Text version

Date: RFI No.

RFP Reference (Sect/Para/Page) QUESTION GOVERNMENT RESPONSE

8/20/2018 1

Our information indicates that plans can be obtained from you. We would like to get a copy, and the specs if they are available, to determine if this is a good fit.

Please let me know if you need any additional information in order to send those.

The only the bid documents are the SOW, a single drawing, and base specifications. No other plans will be available for this project.

8/29/2018 2 Is the work to be done regular business hours? yes unless it is necessary to be done on off hours

8/29/2018 3 Who is moving the furniture? the base will move furniture electronics and personal items.

8/29/2018 4 Who is responsible for Electronic equipment ,computers, copiers.

See RFI answer 3

8/29/2018 5 Will there be a dumpster on site. no contractor will be responsible for providing a dumpster and tracking waste

8/29/2018 6 And is the work to be completed just in the shaded area?

no only carpet to be laid in the shaded areas

8/29/2018 7 And there wasn't any resilient base that I saw in the Purchase request?

See Statement of Work line items 2b and 3a

8/29/2018 8

SOW Provide/Install #1 states to paint all rooms. Can you please clarify if that includes rooms 305, 306, 308, 309, 310, 311, and 317? These rooms are not color coded on the drawings.

all rooms are to be painted except mechanical room 317 and 312 that is called out in SOW line item 1.

Pre-Bid RFI Log for MSG Remodel

8/29/2018 9

1) SOW Provide/Install #11 states to perform test and balance for the rooms shown. Has a test been performed on the system? Can you please provide additional information as to the HVAC system? Are these rooms served by a single system? Are there rooms not shown on the drawing that may be on the same system? If the air flow is high and there are dampers we can easily adjust the flow down. If the air flow is low we will need to balance that air from somewhere and that may include work to HVAC units or work in areas not shown on the drawings.

A test has not been performed on the system. The air handler for the floor HVAC is located in room 317 shown on the drawing. The air handler services the training room/former gym on the second floor and is the far east room on the second floor.

9/11/2018 10 Does the base currently hold a current contract with any Fire Alarm or Fire Suppression company? If not are we free to utilize any contractor of our choosing ?

They can use any fire alarm/fire suppression contractor they wish as long as they are licensed to do that type of work and hold certifications to work on and install the requested fire alarm/fire suppression systems.

Sheet1