Burner Booster Specs.doc

DOC document 44 KB Posted

Attached to
2 - Ultra High Pressure Oil Burner - Houlton &Sanford Armory
Solicitation number
RFQ - 15A - 13090600000000000191
Issued by
Androscoggin County, Maine

About this file

This specification document from the Maine Army National Guard outlines requirements for Bid #14-014 to procure two ultra-high pressure oil burners for installation at existing boiler systems. The project involves replacing fuel oil burners at two facility locations: Houlton Armory (86 Pleasant Street, Houlton, Maine 04730) and Sanford Armory (88 William Oscar Emery Drive, Sanford, Maine 04073). The burners must be specifically designed for boilers with capacity ranges of 1,000,000 to 1,500,000 BTU/hr and are intended to reduce oil consumption and greenhouse gas emissions. Installation and full service training for at least two technicians must be completed within 30 days of award. Bidders must submit quotes using the specified spreadsheet format and provide contact information including name, telephone number, and email address. All inquiries should be directed to David Pelletier at 207-430-5697 or 207-557-2011, or Allen Ballard at 207-430-5679.

The specification requires ultra-high pressure oil burners meeting strict performance standards including 900-1800 PSI fuel injection, 30-40 percent air input reduction, and ETL or UL safety ratings compliant with standards UL 296, 296A, and 343. Anticipated benefits include 15-18 percent annual fuel use reduction and significant emissions reductions including 20 percent SO2, 25 percent NO and NOx, 15 percent CO2, 50 percent CO, and 60 percent SO reductions. The burner system must include an ultra-high pressure pump, one micron fuel filter, pressure accumulator, high-pressure fuel hose, and internal block fuel heater. Electrical requirements specify 110-volt operation integrated with existing boiler power. Warranty coverage includes two years for parts and one year for labor, excluding damage deemed user error. No substitutions are permitted, and bidders must coordinate delivery and installation by calling the designated contacts before items arrive at either facility.

View the file

Other files

File Type Posted
Terms, Conditions, and Instructions to Bidders rev 1-25-12.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid #14-014

Ultra High Pressure Oil Burner Specification Provide (2) ultra-high efficient oil burners specifically designed to reduce oil consumption and green house gases on existing boilers that range from 1,000,000 – 1,500,000 BTU/hr.

OVERVIEW

This specification outlines the performance requirements to provide an ultra-high pressure replacement fuel oil burner to existing Maine Army National Guard boilers. The replacement burner system must conform to and/or exceed the following design and performance standards and specifications. Performance at levels less than those specified below are not acceptable.

ITEM
DESCRIPTION
MINIMUM STANDARD
FUEL INJECTION PSI
Range of pounds per square inch (PSI) that fuel oil is injected
900-1800 PSI
AIR INJECTION
Amount or air input reduction over standard oil burner
30-40% reduction
CONSTRUCTION
System configuration components
Ultra-high pressure pump

1 micron high pressure fuel filter

Pressure accumulator

High pressure fuel hose

Burner modified to accept ultra-high pressure fuel injection

Block fuel heater (internal)

SAFETY RATINGS
Level of safety ratings required
ETL or UL fuel oil burner safety ratings required include UL 296, 296A, and 343 safety standards.
FUEL USE REDUCTION TARGET
Anticipated fuel use reduction amount
15-18% per year
ELECTRICAL
System electrical requirements
110volt

Wire in line with existing boiler power source

EMISSIONS
Target impact on emissions
20% reduction in SO2

25% reduction in NO

25% reduction in NOx

15% reduction in CO2

50% reduction in CO

60% reduction in SO

WARRANTY
Warranty coverage and limitations
Full two year warranty for parts and 1 year for labor unless inoperability is deemed user error
INSTALLATION AND TRAINING – Completed Within 30 Days of Award
Included
Full installation and service training for at least two technicians
LOCATION
Facility location
To be installed in two Armories - Houlton Armory and Sanford Armory (see address below)

TOTAL: _______________________

1. There are no Substitution's on any of these items.

2. Need to Submit Quote using this spreadsheet - ONLY

3. Deliver to Houlton Armory - 86 Pleasant Street, Houlton, Maine 04730 and

Sanford Armory - 88 William Oscar Emery Drive, Sanford, Maine 04073.

(Call David Pelletier at 207-430-5697 and/or Allen Ballard at 207-430-5679 before items are to be Delivered and Installed.)

4. Any questions please call David Pelletier at 207- 430-5697 or (c)207-557-2011.

5. I need a Name, telephone number and email address of person submitting the Quote.

File details come from the government source that posted it. Updated .