORK NOT
CONFORMING TO THE FOLLOWING CODES:
· 2018 N.C. BUILDING CODE (2015 IBC W/ AMENDMENTS)
· 2018 N.C. EXISTING BUILDING CODE (2015 IEBC W/ AMENDMENTS)
· 2018 N.C. FIRE CODE (2015 IFC W/ AMENDMENTS)
· 2018 N.C. FUEL GAS CODE (2015 IFGC W/ AMENDMENTS)
· 2018 N.C. MECHANICAL CODE (2015 IMC W/ AMENDMENTS)
· 2018 N.C. PLUMBING CODE (2015 IPC W/ AMENDMENTS)
· 2020 N.C. ELECTRICAL CODE (2020 NEC)
SCO PROGRAM NUMBER:
18051
SCO PROJECT NUMBER:
24-28062-01A
SITE
AutoCAD SHX Text
NUMBER:
RALEIGH, NC 27615
919-782-2710 www.ets-pllc.com
PREPARED FOR:
SEAL:
SITE ADDRESS:
300 VEASEY ROAD
BUTNER, NC 27509
SITE NAME:
HP-1040
SITE NUMBER:
BUTNER (NEW)
LATITUDE/LONGITUDE:
36.143244°, -78.767803°
SHEET # CURRENT REV #:
ETS #: 23124026
SHEET TITLE:
CHECKED BY: RBDRAWN BY: DF
06/20/2025
REV DATE DETAILS
FIRM #: P-1016
SCO PROJECT NUMBER:
24-28062-01A
08/30/2024 CONSTRUCTION
10/16/2024 CONSTRUCTION
02/24/2025 CONSTRUCTION
02/26/2025 CONSTRUCTION
06/20/2025 SCO COMMENTS
GENERAL NOTES I
GN-1
1. ALL SITE WORK SHALL BE COMPLETED AS INDICATED ON THE DRAWINGS AND NCSHP
SOLUTIONS AND IREDELL COUNTY PROJECT SPECIFICATIONS.
2. GENERAL CONTRACTOR SHALL VISIT THE SITE AND SHALL FAMILIARIZE THEMSELVES WITH ALL
CONDITIONS AFFECTING THE PROPOSED WORK AND SHALL MAKE PROVISIONS. GENERAL
CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING THEMSELVES WITH ALL CONTRACT
DOCUMENTS, FIELD CONDITIONS, DIMENSIONS, AND SHALL CONFIRM THAT THE WORK MAY BE
ACCOMPLISHED AS SHOWN PRIOR TO PROCEEDING WITH CONSTRUCTION. ANY DISCREPANCIES
SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE COMMENCEMENT OF
WORK.
3. ALL MATERIALS FURNISHED AND INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL
APPLICABLE CODES, REGULATIONS AND ORDINANCES. GENERAL CONTRACTOR SHALL ISSUE
ALL APPROPRIATE NOTICES AND COMPLY WITH ALL LAWS, ORDINANCES, RULES, REGULATIONS, AND LAWFUL ORDERS OF ANY PUBLIC AUTHORITY REGARDING THE PERFORMANCE OF WORK.
4. ALL WORK CARRIED OUT SHALL COMPLY WITH ALL APPLICABLE MUNICIPAL AND UTILITY
COMPANY SPECIFICATIONS AND LOCAL JURISDICTIONAL CODES, ORDINANCES, AND APPLICABLE
REGULATIONS.
5. UNLESS NOTED OTHERWISE, THE WORK SHALL INCLUDE FURNISHING MATERIALS, EQUIPMENT, APPURTENANCES, AND LABOR NECESSARY TO COMPLETE ALL INSTALLATIONS AS INDICATED IN
THESE DRAWINGS.
6. PLANS ARE NOT TO BE SCALED. THESE PLANS ARE INTENDED TO BE A DIAGRAMMATIC OUTLINE
ONLY UNLESS OTHERWISE NOTED. DIMENSIONS SHOWN ARE TO FINISHED SURFACES UNLESS
OTHERWISE NOTED. SPACING BETWEEN EQUIPMENT IS THE MINIMUM REQUIRED CLEARANCE.
THEREFORE, IT IS CRITICAL TO FIELD VERIFY DIMENSIONS, SHOULD THERE BE ANY QUESTIONS
REGARDING THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
OBTAINING A CLARIFICATION FROM THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK.
DETAILS ARE INTENDED TO SHOW DESIGN INTENT. MODIFICATIONS MAY BE REQUIRED TO SUIT
JOB DIMENSIONS OR CONDITIONS AND SUCH MODIFICATIONS SHALL BE INCLUDED AS PART OF
WORK AND PREPARED BY THE ENGINEER PRIOR TO PROCEEDING WITH WORK.
7. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS UNLESS SPECIFICALLY STATED OTHERWISE.
8. IF THE SPECIFIED EQUIPMENT CANNOT BE INSTALLED AS SHOWN IN THESE DRAWINGS, THE
CONTRACTOR SHALL PROPOSE AN ALTERNATIVE INSTALLATION SPACE FOR APPROVAL BY THE
ENGINEER PRIOR TO PROCEEDING.
9. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY OF WORK AREA, ADJACENT
AREAS AND BUILDING OCCUPANTS THAT ARE LIKELY TO BE AFFECTED BY THE WORK UNDER
THIS CONTRACT. WORK SHALL CONFORM TO ALL OSHA REQUIREMENTS AND THE LOCAL
JURISDICTION.
10.GENERAL CONTRACTOR SHALL COORDINATE WORK AND SCHEDULE WORK ACTIVITIES WITH
OTHER DISCIPLINES.
11.ERECTION SHALL BE DONE IN WORKMANLIKE MANNER BY COMPETENT EXPERIENCED WORKMEN
IN ACCORDANCE WITH APPLICABLE CODES AND THE BEST ACCEPTED PRACTICE. ALL MEMBERS
SHALL BE LAID PLUMB AND TRUE AS INDICATED IN THE DRAWINGS.
12.SEAL PENETRATIONS THROUGH FIRE RATED AREAS WITH UL LISTED MATERIALS APPROVED BY LOCAL JURISDICTION. CONTRACTOR SHALL KEEP AREA CLEAN, HAZARD FREE, AND DISPOSE OF
ALL DEBRIS.
13.THE SCOPE OF WORK FOR THIS PROJECT IS REPRESENTED BY DARK SHADED LINES AND
NOTES. CONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR OF ANY EXISTING
CONDITIONS THAT DEVIATE FROM THE DRAWINGS PRIOR TO BEGINNING CONSTRUCTION.
14.CONTRACTOR SHALL PROVIDE WRITTEN NOTICE TO THE CONSTRUCTION MANAGER 48 HOURS
PRIOR TO THE COMMENCEMENT OF WORK.
15.THE CONTRACTOR SHALL PROTECT EXISTING IMPROVEMENTS, PAVEMENTS, CURBS,
LANDSCAPING AND STRUCTURES. ANY DAMAGED PART SHALL BE REPAIRED AT CONTRACTOR'S
EXPENSE TO THE SATISFACTION OF THE OWNER.
16.THE CONTRACTOR SHALL CONTACT UTILITY LOCATING SERVICES PRIOR TO THE START OF
CONSTRUCTION.
17. GENERAL CONTRACTOR SHALL COORDINATE AND MAINTAIN ACCESS FOR ALL TRADES AND
CONTRACTORS TO THE SITE AND/OR BUILDING.
18.THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SECURITY OF THE SITE FOR THE
DURATION OF CONSTRUCTION UNTIL JOB COMPLETION.
19.THE GENERAL CONTRACTOR SHALL MAINTAIN IN GOOD CONDITION ONE COMPLETE SET OF
PLANS WITH ALL REVISIONS, ADDENDA, AND CHANGE ORDERS ON THE PREMISES AT ALL TIMES.
20.THE GENERAL CONTRACTOR SHALL PROVIDE PORTABLE FIRE EXTINGUISHERS WITH A RATING OF NO LESS THAN 2-A OT 2-A:10-B:C AND SHALL BE WITHIN 25 FEET OF TRAVEL DISTANCE TO ALL
PORTIONS OF WHERE THE WORK IS BEING COMPLETED DURING CONSTRUCTION.
21. ALL EXISTING ACTIVE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES SHALL BE
PROTECTED AT ALL TIMES, AND WHERE REQUIRED FOR THE PROPER EXECUTION OF
THE WORK, SHALL BE RELOCATED AS DIRECTED BY THE ENGINEER. EXTREME
CAUTION SHOULD BE USED BY THE CONTRACTOR WHEN EXCAVATING OR DRILLING
PIERS AROUND OR NEAR UTILITIES. CONTRACTOR SHALL PROVIDE SAFETY TRAINING
FOR THE WORKING CREW. THIS SHALL INCLUDE BUT NOT BE LIMITED TO A) FALL
PROTECTION, B) CONFINED SPACE, C) ELECTRICAL SAFETY, AND D) TRENCHING &
EXCAVATION.
22. ALL EXISTING INACTIVE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES, WHICH
INTERFERE WITH THE EXECUTION OF THE WORK, SHALL BE REMOVED, CAPPED,
PLUGGED OR OTHERWISE DISCONNECTED AT POINTS WHICH WILL NOT INTERFERE
WITH THE EXECUTION OF THE WORK, AS DIRECTED BY THE RESPONSIBLE ENGINEER,
AND SUBJECT TO THE APPROVAL OF THE OWNER AND/OR LOCAL UTILITIES.
23. THE AREAS OF THE OWNER'S PROPERTY DISTURBED BY THE WORK AND NOT
COVERED BY THE TOWER, EQUIPMENT OR DRIVEWAY, SHALL BE GRADED TO A
UNIFORM SLOPE, AND STABILIZED TO PREVENT EROSION.
24. CONTRACTOR SHALL MINIMIZE DISTURBANCE TO THE EXISTING SITE DURING
CONSTRUCTION. EROSION CONTROL MEASURES, IF REQUIRED DURING
CONSTRUCTION, SHALL BE IN CONFORMANCE WITH THE FEDERAL AND LOCAL
JURISDICTION FOR EROSION AND SEDIMENT CONTROL.
25. NO FILL OR EMBANKMENT MATERIAL SHALL BE PLACED ON FROZEN GROUNDING.
FROZEN MATERIALS, SNOW OR ICE SHALL NOT BE PLACED IN ANY FILL OR
EMBANKMENT.
26. THE SUBGRADE SHALL BE BROUGHT TO A SMOOTH UNIFORM GRADE AND COMPACTED
TO 95 PERCENT STANDARD PROCTOR DENSITY UNDER PAVEMENT AND STRUCTURES
AND 80 PERCENT STANDARD PROCTOR DENSITY IN OPEN SPACE. ALL TRENCHES IN
PUBLIC RIGHT OF WAY SHALL BE BACKFILLED WITH FLOWABLE FILL OR OTHER
MATERIAL PRE-APPROVED BY THE LOCAL JURISDICTION.
27. ALL NECESSARY RUBBISH, STUMPS, DEBRIS, STICKS, STONES, AND OTHER REFUSE
SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN A LAWFUL MANNER.
28. ALL BROCHURES, OPERATING AND MAINTENANCE MANUALS, CATALOGS, SHOP
DRAWINGS, AND OTHER DOCUMENTS SHALL BE TURNED OVER TO THE GENERAL
CONTRACTOR AT COMPLETION OF CONSTRUCTION AND PRIOR TO PAYMENT.
29. CONTRACTOR SHALL SUBMIT A COMPLETE SET OF AS-BUILT REDLINES TO THE
GENERAL CONTRACTOR UPON COMPLETION OF PROJECT AND PRIOR TO FINAL
PAYMENT.
30. CONTRACTOR SHALL LEAVE PREMISES IN A CLEAN CONDITION.
31. THE PROPOSED FACILITY WILL BE UNMANNED AND DOES NOT REQUIRE POTABLE
WATER OR SEWER SERVICE, AND IS NOT FOR HUMAN HABITAT (NO HANDICAP ACCESS
REQUIRED).
32. STRUCTURE IS LIMITED TO PERIODIC MAINTENANCE AND INSPECTION,
APPROXIMATELY 2 TIMES PER MONTH, BY CARRIER TECHNICIANS.
33. NO OUTDOOR STORAGE OR SOLID WASTE CONTAINERS ARE PROPOSED.
34. ALL MATERIAL SHALL BE FURNISHED AND WORK SHALL BE PERFORMED IN
ACCORDANCE WITH THE LATEST CARRIER GROUNDING STANDARD. IN CASE OF A
CONFLICT BETWEEN THE CONSTRUCTION SPECIFICATION AND THE DRAWINGS, THE
DRAWINGS SHALL GOVERN.
35. CONTRACTORS SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS AND
INSPECTIONS REQUIRED FOR CONSTRUCTION. IF CONTRACTOR CANNOT OBTAIN A
PERMIT, THEY MUST NOTIFY THE GENERAL CONTRACTOR IMMEDIATELY.
36. CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE SITE ON A DAILY
BASIS.
37. INFORMATION SHOWN ON THESE DRAWINGS WAS OBTAINED FROM SITE VISITS
AND/OR DRAWINGS PROVIDED BY THE SITE OWNER. CONTRACTORS SHALL NOTIFY
THE ENGINEER OF ANY DISCREPANCIES PRIOR TO ORDERING MATERIAL OR
PROCEEDING WITH CONSTRUCTION.
38. ALL CABLE INSTALLATIONS TO FOLLOW MANUFACTURER'S INSTRUCTIONS AND
RECOMMENDATIONS.
39. NO WHITE STROBE LIGHTS ARE PERMITTED. LIGHTING IF REQUIRED, WILL MEET FAA
STANDARDS AND REQUIREMENTS.
1. DESIGN AND CONSTRUCTION OF ANTENNA SUPPORTS SHALL CONFORM TO CURRENT
ANSI/TIA-222 OR APPLICABLE LOCAL CODES.
2. ALL STEEL MATERIALS SHALL BE GALVANIZED AFTER FABRICATION IN ACCORDANCE
WITH ASTM A123 "ZINC (HOT-DIP GALVANIZED) COATINGS ON IRON AND STEEL
PRODUCTS", UNLESS NOTED OTHERWISE.
3. ALL BOLTS, ANCHORS AND MISCELLANEOUS HARDWARE SHALL BE GALVANIZED IN
ACCORDANCE WITH ASTM A153 "ZINC-COATING (HOT-DIP) ON IRON AND STEEL
HARDWARE", UNLESS NOTED OTHERWISE.
4. DAMAGED GALVANIZED SURFACES SHALL BE REPAIRED BY COLD GALVANIZING IN
ACCORDANCE WITH ASTM A780.
5. ALL ANTENNA MOUNTS SHALL BE INSTALLED WITH LOCK NUTS, DOUBLE NUTS AND
SHALL BE TORQUED TO MANUFACTURER'S RECOMMENDATIONS.
6. CONTRACTOR SHALL INSTALL ANTENNA PER MANUFACTURER'S RECOMMENDATION FOR
INSTALLATION AND GROUNDING.
7. PRIOR TO SETTING ANTENNA AZIMUTHS AND DOWNTILTS, ANTENNA CONTRACTOR
SHALL CHECK THE ANTENNA MOUNT FOR TIGHTNESS AND ENSURE THAT THEY ARE
PLUMB. ANTENNA AZIMUTHS SHALL BE SET FROM TRUE NORTH AND BE ORIENTED
WITHIN +/- 5% AS DEFINED BY THE RFDS. ANTENNA DOWNTILTS SHALL BE WITHIN +/-
0.5% AS DEFINED BY THE RFDS. REFER TO ND-00246.
8. CONTRACTOR SHALL VERIFY THE DOWN-TILT OF EACH ANTENNA WITH A DIGITAL LEVEL.
1. ALL RF CONNECTIONS SHALL BE TIGHTENED BY A TORQUE WRENCH.
2. ALL RF CONNECTIONS, GROUNDING HARDWARE AND ANTENNA HARDWARE SHALL HAVE
A TORQUE MARK INSTALLED IN A CONTINUOUS STRAIGHT LINE FROM BOTH SIDES OF
THE CONNECTION.
A. RF CONNECTION BOTH SIDES OF THE CONNECTOR.
B. GROUNDING AND ANTENNA HARDWARE ON THE NUT SIDE STARTING FROM THE
THREADS TO THE SOLID SURFACE. EXAMPLE OF SOLID SURFACE: GROUND BAR,
ANTENNA BRACKET METAL.
3. ALL 8M ANTENNA HARDWARE SHALL BE TIGHTENED TO 9 LB-FT (12 NM).
4. ALL 12M ANTENNA HARDWARE SHALL BE TIGHTENED TO 43 LB-FT (58 NM).
5. ALL GROUNDING HARDWARE SHALL BE TIGHTENED UNTIL THE LOCK WASHER
COLLAPSES AND THE GROUNDING HARDWARE IS NO LONGER LOOSE.
6. ALL DIN TYPE CONNECTIONS SHALL BE TIGHTENED TO 18-22 LB-FT (24.4-29.8 NM).
7. ALL N TYPE CONNECTIONS SHALL BE TIGHTENED TO 15-20 LB-IN (1.7-2.3 NM).
GENERAL NOTES GENERAL NOTES ANTENNA MOUNTING NOTES
TORQUE REQUIREMENTS
RALEIGH, NC 27615
919-782-2710 www.ets-pllc.com
PREPARED FOR:
SEAL:
SITE ADDRESS:
300 VEASEY ROAD
BUTNER, NC 27509
SITE NAME:
HP-1040
SITE NUMBER:
BUTNER (NEW)
LATITUDE/LONGITUDE:
36.143244°, -78.767803°
SHEET # CURRENT REV #:
ETS #: 23124026
SHEET TITLE:
CHECKED BY: RBDRAWN BY: DF
06/20/2025
REV DATE DETAILS
FIRM #: P-1016
SCO PROJECT NUMBER:
24-28062-01A
08/30/2024 CONSTRUCTION
10/16/2024 CONSTRUCTION
02/24/2025 CONSTRUCTION
02/26/2025 CONSTRUCTION
06/20/2025 SCO COMMENTS
GENERAL NOTES II
GN-2
A/C AIR CONDITIONING MCR MANAGER
AFF ABOVE FINISHED FLOOR MIN MINIMUM
AGL ABOVE GROUND LEVEL, MISC MISCELLANEOUS
ABOVE GRADE LEVEL NA NOT APPLICABLE
AWS ADVANCED WIRELESS SERVICE NIC NOT IN CONTRACT
BBU BATTERY BACKUP UNIT NO NUMBER
BLDG BUILDING NTS NOT TO SCALE
BLK BLOCKING OC ON CENTER
CLG CEILING OD OUTSIDE DIAMETER
CLR CLEAR PCS PERSONAL COMMUNICATION
SERVICE
CONC CONCRETE PDS POWER DISTRIBUTION UNIT
CONT CONTINUOUS PROJ PROJECT
D DEPTH PROP PROPERTY
DBL DOUBLE PT PRESSURE TREATED
DEG DEGREE PVC POLYVINYL CHLORIDE
Φ, DIA DIAMETER REQ REQUIRED
DIAG DIAGONAL RF RADIO FREQUENCY
DN DOWN RM RAOOM
DET DETAIL RO ROUGH OPENING
DWG DRAWING RRJ REMOTE RADIO HEAD
E EXISTING SHT SHEET
EA EACH SIM SIMILAR
ELEV, EL ELEVATION SPEC SPECIFICATION
ELEC ELECTRICAL SF STAINLESS STEEL
EQ EQUAL SS STAINLESS STEEL
EQUIP EQUIPMENT STL STEEL
EW EACH WAY
EXT EXTERIOR SUSP SUSPENDED
FIF FIBER INTERFACE FRAME, TMA TOWER MOUNTED AMPLIFIER
FACILITY INTERFACE FRAME TND TINNED
FIN FINISH TYP TYPICAL
FLOUR FLOURESCENT UMTS UNIVERSAL MOBILE
FLR FLOOR TELECOMMUNICATION
SERVICE
FT FOOT, FEET UNO UNLESS NOTED OTHERWISE
GA GAUGE VERT VERTICAL
GALV GALVANIZED W/ WITH
GC GENERAL CONTRACTOR W/O WITHOUT
GRND GROUND WCS WIRELESS COMMUNICATION
GSM GLOBAL SYSTEM MOBILE SERVICE
GYP GYPSUM BOARD WP WATERPROOF
HORZ HORIZONTAL
HR HOUR
HT HEIGHT
ID INSIDE DIAMETER
IN INCH, INCHES
INSUL INSULATION
INT INTERIOR
IPGB INTERNAL PERIMETER GROUND BUS CONDUCTOR
L LENGTH
LBS POUNDS
LTE LONG TERM EVOLUTION
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MFR MANUFACTURER
ABBREVIATIONS
1. THE FIBER OPTIC TRUNK CABLES SHALL BE INSTALLED INTO CONDUITS, CHANNEL CABLE
TRAYS, OR CABLE TRAY. WHEN INSTALLING FIBER OPTIC TRUNK CABLES INTO A CABLE TRAY
SYSTEM, THEY SHALL BE INSTALLED INTO AN INTER DUCT AND A PARTITION BARRIER SHALL BE
INSTALLED BETWEEN THE 600 VOLT CABLES AND THE INTER DUCT IN ORDER TO SEGREGATE
CABLE TYPES. OPTIC FIBER TRUNK CABLES SHALL HAVE APPROVED CABLE RESTRAINTS
EVERY (60) SIXTY FEET AND SECURELY FASTENED TO THE CABLE TRAY SYSTEM. NFPA 70
(NEC) ARTICLE 770 RULES SHALL APPLY.
2. THE TYPE TC-ER CABLES SHALL BE INSTALLED INTO CONDUITS, CHANNEL CABLE TRAYS, OR
CABLE TRAY AND SHALL BE SECURED AT INTERVALS NOT EXCEEDING (6) SIX FEET. AN
EXCEPTION; WHERE TYPE TC-ER CABLES ARE NOT SUBJECT TO PHYSICAL DAMAGE, CABLES
SHALL BE PERMITTED TO MAKE A TRANSITION BETWEEN CONDUITS, CHANNEL CABLE TRAYS,
OR CABLE TRAY WHICH ARE SERVING UTILIZATION EQUIPMENT OR DEVICES, A DISTANCE (6)
SIX FEET SHALL NOT BE EXCEEDED WITHOUT CONTINUOUS SUPPORTING. NFPA 70 (NEC)
ARTICLES 336 AND 392 RULES SHALL APPLY.
3. WHEN INSTALLING OPTIC FIBER TRUNK CABLES OR TYPE TC-ER CABLES INTO CONDUITS, NFPA
70 (NEC) ARTICLE 300 RULES SHALL APPLY.
1. TYPES AND SIZES OF THE ANTENNA CABLE ARE BASED ON ESTIMATED LENGTHS. PRIOR TO
ORDERING CABLE, CONTRACTOR SHALL VERIFY ACTUAL LENGTH BASED ON CONSTRUCTION
LAYOUT AND NOTIFY THE PROJECT MANAGER IF ACTUAL LENGTHS EXCEED ESTIMATED
LENGTHS.
2. CONTRACTOR SHALL CONFIRM COAX COLOR CODING PRIOR TO CONSTRUCTION. REFER TO
"ANTENNA SYSTEM LABELING STANDARD" ND-00027 LATEST VERSION.
3. ALL JUMPERS TO THE ANTENNAS SHALL BE 1/2" DIA. LDF AND SHALL NOT EXCEED 6'-0".
4. ALL COAXIAL CABLE SHALL BE SECURED TO THE DESIGNED SUPPORT STRUCTURE, IN AN
APPROVED MANNER, AT DISTANCES NOT TO EXCEED 4'-0" OC.
5. CONTRACTOR SHALL FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS REGARDING BOTH
THE INSTALLATION AND GROUNDING OF ALL COAXIAL CABLES, CONNECTORS, ANTENNAS, AND
ALL OTHER EQUIPMENT.
6. CONTRACTOR SHALL WEATHERPROOF ALL ANTENNA CONNECTORS WITH SELF
AMALGAMATING TAPE. WEATHERPROOFING SHALL BE COMPLETED IN STRICT ACCORDANCE
WITH INDUSTRY STANDARDS.
1. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY ANTENNA, TMAS, DIPLEXERS, AND COAX
CONFIGURATION, MAKE AND MODELS PRIOR TO INSTALLATION.
2. ALL CONNECTIONS FOR HANGERS, SUPPORTS, BRACING, ETC. SHALL BE INSTALLED PER
MANUFACTURER'S RECOMMENDATIONS.
3. CONTRACTOR SHALL REFERENCE THE STRUCTURAL ANALYSIS/DESIGN DRAWINGS FOR
DIRECTIONS ON CABLE DISTRIBUTION/ROUTING.
4. ALL OUTDOOR RF CONNECTORS/CONNECTIONS SHALL BE WEATHERPROOFED, EXCEPT THE
RET CONNECTORS, USING BUTYL TAPE AFTER INSTALLATION AND FINAL CONNECTIONS ARE
MADE. BUTYL TAPE SHALL HAVE A MINIMUM OF ONE-HALF TAPE WIDTH OVERLAP ON EACH
TURN AND EACH LAYER SHALL BE WRAPPED THREE TIMES. WEATHERPROOFING SHALL BE
SMOOTH WITHOUT BUCKLING. BUTYL BLEEDING IS NOT ALLOWED.
5. IF REQUIRED TO PAINT ANTENNAS AND/OR COAX:
6. TEMPERATURE SHALL BE ABOVE 50° F.
7. PAINT COLOR MUST BE APPROVED BY BUILDING OWNER/LANDLORD.
8. FOR REGULATED TOWERS, FAA/FCC APPROVED PAINT IS REQUIRED.
9. DO NOT PAINT OVER COLOR CODING OR ON EQUIPMENT MODEL NUMBERS.
10. ALL PROPOSED GROUND BAR DOWNLEADS ARE TO BE TERMINATED TO THE EXISTING
ADJACENT GROUND BAR DOWNLEADS A MINIMUM DISTANCE OF 4'-0" BELOW GROUND BAR.
TERMINATIONS MAY BE EXOTHERMIC OR COMPRESSION.
11. ALL CONNECTIONS FOR HANGERS, SUPPORTS, BRACING, ETC. SHALL BE INSTALLED PER
MANUFACTURER'S SPECIFICATION & RECOMMENDATIONS.
1. NO BOLT THREADS TO PROTRUDE MORE THAN 1-1/2" [.038M].
2. 90 SHORT SWEEPS UNDER ANTENNA ARM. ALL CABLES MUST ONLY TRANSITION ON THE INSIDE
OR BOTTOM OF ARMS (NO CABLE ON TOP OF ARMS).
3. USE 90 CONNECTOR AT CABLE CONNECTION TO ANTENNAS.
4. PLACE GPS ON ARM WITH SOUTHERN SKY EXPOSURE AT MINIMUM 6' [1.83] FROM TRANSMIT
ANTENNA, WHICH IS 24" [.61M] AWAY FROM CENTER OF POLE.
5. USE 1/2" [.013M] CABLE ON ANTENNAS UNLESS OTHERWISE SPECIFIED.
6. FILL VOID AROUND CABLES AT CONDUIT OPENING WITH FOAM SEALANT TO PREVENT WATER
INTRUSION.
COAXIAL CABLE NOTES
GENERAL CABLE AND EQUIPMENT NOTES
FIBER & POWER CABLE MOUNTING
ROW CONSTRUCTION NOTE STANDALONE
RALEIGH, NC 27615
919-782-2710 www.ets-pllc.com
PREPARED FOR:
SEAL:
SITE ADDRESS:
300 VEASEY ROAD
BUTNER, NC 27509
SITE NAME:
HP-1040
SITE NUMBER:
BUTNER (NEW)
LATITUDE/LONGITUDE:
36.143244°, -78.767803°
SHEET # CURRENT REV #:
ETS #: 23124026
SHEET TITLE:
CHECKED BY: RBDRAWN BY: DF
06/20/2025
REV DATE DETAILS
FIRM #: P-1016
SCO PROJECT NUMBER:
24-28062-01A
08/30/2024 CONSTRUCTION
10/16/2024 CONSTRUCTION
02/24/2025 CONSTRUCTION
02/26/2025 CONSTRUCTION
06/20/2025 SCO COMMENTS
GENERAL NOTES III
GN-3
1. THE FABRICATION AND ERECTION OF STRUCTURAL STEEL SHALL CONFORM TO THE AISC
SPECIFICATION FOR MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR
DESIGN, 15TH EDITION.
2. UNLESS OTHERWISE NOTED, ALL STRUCTURAL ELEMENTS SHALL CONFORM TO THE
FOLLOWING REQUIREMENTS:
STRUCTURAL STEEL:
· ANGLE: ASTM A36
· PIPE/TUBE: ASTM A500-50
· PLATE: ASTM A36
A. ALL BOLTS, ASTM A325 TYPE I GALVANIZED HIGH STRENGTH BOLTS.
B. ALL U-BOLTS, ASTM A193 GRADE B7
C. ALL NUTS, ASTM A563 CARBON AND ALLOY STEEL NUTS.
D. ALL WASHERS, ASTM F436 HARDENED STEEL WASHERS.
3. ALL CONNECTIONS NOT FULLY DETAILED ON THESE PLANS SHALL BE DETAILED BY THE STEEL
FABRICATOR IN ACCORDANCE WITH AISC SPECIFICATION FOR MANUAL OF STEEL
CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN, 15TH EDITION.
4. HOLES SHALL NOT BE FLAME CUT THRU STEEL UNLESS APPROVED BY THE ENGINEER.
5. HOT-DIP GALVANIZE ALL ITEMS UNLESS OTHERWISE NOTED, AFTER FABRICATION WHERE
PRACTICABLE. GALVANIZING: ASTM A123, ASTM, A153/A153M OR ASTM A653/A653M, G90, AS
APPLICABLE.
6. REPAIR DAMAGED SURFACES WITH GALVANIZING REPAIR METHOD AND PAINT CONFORMING
TO ASTM A780 OR BY APPLICATION OF STICK OR THICK PASTED MATERIAL SPECIFICALLY
DESIGNED FOR REPAIR OF GALVANIZING. CLEAN AREAS TO BE REPAIRED AND REMOVE SLAG
FROM WELDS. HEAT SURFACES TO WHICH STICK OR PASTE MATERIAL IS APPLIED, WITH A
TORCH TO A TEMPERATURE SUFFICIENT TO MELT THE METALLICS IN STICK OR PASTED;
SPREAD MOLTEN MATERIAL UNIFORMLY OVER SURFACES TO BE COATED AND WIPE OFF
EXCESS MATERIAL.
7. A NUT LOCKING DEVICE SHALL BE INSTALLED ON ALL PROPOSED AND/OR REPLACED BOLTS.
8. ALL PROPOSED AND/OR REPLACED BOLTS SHALL BE OF SUFFICIENT LENGTH TO EXCLUDE THE
THREADS FROM THE SHEAR PLANE.
9. ALL PROPOSED AND/OR REPLACED BOLTS SHALL BE OF SUFFICIENT LENGTH SUCH THAT THE
END OF THE BOLT BE AT LEAST FLUSH WITH THE FACE OF THE NUT. IT IS NOT PERMITTED FOR
THE BOLT END TO BE BELOW THE FACE OF THE NUT AFTER TIGHTENING IS COMPLETED.
10. GALVANIZED ASTM A325 BOLTS SHALL NOT BE REUSED.
1. CONNECTION BOLTS SUBJECT TO DIRECT TENSION SHALL BE INSTALLED AND TIGHTENED AS PER SECTION 8.2 OF THE AISC SPECIFICATION FOR STRUCTURAL JOINTS USING A325 OR A490
BOLTS, LOCATED IN THE AISC MANUAL OF STEEL CONSTRUCTION. THE INSTALLATION
PROCEDURE IS PARAPHRASED AS FOLLOWS:
2. FASTENERS SHALL BE INSTALLED IN PROPERLY ALIGNED HOLES AND TIGHTENED BY ONE OF
THE METHODS DESCRIBED IN SUBSECTION 8.2.1 THROUGH 8.2.4.
8.2.1 TURN-OF-THE-NUT TIGHTENING
BOLTS SHALL BE INSTALLED IN ALL HOLES OF THE CONNECTION AND BROUGHT TO A SNUG
TIGHT CONDITION AS DEFINED IN SECTION 8.1, UNTIL ALL THE BOLTS ARE SIMULTANEOUSLY
SNUG TIGHT AND THE CONNECTION IS FULLY COMPACTED. FOLLOWING THIS INITIAL
OPERATION ALL BOLTS IN THE CONNECTION SHALL BE TIGHTENED FURTHER BY THE
APPLICABLE AMOUNT OF ROTATION SPECIFIED ABOVE. DURING THE TIGHTENING OPERATION
THERE SHALL BE NO ROTATION OF THE PART NOT TURNED BY THE WRENCH. TIGHTENING
SHALL PROGRESS SYSTEMATICALLY FROM THE MOST RIGID PART OF THE JOINT IN A MANNER
THAT WILL MINIMIZE RELAXATION OF PREVIOUSLY PRETENSIONED BOLTS.
3. TIGHTEN CONNECTION BOLTS BY AISC - "TURN OF THE NUT" METHOD, USING THE CHART
BELOW.
BOLT LENGTHS UP TO AND INCLUDING FOUR DIA.
2" BOLTS UP TO AND INCLUDING 2.0 INCH LENGTH +1
3 TURN BEYOND SNUG TIGHT
8" BOLTS UP TO AND INCLUDING 2.5 INCH LENGTH +1
3 TURN BEYOND SNUG TIGHT
4" BOLTS UP TO AND INCLUDING 3.0 INCH LENGTH +1
3 TURN BEYOND SNUG TIGHT
8" BOLTS UP TO AND INCLUDING 3.5 INCH LENGTH +1
3 TURN BEYOND SNUG TIGHT
1" BOLTS UP TO AND INCLUDING 4.0 INCH LENGTH +1
3 TURN BEYOND SNUG TIGHT
BOLT LENGTHS OVER FOUR DIA. BUT NOT EXCEEDING EIGHT DIA.
2" BOLTS 2.25 TO 4.0 INCH LENGTH +1
2 TURN BEYOND SNUG TIGHT
8" BOLTS 2.75 TO 5.0 INCH LENGTH +1
2 TURN BEYOND SNUG TIGHT
4" BOLTS 3.25 TO 6.0 INCH LENGTH +1
2 TURN BEYOND SNUG TIGHT
8" BOLTS 3.75 TO 7.0 INCH LENGTH +1
2 TURN BEYOND SNUG TIGHT
1" BOLTS 4.25 TO 8.0 INCH LENGTH +1
2 TURN BEYOND SNUG TIGHT
4. ALL OTHER BOLTED CONNECTIONS SHALL BE BROUGHT TO A SNUG TIGHT CONDITION AS
DEFINED IN SECTION 8.1 OF THE SPECIFICATION.
1. FOUNDATION INSTALLATION SHALL BE SUPERVISED BY PERSONNEL KNOWLEDGEABLE AND
EXPERIENCED WITH THE PROPOSED FOUNDATION TYPE. CONSTRUCTION SHALL BE IN
ACCORDANCE WITH GENERALLY ACCEPTED PRACTICES AND IN A GOOD WORKMANLIKE
MANNER.
2. CONTRACTOR TO VERIFY DIMENSIONS WITH ORIGINAL TOWER DRAWINGS. ETS SHALL BE
NOTIFIED OF ANY DISCREPANCIES BETWEEN FIELD MEASURED DIMENSIONS AND ORIGINAL
TOWER DRAWINGS.
3. FOUNDATION DESIGN MODIFICATIONS MAY BE REQUIRED IN THE EVENT THE DESIGN
PARAMETERS ARE NOT APPLICABLE FOR THE SUBSURFACE CONDITIONS ENCOUNTERED
DURING CONSTRUCTION.
4. FOR FOUNDATION TOLERANCES, SEE ORIGINAL TOWER DRAWINGS.
5. THE FOUNDATION MODIFICATION DESIGN IS IN ACCORDANCE WITH GENERALLY ACCEPTED
PROFESSIONAL ENGINEERING PRINCIPLES AND PRACTICES WITHIN THE LIMITS OF
SUBSURFACE DATA PROVIDED.
6. THE FOUNDATION DEPTH INDICATED IS BASED ON THE GRADE LINE DESCRIBED IN THE
REFERENCE GEOTECHNICAL REPORT. FOUNDATION MODIFICATION MAY BE REQUIRED IN THE
EVENT CUT OR FILL OPERATIONS HAVE TAKEN PLACE SUBSEQUENT TO THE GEOTECHNICAL
INVESTIGATION.
7. THE FOUNDATION DESIGN ASSUMES THAT INSTALLATION METHODS WILL INCORPORATE THE
PROCEDURES RECOMMENDED IN THIS REPORT.
8. THE FOUNDATION DESIGN ASSUMES FIELD INSPECTIONS WILL BE PERFORMED TO VERIFY
THAT CONSTRUCTION MATERIALS, INSTALLATION METHODS, AND ASSUMED DESIGN
PARAMETERS ARE ACCEPTABLE BASED ON THE CONDITIONS AT THE SITE.
9. THE FOUNDATION DESIGN ASSUMES NO CONSTRUCTION JOINTS, HOWEVER, CONSTRUCTION
JOINTS SHALL BE PERMITTED UPON APPROVAL BY THE OWNER/ENGINEER.
FOUNDATION GENERAL NOTES
EXCAVATION
1. WORK SHALL BE IN ACCORDANCE WITH LOCAL CODES AND SAFETY REGULATIONS.
PROCEDURES FOR THE PROTECTION OF EXCAVATIONS, EXISTING CONSTRUCTION, AND
UTILITIES SHALL BE ESTABLISHED PRIOR TO BEGINNING WORK.
2. THE SIDES OF THE EXCAVATION SHALL BE ROUGH AND FREE OF CUTTINGS.
3. LOOSE MATERIAL TO BE REMOVED FROM THE BOTTOM OF EXCAVATION PRIOR TO CONCRETE
PLACEMENT.
REINFORCING STEEL
1. THE REINFORCING STEEL SHALL CONFORM TO THE REQUIREMENTS OF ASTM A-615, GRADE 60.
IT SHALL BE DEFORMED AND SPLICES SHALL NOT BE ALLOWED UNLESS OTHERWISE NOTED.
2. WELDING IS PROHIBITED ON REINFORCING STEEL AND EMBEDMENTS.
3. REINFORCING CAGES SHALL BE BRACED TO RETAIN PROPER DIMENSIONS DURING HANDLING
AND THROUGHOUT PLACEMENT OF CONCRETE. WHEN TEMPORARY CASING IS UTILIZED,
BRACING SHALL BE ADEQUATE TO RESIST FORCES OCCURRING FROM FLOWING CONCRETE
DURING CASING EXCAVATION.
4. SPACERS SHALL BE ATTACHED INTERMITTENTLY THROUGHOUT THE ENTIRE LENGTH OF
TIEBACK REINFORCING TO INSURE CONCENTRIC PLACEMENT OF CASING IN EXCAVATIONS.
5. MINIMUM CONCRETE COVER FOR REINFORCEMENT SHALL BE 3" UNLESS OTHERWISE NOTED.
APPROVED SPACERS SHALL BE USED TO INSURE A 3" MINIMUM COVER FOR REINFORCEMENT.
6. THE CONCRETE COVER FROM THE TOP OF THE FOUNDATION TO THE ENDS OF THE VERTICAL
REINFORCEMENT SHALL NOT BE LESS THAN 3".
CONCRETE
1. WORK SHALL BE IN ACCORDANCE WITH THE ACI 318-14, "BUILDING CODE REQUIREMENTS FOR
STRUCTURAL CONCRETE AND COMMENTARY".
2. THE CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH OF 3000-PSI IN 28 DAYS.
3. PROPORTIONS OF CONCRETE MATERIALS SHALL BE SUITABLE FOR THE INSTALLATION
METHOD UTILIZED AND SHALL RESULT IN DURABLE CONCRETE FOR RESISTANCE TO LOCAL
ANTICIPATED AGGRESSIVE ACTIONS. THE DURABILITY REQUIREMENTS OF ACI 318-14 SHALL BE
SATISFIED BASED ON THE CONDITIONS EXPECTED AT THE SITE.
4. CONCRETE SHALL BE PLACED IN A MANNER THAT WILL PREVENT SEGREGATION OF CONCRETE
MATERIALS, INFILTRATION OF WATER OR SOIL, AND OTHER OCCURRENCES THAT MAY
DECREASE THE STRENGTH OR DURABILITY OF THE FOUNDATION.
5. FREE FALL CONCRETE MAY BE USED PROVIDED FALL IS VERTICAL DOWN WITHOUT HITTING
THE SIDES OF THE EXCAVATION, FORMWORK, REINFORCING BARS, FORM TIES, CAGE BRACING, OR OTHER OBSTRUCTIONS. UNDER NO CIRCUMSTANCES SHALL CONCRETE FALL THROUGH
WATER.
6. THE MAXIMUM SIZE OF THE AGGREGATE SHALL NOT EXCEED A SIZE SUITABLE FOR THE
INSTALLATION METHODS UTILIZED OR 2/3-CLEAR DISTANCE BEHIND OR BETWEEN
REINFORCING. THE MAXIMUM SIZE MAY BE INCREASED TO 2/3-CLEAR DISTANCE PROVIDED
WORKABILITY AND METHODS OF CONSOLIDATION SUCH AS VIBRATING WILL PREVENT
HONEYCOMBS AND VOIDS.
FINISHING
1. THE TOP OF THE FOUNDATION SHALL BE SLOPED TO DRAIN WITH A FLOATED FINISH.
2. THE EXPOSED EDGES OF THE CONCRETE SHALL BE CHAMFERED 3/4" X 3/4".
1. EPOXY AGENTS SHOULD BE ALLOWED TO CURE ACCORDING TO MANUFACTURERS
RECOMMENDATIONS.
2. ALL HARDWARE ASSEMBLY AND MANUFACTURER'S INSTRUCTIONS SHALL BE FOLLOWED; ANY
CONTRADICTION BETWEEN THE MANUFACTURER'S RECOMMENDATIONS AND THESE
DRAWINGS ARE TO BE BROUGHT IMMEDIATELY TO THE ATTENTION OF THE ENGINEER AND
OWNER.
3. ANY CONTRACTOR INSTALLING ADHESIVE ANCHORING SYSTEMS SHALL BE TRAINED, IN
PERSON BY A MANUFACTURER'S REPRESENTATIVE, ON THE PROPER INSTALLATION
TECHNIQUES. THIS TRAINING SHALL INCLUDE PROPER DRILLING, HOLE CLEANING, AND
INSTALLATION METHODS FOR THE ADHESIVE ANCHORING SYSTEM AND CONSTRUCTION
CONDITIONS ON THIS PROJECT. ALL TRAINING TO BE CONDUCTED PRIOR TO CREWS STEPPING
ON SITE. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT MANUFACTURER
REPRESENTATIVE TO SET UP TRAINING, ETS IS NOT RESPONSIBLE FOR ANY COST OCCURRED
FOR OR DURING ADHESIVE ANCHORING SYSTEM TRAINING.
EPOXY NOTES
SOIL COMPACTION
1. SUBGRADE PREPARATION
1.1. SHAPE TOP OF SUBGRADE TO THE LINES AND GRADES SHOWN ON THE DRAWINGS.
1.2. MAINTAIN TOP OF SUBGRADE IN A FREE-DRAINING CONDITION.
1.3. DO NOT STOCKPILE MATERIALS ON TOP OF SUBGRADE UNLESS AUTHORIZED BY
CONSTRUCTION MANAGER.
1.4. FOR SUBGRADES CONSISTING OF IN-PLACE NATIVE SOILS, SOILS SHALL BE FREE OF
CUTTING AND OTHER LOOSE MATERIAL AND SHALL MEET THE MINIMUM BEARING CAPACITY
REQUIREMENTS NOTES UNDER SOIL STRENGTH
1.5. FOR SUBGRADES CONSISTING OF PLACED STRUCTURAL FILL, STRUCTURAL FILL SHOULD BE
PLACED IN 6 INCH LIFTS AND COMPACTED TO A MINIMUM OF 95 PERCENT OF THE MAXIMUM
DRY DENSITY AS OBTAINED BY THE STANDARD PROCTOR METHOD
1.6. CONSTRUCT TOP OF SUBGRADE WITHIN ONE INCH OF ESTABLISHED GRADE AND
CROSS-SECTION.
SOIL STRENGTH
1. FOUNDATION DESIGN IS BASED ON A 2000 PSF SOIL BEARING CAPACITY. IF OTHER CONDITIONS
EXIST, FOUNDATION SHALL BE REDESIGNED. CONTRACTOR SHALL HAVE SOIL BEARING
CAPACITY VERIFIED BY A LICENSED PROFESSIONAL GEOTECHNICAL ENGINEER PRIOR TO
INITIATION OF CONSTRUCTION ACTIVITIES.
1. ALL WELDING SHALL BE IN ACCORDANCE WITH THE AWS D1.1/D1.1M: 2015 "STRUCTURAL
WELDING CODE-STEEL".
2. ALL WELDING SHALL BE PERFORMED BY AWS CERTIFIED WELDERS.
3. CONTRACTOR SHALL RETAIN AN AWS CERTIFIED WELD INSPECTOR TO PERFORM VISUAL
INSPECTIONS ON FIELD WELDS. A LETTER AND REPORT SHALL BE ISSUED TO THE
CONTRACTOR. CONTRACTOR SHALL SUBMIT LETTER AND REPORT TO TOWER OWNER.
4. GRIND THE SURFACE ADJACENT TO THE WELD FOR A DISTANCE OF 2" MINIMUM ALL AROUND.
GRIND THE SURFACE OF THE ROD TO BE INSTALLED FOR A DISTANCE OF 2" MINIMUM ALL
AROUND THE AREA TO BE WELDED. ENSURE BOTH AREAS ARE 100% FREE OF ALL
GALVANIZING. SURFACES TO BE WELDED SHALL BE FREE FROM SCALE, SLAG, RUST,
MOISTURE, GREASE OR ANY OTHER FOREIGN MATERIAL THAT WOULD PREVENT PROPER
WELDING.
5. DO NOT WELD IF THE TEMPERATURE OF THE STEEL IN THE VICINITY OF THE WELD AREA IS BELOW 0°F. WHEN THE TEMPERATURE IS BETWEEN 0°F AND 32°F, PREHEAT AND MAINTAIN THE
STEEL IN THE VICINITY OF THE WELD AREA AT 70°F DURING THE WELDING PROCESS.
6. DO NOT WELD ON WET OR FROST-COVERED SURFACES & PROVIDE ADEQUATE PROTECTION
FROM HIGH WINDS.
7. FOR ALL WELDING, USE E70XX ELECTRODES.
8. AFTER FINAL INSPECTION, THE AREA OF THE WELDS, THE INSTALLATION AND ALL SURFACES
DAMAGED BY WELDING OR GRINDING SHALL RECEIVE A COLD-GALVANIZED COATING. THIS
COATING SHALL BE APPLIED BY BRUSH. THE GALVANIZING COMPOUND SHALL CONTAIN A
MINIMUM OF 95% ± PURE ZINC. THE FINISHED COATING SHALL BE A MINIMUM THICKNESS OF 3
MILS.
STRUCTURAL STEEL NOTES FOUNDATION NOTES FOUNDATION NOTES
BOLT TIGHTENING PROCEDURE
WELDING NOTES
RALEIGH, NC 27615
919-782-2710 www.ets-pllc.com
PREPARED FOR:
SEAL:
SITE ADDRESS:
300 VEASEY ROAD
BUTNER, NC 27509
SITE NAME:
HP-1040
SITE NUMBER:
BUTNER (NEW)
LATITUDE/LONGITUDE:
36.143244°, -78.767803°
SHEET # CURRENT REV #:
ETS #: 23124026
SHEET TITLE:
CHECKED BY: RBDRAWN BY: DF
06/20/2025
REV DATE DETAILS
FIRM #: P-1016
SCO PROJECT NUMBER:
24-28062-01A
08/30/2024 CONSTRUCTION
10/16/2024 CONSTRUCTION
02/24/2025 CONSTRUCTION
02/26/2025 CONSTRUCTION
06/20/2025 SCO COMMENTS
NC APPENDIX B I
GN-4
336 830-1660
BUTNER (NEW)
300 VEASEY ROAD, BUTNER, NC 27509
NCSHP
BUTNER GRANVILLE
Engineered Tower Solutions, PLLC Paul Bridges 051707 Paul.Bridges@ets-pllc.com
2018 APPENDIX B
BUILDING CODE SUMMARY
FOR ALL COMMERCIAL PROJECTS
(EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)
(Reproduce the following data on the building plans sheet 1 or 2)
Name of Project: _______________________________________________________________________ Address: ________________________________________________________Zip Code _____________ Owner/Authorized Agent: _____________Phone # ( _____ ) _____ - _______E-Mail _________________ Owned By: City/County Code Enforcement Jurisdiction: City____________
Private County_________
CONTACT: _____________________________________________________________
DESIGNER FIRM
Architectural Civil Electrical Fire Alarm Plumbing Mechanical
NAME LICENSE # TELEPHONE #
State State
Sprinkler-Standpipe _____________________ ____________ ____________ (____)_______ __________________ Structural Retaining Walls >5' High _________________ ____________ ____________ (____)_______ __________________ Other (“Others” should include firms and individuals such as truss, precast, pre-engineered, interior designers, etc.)
2018 NC CODE FOR: New Construction Addition 1st Time Interior Completion Shell/Core Phased Construction – Shell/Core Renovation
2018 NC EXISTING BUILDING CODE:
Alteration:
Prescriptive Level I Historic Property
RISK CATEGORY (table 1604.5) Proposed:
BASIC BUILDING DATA
Construction Type:
(check all that apply) Sprinklers:
Standpipes:
Fire District:
No
I-A I-B Partial Yes
No Yes Class No Yes (Primary)
Special Inspections Required: No 2018 NC Administrative Code and Policies
I
Yes Appendix B for Building
II-A
II-B
I I
II
II
III
III
Repair Level II
Chapter 14 Level III Change of Use
CONSTRUCTED:(date) __________ORIGINAL OCCUPANCY(S) (Ch. 3):______________ RENOVATED: (date) __________CURRENT OCCUPANCY(S) (Ch. 3):______________
Current: IV
IV
III-A
III-B
NFPA 13
II III
Flood Hazard Area:
IV
NFPA 13R NFPA 13D
Wet Dry
No Yes
V-A V-B
Renovation
2018 NC Administrative Code and Policies Appendix B for Building
Gross Building Area:
FLOOR
3rd Floor 2nd Floor Mezzanine 1st Floor Basement
TOTAL
ALLOWABLE AREA
Primary Occupancy Classification: SELECT ONE
Assembly Business Educational Factory F-1 Moderate Hazardous H-1 Detonate Institutional I-1 Condition
1-2 Condition 1-3 Condition 1-4
S-1 Moderate
Mercantile Residential R-1 R-2 R-3 R-4 Storage
Parking Garage Open Utility and Miscellaneous
Accessory Occupancy Classification(s): __________________________________________________________ Incidental Uses (Table 509): ____________________________________________________________________ Special Uses (Chapter 4 – List Code Sections): _______________________________________________________ Special Provisions: (Chapter 5 – List Code Sections): _________________________________________________ Mixed Occupancy: No Yes
A-1 A-2 A-3 A-4 A-5
F-2 Low H-2 Deflagrate H-3 Combust H-4 Health H-5 HPM 1 2
S-2 Low Enclosed
3 4 5
High-piled Repair Garage
EXISTING (SQ
FT)
NEW (SQ FT) RENO/ALTER
(SQ.FT)
SUB-TOTAL
Separation: _____ Hr. Exception: ___________________ Non-Separated Use (508.3) The required type of construction for the building shall be determined by applying the height and area limitations for each of the applicable occupancies to the entire building. The most restrictive type of construction, so determined, shall apply to the entire building.
Separated Use (508.4) - See below for area calculations for each story, the area of the occupancy shall be such that the sum of the ratios of the actual floor area of each use divided by the allowable floor area for each use shall not exceed 1.
Actual Area of Occupancy A + Actual Area of Occupancy B Allowable Area of Occupancy A
Allowable Area of Occupancy B
< 1
< 1.00
2018 NC Administrative Code and Policies Appendix B for Building
218.5 218.5
218.5 218.5
STORY
NO.
DESCRIPTION AND
USE
(A) (B)
BLDG AREA PER
STORY (ACTUAL)
TABLE 506.2
AREA
(C)
AREA FOR FRONTAGE
INCREASE
(D)
ALLOWABLE AREA PER
STORY OR UNLIMITED
1 Frontage area increases from Section 506.3 are computed thus:
a. Perimeter which fronts a public way or open space having 20 feet minimum width = _______ (F)
b. Total Building Perimeter = _________ (P)
c. Ratio (F/P) = ___________ (F/P)
d. W = Minimum width of public way = _________ (W)
e. Percent of frontage increase If = 100 [ F/P - 0.25] x W/30 = _______ (%)
2 Unlimited area applicable under conditions of Section 507.
3 Maximum Building Area = total number of stories in the building x D (maximum 3 stories) (506.2).
4 The maximum area of open parking garages must comply with Table 406.5.4 5 Frontage increase is based on the unsprinklered area value in Table 506.2.
ALLOWABLE HEIGHT
ALLOWABLE
(TABLE 503)
Building Height in Feet (Table 504.3)
Building Height in Stories (Table 504.4)
1 Provide code reference if the “Show on Plans” quantity is not based on Table 504.3 or 504.4.
2 The maximum height of air traffic control towers must comply with Table 412.3.1 3 The maximum height of open parking garages must comply with Table 406.5.4
SHOWN ON PLANS CODE REFERENCE
2018 NC Administrative Code and Policies Appendix B for Building
1,5 2,3
PREPARED BY:
3227 WELLINGTON COURT
RALEIGH, NC 27615
919-782-2710 www.ets-pllc.com
PREPARED FOR:
SEAL:
SITE ADDRESS:
300 VEASEY ROAD
BUTNER, NC 27509
SITE NAME:
HP-1040
SITE NUMBER:
BUTNER (NEW)
LATITUDE/LONGITUDE:
36.143244°, -78.767803°
SHEET # CURRENT REV #:
ETS #: 23124026
SHEET TITLE:
CHECKED BY: RBDRAWN BY: DF
06/20/2025
REV DATE DETAILS
FIRM #: P-1016
SCO PROJECT NUMBER:
24-28062-01A
08/30/2024 CONSTRUCTION
10/16/2024 CONSTRUCTION
02/24/2025 CONSTRUCTION
02/26/2025 CONSTRUCTION
06/20/2025 SCO COMMENTS
NC APPENDIX B II
GN-5
1 2 1 2
N/A
N/A
N/A N/A N/A N/A
N/A
0 2 VFP -
203953
N/A N/A N/A
N/A N/A N/A N/A
1 Equip. Shelter 218.5 5,500 N/A 5,500
2018 NC Administrative Code and Policies Appendix B for Building
FIRE PROTECTION REQUIREMENTS
BUILDING ELEMENT FIRE
SEPARATION
DISTANCE
(FEET)
Structural Frame, including columns, girders, trusses Bearing Walls
Exterior North East West South
Interior Nonbearing Walls and Partitions
Exterior walls North East West South
Interior walls and partitions
Floor Construction Including supporting beams and joists
Floor Ceiling Assembly Column Supporting Floors Roof Construction, including supporting beams and joists Roof Ceiling Assembly Column Supporting Roof
Shaft Enclosures - Exit Shaft Enclosures - Other
Corridor Separation Occupancy/Fire Barrier Separation Party/Fire Wall Separation Smoke Barrier Separation
Smoke Partition Tenant/Dwelling Unit/ Sleeping Unit Separation Incidental Use Separation
* Indicate section number permitting reduction
REQ'D
RATING
PROVIDED
(W/_________*
REDUCTION)
DETAIL #
AND
SHEET #
DESIGN #
FOR
RATED
ASSEMBLY
SHEET # FOR
RATED
PENETRATION
SHEET #
FOR
RATED
JOINTS
N/A
110 2
1 1 2018
0 2 VFP-
203953
N/A N/A
N/A
N/A
N/A N/A
10'-7"
VFP -
203953
RALEIGH, NC 27615
919-782-2710 www.ets-pllc.com
PREPARED FOR:
SEAL:
SITE ADDRESS:
300 VEASEY ROAD
BUTNER, NC 27509
SITE NAME:
HP-1040
SITE NUMBER:
BUTNER (NEW)
LATITUDE/LONGITUDE:
36.143244°, -78.767803°
SHEET # CURRENT REV #:
ETS #: 23124026
SHEET TITLE:
CHECKED BY: RBDRAWN BY: DF
06/20/2025
REV DATE DETAILS
FIRM #: P-1016
SCO PROJECT NUMBER:
24-28062-01A
08/30/2024 CONSTRUCTION
10/16/2024 CONSTRUCTION
02/24/2025 CONSTRUCTION
02/26/2025 CONSTRUCTION
06/20/2025 SCO COMMENTS
NC APPENDIX B III
GN-6
PREFABRICATED SHELTER
SECTION NOT APPLICABLE
2018 NC Administrative Code and Policies Appendix B for Building
LIFE SAFETY SYSTEM REQUIREMENTS
Emergency Lighting:
Exit Signs:
Fire Alarm:
Smoke Detection Systems:
Carbon Monoxide Detection:
No No No No No
Yes Yes Yes Yes Yes
Partial _______
LIFE SAFETY PLAN REQUIREMENTS
Life Safety Plan Sheet #: _____________________
Fire and/or smoke rated wall locations (Chapter 7) Assumed and real property line locations (if not on the site plan) Exterior wall opening area with respect to distance to assumed property lines (705.8) Occupancy use for each area as it relates to occupant load calculation (Table 1004.1.2) Occupant loads for each area
Exit access travel distances (1017) Common path of travel distances (1006.2.1 & 2006.3.2(1)) Dead end lengths (1020.4) Clear exit widths for each exit door Maximum calculated occupant load capacity each exit door can accommodate based on egress width (1005.3) Actual occupant load for each exit door A separate schematic plan indicating where fire rated floor/ceiling and/or roof structure is provided for purposes of occupancy separation.
Location of doors with panic hardware (1010.1.10) Location of doors with delayed egress locks and the amount of delay (1010.1.9.7) Location of doors with electromagnetic egress locks (1010.1.9.9) Location of doors equipped with hold-open devices Location of emergency escape windows (1030) The square footage of each fire area (202) The square footage of each smoke compartment for Occupancy Classification I-2 (407.5) Note any code exceptions or table notes that may have been utilized regarding the items above
PERCENTAGE OF WALL OPENING CALCULATIONS
FIRE SEPARATION
DISTANCE (FEET FROM
PROPERTY LINES
DEGREES OF OPENINGS
PROTECTION
(TABLE 705.8)
ALLOWABLE AREA
ACTUAL SHOWN ON
PLANS (%)
Exit sign location (1013)
2018 NC Administrative Code and Policies Appendix B for Building
(SECTION 1106)
LOT OR PARKING AREA TOTAL # OF PARKING SPACES
REQUIRED PROVIDED
# OF ACCESSIBLE SPACES PROVIDED TOTAL # ACCESSIBLE
PROVIDED
TOTAL
PLUMBING FIXTURE REQUIREMENTS
(TABLE 2902.1)
USE
SPACE EXIST’G
NEW
REQ’D
WATERCLOSETS
MALE FEMALE UNISEX
URINALS LAVATORIES
MALE FEMALE UNISEX
SHOWERS
/ TUBS
DRINKING FOUNTAINS
REGULAR ACCESSIBLE
SPECIAL APPROVALS
Special approval: (Local Jurisdiction, Department of Insurance, SCO, DPI, DHHS, ICC, etc., describe below)
ACCESSIBLE PARKING
ACCESSIBLE DWELLING UNITS
(SECTION 1107)
TOTAL
UNITS
ACCESSIBLE
UNITS
REQUIRED
ACCESSIBLE
UNITS
PROVIDED
TYPE A
UNITS
PROVIDED
TYPE B
UNITS
REQUIRED
TYPE B
UNITS
PROVIDED
TOTAL
ACCESSIBLE
PROVIDED
UNITS
TYPE A
UNITS
REQUIRED
UNIT
CLASSIFICATION
96" SPACES 132" SPACES
RALEIGH, NC 27615
919-782-2710 www.ets-pllc.com
PREPARED FOR:
SEAL:
SITE ADDRESS:
300 VEASEY ROAD
BUTNER, NC 27509
SITE NAME:
HP-1040
SITE NUMBER:
BUTNER (NEW)
LATITUDE/LONGITUDE:
36.143244°, -78.767803°
SHEET # CURRENT REV #:
ETS #: 23124026
SHEET TITLE:
CHECKED BY: RBDRAWN BY: DF
06/20/2025
REV DATE DETAILS
FIRM #: P-1016
SCO PROJECT NUMBER:
24-28062-01A
08/30/2024 CONSTRUCTION
10/16/2024 CONSTRUCTION
02/24/2025 CONSTRUCTION
02/26/2025 CONSTRUCTION
06/20/2025 SCO COMMENTS
NC APPENDIX B IV
GN-72018 NC Administrative Code and Policies Appendix B for Building
ENERGY SUMMARY
ENERGY REQUIREMENTS:
The following data shall be considered minimum and any special attribute required to meet the North Carolina Energy Conservation Code shall also be provided. Each Designer shall furnish the required portions of the project information for the plan data sheet. If performance method, state the annual energy cost for the standard reference design vs annual energy cost for the proposed design.
Existing building envelope complies with code:
Exempt Building: No
Climate Zone: 3A 4A
No
5A
Method of Compliance: Energy Code
ASHRAE 90.1
Performance Performance
THERMAL ENVELOPE (Prescriptive method only)
Roof/ceiling Assembly (each assembly) Description of assembly:
U-Value of total assembly:
R-Value of insulation:
Skylights in each assembly: ___________ U-Value of skylight: ___________
Total square footage of skylights in each assembly: ___________
Exterior Walls (each assembly) Description of assembly:
U-Value of total assembly:
R-Value of insulation:
Openings (windows or doors with glazing) U-Value of assembly:
Door R-Values:
Walls below grade (each assembly) Description of assembly:
U-Value of total assembly:
R-Value of insulation:
Solar heat gain coefficient: ___________ Projection factor: ___________
Floors over unconditioned space (each assembly) Description of assembly:
U-Value of total assembly:
R-Value of insulation:
Floors slab on grade Description of assembly:
U-Value of total assembly:
R-Value of insulation:
Horizontal/Vertical requirement:
Slab Heated:
Prescriptive Prescriptive
(If “Other” specify source here) ________________________________________________
Yes (The remainder of this section is not applicable)
Yes (Provide Code or Statutory reference): ____________________________
2018 NC Administrative Code and Policies Appendix B for Building
2018 APPENDIX B
BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS
STRUCTURAL DESIGN
(PROVIDE ON THE STRUCTURAL SHEETS IF APPLICABLE)
DESIGN LOADS:
Importance Factors:
Live Loads:
Ground Snow Load:
Wind Load:
Snow (I ) _________ Seismic (I ) _________
Roof Mezzanine Floor
_________ psf
Ultimate Wind Speed
SEISMIC DESIGN CATEGORY:
Provide the following Seismic Design Parameters:
Risk Category (Table 1604.5) I
A Data Source:
Basic structural system
Analysis Procedure:
LATERAL DESIGN CONTROL:
A
II
Spectral Response Acceleration SS_________ %g Site Classification (ASCE 7) B
Field Test Bearing Wall Building Frame Moment Frame Simplified
Architectural, Mechanical, Components anchored?
Earthquake
_________ mph (ASCE-7) Exposure Category _________
B
III
C
C
IV
S1_________ %g
D E Presumptive
F Historical Data
Dual w/Special Moment Frame Dual w/Intermediate R/C or Special Steel Inverted Pendulum Equivalent Lateral Force
Yes No
Wind
SOIL BEARING CAPACITIES:
Field Test (provide copy of test report) ___________________ psf Presumptive Bearing capacity __________________________ psf Pile size, type, and capacity ______________________________________
Dynamic
D
_________ psf _________ psf _________ psf s e
N/A
0.10
9.8
CONCRETE ROOF + (1) LAYER OF 1-1/2" RIGID INSULATION + 3/4" OSB PANEL
N/A
N/A
CONCRETE + VINYL TILE
NO
CONCRETE ROOF + (2) LAYERS OF 1-1/2" RIGID INSULATION + 3/4" OSB PANEL
0.10
9.8
N/A
N/A
N/A
PENDING STRUCTURAL
ANALYSIS
RALEIGH, NC 27615
919-782-2710 www.ets-pllc.com
PREPARED FOR:
SEAL:
SITE ADDRESS:
300 VEASEY ROAD
BUTNER, NC 27509
SITE NAME:
HP-1040
SITE NUMBER:
BUTNER (NEW)
LATITUDE/LONGITUDE:
36.143244°, -78.767803°
SHEET # CURRENT REV #:
ETS #: 23124026
SHEET TITLE:
CHECKED BY: RBDRAWN BY: DF
06/20/2025
REV DATE DETAILS
FIRM #: P-1016
SCO PROJECT NUMBER:
24-28062-01A
08/30/2024 CONSTRUCTION
10/16/2024 CONSTRUCTION
02/24/2025 CONSTRUCTION
02/26/2025 CONSTRUCTION
06/20/2025 SCO COMMENTS
NC APPENDIX B V
GN-8
2018 APPENDIX B
BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS
MECHANICAL DESIGN
(PROVIDE ON THE MECHANICL SHEETS IF APPLICABLE)
MECHANICAL SUMMARY
MECHANICAL SYSTEMS, SERVICE SYSTEMS AND EQUIPMENT
Thermal Zone winter dry bulb: ___________ summer dry bulb: ___________
Interior design conditions winter dry bulb: ___________ summer dry bulb: ___________ relative humidity: ___________
Building heating load: ___________
Building cooling load: ___________
Mechanical Spacing Conditioning System Unitary description of unit:
heating efficiency:
cooling efficiency:
Boiler Size category. If oversized, state reason.:
Chiller Size category. If oversized, state reason.:
List equipment efficiencies: ___________ size category of unit: __________________________
2018 NC Administrative Code and Policies Appendix B for Building
2018 APPENDIX B
BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS
ELECTRICAL DESIGN
(PROVIDE ON THE ELECTRICAL SHEETS IF APPLICABLE)
ELECTRICAL SUMMARY
ELECTRICAL SYSTEM AND EQUIPMENT
Method of Compliance: Energy Code:
ASHRAE 90.1:
Prescriptive Prescriptive
Performance Performance
Lighting schedule (each fixture type) lamp type required in fixture ____________________________________ number of lamps in fixture ____________________________________ ballast type used in the fixture ____________________________________ number of ballasts in fixture ____________________________________ total wattage per fixture ____________________________________ total interior wattage specified vs. allowed (whole building or space by space) total exterior wattage specified vs. allowed
2018 NC Administrative Code and Policies Appendix B for Building
Additional Efficiency Package Options (When using the 2018 NCECC; not required for ASHRAE 90.1)
C406.2 More Efficient HVAC Equipment Performance C406.3 Reduced Lighting Power Density C406.4 Enhanced Digital Lighting Controls C406.5 On-Site Renewable Energy C406.6 Dedicated Outdoor Air System C406.7 Reduced Energy Use in Service Water Heating
BARD: W24A*-A05XWXXXJ
9.00 EER
24,000 BTUH
9.00 EER
32W FL
ELEC
600 vs 331 (ONLY LIT WHEN OCCUPIED)
CENTRAL AVE
S.R. 1103 - 60' R/W
(BM
34, PG
142)
WESTBROOK DRIVES.R. 1174 - 60' R/W (BM 34, PG 142)
VEASEY ROAD
S.R. 1120 - 60' R/W (BM 34, PG 142)
SHEET
OF
TRACT ID:
PROJECT:
FIELDBOOKS:
PARTYCHIEF:
TECHNICIAN:
DATE:
JOB NUMBER:
SCALE:
DRAWING:
SURVEYOR:
TOPOGRAPHIC SURVEY
ETS - BUTNER SITE
DUTCHVILLE TOWNSHIP
GRANVILLE COUNTY
STATE OF NORTH CAROLINA
N
AD
(2
1) N
C G
R
ID
GRAPHIC SCALE
VEAZEY RD
C
EN
TR
AL AVE
WESTBROOK DRIVE
SITE
AutoCAD SHX Text B
AutoCAD SHX Text M
AutoCAD SHX Text B
AutoCAD SHX Text M
AutoCAD SHX Text TBM NAIL SET (POINT-2000) LOCALIZATION POINT NORTHING: 871,041.31' EASTING: 2,068,702.52' ELEVATION: 386.98' NC GRID NAD83(2011) NAVD 88
AutoCAD SHX Text TBM NAIL SET (POINT-2001) NORTHING: 870,907.30' EASTING: 2,068,834.05' ELEVATION: 390.51' NC GRID NAD83(2011) NAVD 88
AutoCAD SHX Text
TOP OF BANK
AutoCAD SHX Text
TOP OF BANK
AutoCAD SHX Text
TOP OF BANK
AutoCAD SHX Text
TOE OF SLOPE
AutoCAD SHX Text
CENTER OF DITCH
AutoCAD SHX Text
TOP OF BANK
AutoCAD SHX Text
CENTER OF DITCH
AutoCAD SHX Text
TOP OF BANK
AutoCAD SHX Text
TOE OF SLOPE
AutoCAD SHX Text
UNDERGROUND FIBER
AutoCAD SHX Text
EDGE OF ASPHALT
AutoCAD SHX Text
EDGE OF ASPHALT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ETS - CENTRAL AVE
AutoCAD SHX Text
ENGINEERED TOWER SOLUTIONS
AutoCAD SHX Text 1023082791
AutoCAD SHX Text 10/21/2024
AutoCAD SHX Text 1"=40'
AutoCAD SHX Text
JFA
AutoCAD SHX Text
CDR
AutoCAD SHX Text
ETS- BUTNER SITE
AutoCAD SHX Text 0482-01-4995
AutoCAD SHX Text
MSW
AutoCAD SHX Text 43336-8
AutoCAD SHX Text
%%USURVEY DATA:
AutoCAD SHX Text HORIZONTAL DATUM - BASED UPON THE NORTH CAROLINA STATE PLANE COORDINATE SYSTEM, NAD83, US SURVEY FEET. SAID BEARINGS ORIGINATED FROM SAID COORDINATE SYSTEM BY GPS OBSERVATIONS AND OBSERVATIONS OF SELECTED STATIONS IN THE NATIONAL GEODETIC SURVEY CONTINUOUSLY OPERATING REFERENCE STATION (NGS CORS) NETWORK. VERTICAL DATUM - NAVD 88
AutoCAD SHX Text
%%USUBJECT PARCEL:
AutoCAD SHX Text OWNER: NC DEPT OF HEALTH/HUMAN SERVICES SITE ADDRESS: 300 VEASEY ROAD 300 VEASEY ROAD BUTNER, NC 27509 BUTNER, NC…