This is a Construction Bulletin issued by Newfield Construction for the Fred D. Wish Museum School Phase 2 Building Construction project located in Hartford, Connecticut (State Project No. 064-0318). The bulletin addresses three rebid bid packages: BP 2.13 Acoustical Ceilings (SA/DAS), BP 2.25 Communications/Low Voltage Systems (SA/PLA/DAS), and BP 2.26 Fire Alarm, Site Lighting, Security/BDA (SA/DAS). All bids are due on Monday, December 8, 2025, by 2:00 PM at Newfield's Main Office located at 225 Newfield Ave., Hartford, CT 06106. A virtual bid opening will be conducted immediately following the bid submission deadline via Microsoft Teams, with dial-in access available at 872-256-3970, ID: 235 295 582#. No in-person bid opening will occur. The bulletin specifically modifies BP 2.13 by requiring the deletion of Note 01.22 and replacement with updated specifications for matching ceiling access panels at six locations in the metal linear panel ceiling system, with panels custom fabricated from ceiling panel system materials per the USG Ceilings Plus Planx Universal installation guide.
Bidders must submit one original and one copy of required documentation including a completed Bid Form signed by a principal of the bidding firm, current City of Hartford MWBE Certificate (for Hartford Set-Aside Bidders) and/or current DAS MWBE Certificate (for DAS Set-Aside Bidders), a 10% Bid Bond or Bid Security (except Hartford Set-Aside Bidders), Department of Administrative Services Contractor Prequalification Certificate and Update Statement if required, verification of required experience through AIA Document A305 (Contractors Qualification Statement), and NCCI Form showing the most current Workers Compensation Experience Modification Factor. Hartford MWBE and DAS MWBE Certificates and the DAS Prequalification Certificate may be submitted up to 48 hours after the bid due date. Executed Letters of Assent are required for all PLA Bidders and may be submitted prior to the scope review meeting. NCCI Forms must be submitted with the bid or prior to the scope review meeting.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bull 2_11 Wish Ph2_11_19_25.pdf | ||
| Bull 2_11 Wish Ph2_11_19_25.pdf.crdownload | CRDOWNLOAD file | |
| 064-0318N_Jan_27_26_solicitation_doc.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Newfield Construction
Bulletin 2.12 Wish School Page 1 of 1
State Project No. 064-0318
BULLETIN NO. 2.12
Date: December 3, 2025
Fred D. Wish Museum School, Hartford, CT
Phase 2 Building Construction
1. The Bid Due Date and Time remain unchanged by this Bulletin- Monday, December 8, 2025. All bids must be submitted by 2:00 PM at Newfield’s Main Office, 225 Newfield
Ave., Hartford, CT 06106.
A virtual bid opening will be broadcast directly following receipt of the bids. There is no in-person bid opening.
Link to Bid Opening:
https://teams.microsoft.com/l/meetup-join/19%3ameeting_NGRiYzdkOTktYjcwYS00MWFmLTg2OTEtZjM0Yjc3NGFhOGUy%40thread.v2/
0?context=%7b%22Tid%22%3a%22eef47632-ec06-448f-8f91-
0a40b7f5a2f1%22%2c%22Oid%22%3a%2263be10d5-61b6-4ae8-8bc9-db70177a3641%22%7d
Dial In: 872- 256-3970, ID: 235 295 582#
2. Bid Submission: Submit one original and one copy of the following with the bid or as noted:
• Completed Bid Form with all acknowledgements signed by a principal of the bidding firm. (All Bidders)
• Current City of Hartford MWBE Certificate (Required for all Hartford Set-Aside Bidders) Submit with the bid or up to 48 hrs after the bid due date.
• Current DAS MWBE Certificate (Required for all DAS Set-Aside Bidders) Submit with the bid or up to 48 hrs after the bid due date.
• 10% Bid Bond or Bid Security (All Bidders except Hartford Set-Aside Bidders)
• Department of Administrative Services Contractor Prequalification Certificate and Update Statement (if required, can submit 48 hours after bid submission)
• Bidders must provide verification of required experience, see Contractors Qualification Statement (AIA
Document A305) (All Bidders)
• NCCI Form showing the most current Workers Compensation Experience Modification Factor (EMR) (all bidders, Submit with bid or prior to scope review meeting)
• Executed Letter of Assent (See PLA in Contracting Requirements, All PLA Bidders, Submit with bid or prior to scope review meeting)
3. Section 00 2413 BP 2.13 Acoustical Ceilings (SA/DAS)
Bid Package Notes:
DELETE Note 01.22 and REPLACE with: 01.22 Include matching ceiling access panels at 6 locations in the metal linear panel ceiling system. Panels shall be custom fabricated from the ceiling panel system materials. Reference the USG Ceilings Plus Planx Universal installation guide for details.