Building_2930 100__Drawings 04272022.pdf

PDF 4 MB Posted

Attached to
Roof Replacement BLDG 2930 Federal contract opportunity
Solicitation number
W911SG22B0012
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

This solicitation is for a roof replacement project at Building 2930 located at Fort Bliss, Texas. The United States Army Directorate of Public Works seeks a contractor to furnish all labor, materials, equipment and supplies necessary to complete the roof replacement according to the contract terms. The project involves removing the existing TPO roof system and installing a new 30-year, 80-mil TPO roof with 120 mph wind coverage. The contract will be awarded on a firm-fixed price basis with an anticipated period of performance of 180 calendar days. The procurement is estimated between $1-5 million and is set aside as 100% HUBZone. Responses are due by the date specified in the attached solicitation W911SG-22-B-0012 issued by the Mission and Installation Contracting Command at Fort Hood on behalf of the Directorate of Public Works at Fort Bliss, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to Roof Replacement BLDG 2930, newest first.
File Type Posted
OF 1419A B0012.pdf PDF
OF 1419 B0012.pdf PDF
Abstract of offers 1419 0012.pdf PDF
Sign in Roster 2930.pdf PDF
W911SG22B0012 0002 CONFORM COPY.pdf PDF
W911SG22B0012 0002 MOD COPY.pdf PDF
MOD W911SG22B0012 0001.pdf PDF
Conform W911SG22B0012 0001.pdf PDF
Wage Determination.pdf PDF
Solicitation W911SG22B0012.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D E S C R

IP

TI

O N

M A R K

D A

TE

D P

W

FO

R T

B

LI

SS

CASSIDY RD.

A

IR

PO

R

T R

D

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

SPEC. #

AutoCAD SHX Text W.O. #

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NUMBER:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DIRECTORATE OF PUBLIC WORKS FORT BLISS, TEXAS

AutoCAD SHX Text

BUILDING 2930 ROOF REPLACEMENT

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text A-100

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

FORT BLISS, TEXAS

AutoCAD SHX Text

INDEX OF DRAWINGS

AutoCAD SHX Text

NO.

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

CONCURRENCES

AutoCAD SHX Text

USING AGENCY

AutoCAD SHX Text

FIRE DEPARTMENT

AutoCAD SHX Text

ENVIRONMENTAL DIVISION

AutoCAD SHX Text

PHYSICAL SECURITY OFFICER

AutoCAD SHX Text

ANTI-TERRORISM/FORCE PROTECTION

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text

SIGNATURES INDICATE THAT THOSE SIGNING HAVE REVIEWED PROJECT

AutoCAD SHX Text

PLANS AND SPECIFICATIONS AND ARE IN CONCURRENCE WITH THEM.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SAFETY OFFICER

AutoCAD SHX Text

DATE

AutoCAD SHX Text

NEC

AutoCAD SHX Text

DATE

AutoCAD SHX Text

MASTER PLANNING DIVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

OPERATIONS & MAINTENANCE DIVISION

AutoCAD SHX Text

INDUSTRIAL HYGIENE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CHIEF, ENGINEERING SERVICES DIVISION, DPW

AutoCAD SHX Text

CHIEF, DESIGN BRANCH, ESD, DPW

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

BUILDING 2930 ROOF REPLACEMENT PROJECT

AutoCAD SHX Text

PROJECT LOCATION MAP

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT LOCATIONS

AutoCAD SHX Text 1 = COVER SHEET 2 = SITE LOCATION MAP 3 = DEMOLITION WORK PLAN 4 = DEMOLITION WORK PLAN (CONT.) 5 = DEMOLITION WORK PLAN (CONT.) 6 = NEW WORK PLAN 7 = NEW WORK PLAN (CONT.) 8 = NEW WORK PLAN (CONT.) 9 = DETAILS 10= DETAILS (CONT.)

AutoCAD SHX Text A.F.

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text A.F.

AutoCAD SHX Text

EA-10563-6J

AutoCAD SHX Text

BLDG. 2930

AutoCAD SHX Text 04/11/2022

S C R

IP

TI

O N

M A R K

D A

TE

D P

W

FO

R T

B

LI

SS

N

CASSIDY RD.

A

IR

PO

R

T R

D

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

SPEC. #

AutoCAD SHX Text W.O. #

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NUMBER:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DIRECTORATE OF PUBLIC WORKS FORT BLISS, TEXAS

AutoCAD SHX Text

EXISTING SITE PLAN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text A-101

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text A.F.

AutoCAD SHX Text A.F.

AutoCAD SHX Text

BUILDING 2930 ROOF REPLACEMENT

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text

EA-10563-6J

AutoCAD SHX Text

AutoCAD SHX Text

SITE PLAN

AutoCAD SHX Text

SCALE: 1"=50'-0"

AutoCAD SHX Text 0'

AutoCAD SHX Text 50'

AutoCAD SHX Text 100'

AutoCAD SHX Text

BLDG. 2930

AutoCAD SHX Text CONSTRUCTION LIMITS - CONSTRUCTION AREA TO USE DEMARCATION POINTS SUCH AS FENCING, CURBS, ETC., WHEREVER FEASIBLE UNLESS OTHERWISE NOTED.

AutoCAD SHX Text

REMOVE EXISTING ROOF SYSTEM

AutoCAD SHX Text LAY DOWN YARD TO BE SUBMITTED BY CONTRACTOR AND APPROVED BY COR & MASTER PLANNING

AutoCAD SHX Text

GENERAL NOTES (EXISTING CONDITIONS)

AutoCAD SHX Text

UTILITY NOTES

AutoCAD SHX Text

1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR, WHETHER INDICATED ON THE DRAWING OR NOT, TO VERIFY THE LOCATION, DEPTH, AND CONDITION OF ALL EXITING UTILITIES AND SUBSTRUCTURES AND PROTECT THEM FROM ANY DAMAGE. 2. THE CONTRACTOR SHALL CONTACT ALL THE UTILITY COMPANIES AND CONDUCT ALL NECESSARY FIELD INVESTIGATIONS PRIOR TO ANY EXCAVATION. ANY DAMAGE TO EXISTING UTILITIES SHALL BE PROMPTLY REPAIRED BY THE CONTRACTOR AT NO EXPENSE TO GOVERNMENT. 3. NOTIFY THE DPW REPRESENTATIVE IN WRITING AT LEAST 14 NOTIFY THE DPW REPRESENTATIVE IN WRITING AT LEAST 14 DAYS BEFORE ANY UTILITY OUTAGE OR ROAD CLOSURE.

AutoCAD SHX Text

LAY-DOWN AREA NOTES

AutoCAD SHX Text

1. LAY-DOWN AREA SHALL BE DESIGNATED PRIOR TO THE START LAY-DOWN AREA SHALL BE DESIGNATED PRIOR TO THE START OF CONSTRUCTION. CONTRACTOR SHALL COORDINATE WITH DPW MASTER PLANNING. 2. THE CONTRACTOR SHALL RESTORE ANY ACCESS ROADS AND THE CONTRACTOR SHALL RESTORE ANY ACCESS ROADS AND LAY-DOWN AREAS USED BACK TO THEIR ORIGINAL STABILIZED CONDITION OR BETTER. 3. CONTRACTOR SHALL PROVIDE AND INSTALL ALL EQUIPMENT CONTRACTOR SHALL PROVIDE AND INSTALL ALL EQUIPMENT AND SUPPLIES REQUIRED TO SECURE THE TEMPORARY STORAGE AREA.

AutoCAD SHX Text

1. CONTRACTOR SHALL MAINTAIN AND CLEAN CONSTRUCTION AREA CONTRACTOR SHALL MAINTAIN AND CLEAN CONSTRUCTION AREA AS PER CONTRACT AND SAFETY RECOMMENDATIONS. 2. CONTRACTOR SHALL PROVIDE AND FURNISH TRAFFIC CONTROL CONTRACTOR SHALL PROVIDE AND FURNISH TRAFFIC CONTROL FOR AREA ADJACENT TO CONSTRUCTION AREA. CONTRACTOR CONTRACTOR SHALL PROVIDE ALL REQUIRED TRAFFIC CONTROL PLANS. ALL SIGNS, BARRICADES, CHANNELIZATION DEVICES, SIGN FRAMES AND ERECTION OF SUCH DEVICES SHALL CONFORM TO THE REQUIREMENTS OF THE LOCAL TRAFFIC CONTROL AUTHORITY. 3. BUILDING WILL BE OCCUPIED DURING CONSTRUCTION. PROVIDE BUILDING WILL BE OCCUPIED DURING CONSTRUCTION. PROVIDE ACCESS/TEMPERATURE COOLING/HEATING IF NECESSARY DURING PERIODS AC AND HEATER ARE DOWN. CONTRACTOR SHALL PROVIDE BUILDING ACCESS TO USER. 4. CONTRACTOR SHALL PROVIDE VEHICULAR ACCESS TO PARKING CONTRACTOR SHALL PROVIDE VEHICULAR ACCESS TO PARKING SPACES. 5. ALL WORK SHALL COMPLY WITH ALL MANUFACTURER'S ALL WORK SHALL COMPLY WITH ALL MANUFACTURER'S SPECIFICATIONS/RECOMMENDATIONS, FEDERAL, STATE, AND LOCAL REGULATIONS/CODES. 6. CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN A CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN A COMPLETE SET OF CONSTRUCTION DOCUMENTS ON SITE AND INDICATE CHANGES AS THE PROJECT PROGRESSES. 7. NO OBSTRUCTIONS WILL BE PERMITTED WITHIN THREE FEET OF NO OBSTRUCTIONS WILL BE PERMITTED WITHIN THREE FEET OF FIRE HYDRANTS. 8. ANY DEMOLITION DEBRIS SUSPECTED TO CONTAIN HAZARDOUS ANY DEMOLITION DEBRIS SUSPECTED TO CONTAIN HAZARDOUS MATERIALS, SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER REPRESENTATIVE PRIOR TO CONTINUING ANY ADDITIONAL WORK. 9. CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ALL CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ALL EXISTING UTILITIES INCLUDING BUT NOT LIMITED TO EXISTING ELECTRICAL CONDUIT, GAS LINES, WIRES, ETC., AS REQUIRED TO ALLOW FOR CONSTRUCTION. 10. CONTRACTOR IS RESPONSIBLE TO PROTECT ALL EXISTING CONTRACTOR IS RESPONSIBLE TO PROTECT ALL EXISTING EQUIPMENT, MATERIALS AND FINISHES THAT ARE TO REMAIN, AND WITHOUT NECESSARY DAMAGE. ANY DAMAGES SHALL BE REPLACED OR RESTORED WITHOUT ADDITIONAL COST TO THE GOVERNMENT. 11. ALL REMOVED EQUIPMENT SHALL BE REINSTALLED AND ALL REMOVED EQUIPMENT SHALL BE REINSTALLED AND TESTED IN THE PRESENCE OF A CONTRACTING OFFICER REPRESENTATIVE. 12. CONSTRUCTION & DEMOLITION DIVERSION: FORT BLISS CONSTRUCTION & DEMOLITION DIVERSION: FORT BLISS REQUIRES A MINIMUM OF 60% OF CONSTRUCTION WASTE AND DEMOLITION MATERIALS AND DEBRIS BE RECYCLED. IF THE CONTRACTOR HAS A VALID REASON FOR NOT BEING ABLE TO MEET THIS DIVERSION GOAL, THE CONTRACTOR NEEDS TO PRESENT THEIR REASONING IN WRITING TO DPW-ENVIRONMENTAL DIVISION FOR APPROVAL 13. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, EXACT CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, EXACT LOCATIONS AND QUANTITIES BEFORE COMMENCING WORK. 14. PRIOR TO CONSTRUCTION START, CONTRACTOR SHALL PRIOR TO CONSTRUCTION START, CONTRACTOR SHALL CONDUCT A THOROUGH PHOTOGRAPHIC SURVEY OF THE SITE. CRACKED SIDEWALKS, BROKEN WINDOWS, BENT EQUIPMENT, ETC. THIS INCLUDES INVENTORY OF ALL ITEMS ON SITE AND THEIR CONDITION. FAILURE TO DO SO MAY RESULT IN CONTRACTOR RESPONSIBILITY TO REPAIR. 15. ALL SURFACES IN CONTACT WITH NEW WORK THAT ARE ALL SURFACES IN CONTACT WITH NEW WORK THAT ARE DAMAGED DUE TO NEW WORK IN PROGRESS, SHALL BE PATCHED AND REPAIRED AS REQUIRED. 16. EXISTING SITE IMPROVEMENTS DAMAGED BY THE CONTRACTOR EXISTING SITE IMPROVEMENTS DAMAGED BY THE CONTRACTOR SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. 17. CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S FIELD CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S FIELD REPRESENTATIVE IMMEDIATELY OF ANY CONFLICTS DISCOVERED IN THE FIELD VIA RFI, ASAP TO ALLOW SUFFICIENT TIME TO REVIEW AND RESOLVE THE ISSUE. 18. CONTRACTOR SHALL UTILIZE ALL CONSTRUCTION DOCUMENTS, CONTRACTOR SHALL UTILIZE ALL CONSTRUCTION DOCUMENTS, SCOPE, CONTRACT, SPECIFICATIONS, AND DRAWINGS TO ENSURE ALL CONSTRUCTION, DELIVERABLES, AND RESOURCES ARE DELIVERED TO THE GOVERNMENT. 19. PRIOR TO ANY CHANGE OR MODIFICATION TO THESE PRIOR TO ANY CHANGE OR MODIFICATION TO THESE DRAWINGS DUE TO ACTUAL CONDITIONS, DPW REPRESENTATIVE SHALL BE NOTIFIED FOR REVIEW AND APPROVAL.

AutoCAD SHX Text

CONSTRUCTION LIMITS

AutoCAD SHX Text 04/11/2022

LAY DOWN AREA

S C R

IP

TI

O N

M A R K

D A

TE

D P

W

FO

R T

B

LI

SS

N

AutoCAD SHX Text

AutoCAD SHX Text

DEMOLITION PLAN

AutoCAD SHX Text

SCALE: 1/16"=1'-0"

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

SPEC. #

AutoCAD SHX Text W.O. #

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NUMBER:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DIRECTORATE OF PUBLIC WORKS FORT BLISS, TEXAS

AutoCAD SHX Text

DEMOLITION WORK PLAN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text A-102

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text 0'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 32'

AutoCAD SHX Text A.F.

AutoCAD SHX Text A.F.

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text

BUILDING 2930 ROOF REPLACEMENT

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text

EA-10563-6J

AutoCAD SHX Text

DEMOLITION GENERAL NOTES

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

EXISTING PIPE PENETRATIONS

AutoCAD SHX Text

EXISTING VENT PENETRATIONS

AutoCAD SHX Text

EXISTING ELECTRICAL PENETRATIONS

AutoCAD SHX Text

EXISTING ELECTRICAL PENETRATIONS

AutoCAD SHX Text

DEMOLITION KEY NOTES

AutoCAD SHX Text REMOVE EXISTING METAL SCUPPER AND ALL ASSOCIATED COMPONENTS THROUGHOUT INCLUDING WOOD NAILER AND ANCHORING SYSTEM.

AutoCAD SHX Text 1.

AutoCAD SHX Text REMOVE EXISTING TPO ROOF SYSTEM IN ITS ENTIRETY DOWN TO STRUCTURAL DECK. CLEAN AND PREPARE SURFACE FOR NEW ROOF SYSTEM.

AutoCAD SHX Text 2.

AutoCAD SHX Text

EXISTING ROOF DRAIN

AutoCAD SHX Text 3.

AutoCAD SHX Text EXISTING ROOF HATCH TO REMAIN. REPLACE ROOF CURB WHERE NECESSARY. CONTRACTOR TO FIELD VERIFY AND VALIDATE.

AutoCAD SHX Text 4.

AutoCAD SHX Text 5.

AutoCAD SHX Text 6.

AutoCAD SHX Text 7.

AutoCAD SHX Text 8.

AutoCAD SHX Text

EXISTING TPO ROOF SYSTEM

AutoCAD SHX Text EXISTING MECHANICAL EQUIPMENT, REPLACE ROOF CURB WHERE NECESSARY. CONTRACTOR TO FIELD VERIFY AND VALIDATE.

AutoCAD SHX Text

EXISTING MECHANICAL SCREEN, PROTECT DURING CONSTRUCTION

AutoCAD SHX Text

EXISTING ROOF LADDER, PROTECT DURING CONSTRUCTION

AutoCAD SHX Text 9.

AutoCAD SHX Text EXISTING VENT PENETRATION, REMOVE EXISTING FLASHING, AND PREPARE FOR NEW FLASHING, TYPICAL.

AutoCAD SHX Text EXISTING PIPE PENETRATION, REMOVE EXISTING FLASHING, AND PREPARE FOR NEW FLASHING, TYPICAL.

AutoCAD SHX Text

AutoCAD SHX Text

2 TYP.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

5 TYP.

AutoCAD SHX Text

6 TYP.

AutoCAD SHX Text

3 TYP.

AutoCAD SHX Text

7 TYP.

AutoCAD SHX Text

8 TYP.

AutoCAD SHX Text

10 TYP.

AutoCAD SHX Text

EXISTING ROOF DRAIN AND OVERFLOW DRAIN

AutoCAD SHX Text 10.

AutoCAD SHX Text

1. THESE PLANS ARE FOR REFERENCE ONLY AND MAY NOT THESE PLANS ARE FOR REFERENCE ONLY AND MAY NOT REFLECT ALL AVAILABLE INFORMATION, THE EXACT LOCATION AND QUANTITY OF EXISTING DUCTWORK, PENETRATIONS AND EQUIPMENT MAY DEVIATE FROM LOCATIONS AND QUANTITY SHOWN ON DRAWINGS. CONTRACTOR MUST FIELD VERIFY AND EXAMINE EXISTING STRUCTURES, NOTE ALL CONDITIONS AS TO CHARACTER AND EXTENT OF ALL WORK INVOLVED, VALIDATE AND BID ACCORDINGLY. 2. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, EXACT CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, EXACT LOCATIONS AND QUANTITIES BEFORE COMMENCING WORK. 3. GENERAL CONTRACTOR SHALL ASSURE THAT ALL GENERAL CONTRACTOR SHALL ASSURE THAT ALL SUB-CONTRACTORS HAVE REVIEWED THE ENTIRE SET OF CONSTRUCTION DOCUMENTS, THIS INCLUDES BUT NOT LIMITED TO CONSTRUCTION DRAWINGS, PROJECT MANUAL (SPECIFICATIONS), AMENDMENTS, MODIFICATIONS, AND CHANGE ORDERS. THE CONTRACT IS BASED ON CONSTRUCTION DOCUMENTS AS A WHOLE AND COORDINATION BETWEEN SUBCONTRACTOR IS THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 4. THE DEMOLITION PLAN INDICATES THE GENERAL SCOPE OF ITEMS THE DEMOLITION PLAN INDICATES THE GENERAL SCOPE OF ITEMS AND EXISTING CONSTRUCTION ELEMENTS TO BE REMOVED. ANY ADDITIONAL ITEMS ENCOUNTERED IN THESE GENERAL DEMOLITION AREAS, WHICH WILL INTERFERE WITH THE NEW CONSTRUCTION SHALL ALSO BE REMOVED AT NOT ADDITIONAL COST. 5. CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN A COMPLETE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN A COMPLETE SET OF CONSTRUCTION DOCUMENTS ON SITE AND INDICATE CHANGES AS THE PROJECT PROGRESSES. 6. CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S FIELD CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S FIELD REPRESENTATIVE IMMEDIATELY OF ANY CONFLICTS DISCOVERED IN THE FIELD VIA RFI, ASAP TO ALLOW SUFFICIENT TIME TO REVIEW AND RESOLVE THE ISSUE. 7. CONTRACTOR SHALL ENSURE SAFE ACCESS TO BUILDING DURING CONTRACTOR SHALL ENSURE SAFE ACCESS TO BUILDING DURING CONSTRUCTION AND SHALL PROVIDE ALL REQUIRED BARRICADES, FENCING, COVERED WALKS, PLANKING, LIGHTING, BRACING, SHORING, WARNING SIGNS, ETC. AS REQUIRED BY OSHA AND FORT BLISS REGULATIONS FOR THE PROTECTION OF WORKMEN, STAFF AND USERS. 8. CONTRACTOR SHALL PROTECT ALL GOVERNMENT PROPERTY TO CONTRACTOR SHALL PROTECT ALL GOVERNMENT PROPERTY TO INCLUDE CARS, EQUIPMENT AND BUILDING SYSTEMS. 9. THE CONTRACTOR IS RESPONSIBLE TO PROTECT ALL EXISTING THE CONTRACTOR IS RESPONSIBLE TO PROTECT ALL EXISTING EQUIPMENT, MATERIALS, AND FINISHES THAT ARE TO REMAIN AND WITHOUT UNNECESSARY DAMAGE. ITEMS AND MATERIAL TO BE REMOVED SHALL BE DONE IN SUCH A MANNER AS TO PREVENT DAMAGES TO ITEMS AND MATERIALS THAT REMAIN. SUCH DAMAGES SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE DPW REPRESENTATIVE AND AT NO ADDITIONAL COST TO THE GOVERNMENT. ITEMS INCLUDE BUT ARE NOT LIMITED TO BROKEN CURBS, CRACKED SIDEWALKS, ETC. 10. THE CONTRACTOR SHALL OVERSEE CLEANING AND ENSURE THAT THE CONTRACTOR SHALL OVERSEE CLEANING AND ENSURE THAT THE PREMISES ARE MAINTAINED RUBBISH FREE DURING DEMOLITION WORK. FINAL CLEANUP IS THE RESPONSIBILITY OF THE CONTRACTOR. 11. ALL WORK SHALL COMPLY WITH THE MANUFACTURER'S ALL WORK SHALL COMPLY WITH THE MANUFACTURER'S SPECIFICATIONS/RECOMMENDATIONS, FEDERAL, STATE, AND LOCAL CODES. 12. THE GOVERNMENT RESERVES THE FIRST RIGHT OF REFUSAL FOR THE GOVERNMENT RESERVES THE FIRST RIGHT OF REFUSAL FOR ALL DEMOLITION ITEMS. THOSE DEMOLITION ITEMS THE GOVERNMENT DOES NOT WISH TO KEEP SHALL BECOME PROPERTY OF THE CONTRACTOR FOR PROPER DISPOSAL. 13. ANY ITEMS SCHEDULED FOR DEMOLITION SUSPECTED TO CONTAIN ANY ITEMS SCHEDULED FOR DEMOLITION SUSPECTED TO CONTAIN HAZARDOUS MATERIALS, SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE COR PRIOR TO DEMOLITION. 14. CONTRACTOR TO VALIDATE/VERIFY LEAD OR ASBESTOS MATERIAL CONTRACTOR TO VALIDATE/VERIFY LEAD OR ASBESTOS MATERIAL TO BE REMOVED/ABATED. CONTRACTOR SHALL COMPLY WITH ALL REGULATORY REQUIREMENTS APPLICABLE TO LEAD AND ASBESTOS ABATEMENT AS INDICATED IN SURVEYS AND TESTED. 15. CONTRACTOR SHALL IDENTIFY AREAS OF ROOF WHERE ROOF CONTRACTOR SHALL IDENTIFY AREAS OF ROOF WHERE ROOF DECK OR STRUCTURAL REPAIRS ARE NEEDED FOR GOVERNMENT CONSIDERATION. UNLESS NOTED OTHERWISE, CONTRACTOR WILL BID ON AN ESTIMATED 500 SF OF ROOF DECK AREA TO BE REPLACED DUE TO CORROSION AND PROVIDE FULL REPLACEMENT TO INCLUDE STEEL ANGLE REINFORCEMENT SUPPORT AS NEEDED. 16. REMOVE AND REPLACE ALL DAMAGED NAILERS, SOFFIT, AND REMOVE AND REPLACE ALL DAMAGED NAILERS, SOFFIT, AND FASCIA BOARDING TO MATCH EXISTING MATERIALS. 17. CONTRACTOR TO LIFT ALL MECHANICAL EQUIPMENT IN PLACE TO CONTRACTOR TO LIFT ALL MECHANICAL EQUIPMENT IN PLACE TO ALLOW FOR CONSTRUCTION AND REINSTALL ONCE CONSTRUCTION IS COMPLETE. 18. CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ALL CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ALL EXISTING UTILITIES INCLUDING BUT NOT LIMITED TO ELECTRICAL CONDUIT, GAS LINES, WIRES, ETC., AS REQUIRED TO ALLOW FOR CONSTRUCTION. 19. SECURE AND SAFEGUARD EXISTING AND\OR NEW GAS LINES SECURE AND SAFEGUARD EXISTING AND\OR NEW GAS LINES EXPOSED ON THE ROOF. PRIME WITH ONE COAT AND PROVIDE TWO COATS OF SAFETY YELLOW PAINT. 20. ANY ABANDONED PENETRATIONS SHALL BE REMOVED AND THE ANY ABANDONED PENETRATIONS SHALL BE REMOVED AND THE DECK REPAIRED PRIOR TO INSTALLATION OF THE NEW ROOF SYSTEM. SECURE ALL SLEEVES AND PIPES BEFORE ROOF MATERIAL IS REMOVED. 21. CONTRACTOR WILL FIELD VERIFY BEFORE MOVING ANY CONTRACTOR WILL FIELD VERIFY BEFORE MOVING ANY ABANDONED PENETRATIONS. 22. ALL EQUIPMENT TO BE REMOVED SHALL BE DONE SO IN THE ALL EQUIPMENT TO BE REMOVED SHALL BE DONE SO IN THE PRESENCE OF A GOVERNMENT REPRESENTATIVE AND INSTALLED AND TESTED IN THE PRESENCE OF A GOVERNMENT REPRESENTATIVE. 23. CONSTRUCTION & DEMOLITION DIVERSION: FORT BLISS REQUIRES CONSTRUCTION & DEMOLITION DIVERSION: FORT BLISS REQUIRES A MINIMUM OF 60% OF CONSTRUCTION AND DEMOLITION MATERIALS AND DEBRIS FROM LANDFILLS. IF THE CONTRACTOR HAS A VALID REASON FOR NOT BEING ABLE TO MEET THIS DIVERSION GOAL, THE CONTRACTOR NEEDS TO PRESENT THEIR REASONING IN WRITING TO DPW-ENVIRONMENTAL DIVISION. 24. THE CONTRACTOR SHALL NOT EMPLOY FORT BLISS TRASH BINS THE CONTRACTOR SHALL NOT EMPLOY FORT BLISS TRASH BINS TO DISPOSE OF CONSTRUCTION MATERIALS. 25. BURNING ON FORT BLISS PROPERTY IS NOT PERMITTED.BURNING ON FORT BLISS PROPERTY IS NOT PERMITTED.

S C R

IP

TI

O N

M A R K

D A

TE

D P

W

FO

R T

B

LI

SS

N

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

SPEC. #

AutoCAD SHX Text W.O. #

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NUMBER:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DIRECTORATE OF PUBLIC WORKS FORT BLISS, TEXAS

AutoCAD SHX Text

DEMOLITION WORK PLAN (CONT.)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text A-103

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text A.F.

AutoCAD SHX Text A.F.

AutoCAD SHX Text

BUILDING 2930 ROOF REPLACEMENT

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text

EA-10563-6J

AutoCAD SHX Text

AutoCAD SHX Text

DEMOLITION PLAN

AutoCAD SHX Text

SCALE: 1/16"=1'-0"

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text 0'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 32'

AutoCAD SHX Text

DEMOLITION GENERAL NOTES

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

EXISTING PIPE PENETRATIONS

AutoCAD SHX Text

EXISTING VENT PENETRATIONS

AutoCAD SHX Text

EXISTING ELECTRICAL PENETRATIONS

AutoCAD SHX Text

EXISTING ELECTRICAL PENETRATIONS

AutoCAD SHX Text

DEMOLITION KEY NOTES

AutoCAD SHX Text REMOVE EXISTING METAL SCUPPER AND ALL ASSOCIATED COMPONENTS THROUGHOUT INCLUDING WOOD NAILER AND ANCHORING SYSTEM.

AutoCAD SHX Text 1.

AutoCAD SHX Text REMOVE EXISTING TPO ROOF SYSTEM IN ITS ENTIRETY DOWN TO STRUCTURAL DECK. CLEAN AND PREPARE SURFACE FOR NEW ROOF SYSTEM.

AutoCAD SHX Text 2.

AutoCAD SHX Text

EXISTING ROOF DRAIN

AutoCAD SHX Text 3.

AutoCAD SHX Text EXISTING ROOF HATCH TO REMAIN. REPLACE ROOF CURB WHERE NECESSARY. CONTRACTOR TO FIELD VERIFY AND VALIDATE.

AutoCAD SHX Text 4.

AutoCAD SHX Text 5.

AutoCAD SHX Text 6.

AutoCAD SHX Text 7.

AutoCAD SHX Text 8.

AutoCAD SHX Text

EXISTING TPO ROOF SYSTEM

AutoCAD SHX Text EXISTING MECHANICAL EQUIPMENT, REPLACE ROOF CURB WHERE NECESSARY. CONTRACTOR TO FIELD VERIFY AND VALIDATE.

AutoCAD SHX Text

EXISTING MECHANICAL SCREEN, PROTECT DURING CONSTRUCTION

AutoCAD SHX Text

EXISTING ROOF LADDER, PROTECT DURING CONSTRUCTION

AutoCAD SHX Text 9.

AutoCAD SHX Text EXISTING VENT PENETRATION, REMOVE EXISTING FLASHING, AND PREPARE FOR NEW FLASHING, TYPICAL.

AutoCAD SHX Text EXISTING PIPE PENETRATION, REMOVE EXISTING FLASHING, AND PREPARE FOR NEW FLASHING, TYPICAL.

AutoCAD SHX Text

EXISTING ROOF DRAIN AND OVERFLOW DRAIN

AutoCAD SHX Text 10.

AutoCAD SHX Text

7 TYP.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

2 TYP.

AutoCAD SHX Text

3 TYP.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

5 TYP.

AutoCAD SHX Text

6 TYP.

AutoCAD SHX Text

8 TYP.

AutoCAD SHX Text

10 TYP.

AutoCAD SHX Text

1. THESE PLANS ARE FOR REFERENCE ONLY AND MAY NOT THESE PLANS ARE FOR REFERENCE ONLY AND MAY NOT REFLECT ALL AVAILABLE INFORMATION, THE EXACT LOCATION AND QUANTITY OF EXISTING DUCTWORK, PENETRATIONS AND EQUIPMENT MAY DEVIATE FROM LOCATIONS AND QUANTITY SHOWN ON DRAWINGS. CONTRACTOR MUST FIELD VERIFY AND EXAMINE EXISTING STRUCTURES, NOTE ALL CONDITIONS AS TO CHARACTER AND EXTENT OF ALL WORK INVOLVED, VALIDATE AND BID ACCORDINGLY. 2. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, EXACT CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, EXACT LOCATIONS AND QUANTITIES BEFORE COMMENCING WORK. 3. GENERAL CONTRACTOR SHALL ASSURE THAT ALL GENERAL CONTRACTOR SHALL ASSURE THAT ALL SUB-CONTRACTORS HAVE REVIEWED THE ENTIRE SET OF CONSTRUCTION DOCUMENTS, THIS INCLUDES BUT NOT LIMITED TO CONSTRUCTION DRAWINGS, PROJECT MANUAL (SPECIFICATIONS), AMENDMENTS, MODIFICATIONS, AND CHANGE ORDERS. THE CONTRACT IS BASED ON CONSTRUCTION DOCUMENTS AS A WHOLE AND COORDINATION BETWEEN SUBCONTRACTOR IS THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 4. THE DEMOLITION PLAN INDICATES THE GENERAL SCOPE OF ITEMS THE DEMOLITION PLAN INDICATES THE GENERAL SCOPE OF ITEMS AND EXISTING CONSTRUCTION ELEMENTS TO BE REMOVED. ANY ADDITIONAL ITEMS ENCOUNTERED IN THESE GENERAL DEMOLITION AREAS, WHICH WILL INTERFERE WITH THE NEW CONSTRUCTION SHALL ALSO BE REMOVED AT NOT ADDITIONAL COST. 5. CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN A COMPLETE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN A COMPLETE SET OF CONSTRUCTION DOCUMENTS ON SITE AND INDICATE CHANGES AS THE PROJECT PROGRESSES. 6. CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S FIELD CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S FIELD REPRESENTATIVE IMMEDIATELY OF ANY CONFLICTS DISCOVERED IN THE FIELD VIA RFI, ASAP TO ALLOW SUFFICIENT TIME TO REVIEW AND RESOLVE THE ISSUE. 7. CONTRACTOR SHALL ENSURE SAFE ACCESS TO BUILDING DURING CONTRACTOR SHALL ENSURE SAFE ACCESS TO BUILDING DURING CONSTRUCTION AND SHALL PROVIDE ALL REQUIRED BARRICADES, FENCING, COVERED WALKS, PLANKING, LIGHTING, BRACING, SHORING, WARNING SIGNS, ETC. AS REQUIRED BY OSHA AND FORT BLISS REGULATIONS FOR THE PROTECTION OF WORKMEN, STAFF AND USERS. 8. CONTRACTOR SHALL PROTECT ALL GOVERNMENT PROPERTY TO CONTRACTOR SHALL PROTECT ALL GOVERNMENT PROPERTY TO INCLUDE CARS, EQUIPMENT AND BUILDING SYSTEMS. 9. THE CONTRACTOR IS RESPONSIBLE TO PROTECT ALL EXISTING THE CONTRACTOR IS RESPONSIBLE TO PROTECT ALL EXISTING EQUIPMENT, MATERIALS, AND FINISHES THAT ARE TO REMAIN AND WITHOUT UNNECESSARY DAMAGE. ITEMS AND MATERIAL TO BE REMOVED SHALL BE DONE IN SUCH A MANNER AS TO PREVENT DAMAGES TO ITEMS AND MATERIALS THAT REMAIN. SUCH DAMAGES SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE DPW REPRESENTATIVE AND AT NO ADDITIONAL COST TO THE GOVERNMENT. ITEMS INCLUDE BUT ARE NOT LIMITED TO BROKEN CURBS, CRACKED SIDEWALKS, ETC. 10. THE CONTRACTOR SHALL OVERSEE CLEANING AND ENSURE THAT THE CONTRACTOR SHALL OVERSEE CLEANING AND ENSURE THAT THE PREMISES ARE MAINTAINED RUBBISH FREE DURING DEMOLITION WORK. FINAL CLEANUP IS THE RESPONSIBILITY OF THE CONTRACTOR. 11. ALL WORK SHALL COMPLY WITH THE MANUFACTURER'S ALL WORK SHALL COMPLY WITH THE MANUFACTURER'S SPECIFICATIONS/RECOMMENDATIONS, FEDERAL, STATE, AND LOCAL CODES. 12. THE GOVERNMENT RESERVES THE FIRST RIGHT OF REFUSAL FOR THE GOVERNMENT RESERVES THE FIRST RIGHT OF REFUSAL FOR ALL DEMOLITION ITEMS. THOSE DEMOLITION ITEMS THE GOVERNMENT DOES NOT WISH TO KEEP SHALL BECOME PROPERTY OF THE CONTRACTOR FOR PROPER DISPOSAL. 13. ANY ITEMS SCHEDULED FOR DEMOLITION SUSPECTED TO CONTAIN ANY ITEMS SCHEDULED FOR DEMOLITION SUSPECTED TO CONTAIN HAZARDOUS MATERIALS, SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE COR PRIOR TO DEMOLITION. 14. CONTRACTOR TO VALIDATE/VERIFY LEAD OR ASBESTOS MATERIAL CONTRACTOR TO VALIDATE/VERIFY LEAD OR ASBESTOS MATERIAL TO BE REMOVED/ABATED. CONTRACTOR SHALL COMPLY WITH ALL REGULATORY REQUIREMENTS APPLICABLE TO LEAD AND ASBESTOS ABATEMENT AS INDICATED IN SURVEYS AND TESTED. 15. CONTRACTOR SHALL IDENTIFY AREAS OF ROOF WHERE ROOF CONTRACTOR SHALL IDENTIFY AREAS OF ROOF WHERE ROOF DECK OR STRUCTURAL REPAIRS ARE NEEDED FOR GOVERNMENT CONSIDERATION. UNLESS NOTED OTHERWISE, CONTRACTOR WILL BID ON AN ESTIMATED 500 SF OF ROOF DECK AREA TO BE REPLACED DUE TO CORROSION AND PROVIDE FULL REPLACEMENT TO INCLUDE STEEL ANGLE REINFORCEMENT SUPPORT AS NEEDED. 16. REMOVE AND REPLACE ALL DAMAGED NAILERS, SOFFIT, AND REMOVE AND REPLACE ALL DAMAGED NAILERS, SOFFIT, AND FASCIA BOARDING TO MATCH EXISTING MATERIALS. 17. CONTRACTOR TO LIFT ALL MECHANICAL EQUIPMENT IN PLACE TO CONTRACTOR TO LIFT ALL MECHANICAL EQUIPMENT IN PLACE TO ALLOW FOR CONSTRUCTION AND REINSTALL ONCE CONSTRUCTION IS COMPLETE. 18. CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ALL CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ALL EXISTING UTILITIES INCLUDING BUT NOT LIMITED TO ELECTRICAL CONDUIT, GAS LINES, WIRES, ETC., AS REQUIRED TO ALLOW FOR CONSTRUCTION. 19. SECURE AND SAFEGUARD EXISTING AND\OR NEW GAS LINES SECURE AND SAFEGUARD EXISTING AND\OR NEW GAS LINES EXPOSED ON THE ROOF. PRIME WITH ONE COAT AND PROVIDE TWO COATS OF SAFETY YELLOW PAINT. 20. ANY ABANDONED PENETRATIONS SHALL BE REMOVED AND THE ANY ABANDONED PENETRATIONS SHALL BE REMOVED AND THE DECK REPAIRED PRIOR TO INSTALLATION OF THE NEW ROOF SYSTEM. SECURE ALL SLEEVES AND PIPES BEFORE ROOF MATERIAL IS REMOVED. 21. CONTRACTOR WILL FIELD VERIFY BEFORE MOVING ANY CONTRACTOR WILL FIELD VERIFY BEFORE MOVING ANY ABANDONED PENETRATIONS. 22. ALL EQUIPMENT TO BE REMOVED SHALL BE DONE SO IN THE ALL EQUIPMENT TO BE REMOVED SHALL BE DONE SO IN THE PRESENCE OF A GOVERNMENT REPRESENTATIVE AND INSTALLED AND TESTED IN THE PRESENCE OF A GOVERNMENT REPRESENTATIVE. 23. CONSTRUCTION & DEMOLITION DIVERSION: FORT BLISS REQUIRES CONSTRUCTION & DEMOLITION DIVERSION: FORT BLISS REQUIRES A MINIMUM OF 60% OF CONSTRUCTION AND DEMOLITION MATERIALS AND DEBRIS FROM LANDFILLS. IF THE CONTRACTOR HAS A VALID REASON FOR NOT BEING ABLE TO MEET THIS DIVERSION GOAL, THE CONTRACTOR NEEDS TO PRESENT THEIR REASONING IN WRITING TO DPW-ENVIRONMENTAL DIVISION. 24. THE CONTRACTOR SHALL NOT EMPLOY FORT BLISS TRASH BINS THE CONTRACTOR SHALL NOT EMPLOY FORT BLISS TRASH BINS TO DISPOSE OF CONSTRUCTION MATERIALS. 25. BURNING ON FORT BLISS PROPERTY IS NOT PERMITTED.BURNING ON FORT BLISS PROPERTY IS NOT PERMITTED.

S C R

IP

TI

O N

M A R K

D A

TE

D P

W

FO

R T

B

LI

SS

N

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

SPEC. #

AutoCAD SHX Text W.O. #

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NUMBER:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DIRECTORATE OF PUBLIC WORKS FORT BLISS, TEXAS

AutoCAD SHX Text

DEMOLITION WORK PLAN (CONT.)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text A-104

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text A.F.

AutoCAD SHX Text A.F.

AutoCAD SHX Text

BUILDING 2930 ROOF REPLACEMENT

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text

EA-10563-6J

AutoCAD SHX Text

AutoCAD SHX Text

DEMOLITION PLAN

AutoCAD SHX Text

SCALE: 1/16"=1'-0"

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text 0'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 32'

AutoCAD SHX Text

DEMOLITION GENERAL NOTES

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

EXISTING PIPE PENETRATIONS

AutoCAD SHX Text

EXISTING VENT PENETRATIONS

AutoCAD SHX Text

EXISTING ELECTRICAL PENETRATIONS

AutoCAD SHX Text

EXISTING ELECTRICAL PENETRATIONS

AutoCAD SHX Text

DEMOLITION KEY NOTES

AutoCAD SHX Text REMOVE EXISTING METAL SCUPPER AND ALL ASSOCIATED COMPONENTS THROUGHOUT INCLUDING WOOD NAILER AND ANCHORING SYSTEM.

AutoCAD SHX Text 1.

AutoCAD SHX Text REMOVE EXISTING TPO ROOF SYSTEM IN ITS ENTIRETY DOWN TO STRUCTURAL DECK. CLEAN AND PREPARE SURFACE FOR NEW ROOF SYSTEM.

AutoCAD SHX Text 2.

AutoCAD SHX Text

EXISTING ROOF DRAIN

AutoCAD SHX Text 3.

AutoCAD SHX Text EXISTING ROOF HATCH TO REMAIN. REPLACE ROOF CURB WHERE NECESSARY. CONTRACTOR TO FIELD VERIFY AND VALIDATE.

AutoCAD SHX Text 4.

AutoCAD SHX Text 5.

AutoCAD SHX Text 6.

AutoCAD SHX Text 7.

AutoCAD SHX Text 8.

AutoCAD SHX Text

EXISTING TPO ROOF SYSTEM

AutoCAD SHX Text EXISTING MECHANICAL EQUIPMENT, REPLACE ROOF CURB WHERE NECESSARY. CONTRACTOR TO FIELD VERIFY AND VALIDATE.

AutoCAD SHX Text

EXISTING MECHANICAL SCREEN, PROTECT DURING CONSTRUCTION

AutoCAD SHX Text

EXISTING ROOF LADDER, PROTECT DURING CONSTRUCTION

AutoCAD SHX Text 9.

AutoCAD SHX Text EXISTING VENT PENETRATION, REMOVE EXISTING FLASHING, AND PREPARE FOR NEW FLASHING, TYPICAL.

AutoCAD SHX Text EXISTING PIPE PENETRATION, REMOVE EXISTING FLASHING, AND PREPARE FOR NEW FLASHING, TYPICAL.

AutoCAD SHX Text

EXISTING ROOF DRAIN AND OVERFLOW DRAIN

AutoCAD SHX Text 10.

AutoCAD SHX Text EXISTING SKYLIGHT, REMOVE EXISTING FLASHING AND PREPARE FOR NEW FLASHING. PROTECT DURING CONSTRUCTION.

AutoCAD SHX Text 11.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

2 TYP.

AutoCAD SHX Text

3 TYP.

AutoCAD SHX Text

AutoCAD SHX Text

5 TYP.

AutoCAD SHX Text

6 TYP.

AutoCAD SHX Text

7 TYP.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

10 TYP.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1. THESE PLANS ARE FOR REFERENCE ONLY AND MAY NOT THESE PLANS ARE FOR REFERENCE ONLY AND MAY NOT REFLECT ALL AVAILABLE INFORMATION, THE EXACT LOCATION AND QUANTITY OF EXISTING DUCTWORK, PENETRATIONS AND EQUIPMENT MAY DEVIATE FROM LOCATIONS AND QUANTITY SHOWN ON DRAWINGS. CONTRACTOR MUST FIELD VERIFY AND EXAMINE EXISTING STRUCTURES, NOTE ALL CONDITIONS AS TO CHARACTER AND EXTENT OF ALL WORK INVOLVED, VALIDATE AND BID ACCORDINGLY. 2. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, EXACT CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, EXACT LOCATIONS AND QUANTITIES BEFORE COMMENCING WORK. 3. GENERAL CONTRACTOR SHALL ASSURE THAT ALL GENERAL CONTRACTOR SHALL ASSURE THAT ALL SUB-CONTRACTORS HAVE REVIEWED THE ENTIRE SET OF CONSTRUCTION DOCUMENTS, THIS INCLUDES BUT NOT LIMITED TO CONSTRUCTION DRAWINGS, PROJECT MANUAL (SPECIFICATIONS), AMENDMENTS, MODIFICATIONS, AND CHANGE ORDERS. THE CONTRACT IS BASED ON CONSTRUCTION DOCUMENTS AS A WHOLE AND COORDINATION BETWEEN SUBCONTRACTOR IS THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 4. THE DEMOLITION PLAN INDICATES THE GENERAL SCOPE OF ITEMS THE DEMOLITION PLAN INDICATES THE GENERAL SCOPE OF ITEMS AND EXISTING CONSTRUCTION ELEMENTS TO BE REMOVED. ANY ADDITIONAL ITEMS ENCOUNTERED IN THESE GENERAL DEMOLITION AREAS, WHICH WILL INTERFERE WITH THE NEW CONSTRUCTION SHALL ALSO BE REMOVED AT NOT ADDITIONAL COST. 5. CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN A COMPLETE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN A COMPLETE SET OF CONSTRUCTION DOCUMENTS ON SITE AND INDICATE CHANGES AS THE PROJECT PROGRESSES. 6. CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S FIELD CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S FIELD REPRESENTATIVE IMMEDIATELY OF ANY CONFLICTS DISCOVERED IN THE FIELD VIA RFI, ASAP TO ALLOW SUFFICIENT TIME TO REVIEW AND RESOLVE THE ISSUE. 7. CONTRACTOR SHALL ENSURE SAFE ACCESS TO BUILDING DURING CONTRACTOR SHALL ENSURE SAFE ACCESS TO BUILDING DURING CONSTRUCTION AND SHALL PROVIDE ALL REQUIRED BARRICADES, FENCING, COVERED WALKS, PLANKING, LIGHTING, BRACING, SHORING, WARNING SIGNS, ETC. AS REQUIRED BY OSHA AND FORT BLISS REGULATIONS FOR THE PROTECTION OF WORKMEN, STAFF AND USERS. 8. CONTRACTOR SHALL PROTECT ALL GOVERNMENT PROPERTY TO CONTRACTOR SHALL PROTECT ALL GOVERNMENT PROPERTY TO INCLUDE CARS, EQUIPMENT AND BUILDING SYSTEMS. 9. THE CONTRACTOR IS RESPONSIBLE TO PROTECT ALL EXISTING THE CONTRACTOR IS RESPONSIBLE TO PROTECT ALL EXISTING EQUIPMENT, MATERIALS, AND FINISHES THAT ARE TO REMAIN AND WITHOUT UNNECESSARY DAMAGE. ITEMS AND MATERIAL TO BE REMOVED SHALL BE DONE IN SUCH A MANNER AS TO PREVENT DAMAGES TO ITEMS AND MATERIALS THAT REMAIN. SUCH DAMAGES SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE DPW REPRESENTATIVE AND AT NO ADDITIONAL COST TO THE GOVERNMENT. ITEMS INCLUDE BUT ARE NOT LIMITED TO BROKEN CURBS, CRACKED SIDEWALKS, ETC. 10. THE CONTRACTOR SHALL OVERSEE CLEANING AND ENSURE THAT THE CONTRACTOR SHALL OVERSEE CLEANING AND ENSURE THAT THE PREMISES ARE MAINTAINED RUBBISH FREE DURING DEMOLITION WORK. FINAL CLEANUP IS THE RESPONSIBILITY OF THE CONTRACTOR. 11. ALL WORK SHALL COMPLY WITH THE MANUFACTURER'S ALL WORK SHALL COMPLY WITH THE MANUFACTURER'S SPECIFICATIONS/RECOMMENDATIONS, FEDERAL, STATE, AND LOCAL CODES. 12. THE GOVERNMENT RESERVES THE FIRST RIGHT OF REFUSAL FOR THE GOVERNMENT RESERVES THE FIRST RIGHT OF REFUSAL FOR ALL DEMOLITION ITEMS. THOSE DEMOLITION ITEMS THE GOVERNMENT DOES NOT WISH TO KEEP SHALL BECOME PROPERTY OF THE CONTRACTOR FOR PROPER DISPOSAL. 13. ANY ITEMS SCHEDULED FOR DEMOLITION SUSPECTED TO CONTAIN ANY ITEMS SCHEDULED FOR DEMOLITION SUSPECTED TO CONTAIN HAZARDOUS MATERIALS, SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE COR PRIOR TO DEMOLITION. 14. CONTRACTOR TO VALIDATE/VERIFY LEAD OR ASBESTOS MATERIAL CONTRACTOR TO VALIDATE/VERIFY LEAD OR ASBESTOS MATERIAL TO BE REMOVED/ABATED. CONTRACTOR SHALL COMPLY WITH ALL REGULATORY REQUIREMENTS APPLICABLE TO LEAD AND ASBESTOS ABATEMENT AS INDICATED IN SURVEYS AND TESTED. 15. CONTRACTOR SHALL IDENTIFY AREAS OF ROOF WHERE ROOF CONTRACTOR SHALL IDENTIFY AREAS OF ROOF WHERE ROOF DECK OR STRUCTURAL REPAIRS ARE NEEDED FOR GOVERNMENT CONSIDERATION. UNLESS NOTED OTHERWISE, CONTRACTOR WILL BID ON AN ESTIMATED 500 SF OF ROOF DECK AREA TO BE REPLACED DUE TO CORROSION AND PROVIDE FULL REPLACEMENT TO INCLUDE STEEL ANGLE REINFORCEMENT SUPPORT AS NEEDED. 16. REMOVE AND REPLACE ALL DAMAGED NAILERS, SOFFIT, AND REMOVE AND REPLACE ALL DAMAGED NAILERS, SOFFIT, AND FASCIA BOARDING TO MATCH EXISTING MATERIALS. 17. CONTRACTOR TO LIFT ALL MECHANICAL EQUIPMENT IN PLACE TO CONTRACTOR TO LIFT ALL MECHANICAL EQUIPMENT IN PLACE TO ALLOW FOR CONSTRUCTION AND REINSTALL ONCE CONSTRUCTION IS COMPLETE. 18. CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ALL CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ALL EXISTING UTILITIES INCLUDING BUT NOT LIMITED TO ELECTRICAL CONDUIT, GAS LINES, WIRES, ETC., AS REQUIRED TO ALLOW FOR CONSTRUCTION. 19. SECURE AND SAFEGUARD EXISTING AND\OR NEW GAS LINES SECURE AND SAFEGUARD EXISTING AND\OR NEW GAS LINES EXPOSED ON THE ROOF. PRIME WITH ONE COAT AND PROVIDE TWO COATS OF SAFETY YELLOW PAINT. 20. ANY ABANDONED PENETRATIONS SHALL BE REMOVED AND THE ANY ABANDONED PENETRATIONS SHALL BE REMOVED AND THE DECK REPAIRED PRIOR TO INSTALLATION OF THE NEW ROOF SYSTEM. SECURE ALL SLEEVES AND PIPES BEFORE ROOF MATERIAL IS REMOVED. 21. CONTRACTOR WILL FIELD VERIFY BEFORE MOVING ANY CONTRACTOR WILL FIELD VERIFY BEFORE MOVING ANY ABANDONED PENETRATIONS. 22. ALL EQUIPMENT TO BE REMOVED SHALL BE DONE SO IN THE ALL EQUIPMENT TO BE REMOVED SHALL BE DONE SO IN THE PRESENCE OF A GOVERNMENT REPRESENTATIVE AND INSTALLED AND TESTED IN THE PRESENCE OF A GOVERNMENT REPRESENTATIVE. 23. CONSTRUCTION & DEMOLITION DIVERSION: FORT BLISS REQUIRES CONSTRUCTION & DEMOLITION DIVERSION: FORT BLISS REQUIRES A MINIMUM OF 60% OF CONSTRUCTION AND DEMOLITION MATERIALS AND DEBRIS FROM LANDFILLS. IF THE CONTRACTOR HAS A VALID REASON FOR NOT BEING ABLE TO MEET THIS DIVERSION GOAL, THE CONTRACTOR NEEDS TO PRESENT THEIR REASONING IN WRITING TO DPW-ENVIRONMENTAL DIVISION. 24. THE CONTRACTOR SHALL NOT EMPLOY FORT BLISS TRASH BINS THE CONTRACTOR SHALL NOT EMPLOY FORT BLISS TRASH BINS TO DISPOSE OF CONSTRUCTION MATERIALS. 25. BURNING ON FORT BLISS PROPERTY IS NOT PERMITTED.BURNING ON FORT BLISS PROPERTY IS NOT PERMITTED.

S C R

IP

TI

O N

M A R K

D A

TE

D P

W

FO

R T

B

LI

SS

N

AutoCAD SHX Text

254'-6" OVERALL

AutoCAD SHX Text

254'-6" OVERALL

AutoCAD SHX Text

317'-2" OVERALL

AutoCAD SHX Text

317'-2" OVERALL

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

SPEC. #

AutoCAD SHX Text W.O. #

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NUMBER:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DIRECTORATE OF PUBLIC WORKS FORT BLISS, TEXAS

AutoCAD SHX Text

DEMOLITION WORK PLAN (CONT.)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text A-105

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text A.F.

AutoCAD SHX Text A.F.

AutoCAD SHX Text

BUILDING 2930 ROOF REPLACEMENT

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text

EA-10563-6J

AutoCAD SHX Text

AutoCAD SHX Text

NEW WORK PLAN

AutoCAD SHX Text

SCALE: 1/16"=1'-0"

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text 0'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 32'

AutoCAD SHX Text

EXISTING PIPE PENETRATIONS

AutoCAD SHX Text

EXISTING VENT PENETRATIONS

AutoCAD SHX Text

EXISTING ELECTRICAL PENETRATIONS

AutoCAD SHX Text

EXISTING ELECTRICAL PENETRATIONS

AutoCAD SHX Text

KEY NOTES

AutoCAD SHX Text 1.

AutoCAD SHX Text

NEW WORK GENERAL NOTES

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

NEW 30 YEAR, 80-MIL TPO ROOF SYSTEM WITH 120 MPH WIND SPEED COVERAGE

AutoCAD SHX Text

NEW TPO

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

2 TYP.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

5 TYP.

AutoCAD SHX Text

6 TYP.

AutoCAD SHX Text

3 TYP.

AutoCAD SHX Text

7 TYP.

AutoCAD SHX Text

8 TYP.

AutoCAD SHX Text

10 TYP.

AutoCAD SHX Text 2.

AutoCAD SHX Text 3.

AutoCAD SHX Text 4.

AutoCAD SHX Text 5.

AutoCAD SHX Text EXISTING MECHANICAL SCREEN, PROTECT DURING CONSTRUCTION AND PROVIDE FLASHING AND SEALANT AT ANCHORS.

AutoCAD SHX Text 6.

AutoCAD SHX Text 7.

AutoCAD SHX Text 8.

AutoCAD SHX Text 9.

AutoCAD SHX Text 10.

AutoCAD SHX Text 11.

AutoCAD SHX Text EXISTING VENT PENETRATION, PROVIDE NEW FLASHING AND SEALANT ACCORDING TO MANUFACTURE'S RECOMMENDATIONS.

AutoCAD SHX Text EXISTING PIPE PENETRATION, PROVIDE NEW FLASHING AND SEALANT ACCORDING TO MANUFACTURE'S RECOMMENDATIONS.

AutoCAD SHX Text

NEW PREFINISHED METAL SCUPPER INCLUDING WOOD NAILER AND ANCHORING SYSTEM.

AutoCAD SHX Text

EXISTING ROOF DRAIN

AutoCAD SHX Text

EXISTING ROOF LADDER, PROTECT DURING CONSTRUCTION

AutoCAD SHX Text

EXISTING ROOF DRAIN AND OVERFLOW DRAIN

AutoCAD SHX Text

NEW PERMANENT FALL PROTECTION ROOF ANCHOR POSTS.

AutoCAD SHX Text 12.

AutoCAD SHX Text EXISTING SKYLIGHT, PROVIDE NEW FLASHING AND SEALANT. PROTECT DURING CONSTRUCTION.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

12 TYP.

AutoCAD SHX Text PROVIDE NEW PREFINISHED METAL COPING AND FLASHING AT ALL CAST STONE PARAPET CAPS AT PERIMETER OF ENTIRE BUILDING.

AutoCAD SHX Text 13.

AutoCAD SHX Text

13 TYP.

AutoCAD SHX Text

NEW FALL PROTECTION ROOF ANCHOR POSTS

AutoCAD SHX Text EXISTING ROOF HATCH TO REMAIN. REPLACE ROOF CURB WHERE NECESSARY. CONTRACTOR TO FIELD VERIFY AND VALIDATE. INSTALL ROOFING UP AND OVER CURBS AND PROVIDE NEW FLASHING AND SEALANT, TYPICAL.

AutoCAD SHX Text EXISTING MECHANICAL EQUIPMENT, INSTALL ROOFING UP AND OVER CURBS AND PROVIDE NEW FLASHING AND SEALANT, TYPICAL.

AutoCAD SHX Text

1. THESE PLANS ARE FOR REFERENCE ONLY AND MAY NOT THESE PLANS ARE FOR REFERENCE ONLY AND MAY NOT REFLECT ALL AVAILABLE INFORMATION, THE EXACT LOCATION AND QUANTITY OF EXISTING DUCTWORK, PENETRATIONS AND EQUIPMENT MAY DEVIATE FROM LOCATIONS AND QUANTITY SHOWN ON DRAWINGS. CONTRACTOR MUST FIELD VERIFY AND EXAMINE EXISTING STRUCTURES, NOTE ALL CONDITIONS AS TO CHARACTER AND EXTENT OF ALL WORK INVOLVED, VALIDATE AND BID ACCORDINGLY. 2. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS, ALL CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS, ALL DIMENSIONS, EXACT LOCATIONS AND QUANTITY BEFORE COMMENCING WORK. 3. GENERAL CONTRACTOR SHALL ASSURE THAT ALL GENERAL CONTRACTOR SHALL ASSURE THAT ALL SUB-CONTRACTORS HAVE REVIEWED THE ENTIRE SET OF CONSTRUCTION DOCUMENTS, THIS INCLUDES BUT NOT LIMITED TO CONSTRUCTION DRAWINGS, PROJECT MANUAL (SPECIFICATIONS), AMENDMENTS, MODIFICATIONS, AND CHANGE ORDERS. THE CONTRACT IS BASED ON CONSTRUCTION DOCUMENTS AS A WHOLE AND COORDINATION BETWEEN SUBCONTRACTOR IS THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 4. CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN A CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN A COMPLETE SET OF CONSTRUCTION DOCUMENTS ON SITE AND INDICATE CHANGES AS THE PROJECT PROGRESSES. 5. CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S FIELD CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S FIELD REPRESENTATIVE IMMEDIATELY OF ANY CONFLICTS DISCOVERED IN THE FIELD VIA RFI, ASAP TO ALLOW SUFFICIENT TIME TO REVIEW AND RESOLVE THE ISSUE. 6. CONTRACTOR SHALL ENSURE SAFE ACCESS TO BUILDING CONTRACTOR SHALL ENSURE SAFE ACCESS TO BUILDING DURING CONSTRUCTION AND SHALL PROVIDE ALL REQUIRED BARRICADES, FENCING, COVERED WALKS, PLANKING, LIGHTING, BRACING, SHORING, WARNING SIGNS, ETC. AS REQUIRED BY OSHA AND FORT BLISS REGULATIONS FOR THE PROTECTION OF WORKMEN, STAFF AND USERS. 7. ALL WORK SHALL COMPLY WITH THE MANUFACTURER'S ALL WORK SHALL COMPLY WITH THE MANUFACTURER'S SPECIFICATIONS/RECOMMENDATIONS, FEDERAL, STATE, AND LOCAL CODES. 8. NO NEW MATERIALS SHALL CONTAIN ASBESTOS, LEAD, OR NO NEW MATERIALS SHALL CONTAIN ASBESTOS, LEAD, OR ANY REGULATED MATERIALS. 9. PROVIDE NEW THERMOPLASTIC POLYOLEFIN (TP0) ROOF PROVIDE NEW THERMOPLASTIC POLYOLEFIN (TP0) ROOF SYSTEM OR APPROVED EQUAL. 80 MIL, ADHERED, WITH R30 INSULATION. THE INSTALLATION OF TAPERED INSULATION, AS SHED RAINWATER, THE FALL SHOULD BE PREFERABLE 1:40 WITH THE MINIMUM 270 MM THICK. USE THE FOUR-WAY INSULATION METHOD TO DRAIN THE ROOF. PROVIDE FULLY LINED AND INSULATED CURBS ON THE ROOF HATCHES, THE HEIGHT OF THE CURB SHALL BE SELECTED TO PROVIDE 8 INCH MINIMUM CURBING ABOVE THE SURFACE OF THE ROOF. 10. ALL ROOF PENETRATION AND FLASHING WORK SHALL BE THE ALL ROOF PENETRATION AND FLASHING WORK SHALL BE THE RESPONSIBILITY OF ROOFING CONTRACTOR USING MANUFACTURER'S STANDARD DETAILS AND SHALL BE COVERED AS PART OF THE MANUFACTURER'S WARRANTY. CONTRACTOR WILL PROVIDE ALL NEW ACCESSORIES, PIPE SUPPORTS, PIPE BOOTS, CANT STRIPS, ETC. SUPPORTS SHALL NOT PENETRATE THE NEW ROOF SYSTEM. 11. ALL SHEET METAL INCLUDING COPING, GUTTERS, FLASHING, ALL SHEET METAL INCLUDING COPING, GUTTERS, FLASHING, TRIM, LEADER BOXES AND LEADERS ARE TO BE SUPPLIED BY METAL ROOFING MANUFACTURER AND INSTALLED ACCORDING TO MANUFACTURERS INSTRUCTIONS. ALL GAUGES OF SHEET METAL SHALL BE ACCORDING TO MANUFACTURERS RECOMMENDATIONS. 12. ALL ROOF AND WALL PANEL TERMINATIONS, COPING, EDGE ALL ROOF AND WALL PANEL TERMINATIONS, COPING, EDGE METAL, SHALL MEET ES-1 STANDARDS. 13. SECURE AND SAFEGUARD EXISTING AND\OR NEW GAS LINES SECURE AND SAFEGUARD EXISTING AND\OR NEW GAS LINES EXPOSED ON THE ROOF. PRIME WITH ONE COAT AND PROVIDE TWO COATS OF SAFETY YELLOW PAINT. 14. CONTRACTOR SHALL IDENTIFY AREAS OF ROOF WHERE ROOF CONTRACTOR SHALL IDENTIFY AREAS OF ROOF WHERE ROOF DECK OR STRUCTURAL REPAIRS ARE NEEDED FOR GOVERNMENT CONSIDERATION. UNLESS NOTED OTHERWISE, CONTRACTOR WILL BID ON AN ESTIMATED 500 SF OF ROOF DECK AREA TO BE REPLACED DUE TO CORROSION AND PROVIDE FULL REPLACEMENT TO INCLUDE STEEL ANGLE REINFORCEMENT SUPPORT AS NEEDED. 15. PROVIDE TAPERED INSULATION CRICKETS AT HIGH SIDES OF PROVIDE TAPERED INSULATION CRICKETS AT HIGH SIDES OF ALL ROOF MOUNTED EQUIPMENT, SKYLIGHTS, CORNERS, ETC. AND ALONG WALLS AS REQUIRED TO PROVIDE POSITIVE DRAINAGE. SLOPE FOR ALL CRICKETS SHALL MATCH THE ADJACENT ROOF ASSEMBLY, SLOPE = 1/4" PER FOOT. REFER TO NRCA ROOFING MANUAL, CURRENT EDITION. 16. PROVIDE PRECAST, REINFORCED CONCRETE SPLASHBLOCKS AT PROVIDE PRECAST, REINFORCED CONCRETE SPLASHBLOCKS AT ALL DOWNSPOUTS. 17. PROVIDE AND INSTALL SIX, 12 INCH HIGH GALVANIZED, PROVIDE AND INSTALL SIX, 12 INCH HIGH GALVANIZED, PERMANENT FALL PROTECTION ROOF ANCHOR POSTS ANCHORED TO DECK. 18. REMOVE AND REPLACE ALL DAMAGED NAILERS, SOFFIT, AND REMOVE AND REPLACE ALL DAMAGED NAILERS, SOFFIT, AND FASCIA BOARDING TO MATCH EXISTING MATERIALS. 19. ALL SURFACES IN CONTACT WITH NEW WORK THAT ARE ALL SURFACES IN CONTACT WITH NEW WORK THAT ARE DAMAGED DUE TO NEW WORK IN PROGRESS, SHALL BE PATCHED AND REPAIRED AS REQUIRED. 20. EXISTING SITE DAMAGED BY THE CONTRACTOR SHALL BE EXISTING SITE DAMAGED BY THE CONTRACTOR SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. ITEMS INCLUDE BUT ARE NOT LIMITED TO BROKEN CURBS, CRACKED SIDEWALKS, ETC. 21. CONSTRUCTION & DEMOLITION DIVERSION: FORT BLISS CONSTRUCTION & DEMOLITION DIVERSION: FORT BLISS REQUIRES A MINIMUM OF 60% OF CONSTRUCTION AND DEMOLITION MATERIALS AND DEBRIS FROM LANDFILLS. IF THE CONTRACTOR HAS A VALID REASON FOR NOT BEING ABLE TO MEET THIS DIVERSION GOAL, THE CONTRACTOR NEEDS TO PRESENT THEIR REASONING IN WRITING TO DPW-ENVIRONMENTAL DIVISION. 22. THE CONTRACTOR SHALL NOT EMPLOY FORT BLISS TRASH THE CONTRACTOR SHALL NOT EMPLOY FORT BLISS TRASH BINS FOR DISPOSE OF CONSTRUCTION MATERIALS. 23. BURNING ON FORT BLISS PROPERTY IS NOT PERMITTED.BURNING ON FORT BLISS PROPERTY IS NOT PERMITTED.

AutoCAD SHX Text

1/4"SLOPE TYP.

AutoCAD SHX Text

1/4"SLOPE TYP.

S C R

IP

TI

O N

M A R K

D A

TE

D P

W

FO

R T

B

LI

SS

N

AutoCAD SHX Text

254'-6" OVERALL

AutoCAD SHX Text

254'-6" OVERALL

AutoCAD SHX Text

303'-7" OVERALL

AutoCAD SHX Text

303'-7" OVERALL

AutoCAD SHX Text

7 TYP.

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

SPEC. #

AutoCAD SHX Text W.O. #

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NUMBER:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DIRECTORATE OF PUBLIC WORKS FORT BLISS, TEXAS

AutoCAD SHX Text

NEW WORK PLAN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text A-106

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text A.F.

AutoCAD SHX Text A.F.

AutoCAD SHX Text

BUILDING 2930 ROOF REPLACEMENT

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text

EA-10563-6J

AutoCAD SHX Text

AutoCAD SHX Text

NEW WORK PLAN

AutoCAD SHX Text

SCALE: 1/16"=1'-0"

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text 0'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 32'

AutoCAD SHX Text

EXISTING PIPE PENETRATIONS

AutoCAD SHX Text

EXISTING VENT PENETRATIONS

AutoCAD SHX Text

EXISTING ELECTRICAL PENETRATIONS

AutoCAD SHX Text

EXISTING ELECTRICAL PENETRATIONS

AutoCAD SHX Text

KEY NOTES

AutoCAD SHX Text

NEW WORK GENERAL NOTES

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

NEW TPO

AutoCAD SHX Text

NEW FALL PROTECTION ROOF ANCHOR POSTS

AutoCAD SHX Text

7 TYP.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

2 TYP.

AutoCAD SHX Text

3 TYP.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

5 TYP.

AutoCAD SHX Text

6 TYP.

AutoCAD SHX Text

8 TYP.

AutoCAD SHX Text

10 TYP.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

13 TYP.

AutoCAD SHX Text

13 TYP.

AutoCAD SHX Text 1.

AutoCAD SHX Text

NEW 30 YEAR, 80-MIL TPO ROOF SYSTEM WITH 120 MPH WIND SPEED COVERAGE

AutoCAD SHX Text 2.

AutoCAD SHX Text 3.

AutoCAD SHX Text 4.

AutoCAD SHX Text 5.

AutoCAD SHX Text EXISTING MECHANICAL SCREEN, PROTECT DURING CONSTRUCTION AND PROVIDE FLASHING AND SEALANT AT ANCHORS.

AutoCAD SHX Text 6.

AutoCAD SHX Text 7.

AutoCAD SHX Text 8.

AutoCAD SHX Text 9.

AutoCAD SHX Text 10.

AutoCAD SHX Text 11.

AutoCAD SHX Text EXISTING VENT PENETRATION, PROVIDE NEW FLASHING AND SEALANT ACCORDING TO MANUFACTURE'S RECOMMENDATIONS.

AutoCAD SHX Text EXISTING PIPE PENETRATION, PROVIDE NEW FLASHING AND SEALANT ACCORDING TO MANUFACTURE'S RECOMMENDATIONS.

AutoCAD SHX Text

NEW PREFINISHED METAL SCUPPER INCLUDING WOOD NAILER AND ANCHORING SYSTEM.

AutoCAD SHX Text

EXISTING ROOF DRAIN

AutoCAD SHX Text

EXISTING ROOF LADDER, PROTECT DURING CONSTRUCTION

AutoCAD SHX Text

EXISTING ROOF DRAIN AND OVERFLOW DRAIN

AutoCAD SHX Text

NEW PERMANENT FALL PROTECTION ROOF ANCHOR POSTS.

AutoCAD SHX Text 12.

AutoCAD SHX Text EXISTING SKYLIGHT, PROVIDE NEW FLASHING AND SEALANT. PROTECT DURING CONSTRUCTION.

AutoCAD SHX Text PROVIDE NEW PREFINISHED METAL COPING AND FLASHING AT ALL CAST STONE PARAPET CAPS AT PERIMETER OF ENTIRE BUILDING.

AutoCAD SHX Text 13.

AutoCAD SHX Text EXISTING ROOF HATCH TO REMAIN. REPLACE ROOF CURB WHERE NECESSARY. CONTRACTOR TO FIELD VERIFY AND VALIDATE. INSTALL ROOFING UP AND OVER CURBS AND PROVIDE NEW FLASHING AND SEALANT, TYPICAL.

AutoCAD SHX Text EXISTING MECHANICAL EQUIPMENT, INSTALL ROOFING UP AND OVER CURBS AND PROVIDE NEW FLASHING AND SEALANT, TYPICAL.

AutoCAD SHX Text

1. THESE PLANS ARE FOR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .