BUILDING RENOVATIONS - CARDINAL SHEHAN CENTER 1494 MAIN ST
Solicitation number
CGB030252
Issued by
Fairfield County, Connecticut

About this file

This is an Invitation to Bid (ITB) issued by the City of Bridgeport, Connecticut's Department of Public Purchases for building renovations at the Cardinal Shehan Center located at 1494 Main Street. The project involves comprehensive renovation work including replacing approximately 18 double-hung windows with new welded frame vinyl windows, installing approximately 80 linear feet of leaders, replacing rubber mats, chairs, and padding, installing new vinyl flooring in hallways and offices, retiling the boy's locker room, updating lighting and acoustical ceiling, and painting the bathroom and locker room areas. The bid is due on Thursday, February 27, 2025 at 2:00 pm, with a mandatory site visit previously held on Tuesday, February 11, 2024 at 10:30 am. The contract requires a one-year warranty on all work, materials, and labor.

The project is funded through the Community Development Block Grant (CDBG) Program, with a focus on supporting low and moderate-income communities. The bid encourages participation from Minority Business Enterprises (MBE), Women Business Enterprises (WBE), and City-based Businesses (CBB), requiring certification documentation to be submitted with the bid. Payment terms are Net 45 Days, and all pricing must remain valid for 120 days from the bid opening date. The project will follow Davis-Bacon wage requirements, and contractors must secure all necessary permits, maintain insurance, and comply with all state and local building codes. The City reserves the right to reject any or all bids and to award the contract based on factors beyond just the lowest bid price.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID

CGB030252

BUILDING RENOVATIONS - CARDINAL SHEHAN

CENTER 1494 MAIN ST

CITY OF BRIDGEPORT

DEPARTMENT OF PUBLIC PURCHASES

999 BROAD STREET

BRIDGEPORT CT 06604

Submission Deadline:

Thursday, February 27, 2025 by 2:00 pm

Table Of Contents

1. Introduction

2. Bid Information

3. Statement of Work

4. Pricing

5. Submission Deadlines

6. Terms and Conditions

7. Vendor Questionnaire

Attachments:

A - ATTACHMENT A - CGB030252 PY48 Scope of Work and Specification

B - ATTACHMENT B CBG030252 PROJECT COMPLETION SCHEDULE

C - ATTACHMENT C DRAFT CONSTRUCTION CONTRACT CDBG PROGRAM

D - ATTACHMENT D - CBG030252 DAVIS- BACON WAGES 1-31-25

1. Introduction

The City of Bridgeport seeks bids for BUILDING RENOVATIONS - CARDINAL

SHEHAN CENTER 1494 MAIN ST.

The requirements of this bid are outlined in greater detail under Bid Information Section.

The selected awardee must meet all municipal, State and Federal practices and requirements.

Please note the City of Bridgeport encourages Minority business enterprises (MBE), Women business enterprises (WBE) and City-based businesses (CBB) to submit proposals. MBE, WBE or CBB State and/or City certification(s) showing the vendor’s current M/WBE and/or CBB status must be included as part of the proposal package at the time of submission for such status to be considered. For details, please see City Ordinance 3.12.130D

1.1. City Background

Bridgeport, the most populous city in Connecticut and the fifth-most populous in New England, is situated in eastern Fairfield County at the mouth of the Pequonnock River on Long Island

Sound. With a population of 148,654 in 2020, it is 60 miles from Manhattan and 40 miles from

The Bronx, forming part of the New York metropolitan area. The city borders Trumbull to the north, Fairfield to the west, and Stratford to the east. Bridgeport is a significant part of the

Greater Bridgeport Planning Region and the Bridgeport-Stamford-Norwalk-Danbury metropolitan statistical area, the second largest in Connecticut.

Since the early 21st century, Bridgeport has seen extensive redevelopment in its downtown and other neighborhoods. Bridgeport is home to several educational institutions, including the

University of Bridgeport, Housatonic Community College, Paier College, and part of Sacred

Heart University, as well as the state's only zoo, Connecticut's Beardsley Zoo. The city is also nicknamed "Park City" for its 35 public parks, covering 1,300 acres, including two large parks.

Despite not being headquartered in the city, over a dozen Fortune 500 companies are based in the metropolitan area shared with Stamford.

Bridgeport is a culturally vibrant city with three museums, numerous parks, and significant venues like Seaside Park, the Total Mortgage Arena, and the Hartford HealthCare Amphitheater.

The Barnum Museum and Connecticut's Beardsley Zoo are notable attractions, enhancing the city's cultural and recreational appeal. Recognized for its diversity, Bridgeport is consistently ranked among the 25 most ethnically and culturally diverse cities in the United States.

The Housing & Community Development Department works to address and mitigate the effects of poverty, homelessness and substandard housing in the city of Bridgeport.

The Community Development Block Grant (CDBG) Program is authorized under Title I of the

Housing and Community Development Act of 1974, as amended. The primary objective is the development of viable urban communities. These viable communities are achieved by providing the following, principally for persons of low and moderate income:

- Decent Housing

- A suitable living environment

- Expanded economic opportunities

2. Bid Information

The Invitation to Bid (ITB) is to obtain pricing information for BUILDING RENOVATIONS -

CARDINAL SHEHAN CENTER 1494 MAIN ST

Bid price submitted shall be firm fixed and valid through JUNE 30, 2025.

No added freight or fuel surcharges will be permitted at the time of or after the initial order. All pricing submitted shall be furnished and delivered to the following address: 999 BROAD ST, 2ND FLOOR BPT, CT 06604.

For general information please contact Ann Binkley for any technical question must be posted on procurement portal . All inquiries regarding this bid must be presented in writing and may be posted directly on the procurement portal, OpenGov. The cut-off date for questions is 5:00 pm on Tuesday, February 18, 2025. All answers will be published by 5:00 pm on Friday, February

21, 2025.

No work or deliveries shall be performed under the contract award until the purchase order has been issued by the purchasing department.

3. Statement of Work

Exterior Windows

• The contractor will field approximately eighteen (18) double hung windows. Remove all broken and deteriorated windows and dispose of them legally off site.

• Contractor will purchase and install new welded frame vinyl windows to match same type and style that currently exists.in building. Vinyl windows shall have low-e argon gas as part of the windows energy efficiency.

• All windows will be installed plumb and level. Windows will need to be shimmed as part of the installation. All windows will be filled with batt and foam insulation to fill any voids or air pockets when installing new windows. Before windows are inserted into place all exterior window stops will be clean, caulked, and new windows will be pushed against exterior stop to make a weather tight seal.

• If the interior or exterior window trim stops are damaged, the contractor will purchase and modify to match the existing if necessary. Install new window stops and trims to match existing ones.

The contractor will patch and paint to match existing window trim. All interior and exterior stops will be reinstalled if not damaged. All window trim must be painted.

• All stops will be nailed and caulked where the windows meet the stop, and at the beginning of the window stop for a total of three separate caulking. All trim will be painted with one coat of primer and one coat of finish. The contractor will smoothly finish all exterior & interior caulking that's adjacent to all windows, so they are aesthetically pleasing.

• Contractor will repair or replace aluminum coil over existing exterior window trim if damage as part of the installation. The contractor will repair or replace any vinyl siding materials as part of their installation. Any damage from the installation of the new windows in this area will be the sole responsibility of the contractor to make all matching necessary repairs.

Leaders

• Contractor will field measure leaders buy and replace est.80’ linear ft. of leaders and install into existing drains. Contractor will purchase and install new leaders to existing building. Leaders will be secured with proper leader screws (brown). Galvanized or coated screws will be accepted if colored screws are not available. Contractor will install gutter seal to all joints and splices.

Contractor will ensure proper fit and pitch to building. Contractors will use no less than 032-gauge leaders. The owner to pick color (Brown).

Rubber Mats

• Contractor will field measure and replace the existing rubber or vinyl floor mats by water fountain roughly 4x12sf and vending machines 5x30 sf.

Chairs

• Contractor will purchase and replace the existing deteriorated sitting foldable chairs in gym area with color red with white lettering same in-kind. The contractor will have padding same in-kind, and lettering approved by owner. The number of the chairs to be replaced is thirty (30).

Padding

• Contractor will purchase and install approved padding on both upper basketball hoops color red sane in-kind.

Vinyl Flooring

• Contractor will prep the existing floors in hallways, and landing flooring in all hallways on office floor. The prepping of the floor is to receive new flooring including patching and a smooth finish.

• Contractor will field measure these areas by removing existing carpet in upstairs and downstairs areas and discard to legal dumping area. Contractor will field measure purchase and install new vinyl flooring to these areas including landings. One (1) office upstairs and gym area office on lower level roughly twelve hundred sf (1,200). Contractor will also remove the existing vinyl base and discard. Buy and install vinyl base same in-kind to the same areas.

• Contractor will purchase and install Home Depot Life Proof Rigid Core Luxury Vinyl Flooring or equal for installation in these areas. This floor is a floating floor contractor will follow all manufacture recommendation for the installation of this floor. Including all accessories but not limited to reducers, transition strips,1/4 round, t-molding or what is needed for the completion of this flooring project. (Owner to pick color). Contractor will buy and install new vinyl base in these areas (Owner to pick color).

Boy’s Locker Room Tiling

• Contractor will field measure the existing flooring roughly 20 x 25 sf in the boy’s locker room and bath area. Demo the existing flooring tiles and remove to a legal dumping area.

• Contractor will patch and level the existing cement floor before installing new tiles. Contractor will patch and paint the existing baseboard cement. Contractor will buy and install new mosaic tiles no larger than two inches (2”) in-kind to this area floor and install with thinset cement.

Contractor will ensure that the newly installed flooring is level with no and high & low areas.

(Owner to pick color and style).

Lighting

• Contractor will buy and replace the existing lighting in locker room with new 2’ x 4’ LED lights.

Contractor will jack chain to ceiling joist the new LED light fixture. All four corners of the new light fixtures will be connected and placed in the ceiling grids without stress to lights & grids.

Acoustical Ceiling

• Contractor will remove all ceiling tiles and grids throughout locker room area and discard to a legal dumping area. Contractor will Purchase and install new 2x4 ceiling tiles and grids to this area roughly 20 x 25sf. (Owner to pick style).

Bathroom

• Contractor will scrape patch and paint the entire bathroom & locker-room areas.

3.1. Qualification Expectations

Eligible respondents must be able to demonstrate the following:

3.2.1 Demonstrated experience with projects like this project. To be qualified, the proposed project awardee for this project must have recently and successfully completed recent projects with similar scope and complexity and shall provide references for those projects.

3.2.2 Demonstrated experience with municipalities like the City of Bridgeport. Any additional information which demonstrates the respondent’s ability to perform the required work not already mentioned herein, must be provided.

3.2.3 Assigned Staff and office support must have the necessary experience, organization, and professional skills and facilities to successfully perform the required services described in the scope of work in this BID. Description of the firm’s composition with identification of roles of all anticipated employees and/or subcontractors, if any. Resumes of key personnel are required for all key personnel.

3.2.4 No pending criminal litigation or criminal charges against the firm, Principal

Owners, Partners, Corporate Officers, or management Personnel.

3.2. Project Description

Please see attachment A for detailed scope of work

3.3. Key Deliverables

• Contractor will warrant all work, equipment, materials, and labor for a period of one (1) year.

• Contractor SHALL NOT negotiate directly with homeowners for any changes to this contract. Any changes will be brought to the attention of the Office of The

Housing Community Development office.

• Contractor will secure all necessary permits and follow all current State and local building codes for the duration of this project. Contractor will have and maintain all necessary certificates of insurance for the duration of this project. All work will be done in a professional manner throughout the duration of this project. All waste must be discarded in a legal manner.

• Contractor will keep the worksite clean daily (Construction or Working Area) until the construction is complete. Contractor will adhere to all OSHA safety standards while working on the site.

• Contractor cannot deviate from the specs without permission from construction manager. Contractor cannot negotiate with homeowner under any circumstances.

• Contractor will fill in each line item. Not filling each line could result in not being awarded this contract.

3.4. Project Completion Schedule

Please see Attachment B

3.5. Pricing

All pricing must be valid for no less than one hundred and twenty (120) days from the BID opening date. Services and materials for this project are exempt from State of Connecticut sales tax.

3.6. Payment Terms

Payment terms are Net 45 Days.

4. Pricing

CGB030253 - LINE ITEM PRICING SPECIFICATIONS

CGB030253 LINE ITEM PRICING

SPECIFICATIONS

Line Item Description Quantity Unit of

Measure Unit Cost Total

1 WINDOWS 1 each

2 LEADERS 1 each

3 RUBBER MATS 1 each

4 CHAIRS 1 each

5 PADDING 1 each

6 VINYL FLOOR 1 each

7 BOY'S LOCKER ROOM TILING 1 each

8 LIGHTING 1 each

9 ACOUSTICAL CEILING 1 each

10 BATHROOM 1 each

TOTAL

CGB030253 PROJECT BUDGET

Line Item Description Quantity Unit of

Measure Unit Cost Total

1 PROJECT MATERIALS COST 1 each

2 PROJECT LABOR COSTS 1 each

TOTAL

5. Submission Deadlines

5.1. Contacting the City of Bridgeport

The exclusive means by which all prospective respondents may obtain ITB packages, direct inquires, request and receive addenda and supplemental information, and submit proposals shall be through the City of Bridgeport’s bidding platform.

The City of Bridgeport has made it possible for vendors to view our solicitations, download bid packages and ask questions, free of charge.

Instructions to do so are as follows:

1. Go to the procurement portal, OpenGov

2. Click on any bid you see. It will take you that bid’s page.

3. On the right-hand side of the page, click on Register now for free!

4. After you register, you'll be able to view/download or ask questions on any bid you have interest in.

If you have any trouble registering on the procurement portal, please email OpenGov at procurement-support@opengov.com

Addenda Notification: Respondents are required to register on the procurement portal, OpenGov. Once the respondent has completed registration, they will receive addenda notifications in their email. Ultimately, it is the sole responsibility of each respondent to periodically check the site for any addenda.

General Information: All inquiries regarding this bid must be presented in writing and may be posted directly on the procurement portal, OpenGov. The cut-off date for questions is Tuesday, February 18, 2025 at 5:00pm and answers will be posted Friday, February 21, 2025 by 5:00pm on the procurement portal.

5.2. Submission Instructions

Submissions are encouraged to be made electronically through the OpenGov site at https://procurement.opengov.com/portal/bridgeportct no later than 2:00 pm on Thursday, February, 27, 2025.

Submissions may also be made as follows:

ONE (1) ORIGINAL, AND ONE (1) ELECTRONIC VIA THUMBDRIVE MUST BE

SUBMITTED.

Sealed submissions must be received and time-stamped by the Department of Public Purchases prior to BID closing time. No submission received after closing time will be considered. The opening will be in the City of Bridgeport Department of Public Purchases’ Conference Room. To ensure proper handling and avoid misdirected delivery, please mark your BID envelope as follows:

CGB030252 — BUILDING RENOVATIONS - CARDINAL SHEHAN CENTER

1494 MAIN STREET

Submissions to:

Ann Binkley City of Bridgeport Department of Public Purchases 2nd floor, 999 Broad Street Bridgeport, CT 06604

5.3. Compliance

Certificates of Insurance: Certificates of insurance will be required from the awarded contractor prior to the commencement of any work and shall be furnished to the Department of

Public Purchases, Margaret E. Morton Government Center, Second Floor, 999 Broad Street, Bridgeport, Connecticut 06604 and must be shown to the City of Bridgeport as an additional insured with thirty (30) days’ notice for cancellation or non-renewal of policy. A copy of the endorsement insurance will also be required for this project.

No Conflicts| Disclosure: the awarded contractor must accurately complete and submit the No

Conflicts/Disclosure Form when it receives a Notice of Intent to Award. Failure to submit the No

Conflicts within three (3) business days of receipt of the Notice of Intent may result in the loss of the award.

Non-Collusion Affidavit: all bidders must accurately complete and submit non-collusion affidavits with all bids or bids will be considered non-responsive.

Addendums: all bidders shall check the procurement portal regularly to see if any addendums are issued.

Contract Award Requirements: the contract award will require that the successful will require that the successful vendor have a valid SAM, DUNS, CT, and Federal Tax ID numbers prior to commencing work.

https://procurement.opengov.com/portal/bridgeportct

Late Submissions: The City of Bridgeport will not assume responsibility if a submission is misdirected, or its delivery is delayed. The city will not accept late submission. It shall be the sole responsibility of the submitter to pay for any type of delivery service charge, and to see that the Office of the Purchasing Agent receives his/her submission on time. The clock used shall be the Purchasing Agent’s official date and time stamp clock. The City does not assume financial responsibility for late deliveries by the U.S. Postal System or any other delivery service.

Expenses: The City shall not be responsible for and/or shall not pay any costs associated with the preparation, submission, or presentation of any submission, or costs incurred by the responding firms during the interview and negotiations phase of the solicitation process

Information and Materials: Any information or materials submitted to this ITB shall become the property of the City of Bridgeport and will not be returned. All submitted materials will be available for public review.

Dates: Please keep in mind dates are estimates only and are subject to change.

5.4. Reservation of Rights

This solicitation is for an “Invitation to Bid (ITB) only”. This invitation to bid is not to be construed as a specific proposal or an offer to buy any products or services. Notwithstanding anything else herein to the contrary, the City expressly reserves all rights in its sole discretion and in the best interests of the City at any time prior to the selection of a preferred respondent and purchase order:

Bid Rejection: The City of Bridgeport reserves the right to reject any and all bids in whole or in part or to accept any bid, in its sole discretion if doing so deemed to be in the best interest of the

City of Bridgeport. This includes the right to reject any or all bids or to decline to make an award. Further, the City of Bridgeport reserves the right to make an award to more than one bidder or make awards not based solely on low bid when time is of the essence.

MSDS: The City of Bridgeport may request MSDS (Material Safety Data Sheets) or additional product information and literature or samples on any brands or products proposed as equivalents to those listed herein prior to award or to be included with shipment.

Tax Delinquency: The City of Bridgeport reserves the right to ensure bidders are not delinquent on any City real estate and personal property taxes, ate the time of bid opening.

Purchase Order - Contract Award: The City of Bridgeport reserves the right to award a purchase order to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the City of Bridgeport in terms of cost. Other factors such as lead time, equipment, availability and other factors specified in this solicitation may be considered.

Bid Dates: The City of Bridgeport reserves the right to modify any dates other terms of the ITB upon posting notice.

Liability: the City of Bridgeport is not liable to any Respondent for damages of any type, however arising.

5.5. Additional Bid Requirements

Title: vendors are prohibited from assigning, transferring, conveying, subletting, or otherwise disposing of the ultimate contract award or its rights, title or interest therein or its power to execute such agreement to any other person, company or corporation without the prior consent and approval in writing by the City.

Taxes: bidders should not include any taxes in their quotation for which the city is not liable. The City of Bridgeport will issue tax-exempt certificates covering the work upon request.

Minority and Buy Local: The City of Bridgeport Minority and Buy Local Program Ord.

3.12.130 E, may be applicable to this project.

Minority Business Enterprise (MBE) and, or as a City Based Business (CBB): In conjunction with this invitation, certifications of the vendors current MBE and, or CBB status must be included as part of the bid package at the time of the bid submission. Consistent with the terms of City Ordinance 3.12.130 no submission either MBE or CBB certification will be accepted when such certifications(s) is, are not submitted as part of the bid package at the time of bid submission. For MBE | CBB certification information, please contact Mr. Jason

Chandersingh, Special Project Coordinator, Small & Minority Business Resource Center at (203)

576-7110, jason.chandersingh@bridgeportct.gov

6. Terms and Conditions

6.1. Terms and Conditions

All City of Bridgeport contracture terms, conditions, and requirements apply.

6.2. Openness of Procurement Process

Written responses, other discussions, correspondence, and all other pertinent records shall be handled as public records in compliance with State and Federal open records statutes and regulations.

6.3. Errors and Omissions

Once a response is submitted, the City of Bridgeport may consider requests by any contractor to correct errors or omissions but shall retain sole discretionary authority to determine the outcome of such a request.

6.4. Collusion

By offering a response to this ITB the supplier certifies that no attempt has been made or will be made by the consultant to induce any other person or firm to submit or not to submit a proposal for the purpose of restricting competition. All persons interested in this project, principal or principals being named therein, and no other person have an interest in this project or in the

Agreement which they may participate in. No person or agency has been employed or retained to solicit or secure this Agreement upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee, excepting legitimate employees or established mailto:jason.chandersingh@bridgeportct.gov commercial agencies maintained by the consultant for the purpose of doing business. All firms interested in this project (including the firm's employees, representatives, agents, lobbyists attorneys and subconsultants) will refrain, under penalty of disqualification, from direct or indirect contact for the purpose of influencing the selection or creating bias in the selection process with any person who may play a part in the selection process, including the evaluation panel and other administrative staff. The policy is intended to create a level playing field for all potential firms; assure that contract decisions are made in public and to protect the integrity of the selection process.

6.5. Suspension and Debarment

The City will not participate in contracts with parties that have been debarred, suspended or excluded from Federal assistance programs per 2 CFR part 180 and part 1532 and 40 CFR part

31.35. Further, the respondent is required to verify that the respondent, or its principals, as defined at 49 CFR 19.995, or affiliates, as defined at 49 CFR 29.905, are excluded or disqualified as defined at 49 CFR 29.40 and 29.945

The respondent is required to comply with 49 CFR 29, Subpart C and must include the requirement to comply with 49 CFR 29, Subpart C in any lower-tier covered transaction it participates in.

By signing and submitting its bid or proposal, the respondent or proposer certifies as follows:

The certification in this clause is a material representation of fact relied upon by the City if it is later determined that the respondent or proposer knowingly rendered an erroneous certification, in addition to remedies available to the City the Federal Government may pursue available remedies, including but not limited to suspension and/or debarment. The respondent or proposer agrees to comply with the requirements of 49 CFR 29, Subpart C while this offer is valid and throughout the period of any contract that may arise from this offer. The respondent or proposer further agrees to include a provision requiring such compliance in its lower-tier covered transactions.

7. Vendor Questionnaire

1. Federal I.D. Number or Social Security Number:*

*Response required

2. Confirmation*

Pursuant to and in compliance with your Invitation To Bid relating thereto, the submitter states that he has examined the Contract Documents and the site of the work, and that he understands the purport and magnitude of the work intended, and the undersigned hereby offers to furnish all plant, materials, supplies, equipment, labor, and other facilities and things necessary or proper for or incidental to, the proper construction of the work, and to construct the said work in strict accordance with the Contract Documents and such detailed directions, plans, and drawings as may be furnished from time to time during the progress of construction by the Engineer at the following unit and lump sum prices which prices include all incidental work, viz.

☐ Please confirm

*Response required

3. Contractor's License Number*

*Response required

4. Contractor's Certification of Surety*

Please download the below documents, complete, and upload.

• Contractor's_Certification_...

*Response required

5. Contractor's Designation of Compliance Officer*

Please download the below documents, complete, and upload.

• Contractor's_Designation_of...

*Response required

6. Contractor's Good Standing Certification*

Please download the below documents, complete, and upload.

• Contractor's_Good_Standing_...

*Response required

7. Contractor's MWBE Utilization Form*

Please download the below documents, complete, and upload.

• Contractor's_MWBE_Utilizati...

*Response required

8. Equal Opportunity Policy Statement*

Please download the below documents, complete, and upload.

• Equal_Opportunity_Policy_St...

*Response required

9. Mandatory Good Faith Efforts-Waivers-Exceptions*

Please download the below documents, complete, and upload.

• Mandatory_Good_Faith_Effort...

*Response required

10. No Conflicts-Disclosure Form*

Please download the below documents, complete, and upload.

https://government-project.s3.us-west-2.amazonaws.com/115403/e5aa1a6f-6b99-4f8f-af4f-c380ae23d501_Contractor%27s_Certification_of_Surety.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4BKFHK7M2%2F20250220%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250220T185636Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJv%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQCamZC2qscFCmKprKrXlH3IPHGDzB%2BVTMH%2BvLVmVdY4bgIgfSGBa9SVrhlIKOxuPqaCF77pz7OcIMr%2FrkOqamS87W0qjAUIxP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDAqtD%2FrGn2%2Fv7mYxYCrgBBjNJUTVDhWWWxOSh5KT3TMaC9D%2F2o3vnCorSdglIXV7wcM5we9W2TiBzgXYXzEucZHNNvSO4tu8VlcXN4EKepTtnCEIhaPRZZ863DCDy7JeqzZoUmSoq3y1qzKwDqM6GdS2bR643PJxeYMjDjJuiAuLFX4dmiTT5KPmx8BYguo1s2EL2XQL925v1G8nmwDxcW0bvOYYsRUi8RPF4RAmcYQ3t8GXmzN83BGV807ZyX4sv3sgJfpXw7S7jwMWd29G5eRhqp3FkS4xjhbkSPxWBN%2B8lW2BUEugMG0JURhKj5JfF%2FTTo8A505tA5Dh2Eji7f7z0StbpsnHr785exEW6W1mkFfqbBzK%2B17GGQQjWtgA3w7brrPCLilxAQgwtJJ%2FpJwYKUn4Lt7r%2FjUieipGhfPhOLMgy9mYAvCFqqANB9a9u0JBUQr5sa2oVHnjd43E16TltYsWmlWUiI5yuw0OnWvxWiEVksRGjwYWs8QpXxXWUlCw01rWsMzf0hCSJBk0oWySmdVS5N%2FO5ExmuOQJd%2Fdk0C5d9IbbttSpbpAlQRfPs9kauhcetps3a4ElWVJAmlLgsH3Z9R%2BQFOUepfCxDKzMLcKzBJByECTbXLzBN783dgUWnyEy5PLbfv6D8DXVSJT0E083JJ%2Fhl%2BsmZY4Y19bJBucf3Ag5EIb3b1qwjaGggptKFtbKM4u9AcKk6xwhrHNE9ufUcYtbc14D4mSAj6J7gOOiipeI97pxJMDpt3ZdMkbXjGS3dXhqH8Wr9plU3CY8LlK5F4XxUPsHmPVBcVhVRkxvEfm1TtSs2RqT3%2BuwXMJP03b0GOpsBHOwPfSGJiHLjiLPolXOzWP4Hr4VusogxzcjECEzV7hQNhhyN9%2BonjQ1nM0PzGXvAn5ih%2BkWBmEnt6mVwywWCnuPUYkeXsKMdzwQZqpuKVqZYVgOs04vY2jJeuq319aGsoEFQcCjRHkkn9qfK20kbgo%2F1iLJ4vjuSORiFCr6VdZGoY%2FwvQ%2BtkXqFucZSR9Sl%2Bdfnmj9C3quOM7D8%3D&X-Amz-Signature=314d7711e67fadb669aadd769b405304d22f5e3ea588131e42b9d0df90a3a791&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_Certification_of_Surety.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/75efbd30-4945-4f69-a730-84ce2633da7b_Contractor%27s_Designation_of_Compliance_Officer.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4BKFHK7M2%2F20250220%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250220T185636Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJv%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQCamZC2qscFCmKprKrXlH3IPHGDzB%2BVTMH%2BvLVmVdY4bgIgfSGBa9SVrhlIKOxuPqaCF77pz7OcIMr%2FrkOqamS87W0qjAUIxP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDAqtD%2FrGn2%2Fv7mYxYCrgBBjNJUTVDhWWWxOSh5KT3TMaC9D%2F2o3vnCorSdglIXV7wcM5we9W2TiBzgXYXzEucZHNNvSO4tu8VlcXN4EKepTtnCEIhaPRZZ863DCDy7JeqzZoUmSoq3y1qzKwDqM6GdS2bR643PJxeYMjDjJuiAuLFX4dmiTT5KPmx8BYguo1s2EL2XQL925v1G8nmwDxcW0bvOYYsRUi8RPF4RAmcYQ3t8GXmzN83BGV807ZyX4sv3sgJfpXw7S7jwMWd29G5eRhqp3FkS4xjhbkSPxWBN%2B8lW2BUEugMG0JURhKj5JfF%2FTTo8A505tA5Dh2Eji7f7z0StbpsnHr785exEW6W1mkFfqbBzK%2B17GGQQjWtgA3w7brrPCLilxAQgwtJJ%2FpJwYKUn4Lt7r%2FjUieipGhfPhOLMgy9mYAvCFqqANB9a9u0JBUQr5sa2oVHnjd43E16TltYsWmlWUiI5yuw0OnWvxWiEVksRGjwYWs8QpXxXWUlCw01rWsMzf0hCSJBk0oWySmdVS5N%2FO5ExmuOQJd%2Fdk0C5d9IbbttSpbpAlQRfPs9kauhcetps3a4ElWVJAmlLgsH3Z9R%2BQFOUepfCxDKzMLcKzBJByECTbXLzBN783dgUWnyEy5PLbfv6D8DXVSJT0E083JJ%2Fhl%2BsmZY4Y19bJBucf3Ag5EIb3b1qwjaGggptKFtbKM4u9AcKk6xwhrHNE9ufUcYtbc14D4mSAj6J7gOOiipeI97pxJMDpt3ZdMkbXjGS3dXhqH8Wr9plU3CY8LlK5F4XxUPsHmPVBcVhVRkxvEfm1TtSs2RqT3%2BuwXMJP03b0GOpsBHOwPfSGJiHLjiLPolXOzWP4Hr4VusogxzcjECEzV7hQNhhyN9%2BonjQ1nM0PzGXvAn5ih%2BkWBmEnt6mVwywWCnuPUYkeXsKMdzwQZqpuKVqZYVgOs04vY2jJeuq319aGsoEFQcCjRHkkn9qfK20kbgo%2F1iLJ4vjuSORiFCr6VdZGoY%2FwvQ%2BtkXqFucZSR9Sl%2Bdfnmj9C3quOM7D8%3D&X-Amz-Signature=9e2bcf970b2380a46248b196de5238f3b254ab23ca32495eb0687ac404062271&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_Designation_of_Compliance_Officer.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/8d9bf061-767f-4716-a5fe-0d8d8ec81783_Contractor%27s_Good_Standing_Certification.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4BKFHK7M2%2F20250220%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250220T185636Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJv%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQCamZC2qscFCmKprKrXlH3IPHGDzB%2BVTMH%2BvLVmVdY4bgIgfSGBa9SVrhlIKOxuPqaCF77pz7OcIMr%2FrkOqamS87W0qjAUIxP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDAqtD%2FrGn2%2Fv7mYxYCrgBBjNJUTVDhWWWxOSh5KT3TMaC9D%2F2o3vnCorSdglIXV7wcM5we9W2TiBzgXYXzEucZHNNvSO4tu8VlcXN4EKepTtnCEIhaPRZZ863DCDy7JeqzZoUmSoq3y1qzKwDqM6GdS2bR643PJxeYMjDjJuiAuLFX4dmiTT5KPmx8BYguo1s2EL2XQL925v1G8nmwDxcW0bvOYYsRUi8RPF4RAmcYQ3t8GXmzN83BGV807ZyX4sv3sgJfpXw7S7jwMWd29G5eRhqp3FkS4xjhbkSPxWBN%2B8lW2BUEugMG0JURhKj5JfF%2FTTo8A505tA5Dh2Eji7f7z0StbpsnHr785exEW6W1mkFfqbBzK%2B17GGQQjWtgA3w7brrPCLilxAQgwtJJ%2FpJwYKUn4Lt7r%2FjUieipGhfPhOLMgy9mYAvCFqqANB9a9u0JBUQr5sa2oVHnjd43E16TltYsWmlWUiI5yuw0OnWvxWiEVksRGjwYWs8QpXxXWUlCw01rWsMzf0hCSJBk0oWySmdVS5N%2FO5ExmuOQJd%2Fdk0C5d9IbbttSpbpAlQRfPs9kauhcetps3a4ElWVJAmlLgsH3Z9R%2BQFOUepfCxDKzMLcKzBJByECTbXLzBN783dgUWnyEy5PLbfv6D8DXVSJT0E083JJ%2Fhl%2BsmZY4Y19bJBucf3Ag5EIb3b1qwjaGggptKFtbKM4u9AcKk6xwhrHNE9ufUcYtbc14D4mSAj6J7gOOiipeI97pxJMDpt3ZdMkbXjGS3dXhqH8Wr9plU3CY8LlK5F4XxUPsHmPVBcVhVRkxvEfm1TtSs2RqT3%2BuwXMJP03b0GOpsBHOwPfSGJiHLjiLPolXOzWP4Hr4VusogxzcjECEzV7hQNhhyN9%2BonjQ1nM0PzGXvAn5ih%2BkWBmEnt6mVwywWCnuPUYkeXsKMdzwQZqpuKVqZYVgOs04vY2jJeuq319aGsoEFQcCjRHkkn9qfK20kbgo%2F1iLJ4vjuSORiFCr6VdZGoY%2FwvQ%2BtkXqFucZSR9Sl%2Bdfnmj9C3quOM7D8%3D&X-Amz-Signature=e475b96d7e208e3c84dae635d48bb6a406fcdf8792d310e5bfb371515abea6a7&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_Good_Standing_Certification.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/a2e401a8-0a6b-4dee-8b6c-a19d3aab26eb_Contractor%27s_MWBE_Utilization_Form.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4BKFHK7M2%2F20250220%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250220T185636Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJv%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQCamZC2qscFCmKprKrXlH3IPHGDzB%2BVTMH%2BvLVmVdY4bgIgfSGBa9SVrhlIKOxuPqaCF77pz7OcIMr%2FrkOqamS87W0qjAUIxP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDAqtD%2FrGn2%2Fv7mYxYCrgBBjNJUTVDhWWWxOSh5KT3TMaC9D%2F2o3vnCorSdglIXV7wcM5we9W2TiBzgXYXzEucZHNNvSO4tu8VlcXN4EKepTtnCEIhaPRZZ863DCDy7JeqzZoUmSoq3y1qzKwDqM6GdS2bR643PJxeYMjDjJuiAuLFX4dmiTT5KPmx8BYguo1s2EL2XQL925v1G8nmwDxcW0bvOYYsRUi8RPF4RAmcYQ3t8GXmzN83BGV807ZyX4sv3sgJfpXw7S7jwMWd29G5eRhqp3FkS4xjhbkSPxWBN%2B8lW2BUEugMG0JURhKj5JfF%2FTTo8A505tA5Dh2Eji7f7z0StbpsnHr785exEW6W1mkFfqbBzK%2B17GGQQjWtgA3w7brrPCLilxAQgwtJJ%2FpJwYKUn4Lt7r%2FjUieipGhfPhOLMgy9mYAvCFqqANB9a9u0JBUQr5sa2oVHnjd43E16TltYsWmlWUiI5yuw0OnWvxWiEVksRGjwYWs8QpXxXWUlCw01rWsMzf0hCSJBk0oWySmdVS5N%2FO5ExmuOQJd%2Fdk0C5d9IbbttSpbpAlQRfPs9kauhcetps3a4ElWVJAmlLgsH3Z9R%2BQFOUepfCxDKzMLcKzBJByECTbXLzBN783dgUWnyEy5PLbfv6D8DXVSJT0E083JJ%2Fhl%2BsmZY4Y19bJBucf3Ag5EIb3b1qwjaGggptKFtbKM4u9AcKk6xwhrHNE9ufUcYtbc14D4mSAj6J7gOOiipeI97pxJMDpt3ZdMkbXjGS3dXhqH8Wr9plU3CY8LlK5F4XxUPsHmPVBcVhVRkxvEfm1TtSs2RqT3%2BuwXMJP03b0GOpsBHOwPfSGJiHLjiLPolXOzWP4Hr4VusogxzcjECEzV7hQNhhyN9%2BonjQ1nM0PzGXvAn5ih%2BkWBmEnt6mVwywWCnuPUYkeXsKMdzwQZqpuKVqZYVgOs04vY2jJeuq319aGsoEFQcCjRHkkn9qfK20kbgo%2F1iLJ4vjuSORiFCr6VdZGoY%2FwvQ%2BtkXqFucZSR9Sl%2Bdfnmj9C3quOM7D8%3D&X-Amz-Signature=abae3f067c9501356fa7d86c16d11baeffe312093b103816d0bbc3beac626567&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_MWBE_Utilization_Form.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/5b16fe76-119d-4555-9b91-564f8a193a43_Equal_Opportunity_Policy_Statement.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4BKFHK7M2%2F20250220%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250220T185636Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJv%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQCamZC2qscFCmKprKrXlH3IPHGDzB%2BVTMH%2BvLVmVdY4bgIgfSGBa9SVrhlIKOxuPqaCF77pz7OcIMr%2FrkOqamS87W0qjAUIxP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDAqtD%2FrGn2%2Fv7mYxYCrgBBjNJUTVDhWWWxOSh5KT3TMaC9D%2F2o3vnCorSdglIXV7wcM5we9W2TiBzgXYXzEucZHNNvSO4tu8VlcXN4EKepTtnCEIhaPRZZ863DCDy7JeqzZoUmSoq3y1qzKwDqM6GdS2bR643PJxeYMjDjJuiAuLFX4dmiTT5KPmx8BYguo1s2EL2XQL925v1G8nmwDxcW0bvOYYsRUi8RPF4RAmcYQ3t8GXmzN83BGV807ZyX4sv3sgJfpXw7S7jwMWd29G5eRhqp3FkS4xjhbkSPxWBN%2B8lW2BUEugMG0JURhKj5JfF%2FTTo8A505tA5Dh2Eji7f7z0StbpsnHr785exEW6W1mkFfqbBzK%2B17GGQQjWtgA3w7brrPCLilxAQgwtJJ%2FpJwYKUn4Lt7r%2FjUieipGhfPhOLMgy9mYAvCFqqANB9a9u0JBUQr5sa2oVHnjd43E16TltYsWmlWUiI5yuw0OnWvxWiEVksRGjwYWs8QpXxXWUlCw01rWsMzf0hCSJBk0oWySmdVS5N%2FO5ExmuOQJd%2Fdk0C5d9IbbttSpbpAlQRfPs9kauhcetps3a4ElWVJAmlLgsH3Z9R%2BQFOUepfCxDKzMLcKzBJByECTbXLzBN783dgUWnyEy5PLbfv6D8DXVSJT0E083JJ%2Fhl%2BsmZY4Y19bJBucf3Ag5EIb3b1qwjaGggptKFtbKM4u9AcKk6xwhrHNE9ufUcYtbc14D4mSAj6J7gOOiipeI97pxJMDpt3ZdMkbXjGS3dXhqH8Wr9plU3CY8LlK5F4XxUPsHmPVBcVhVRkxvEfm1TtSs2RqT3%2BuwXMJP03b0GOpsBHOwPfSGJiHLjiLPolXOzWP4Hr4VusogxzcjECEzV7hQNhhyN9%2BonjQ1nM0PzGXvAn5ih%2BkWBmEnt6mVwywWCnuPUYkeXsKMdzwQZqpuKVqZYVgOs04vY2jJeuq319aGsoEFQcCjRHkkn9qfK20kbgo%2F1iLJ4vjuSORiFCr6VdZGoY%2FwvQ%2BtkXqFucZSR9Sl%2Bdfnmj9C3quOM7D8%3D&X-Amz-Signature=c20d5e10d7d7f61150b3d48861222bc943701065b80a32b9522db9599d277a2c&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Equal_Opportunity_Policy_Statement.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/5e2a342c-4e1b-495e-bcd0-968e0b09d858_Mandatory_Good_Faith_Efforts-Waivers-Exceptions.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4BKFHK7M2%2F20250220%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250220T185636Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJv%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQCamZC2qscFCmKprKrXlH3IPHGDzB%2BVTMH%2BvLVmVdY4bgIgfSGBa9SVrhlIKOxuPqaCF77pz7OcIMr%2FrkOqamS87W0qjAUIxP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDAqtD%2FrGn2%2Fv7mYxYCrgBBjNJUTVDhWWWxOSh5KT3TMaC9D%2F2o3vnCorSdglIXV7wcM5we9W2TiBzgXYXzEucZHNNvSO4tu8VlcXN4EKepTtnCEIhaPRZZ863DCDy7JeqzZoUmSoq3y1qzKwDqM6GdS2bR643PJxeYMjDjJuiAuLFX4dmiTT5KPmx8BYguo1s2EL2XQL925v1G8nmwDxcW0bvOYYsRUi8RPF4RAmcYQ3t8GXmzN83BGV807ZyX4sv3sgJfpXw7S7jwMWd29G5eRhqp3FkS4xjhbkSPxWBN%2B8lW2BUEugMG0JURhKj5JfF%2FTTo8A505tA5Dh2Eji7f7z0StbpsnHr785exEW6W1mkFfqbBzK%2B17GGQQjWtgA3w7brrPCLilxAQgwtJJ%2FpJwYKUn4Lt7r%2FjUieipGhfPhOLMgy9mYAvCFqqANB9a9u0JBUQr5sa2oVHnjd43E16TltYsWmlWUiI5yuw0OnWvxWiEVksRGjwYWs8QpXxXWUlCw01rWsMzf0hCSJBk0oWySmdVS5N%2FO5ExmuOQJd%2Fdk0C5d9IbbttSpbpAlQRfPs9kauhcetps3a4ElWVJAmlLgsH3Z9R%2BQFOUepfCxDKzMLcKzBJByECTbXLzBN783dgUWnyEy5PLbfv6D8DXVSJT0E083JJ%2Fhl%2BsmZY4Y19bJBucf3Ag5EIb3b1qwjaGggptKFtbKM4u9AcKk6xwhrHNE9ufUcYtbc14D4mSAj6J7gOOiipeI97pxJMDpt3ZdMkbXjGS3dXhqH8Wr9plU3CY8LlK5F4XxUPsHmPVBcVhVRkxvEfm1TtSs2RqT3%2BuwXMJP03b0GOpsBHOwPfSGJiHLjiLPolXOzWP4Hr4VusogxzcjECEzV7hQNhhyN9%2BonjQ1nM0PzGXvAn5ih%2BkWBmEnt6mVwywWCnuPUYkeXsKMdzwQZqpuKVqZYVgOs04vY2jJeuq319aGsoEFQcCjRHkkn9qfK20kbgo%2F1iLJ4vjuSORiFCr6VdZGoY%2FwvQ%2BtkXqFucZSR9Sl%2Bdfnmj9C3quOM7D8%3D&X-Amz-Signature=c1cf91b15823a2e01ca0295c6a69b171dd4a90b4a2d8f1a96cbdab88fc195ac4&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Mandatory_Good_Faith_Efforts-Waivers-Exceptions.pdf%22&x-id=GetObject

• No_Conflicts-Disclosure_For...

*Response required https://government-project.s3.us-west-2.amazonaws.com/115403/71724e63-735a-4ba1-a382-4248a8a3ee90_No_Conflicts-Disclosure_Form.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4BKFHK7M2%2F20250220%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250220T185636Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJv%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQCamZC2qscFCmKprKrXlH3IPHGDzB%2BVTMH%2BvLVmVdY4bgIgfSGBa9SVrhlIKOxuPqaCF77pz7OcIMr%2FrkOqamS87W0qjAUIxP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDAqtD%2FrGn2%2Fv7mYxYCrgBBjNJUTVDhWWWxOSh5KT3TMaC9D%2F2o3vnCorSdglIXV7wcM5we9W2TiBzgXYXzEucZHNNvSO4tu8VlcXN4EKepTtnCEIhaPRZZ863DCDy7JeqzZoUmSoq3y1qzKwDqM6GdS2bR643PJxeYMjDjJuiAuLFX4dmiTT5KPmx8BYguo1s2EL2XQL925v1G8nmwDxcW0bvOYYsRUi8RPF4RAmcYQ3t8GXmzN83BGV807ZyX4sv3sgJfpXw7S7jwMWd29G5eRhqp3FkS4xjhbkSPxWBN%2B8lW2BUEugMG0JURhKj5JfF%2FTTo8A505tA5Dh2Eji7f7z0StbpsnHr785exEW6W1mkFfqbBzK%2B17GGQQjWtgA3w7brrPCLilxAQgwtJJ%2FpJwYKUn4Lt7r%2FjUieipGhfPhOLMgy9mYAvCFqqANB9a9u0JBUQr5sa2oVHnjd43E16TltYsWmlWUiI5yuw0OnWvxWiEVksRGjwYWs8QpXxXWUlCw01rWsMzf0hCSJBk0oWySmdVS5N%2FO5ExmuOQJd%2Fdk0C5d9IbbttSpbpAlQRfPs9kauhcetps3a4ElWVJAmlLgsH3Z9R%2BQFOUepfCxDKzMLcKzBJByECTbXLzBN783dgUWnyEy5PLbfv6D8DXVSJT0E083JJ%2Fhl%2BsmZY4Y19bJBucf3Ag5EIb3b1qwjaGggptKFtbKM4u9AcKk6xwhrHNE9ufUcYtbc14D4mSAj6J7gOOiipeI97pxJMDpt3ZdMkbXjGS3dXhqH8Wr9plU3CY8LlK5F4XxUPsHmPVBcVhVRkxvEfm1TtSs2RqT3%2BuwXMJP03b0GOpsBHOwPfSGJiHLjiLPolXOzWP4Hr4VusogxzcjECEzV7hQNhhyN9%2BonjQ1nM0PzGXvAn5ih%2BkWBmEnt6mVwywWCnuPUYkeXsKMdzwQZqpuKVqZYVgOs04vY2jJeuq319aGsoEFQcCjRHkkn9qfK20kbgo%2F1iLJ4vjuSORiFCr6VdZGoY%2FwvQ%2BtkXqFucZSR9Sl%2Bdfnmj9C3quOM7D8%3D&X-Amz-Signature=4b5f0d2ddf0f20d76c84f1f40b0926f33ef57fa270026ec8415b866bcc8681bf&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22No_Conflicts-Disclosure_Form.pdf%22&x-id=GetObject

File details come from the government source that posted it. Updated .