Building F Window Replacement.docx
DOCX document 44 KB Posted
- Solicitation number
- SRC0000031091
- Issued by
- Franklin County, Ohio
About this file
This document is a Scope of Work for the Ohio Department of Natural Resources (ODNR) Fountain Square Building F Window Replacement project located at 2045 Morse Road in Columbus, Ohio. The contract requires a contractor to provide all labor and materials to remove and replace existing windows in Building F, with all materials to be installed according to manufacturer recommendations and subject to owner color sample approval. The project specifications include detailed installation guidelines referencing Section 084113 for Aluminum-Framed Entrances and Storefronts and Section 088000 for Glazing, with accompanying architectural drawings dated May 16, 2025. The project is scheduled to be completed by October 17, 2025.
No specific pricing, funding sources, or financial details are provided in this scope of work document. The primary focus is on the technical requirements for window replacement, including surface preparation, removal of existing windows, and installation of new windows. The contractor will be responsible for disposal of existing windows and ensuring all installation meets the specified technical standards and drawings. Additional details about bidding, budget, or contract terms are not included in this particular document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ODNR Fountain Square Building F Window Replacement Scope of Work
Contractor shall provide all labor and materials to install new windows at ODNR Building F located at 2045 Morse Road, Columbus, Ohio 43221. All materials shall be installed per manufacturer’s recommendations. Color samples shall be provided for approval by Owner prior to installation.
Window Replacement
1. Contractor shall be responsible for removing and disposing of existing windows. The contractor shall be responsible for any and all existing surface preparation in accordance with the manufacturer’s recommendations.
2. Contractor shall install new windows in accordance with the attached specifications dated May 16, 2025, and titled Section 084113 – Aluminum-Framed Entrances and Storefronts and Section 088000 – Glazing and in accordance with the attached drawings dated May 16, 2025, and titled DNR-240001 Building F – Renovation: Exterior Elevations.
Schedule:
All work shall be completed by October 17, 2025.